Loading...
HomeMy WebLinkAboutContract 38798-A2 NT No.2 C CONTRACT . TO CITY SECRETARY CONTRACT No. 387918 WHEREAS,, the City of Fort Worth (CITY) and Brown & Gay Engineers, nc. (ENGINES. made and entered, into City Secretary Contract No. 38798, (the CONTRACT) which was authorized on, the 16�h day of Jun 200.9 in the amount of $ 384, 46,8 - and WHEREAS the CONTRACT as aubsequently revised y.- Amendment Number 1 'in tie amount of $99, 068 which was authorized. on August 14, 2012, WHEREAS, the CONTRAC T::: _nvol es engineering services for the following prolect .- 2008 CIP Arterial Street R ber-Lso Road- an WHEREAS, it has become necessary to execute Amendment No. '2 to the CONTRACT to include an increased scope of work and revised fee NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the ollow.. n agreement, which h amends the CONTRACT.- l Article l of the CONTRACT is amended to :include the additional engineering services specified in a proposal dated Movember 11, 2013 a copy of which is attached hereto and ncorpo ated. herein. The cost to City for the ad itiona1 sign services to be performed by Engineer totals $45, 120. (See Attached F'u .ding Brea Beset, Page -3- 2 . Art cle -11 of the CONTRACT' is amended to provide for an increase i the fee to be paid to Engi ­iee for all work and services performed. under the Contract,, as amended, s -that the total fee paid by the City for all work and services shall be an, amount of $528, 656. MODUUU�'°9Y7YN0 _ � (IW'WYJgdryV`yl GlltaV lllPWl'AI4'PM,rWG^gl!WWiMO tmbl0fioilMOmmm f N W i0owu Cif of Ford Worth Professional Services Agreerne,nt Amendment Templ ate d .RECORD 01 Official Fula 8/1/2012 Page 1 of 3 RECEIVED 5F.ICIISTAi it i�4 FT .....1100M,TX RECEIVED, J 2 2014 ........... 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain 'In full force and effect. EXECUTED, and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Brow.n.-- Gad J,nee-rs,, Inc. .Fe.rnando Costa aft 62.6;pj"t Assistant City Manager IrP03 10 VJ-ce President DATE* DATE: APPROVAL RECOMMENDED,-,, insert dfartment head na Director, insert department Department APPROVED AS TO FORM AND LEGALITY: M&CO" K Date: vv'­ 'A7 D Assistant City Attorney (7 ATTEST., Ell 10" Mary J. S City Sec star y FICIAL 41 OF is n 'GREIMORY" City of Fort Worth TH P Mees Are0 Official Release 8/1/2012 ...... Page 2 of 3 "I"M ................ FUNDING BREAKDOWN SHEET ,.its"' Secretary No 38798 Amendment No. Department Fund-Account-Center Amount TPW C204-531200-207230129980 �451 Total $45, 120 - 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official release 8/1/2012 Pugs 3 of 3 e IIIIIIIfAIIIIIIIIIIIIAIXfNMllll%IIMM%IIIIIHM IV%I�VHON�I�M�INll�NL%tlNllNlltl APo�� im���'°^'��'"'"'""www' '""'W00°"" ""'"° BROWN I &i, I a&= GAY ENGINEERS, November 20, Mr. Mire Bennett, PE r F r(l ect Manager I"ranspo t.at.on and Public Works City of "or Worth 000 "Throckmo.rt+ n Fort Worth, TX 76102 Re: Robertson Road Reconstruction,, City "r(Ie t No. 01299 Amendment Now 02 Dear.N4j°. :Bennett: Per our previous discussion, Brown & Gay Engineers, Eric. (BCE) proposes that the fol lowing additional services be Budded to this contract: L Water line lateral lead ad Ustincnt Detail. 2. Construction Phase Support Services At the request of the City,, the following addit on�tl scope items have been identified to support completion of the project and aid in schedule recovery, The additional work includes basic enginceri1ng services for the creation of a water line lateral lead a(Ijustment detail, engineering analysis and response to Requests for Infon ration and assistance in management of the contractor through completion of the construction of the project as requested by the City froin the Notice to Proceed, rate(04/29/201-3) rov ded t Bell Construction. Part 1. --""mater Line Detail a. Design a water line lateral lead detail for construction of the proposed water line-tbr the project. BGE will create a detail to adjust water line lateral leads to;yid the contractor in avoiding conflicts with storm sewer or other utilities. ��'his detail will si r gned and sealed by a professional engineer licensed in the State of Texas. Part 2--Construction phase Support a. Response to Requests ests for Information G.E will , r v%de eng%neen i,'ig analysis and response to up to 25 Requests for In f`�rnia.ti n as requested by the City submitted via the RF1 process. 2595 Dallas Parkway - suite 204 Frisco,°Tex 3 TEL:972-464-4800 �i FAQ-,,, 972-464-4899 * ww1w.brown9ay.com 'Mr. Mike Bennett, PE Novernber 20, 2013 Page 2 b. Constrijetion Contract Management Support BGE will attend 6 construction coordination nieetings, make 3 project site visits as needed and review 6 monthly schedules and pay requests as reqLiested. In accordance with our contract, Article V, Section 'K of the STANDARD AGRIFEMENT FOR ENGINEERING SERVICES, Brown & Gay Engineers, "h1c., requests,an equitable adjustment to our contract to account for the additional. cost reqUired to perform the City's requested additional services. The proposed man hour breakdown fort he additional services is attached. The proposed $45,120.00 hourly not to exceed tree for these services was detei-t-nined based on the time estimated to complete at the hourly rates outlined in ExIiibit B-2, HOUrly Rate SchedUlefr coin,the s,rANDARD AGREEMENT FOR LNG NGfNEERING, SERVICES. The MWBE participation for this amendment, is 0%,. Please contact me at your earliest convenience, so we C-.an discuss this matter and move to finalizing the project for construction. Sincerely, P I U Chris Kuykendall, PE Attachments .......... 04� Pl- 8 co 00 (a (Of wl 0 0 0) co f- 0 (D 0) 0) to 0 m (61 Ow 0, 64 0 ob Mgt A V) 60 � CL x uj 0 0 II 0 0 0 u 44 CL 00" ol 0 0 60, > c CL x uj Lu 4-0 c 0 10 10 .0 Lu 0 0)t- 0 (0 0 6% (0 601�1 00 to tO ul V)40 40 co 4- N Ir LO V) 0 0 z ol 0 0) 400 0 cr) 4) Nr m 01 CL UJ Ul Z t! al/I 00 W4, c4i (%4 UJ 0 cp CL 4— rri ol tow ll;r cn ui RIN 0 0 44, co (D co OD (N4 M w co Q R INEO ISEN R AAMI u CL cn 0 ol E 0 Z E cN 0), =; 4) 0 0) 'q- >* 10- Q W cr CL C U CL C -C c 0 0 4) CL cN E 0 CL 2 0 0 N— 0 w. 0 1-1 , t c6 C, E :te cu cn LO U- 0 E Ic a T 0 CL o 3: CL Wi n (1) 0 w 7t=* M,4--a rx L) 2 �Lu o FO m CL C ol U) (n m co a C c > c 0 0 0 U) cr o Z; U) IM CD V -J, a) E w 0 Ca 7 0 CL L> �5; ICI (D > 0 to W 0 0 LL 0 0 < Cl. -i E, U- 0 0 x 0 E C) A,U w j 101 0 C4� CY) lq- M 0 � cl� 04 C14 z ci c (0 C*4 01