HomeMy WebLinkAboutOrdinance 21082-01-2014 ORDINANCE NO. 21082-01-2014
AN ORDINANCE ADOPTING A PER ACRE CHARGE
PURSUANT TO CHAPTER 35 OF THE CITY CODE AS
AMENDED (1986), ARTICLE 111, DIVISION' 3 "SEWER PER
ACRE CHARGES", SECTIONS 35-81 TRI[IOUGH 35-86, FOR A
CITY INITIATED 18- INCH SEWER MAIN TO SERVE FROM
THE WESTSIDE WATER TREATMENT PLANT; MAKING THIS
ORDINANCE CUMULATIVE OF OTHER ORDINANCES;
REPEALING ALL ORDINANCES IN CONFLICT HEREWITH;
PROVIDING A SAVINGS CLAUSE, AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, on May 14, 2002, the City Council adopted City of Fort Worth
Ordinance No. 15095 providing for the adoption of per acre charges when certain criteria
are met; and
WHEREAS, the City of Fort Worth constructed a. City initiated 18-inch diameter
sewer main to serve from the Westside Water Treatment Plant.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS:
SECTION 1.
In accordance with the City Code of the City of Fort Worth as amended (1986), Chapter
35 "Water and Sewers", Article III, Division 3 "Sewer Per Acre Charges" Sections 35-81,
through 35-86, the City Council finds that the City initiated the construction of an 18-
inch diameter sewer main to provide wastewater service to Westside Water Treatment
Plant and the Surrounding area. Further, the City Council finds that this 18-inch sewer
main will serve a calculated sewer basin area of 710.86 acres, such sewer basin being
shown In the attached exhibit. This sewer main is located in the easement from Mary's
Creek to the Westside Water Treatment Plant in City Council District Number 3.
Ordinance No. 2 t082-01-2014
Page I of 3
SECTION 2.
The City Council also finds that the Development Cost for the 18-inch sewer main is
$550,395, and that the per acre charge to be assessed within the calculated sewer basin
shall be $774. The City Council further finds that per acre charge has been calculated in
accordance with the requirements of the City Code Section 35-81 through 35-86.
SECTION 3.
This ordinance shall be cumulative of all provisions of ordinances and of the Code of the
City of Fort Worth, Texas (1986), as amended, except where the provisions of this
ordinance are in direct conflict with the provisions of such ordinances and such. Code, in
which event conflicting provisions of such ordinances and such Code are hereby
repealed.
SECTION 4.
It is hereby declared to be the intention of the City Council that the sections, paragraphs,
sentences, clauses and phrases of this ordinance are severable, and, if any phrase, clause,
sentence, paragraph or section of this ordinance shall, be declared unconstitutional. by the
valid I
I judgment or decree of any court of competent Jurisdiction, such unconstitutionality
shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections
of this ordinance, since the same would have been enacted by the City Council without
the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence,
paragraph or section.
Ordinance No.21082-01-2014
Page 2 of 3
SECTION 5.
This ordinance shall be effective upon adoption.
APPROVED AS TO FORM AND LEGALITY:
Assista City Attome Mary J. Ka r city retary
ADOPTED: Januar 7, 2013
Ordinance No. 21082-01-2014
Page 3 of 3
.......—. .... .... �.�momo ummmomwo�wwwwwiwuwiuiwiuwuuViiwwwwwwuWww
FORTWORTH Westside III & IV 18-Inch Sewer Per Acre Charge
wx�>�
,,/r N��Y. ;%/:' %/iiio / r/r� r� of
r / j/ /l r� /j %
/�rJ 1��/ //rt�l rr Ir m r r' C
iiii/i �! rr�i/�e r �ri
"fi r b
Legend
9 G/gfn� r/l�/� i/ � l r% �� r rt N1) fi'T !��VI�r rtt
�/ �� j iir��N°«)����vllr in '
X18-Inch Sewer with Per Acre Charge
srr r �i✓ J� �/� uuoo i
��oMmoro Sewer lines i��
��✓ , xrJ /, �k ry
Sewer Per Acre Basin A�� 'r!
® / fir/
r�/ ",/ %/// r r ��
/iiii r � r/' / U1'`' rf iNli N'��fiu// VY ln% Lr�jr� �.
l// /i//%/''///iii/%%a „i', /ii,/ // 0//
N
fir
/ /r �%% / �h
rl '
�i/// / r r (�
e /i// /i II
mg
at
AV
„
, - r, fk / ;,,, ✓ % / 1115jlfr r%/i/ii/�✓�� « j m
/ / 1
/r
r r" j✓//% / r////r// �r �� % / / a
tvtoE ,%�i%, �a'/// ;iiiiia rr//rt�%iN i�c m` / ; /,� / fii/ r r r0 i 6 2a l }P > 1 �' i//ice � r r�lrr p N m�
°U /av/ .. ,
U
.�N /� / //%/r %/ ,,,,rr/r/✓/!/i/�//!/rdrr �y �� r J//
IN
oU
o
ao /ri/r / j%!/1//r%%' �/ r�ii / //r -a-
'/0
v r / / /�%` f Fi // / r
m /✓ % r�l'r //rr %/ ,/%'
WS
wa rJrr G %
A
��I;
OLD 1 A� Htiz2PtFkG wEATEtCi
o s
r
�y� r/,
m m ✓t' Y i//I I/ ✓� r /nl
i' �0 o V � �j��l �h�,�lr� / JylOtr � Niiml ou0awumonw���';
°
y.o
.m ° !' ✓� r rr� /� 1� +1��1 /r�II11��J��,�b(, '�I � / f"
'Alt
U
, 07
r
�Jqy r,r
r io;", N„
I UN�rr , f°
fill" I///1, r/;; %12 11 1��j,l%'�`,N;,r,r l;>�//Dili ei%�//ml t/�f l';°t,'",r.r r//j/r//////�r�//��/'i if i✓///�%/i�,/,�a/���i/r ji i//r/r/i i/,/i/i%/r.....r i N///u0 rn. /%i/G J/�r i/„,'
/
/� /✓
,/ r.!/li„
//i /iii r, ,,,� / ;%:�//�% ter/ 9y:. i(grv✓ ,�%,�/, /,,,r�,,
rrl
„/ "N"?
IE iJ
LL
of
0 750 1,500 2,250 3,000 NAD 1983 SlatePlane Texas North Central RPS 4202 Feet
Feet
,,, .•�,..� �omN�owwxuwwwwww�m��umwmmmiwmiioiuibNNmmuuuuomNuN
City of Fort Worth, Texas
Mayor and Council Communication
.........
COUNCIL ACTION: Approved on 117/2014 - Ordinance No. 21082-01-2014
DATE: Tuesday, January 07, 2014 REFERENCE NO.: **G-18104
LOG NAME: 60WESTSIDE SEWER PER ACRE CHARGE
SUBJECT:
Adopt Ordinance to Establish the Sewer per Acre Charge in the Amount of $774.00 per Acre for an
Eighteen-Inch Sewer Main to Serve Customers from the Westside Water Treatment Plant and to Establish
the Basin Boundaries, Pursuant to Chapter 35, Article 111, Division 3, Sewer per Acre Charges, Sections 35-
81 Through 35-86 of the City Code (COUNCIL DISTRICT 3)
RECOMMENDATION:
It is recommended that the City Council adopt the attached ordinance to establish the sewer per acre
charge for the eighteen-inch sewer main in the amount of $774.00 to serve customers from the Westside
Water Treatment Plant and to establish the basin boundaries, in accordance with Chapter 35, Water and
Sewers, Division 3, sewer per acre charges, Sections 35-81 through 35-86 of the City Code.
DISCUSSION:
The 18-inch sewer main in the easement from Mary's Creek north to the Westside Water Treatment Plant
was installed by the Fort Worth Water Department. The Westside Water Treatment Plant is served by
3,892 linear feet of the 18-inch sewer main.
The qualified costs used to establish this sewer per acre charge are:
Sewer Construction Cost $ 389,163.00
Engineering Cost $ 119,232.00
Easements Cost $ 42,000.00
Total Cost $ 550,395.00
The sewer per acre charge for the 18-inch sewer main in the easement from Mary's Creek to Westside
Water Treatment Plant is $774.00 per acre in accordance with City Code Section 35-84. This amount will
be reimbursed to the Water Department.
This sewer main meets the criteria established under the per acre charge policy.
The adoption of this charge is in accordance with the City Code and Water Department policies.
The sewer main is located adjacent to COUNCIL DISTRICT 3, Mapsco 57X, 57Y, 71 B, 71 C, 71 F, 71 G,
71 K and 71 L.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that this action will have no material effect on City
funds.
Lognatrre: 60WESTSIDE SEWER PER ACRE CHARGE Page 1 of 2
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8207)
Viesha Kaminska (8428)
Additional Information Contact: Wendy Chi-Babulal (8242)
Lognarne: 60WESTSIDE SEWER PER ACRE CHARGE Page 2 of 2