HomeMy WebLinkAbout059492-A2 - Construction-Related - Contract - SHIELD Engineering Group, PLLCCSC No. 59492-A2 AMENDMENT No.2
TO CITY SECRETARY CONTRACT No. 59492
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group,
PLLC, (ENGINEER) made and entered into City Secretary Contract No. 59492,
(the CONTRACT) which was authorized by M&C 23-0343 on the 25th day of April,
2023 in the amount of $671,995.00; and
WHEREAS, the CONTRACT was subsequently revised by:Amendment Nwnber 1
in the amount of $16,194.00 administratively authorized October 30, 2024;
and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Water and Sanitary Sewer Replacement Contract 2022, WSM-J, CPN
104482; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $10,265.00.
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $698,454.00.
3.
1Ul other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 1 of 2
WSSS Repl Contract 2022 WSM-J
104482
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 10/22/2025
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED: Christopher t+arder
Christopher Harder (Od 15, 2025 16:21:25 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Shield Engineering Group, PLLC
an-Marie Alexander, P.E.
Chief Operating Officer
DATE: /o/r.-5/z5
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Preeti KC, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black {Oct 16, 2025 17:19:59 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2
M&C No.#:
M&C Date:
N/A
N/A
W£SS Repl Contract 2022 WSM-J 104482
I � SHIELD
ENGINEERING
September 23, 2025
Preeti KC
Senior Professional Engineer
City of Fort Worth
Water Department
RE: Amendment 2 to Provide Limited Professional Services
Dear Preeti,
Shield Engineering Group, PLLC (The Firm) is pleased to submit the following as amended
services to the original contract below:
Original Contract: Water and Sanitary Sewer Replacements Contract 2022, WSM-J
City Contract No: 104482
Shield Project No: 2022128.01
Amendment 2
For effort creating then removing a"Unit 3" section per direction of TPW and the Water
Department, including changing Plan Sheets, Contract Documents, and Contract
Documents Workbook:
• Specification, Plan and Contract Document Updates: $10,160
• Subconsultant Markup: $105
10% sub markup for administration.
Amendment No. 2 = $10,265
Shield Engineering Group, PLLC
1600 West 7th Street, Suite 400, Fort Worth, TX 76102 � 817.810.0696
info@shield-engineering.com � www.shield-engineering.com
TBPELS � Engineering#F-11039 � Surveying#10193890
� � SHIELD
ENGINEERING
The followin table summarizes the fee for this amendment b ra�ect hase:
Water Sewer Pavin
Ori inal Contract $401,325 $246,910 $23,760
Total Amendment No. 1 $8,471 $7,723
Total Amendment No_ 2 $6,364 $3,901
Total $416,160 $258,534 $23,760
Please feel free to contact me with any questions or comments.
5ir�c�rely,
.�� .
Jean Marie A#exander, PE
COO
Shield Engineering Group, PLLC
Shield Engineering Group, PLLC
1600 West 7th Street, 5uite 400, Fort Worth, TX 76102 � 817.810.0696
Total
$671,995
$16,194
$10,265
$698,454
info@shield-engineering.com � www.shield-engineering.com
TBPELS � Engineering #F-11039 � Surveying #10193890
FoRTWoRTH��
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Shield Engineering Group
Subj ect of the Agreement:
M&C Approved by the Council? * Yes ❑ No 0
If so, the M&G must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 59492-A2
If so, provide ihe original coniraci number and ihe amendmeni number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract lisiing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 0
�`If so, please ensure it is attached io the approving M&G or attached to the coniract.
Proj ect Number: If applicable. 104482
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processin� in the followin_ og rder:
L Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the coniract will be
returned to the department.