HomeMy WebLinkAboutContract 44650-A1 CITY SECRETARY
CONTRACT NOON ,r.+
AMENDMENT No.1
TO CITY SECRETARY CONTRACT No., 44650
WHEREAS, the City of Fort Werth (CITY) and Freese and Nichols, Tnc. ,
(ENGINEER) made and entered into City Secretary Contract No. 44650, (the
CONTRACT) which was authorized by M&C C-26322 on the 9th day of ul_y,
13 in the amount of $ 164,, 371; and
WHEREAS, the CONTRACT involves engineering services for the
following project
Evaluation of S t -rmwa t er Development Review Policies, and
WHEREAS, it has became necessary to execute Amendment No. I to the
CONTRACT te include an increased scope of work and revised fee.
NOW THEREFORE,, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
Article l of the CONTRACT is amended to .nel de the additie�nal
engineering services specified in a proposal dated J n ar_ 15, 2014, a
copy of which is attached hereto and incorporated herein. The Lest to
City for the additional engineering services to be performed by Engineer
totals $48,341 . see Attached Funding Breakdown sheet, Wage 3
2 .
Article II of the CONTRACT is amended to provide for an increase in
r.
the :fee to be paid to Engineer for all work and services performed under
the Contract, as amended, se that the total fee paid by the City for all
work and services shall be an amount of $212, 712.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
EXECUTED and EFFECTIVE as of the date last written by a signatory,.
below.
APPROVED: OffICIAL RECIORD
City of Fort Worth CITY SECRETARY'
Professional Services agreement Amendment Template
PMO Official Release /1/2012 FTe WOONs TX
Wage 1 of 3
R E C V D �J'14, 7014
APPROVED,-.
City of Fort, Worth ENGINEER
F_ree and Hicho.1,43., Inc.
AMU
Wo
Ferna,ndo Cos,to J0 n De'w,a r,, Pi.
Assistant City Manager
V ce President
c
5
DATE: DATE,
APPRQ AL RECOMMENDED:
J,
'\
Douglas Wiers1g, P.E'
Director,, Transportation and Public Works Department-
APPROVED AS TO FORM AND LEGALITY: M&C-0 ok
Date
TM
u
Assistant City Attorney
ATTEST,.#
do
(0)
er(
City Secr"etary
ro Professional Services Agre en ement Amdmnt e Templ W0ffHq TX
Page 2 of 3
FUNDING BREAKDOWN S' E '
City Secretary No. 44650
Amendment No. 1
Department nil--Account-Center Amount
TPW PE,69 53120:01 012109207 $48,r341 . 00
i
Total : $48r 341 . 00
OFFICIAL RECORD
CITY SECRETARY
City of Fort Worth no WORTH,
Professional cervices Agreement Amend me nt'Templ a
PMO,Official Release 8/1/2012,
Page 3 of 3
I N
, u
J
woo
40551 International Plaza,Suite 200 * Fort ,,Texas 761,09 a 817-715-7300 ' -'7 s- 9 www.'freese.com
January 15, 2014
Mr. Greg Simmons, P.E.
Transportation and Public Works—storrnw rater Division
City of Fort Worth
10,00 Throckm rton
Fort Worth,TX 7610
FEE.- Evaluation of Storrnwwater Development Review Policies—Amendment No. 1
Dear Mr.Simmons:
Through discussions with the City of Fort Worth, it was determined that additional effort would be
required to modify the iSWM Criteria Manuol d'rSite Development and Con5truction which is the drainage
standard for the City of Fort'Worth.We are requesting an amendment for the additional services included
in revising and updatiing the storrnwwrater criteria. The scope items are discussed briefly below. A fee
summary is also included..
Scope Addition.
.. iSWM Criteria Manual Updates and Revisions
a.. !update document to align with the following changes implemented during the
Evaluation of storrnwvater Development Review Policies.These changes include:
i. Modify Chapter Overview of iSWM Criteria Manual to represent the
stor wwrater Policy and Guidelines for the City of Fort Worth. This includes
clarification of the purpose and ,goals of the City's drainage criteria and the
applicability of the drainage standards as it applies to Nand disturbance and
previously approved projects.
ii. Modify Chapter 2 integrated Development Process specifically for the City of
Fort Worth storrnwvater devellopment review's. This wwrill incorporate the
flowchart developed as part of the original project. The local provisions for
requirements on the iSWIVI plans will be incorporated into the drainage
manual, and no longer included in the separate local'provision boxes.
iii. Modify Chapter 3 integrated Design Criteria specifically for the City of Fort
"'worth storrnwwater design criiteria. These revisions will consolidate the existing
Chapter 3 design guidelines with the specific City of Fort ''worth criteria
provided in the current Chapter 5.The local provisions will be incorporated into
the drainage manual, and no longer included in the separate local rovision
boxes,
iv.. Modify Chapter 4 integrated Construction Criteria will be modified to
incorporate the local provisions into the drainage manual, and no longer
included in the separate local provision boxes.
v. Re-write Chapter 5 The existing Chapter 5, Additional local Requirements,
will be incorporated, where appropriate, in Chapters 2 and 3. Chapter 5 wvill.
then be modified to provide sample submittals for the iS"'vl'"wPl plans, final
construction drawings,and the final iSWM plan.
vi. Appendix City of Fort Worth checklists will be revised according the
modified review requirements for the conceptual, preliminary and final ii aWM
plans.
OF D
rl FICIAL RECORD
CITY SECRETARY
[FT1 13294]T:\Contract\Ar-nendmcnt No,1\02 FT 13294-Amendment L tterl.doic FT WORTHr TX
Evaluation of Storm Ater Development Review Policies
January 15, 2014
Page 2 of 2
In addition to the scope items, added for the iS'WM criteria manual revisions, additional funds are being
requested to complete the following items for the Evaluation of Stormwater,Review Polices.
1. Project Management and Meetings —Additional meetings to discuss the iSWM criteria manual
revisions and the final project summary document.
2. Summary Documentation of Findings — A summary report documenting data collected, final
recommendations and implementation plan.
3. Training—One additional tra,ining meeting, as req,uired by our original scope.
The total fee requested for this contract amendment is$48.,341.Attachment B includes the fee breakout.
We look forward to discussing this work with you further. Please feel free to contact me if you have any
additional questions..
Sincerely,
Kelly D lirdl P.E.
N LOFFICIAL RE
CITY SECRETARY
F T
I*WOR 9 T
T.WORITH9 Tx
T11 1 :I\Contract\Amendment No.1\02 F"x`11 294-Amendment Letterl.doc
ATTACHMENT "B"
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO., I
COMPENSATION AND PAYMENT SCHEDULE,
A. The Engineer shall be compensated a total project fee of'$48,341.0101, on a
time and materials basis for hours actually worked on the project at the
rates shown on the attached compensations schedule. Payment of' the
hourly fees shall be considered full compensation for the Basic Services
described in Attachment ""A" for all labor materials, supplies, and
equipment necessary to complete the project.
B. The Engineer shall be paid in accordance with "Exhibit B-1", Su pplement
to Attachment B. Each invoicefrom the Engineer shall be verified as to its
accuracy and compliance with the terms of this contract by an officer of'
the Engineer.
C. Additional tasks assigned by the CITY not included in Attachment ""A""
Scope of Services will be billed on an hourly basis. These tasks will not
be performed without written authorization from the CITY. A, summary of
current hourly billing rates is provided in Exhibit "B-2".
D. Professional Services Fee summary is provided in Exhibit "13-3".
E. A Summa�ry of Total Project Fees including SIBE part,icipation percentages,
is provided in Exhibit "13-3K.
F. A schedule of partial submittals for review will be based on the Project
Schedule Attachment "D" and is as follows.-
Prollect Phase Estimated Cow ietion Date
Draft iSWM Revisions January 2,0,14
Final Summary Report Early 2014
Training Course Early 2014
OFFICIAL RECORD
CITY SECRETARY
FTs WORTH9 TX
ATTACHMENT(113"
Page 1 of 1
EXH I B IT "13- 07
(SUPPLEMENT TO ATTACHMENT B)
EVALUATION OF STORM TER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO. 1
METHOD OF PAYMENT
PROGRESS REPORT REQUIREMENTS
1. Method of Payment
Partial payment shall be made to the Engineer monthly based on hours actually
worked, upon City's approval of an invoice from the Engineeir outlinin,g, the current
labor and expenses of the total project. The aggregate of such monthly partial fee
payments shall not exceed the following:
Project Phase Estimated Project, Percent Complete
Project Management 10%
Summary Report 35%
I"SWM Revis,ioins 95%
Training Curriculum 100%
The balance of fees fore the time arude materials expended on the project, less,
previous payments, sihall, be payable after delivery, of the F'INAL report, and
ell ectroini�c files.
11. Progress Reports
A. The Engineer shall submit to the designated representative of the Director of
the Department of Transportation/Public Works monthly progress reports
covering all phases of the analysis in the format required by the City.
B. Periodic reports concerning MW'BE participation, shall be, submitted as required
by the MWBE Office.
0 OFF'ICIAL RECORD
E RD
y
CO]
CITY,SECR!E'TARY
2
F11WORTH; TX
I
EXHIBIT"B-1
Page 1 of 1
EXHIBIT g'E3,m2$1
(S J LEMENT TO ATTACHMENT B)
EVALUATION OF STORMW'ATER DEVELOPMENT REVIEW POLICIEES
AMENDMENT . I
HOURLY RATE SHEDULES
A summary of current hourly bil�ling rates is provided below-.
CAD Technician/Designer- 1 95
CAD Tech n ician/Desiginer- 2 123
CAD Technician/Designer- 3 151
Construction Manager- 1, 89
Construction Manager-2 115
Construction Manager- 3 135
Construction Manager-4 170
Corporate Project Support- 1 90
Corporate Project Support-2 109
Corporate Project Support- 3 145
Intern/Coop 55
Professional- 1 ill
Professional -2 134
Professional -3 1512
Professional -4 175
Professional - 5 205
Professional-6 234
Technology Chlairg:e
8.50
OFFICIAL RECORD
C C tj
11TY SECRETARY
C
FTe WORTH, TX
EXHIBIT T_2)'
Page
EXHIBIT "13-31$
(SUPPLEMENT TO ATTACHMENT B)
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO. 1
PROFESSIONAL SERVICES FEE SUMMARY
Task Description Fee
1 Pr o $15,196
j'ect Management and Meetings
2 Summa�y ��e
S,ort $12'101'6
3 'IS'WM Revisions $271550
4 Training Curriculum and Resource Devel2pmeat $31579
Total Fee $481,341
EOFFICIAL RECOjj)
FF1.1 A REJ
CITY L ' CORD
CITY' y
SECRETARy
FT. WORTH), TX
MOM"
EXHIBIT it
Page 1, of I
EXHIBIT "R.,3V
(SUPPLE ENT TO AT�T�A,CHM�E�INT B�)
EVALUATION OF ST'ORMW'ATER DEVELOPMENT R,EVICEW P'O,LICIIES
AMENDMENT
SU,MMIARY OF TOTAL PROJECT FEES
Consulting Firm Prime Re§ponsibili Amount Percent
11 ' ' Iy
PRIME ENGINEER,
Freese and Nichols, Inc. Engineering and Project Mgmit. $481341 1010%
-—-—--------------
Total for Professional Services $481341 �i ooi'�
SUB EN,G,INEER., shall Participate in performing portions, o the following Tasks.-
Pro,liect Description Sco e of Services, Total Fee M,WBE Fee Percent
N/A N/A N/A N/A N/A
Non-MW BE Par ticip, tion Scope of Services Total Fee Non Fee Percent
N/A N/A N/A N/A NIA
OFFICIAL RECORD
CITY S,E,C,RETARY
FT WO�RTH,TX
EXHIIBI:T"B-3A
Page 1 of 1