Loading...
HomeMy WebLinkAboutContract 45341 COMMUNITY FACILITIES AGREEMENT THE STATE OFTEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHE,REAS,, the undersigned Developer (",Developer") desires to make certain improvements (Improvenlents") related to a prQJect as described below ("Project") within the City of Fort Worth, Texas("City"); and WHEREAS,, the Developer and the City desire to enter into this Community Facilities Agreement("CFA"or"Agreement") in co nection with the Improvements. Developer and Project Information'. Developer Company B Name: eazer,110mes of T x eas,L.P. ............. ....... Address, State,Zip Code- 1750 Valley View, Ln. Suite 200, Dallas Texas 75234 Phone,E-Mail: 972-250-5558, troy.radelat@beazer.com Authorized Signatory/Title: Troy Radelat, Division President Project Name and Brief Description: Water, Sewer,Drainage& Street Light Improvements to serve Willow Ridge Ph. 2A Project Location.- East of Mesa Crest Dr. and Breeze Dr., Southwest of US 287 Plat Case No.: FP-01 3-049 Plat Name: Willow Ridge Estates Council District: 7 City Project No: 021 86 CFA: 2013-094 DOE: 7129 To be completed by,staff.- Received by: Date: OFFICIAL RECORD CITY SECRETARY r 4 FT. WORTHI TX NOW,THEREFORE,For and in consideration of the covenants and conditions contained hereiti,, the City and the Developer do hereby agree as follows: General Requireluents A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as arriended, is hereby incorporated into this Agreement as if copied herein verbat im. Developer agrees, to comply with all provisiolls of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work per erne by said contractors. B. Developer shall provide financial SeCLirity in e,orformanee with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been, completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to; ensure the contractor has paid the sub contractor and suppliers in full. Additionally, the contractor will provide in writing, that the contractor has been paid in full for all -the set-vices, provided under this contract. C. Developer agrees to cause the construction of the Improvements conternplated by this Agrectrient and that said construction, shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved constructiot'i plans, specifications and cost estimates provided for the 'Project and the exhibits attached hereto, D. The following checked, exhibits are made a part hereof: Water(A) X , Sewer(A-1) Paving(B) Storm Drain (B-1) Street Lights & Signs (C), X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall, be administered in conformance with paragraph 8,, Section 1-1-, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infi-astructure to be constructed,, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. it. To require its contractor to furnish to the City a, payment and performance bond in the narnes of the City and the Developer for one hUndred percent (100%) of the contract pr-Ice of the Improvements, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the Iiriprovern[ents for a period of two (2) years insuring, the matriteriance and repair of the constructed infrastructure during the terra of the maintenance bond, All bonds to be furnished before work is commenced and to meet, the requirements of Chapter 2253, Texas Govemment Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts re aired by the City's standard specifications and contract documents for develolper-awarded infrastructure construction contracts. The City shall be named as additional i.n.sured on all insurance required by said documents,and same will be evidenced on the ACORI) Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the Gig's Construction Services Division of intent to commence construction so that City inspection personnel will be available- and to require the contractor to allow the construction to be sub I ject to inspection at any and all times by City inspection forces, and not to Itis,tall or relocate any sanitary sewer, storm drain) or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents subitilitted to the City to, schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working d. ys prior to the desired date of the meeting. No construction will commence without a City-issued, Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service l,ines, have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, t its expense, all engineering drawings and documents necessary to construct the improver tints required by this Agreement. 11 Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation ol'.' any UtllitieS, that are or may be in conflict with any of the community 3 facilities to be installed hereunder. J. Developer were releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for thisAgreenient# K. Developer agrees to provide, at 'Its expense, all necessary rights of way and ease Tents across property owned by Developer atid required for the construction of the current and future iniprovenients rovided for l thlis,Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harnfless and defend the City, its officers, agents and employees from all suits,actions, or claims of any character,whether real or asserted,, brought for or on account of'any injuries or damages sustained by any persons (kinc u in death), or to any property, resulting from or 1*11 connect on w ith the construction,, design, performance oi- completion of any work to be performedby said Developer, his contractors,subcontractors, officers,agents or employees, or iin consequence of any falilure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, hi's contractors, sub-contractors,, officers,, agents or employees, whether or no s ch i*VJuri`es tlBath r t1anigges are cans )vhloll'e or in part, bE the alle e,H o the OIL, oLT',,rt Worth, ilsjoffic ry Servants, .ged !L_g gence—f _L e, or eMi Io ees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, 'Its officers, agents and employees froni and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brou fo oaccount ht r or n a nt of any injuries or damages to persons or property, 'including death, resulting 'from, or 'in any way connected whirr, the d A construction of' the in't%rastruct,ure. contemplated he ern, whieffier or not such 0 IN In-urles, death or i-laniages are c-qusetI,, in whole or I' b L - 1. n_parl, ...-y the al neg,11*gence 0 ie Cif Fort Worth, it olLicers, stir ant or e IoEees. Further, Developer will require its contractors to,indemnify,and hold harmless the City for any losses,, damages,costs or expenses suffered by the City or caused as a result,of' s id contractor's failure to complete the work and construct the *improvements m ,al I a good and workmanlike manner, free from defects, in conformance with the Policy,and inaccordance with all plans,and specifications. N. on cornpletion of all work associated with the construction of the infirastructure, and Imp rove tiletitS. Developer will assign to the City, a -non-excILISIve right to enforce the 4 contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts wIll"i any contractor shall include provisions grantl*t.Ig to the City the right to enforce such contracts, as an express intended third party beneficiary of such contracts. 0. I-nspectl*on and rnaterial testing fees,are required as follows: 1. Developer shall pay in cash water and wastewater 'Inspection fees and material, testing fees equal to two percent(2%) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash plaving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent (2%1) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract, iii., Developer shall pay in cash the total cost of streetlights, or if the city is not installing the streetliglits, inspection fees equal to four percent (4%) of the developer's, share of the streetlight construction cost as stated in the construction contract. iv. Developer shall play in cash the total cost of street signs. P". COMPLETION WITHIN 2 YEARS i. If applicable,the City's obligation to participate(exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2), years- provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within Stich extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is 'Intended to 11"mit the Developer's obIligations under the Pollicy, this Agreement, its fin anel'al guarantee, its agreement with its contractor or other related agreements. ill. The City may utilize the Developer's financial, guarantee Submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements, have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the cornpletion of 5 the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or ,suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject, of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 6 Cost Summary Sheet Project Name: Willow Ridge Ph.2A CFA No.: 2013-094 DOE No..7129 .......... .......... ... ......... ------ Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 250,,81115.00 2,Sewer Construction $ 195,447.90 Water and Sewer Construction Total $ 446,262,90 B. TPW'Constru:ction 1.Street $ 617,265.33 2,Stoirm Drain $ 5172,,162.501 3.Street Lights Installed by Developer $ 69,416.15_ TPW Construction Cost Total $ 1,21518,843.98 Total Construction Cost(excluding the,fees): $ 1,705,106.88 Construction Fees: C,. Watense Inspection Fee 21%) $ 81,925.26 D. Water/Sewer Material Testing Fee(2%,) $1 8,925.26 Sub-Total for I Water Construction Fees $ 17,850.52 E. TPW llinis,plecti�on Fee(4%) $ 4 ,6 ` .11 F. TPVV'Material Testing(2%) $ 23m 8,56 G. Street Light Inspection Cost $ 2,7'7'6.65 H. Street Signs installation Cost $ 11,4701,001 Sub-Total for TPW Construction Fees $ 75,612.32 Total,Construction Fees: $ 913,14612.83 Choice Financia]Guara,nte Options,choose or Amo"int (ck one Bond=100% $ 1,705,106,88 ,Completion Agreement= 10,101%/Holds Plat $ 1,705p 1 06.88 .Cash Escrow Water/Sanitary Sewer=12 % $ 5157,,828.63 Cash Escrow Plaving/S,torm Drain= 1 5% $ 1,573,554.98 Letter of Credit=125 /?yr exp,irati22.period $ 2,131,,383M60 7 IN TESTIMONY WHERE,OF., the City of Fort Worth has caused this instrument to be executed, in quadruphicate in its n M ame and on its behalf by its Assistant City anager,attested by its Cif Secretary, with the corporate seal of the City affixed, and said eloper has executed this instrtiment in auadrup1licate, at'Fort Worth, Texasthis day of 2 0 CITY OF FORT WORTH-Recommended kv.- Water Departmen'ti Transportation& Public Works Department toosi, Lj Wendy Chi-Ba/bulal, EMBA, P.E. Douglas WdWiersig,P.E. Development Engineering Manager Director Approved as to Forin & Legali�y- AI)I)roved ky C*ty Manager' I S fice ............................................... Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. Ae - Date.: ATTEST: of 0A N OFFICI AL RECORD Mary J. 01 E RD CO ] City Beene-ary CITY SECREE,TARY ro lop FTa TH, YX WOR .................... ATTEST: DEVELOPER: Beazer[Ionies, Texas.,L.P. By Beazer Homes Texas Holdings, .iw ic. lts general partner jS S i a ture Signatu re iati (Print)Name.- ,, TkW ruin...... in arne: Title: n 71-1 itle: i roy,,Radeiat Name" 0 TiItie�'m re siolenTs 8 IN TEs"riMONY WHEREOF,the City of Fort Worth has caused this instrunient to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City. Secretary, with the corporate seal of the City affIxed, and said veloper h,as executed thi s ay Sri m struent in qua ruplicate. at Fort Worth,Texas this d of CITY OF FORT WORTf I-Recommen(led by, 'Water D'epa �en t Transportation &Public Works Department ater,11epa, 4 LJ ............I tA� Wendy Chi-Babulal, EMBA, P,.E. Douglas W)Wiersig,P.E. Development' E' ngincering Manager Director Approved a to Forni & Legality.- Approved k ity Manager ,s Ofjice Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C . Date:-- ATTEST: puft.0 0 7a Gomm OFFICIAL RECORD Mary J. r F VAL RECORD C r T Y 00 City Secre ary CITY SECRETARY X A FMWORTHI TX A' 'TI ,ST. DEVELOPER.- Beazer Homes Texas,,L.P., By.- Beazer fl roes Texas 1-1 oldings, Inc. Its general partner Si nature Signature (Print)Name: (Prin ' ame: Title.- o Title.- Name. Troly Radelat, Title: President 8 Check items associated with the project beling undertaken;checked items,must be *Included as Attachments to this Agreement Included Attachment Location Map Exhibit A: 'Water Improvements Water E,sti i fl a t e Exhibit A-I.- Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Pav i ng"Estimate Exhibit B­1: Storm Drain Improvements Storm, Drain Estimate Z' Exhibit C: Street Lights and Signs Improvements I I z Street I-Ag I nts and S,igns Estimate (Remainder of Page Intentionally Left Blank) 9 PLANS FOR CONSTRUCTION OF A R$ PAVING, STREET: G I AID IMPROVEMENTS: TO SERVE WILLOW'RIDGE,PHASE 2 C) MESA o CROSSIN C"' D RIV'E MES Cn CREST �I RIVE HAWKS, LANDING SITE ROAD TWISTING STAR DRIVE WAGLEY ROBERTSON R 0 AD BEST HICKS R MCINITY MAP (N.,T.S.) �m d D. NO. 7129 CITY PROJECT NO., �21 -M-US REGISUERM EN.KZN EIM FWIF4 WATER PROJECT NO. P -6071 5012'1 6- ° 1:163011 O Dive,Suiite SEWER PROJECT NO. P275-7021302186-83 Awn,Texas 751 Tel:972.241 7676 �I FILE W-22851 Fax:972-48-1414 October 16, 201'3— SHEET" 1 FINAL PLAT WILLOW RIDGE ESTATES - . FP # 013�mOO BLOCK 4, LOTS 28-,,-36; BLOCK 10, LOTS 49-58; BLOCK 12, LOTS 62-90; BLOCK 13, LOTS 1-15-P BLOCK 14, LOTS 1-6 AND LOTS 39�42* BLOCK 15, LOTS 1,m-5 AND LOTS 45-47, BLOCK 16, LOTS 19-48 25.683 ACRES OUT OF THE JAMES RIGHLY SURVEY. ABSTRACT N0. 12618, CITY OF FORT WORTH, TARRANT COUNTY,,,,,,,, TEXAS BEAZER HOMES TEXAS, L.P. OWNERS/DEVELOPERS 1750 Valley View Lane, Suite 200 (972)250-5544 Dallas, Texas 7'5234 JBI PARTNERS, INC. SURVEYOR/ENGINEER 16301 Quorum Drive, Suite 200 B (972) 248:-7676 Addison, Texas 75,0011 MAY 24, 2013 Sheet 2 of 2 D.O.E. NO. 7129 CITY PROJECT NO. 02186 nKnsxEC¢'¢smc+cnremccFaaiws WATER PROJECT NO. P265-6071502186-83 16301 Qumm Dve,Suite 200B SEWER PROJECT NO. P275-7021302186-83 Tel:972-248-7676 FILE NO. W-2285 ru snxaauu October 15, 2013— SHEET 2 WkV OWL m.UAW � � _.,. ..,M..v... ,.. ._,., CONNEC T 70 � C.a. li n� l 010F — 5308 N � X­ 186fj5 � Vpl".0* PAR rM*3 10M 2.LID p � k. 6 07TWT W_MOM DII120"M °- m m 5 _ ��'.1WC' ism ..: 'g DOt 4M 020"M14 RM E. „, , _. I � CONNECT T WATER' ONE w m IRE tME r I Docvk"T 4a 186651 ��.. MA { CM.B"r �7 "�rt p, " n WI , No n'" �a tltltl � I G LND 1 W A TER _ BECUN " WA TER a O"mop'fib"474+ TWO"r' E wdrMwd ' '. aw,awaWaG K)OCOMI �, m m r 10 9 eCA we NCR 02MM w s Pr' r 7wRfNG8RANCH0fdE V .+MSC M,NY'WU tia DIX No.V""""R "MMC1 I� .MAT#'1' ff �, p C ft 9N67GRMN,imuw7:M..:. CIE —T WNNG BRANCH a] bA flIPQ „�.� ........mmm..,,.�..... 1. m yr."EI41MY f m.,apa AAv 0m I r � H mm r,r q 0 sm m spa SCALE: 1 M300" LEGEN w PROP. WATERLINE _ WATER M. PROP.. VALVE PROP. FIRE ""'F S ION OF WATER, HYDRANT SEWER. PAVING, S , DRAINAGE IMPROVEMENTS XI' s`. WATER LINE TO SERVE 16301 Quorum Dhve,Soite 20M 'BILLOW N G , F ASE A Adidism Vexes T .972-248-71676 Fax:972-248-1414 UN ES ARE UNLESS OTHERWISE INDICATED. October 15,, 20;13— SHEET 3 Mrw a+�CA�arwl�,�rAcAwl WWI F � m RM I FK96WAL PARNINI 40.ar ILTO 010CL*4xwW KO SAW 1w 7 w ...,. ,. Ili � K Doc-HIM 021,1200456 4w Csl yF'W SCPM � 1 4 M➢4rMw1,wWN4RC,�uuwlr� r'�444 .�� .�.�..,. '""W:k:pwA�;lw4y4"4 14AWi btW„i.0"ow4Wtl1E fm .m sue^ CONNFCT'4' SS Md a pw� nw6 a N �.a lk N r 0111(K WRY *WI AS W ru AA EXISTING �' ��" �° RAAR4Cru4"4W AdIW4W44, iMr � Tft ww „,"..,.. W0. am r'4n4 "�4 VC)CUM00 OE - 5308 PAR11 co rtlf , lrAKr#4494M *A SOCK DOC*41"MWOV 44 C*4f%M%K 4 W A4a'wA a 4aMwrw 9t 04M 9#400w AS acM r14w � AwRx w vwv*n cork IPAO wy PPONE B N wW[ y!L.;p. 00C'No W4 4"' M AIP ww r14�"arp �aw1'WWIX�wW1LwCWw9'. of"..„M'AkwlA,'4W. �iY14Rw.'tl'�I r "� �' II o T � w".4A4'414'W wf"N!'M BMWWA, ^ l Wes,.. (r ACM T4,M4PftAk4", we tv w � ww WwIW14N'TM'wwQ°',W XIM64'�'4;'MApW.WAW M S�WarS rwc I r v " D9G.IWA�,4Y�1�b4M4W 11 r. -Will,101-114 w .. ., nM 00 LP we .w wM ar A4' ; 440 WWI 32" m I W W'AM4W' 44W"*MPr,Mn!Na:,NXp,lftw,EMI �. Vol m300"M m300" PROP. ,.. S.S. U N ir..,... ro ,. SANITARY PROP. S.S. MH IBIIT A-11 n ...mom EXIST. S.S. MH PLANS FOR CONSTRUCTION OF WATER, EXIST S.S., LINE SEWER, PAVING, STREET UGHTING,, & MCASFXGIST D FMNMf-,4M DRAINAGE, IMPROVEMENTS TO SE RVE."I 16301 Quote Nve,Suite 2M I 11 SANITARY WILL W RIDGE, FH ASE Addism,Texas W SEWER LINES ARE 8* (001 NO,71 2�9) TO -248 972-248-767 UNLESS OTHERWISE October 15, 2013— SHEET I M CAB.A.SLCC x 12040 V • r m_ Wrr*RM RESACNfiAJm PARTNERS .2.LTD _. .-.- DDCUMENV �.... .. _�" 021121237 I 11 _ ..._ V .. ,.. NM YYyypp Qlpq "W��:�w�.Syt Iy��I�,�Sr� M -'NCH M 011"Cr WP »„y ddv a W,No.OV1 xAAar+!Arl'AAAY'b4�M3�M4ArAC1"1xrM RA,'41 rNN„rAr ..... ff Ii _ MNCrEKWENT {NNE Ar aRaxx 4NIxRxAK1x•N' MCI No v Np b NNo 02AAIO$21168 ESI 0013 {4P ....,..,.:... ....,w .,.,�..... ...�..w, -.-�Pf m NOM IA t?rIRMNN!Cr r4f Ea TW:NT 1 THC Ory Of rORr WCOTK AS RECCAWO wr 00NULNT NO,DM3611"A.AND&40* ha1CnEKWON.M aaRDONEA N •' MARY JAAMS *EVA DOCUMENT a+..�..�..�,�.._._..®.,.�..., , � vOr. ru,K 2001 rN . " PAR 114 THE ' 25.4 D2 aA.,RE r1anA;- AlrrawmW, N"NAh44nIAxw AS p rM NO. CO,6 40 �,, ■r NAA« N41.NY2xAAg2/3+5CA N ANAw�C Alr"txa4 RAC'.p VACC NN _Mus L r 0,f_M4,;.E Wouslimw PWELNNE ~ANY,� �r h I PWC041—CC­WAY A4:ENECW(W'T 4-0 LAWW"I r h,P � NAq�17�N."hA1N'T."N' 1SIXs'iMAkh AFdNCPN,rP'S r'!P '�. (rrY "A'AUA�"gC CA7f.LMWt[WY'Y�' ,p r �Rr a- . N^ PrJWfF'![91KA4Ar"$MIJ1M!r,#,"AA NAA" „ lWf WC OR 1 C"" K NA'A SIDiAA#xA.i�CNAT,� M AAC)ATHWSI NAExt°.P'END['A+N"T Na 07490060200 r f IN$I P WWnrNA C+�sN:xri;rN� r Ll " rw WOO"FN,""1A'GY TIO N W.d„.a 14 NO.D204 213200 r tO Nam pa_ C41r aAAaxE r4 �I (S'f'WPAN4'Fr°WSu V U I DOCUNNr NCN 0211224#37 wwxw.....- R.1rVw . gym........ ...,...w..�,.... ....... ..... , .._, . .......-saw AwrwWA! � � %AW40 MPUX,FYN .rAr4rxrA r�Mai AtM MACWr'K,1#1 ax 4M 'rrA,wlmvwa1 L N7Oa rc FXW RA 94 to I! r a mI�-AA+4d^ +IrAA» A�Atli.dA 9RAAIAAAO fW.Pt 0"fA¢�C'rw�rP?PA'.9rx r,r.,.�..�Pe, «.'.. P"AIr 7FPcmvi M Pr 4NNr �rxx4 r1 W AM P""ArAMM i4 A .rw P"as,A rr11A2� ;q*r^A.Cr k) t4aw 1 ng'r.°'$4) p r a1 pw�44 N x~rP IAr a4r m 64 WwPN >A PAVING SCALE: 1 "=300" A�a.rl;rncc rtN NA rl N!-CP/x1 � �re�uma4 "IN A�E►rwNAa M.ePxprxANrowu urPN axon wantirea M Awwrrm Ar �xanr4xrNAa�x4Arr rN4rwx ! �" .7x 2+i ma #�"'rl"APwA.r4'. sNa�,1EC,ANNY'4 1r 14r� N41N.'N.'&' ,. N&A, 1,!4Y[1r4AlAN%Q KG'�04"of ,.. � ter,...., RESCENTIAL No s e 321312 NwAl,) r CONSTRUCTION F WATER, S, ��+&1`d'r1A"AIN� r. DRAINAGE IMPROVEMENTS _�rP NI7ApaAar _ —,�A wA TO SERVE w � 11 4r r irR .... 4w PwNPZwmroe iK P N as $ ILL IDG " IC ASE TEXAS . � NAn r `ui r rwxiAr nr+r nom 16301 A�" w 'ro�0. 201. �A "w'"r wlaa1r Or 4 M!'MMLJ4CI 4 so) ]PNti,INRi6% a. r, r*a* •a Ad M }Texas 2*On 37 k1 33 Tel'972-248-7676 Fax C.91'd-L' "li*F q'1 #dawwPE4 PP C1 SIF&EI S T k SHEET 55 ML SECTON TOD CW w ww SLOF MN yyy w�.dM.nw. ..ea r+n.wrorw n,r.n.a. .m..�x u.�.M..m wrv,•wnm- ....®.. ,,,,,...,�. wn w.•,,� PR&K R s .. ..a,..m *M mMMUCI w g b " n: r our )0 AAWK45 NO,L LVO duo %14 0'02$2 0M �� NO W)R twrwC&M mm"w �rra6 PUVENs SCHOOL WWI Ita M:2.M CONNI:C7]a E14704 M A ...�..�.�. ..o«..., ...,�w...„ W as bra MbtlJMM 7I 04 or 14 t*40 10 TO DOE SM"O INC�36"'M lM M�AS �M 4 owr,kl�4,ox"mill,�'�Mw r tiS hwM' NwM rw MM'A,'T ",�wwCMkd�OM+N„0M� ;�M�V uw ""'�, � '* "'ll��i� �wa,aimms wo „ «.. L _ SAM �..,.w"'^^"'""""" � �»✓a"MMI��Mw'M�'rMMw V�4.Mw i wM auw S'u,WM,R.'"1' M rrM teoiw Mir ,J"r r col ,,,P 40e A MO#A LP way W 1 Mr, ISIZ ow ... � sr of wN p " ��. IN a III «w a M M rw - p 11ON COL NMw I II v'JA"AMAN YWI'7» . o0 *rWmnA,P RS,N MGM SCALE: 1 xw3lOO* LE'IGE *room ileA PROP. INLET STORM DRAIN'' EXHIBIT B-1 EXIST. IN'LET pr�MaCa„ 'MMM�MM3���7'MM �� M PLANS YOR CONSTRUCTION OF WATER,, SEWER, PAVING, STREET' LIGHTING, & M F DRAINAGE IMPROVEMENTS' T,��`�Py�*��w��rr yyw�y 1631 , i1 .�. .. STORM FH ASE 2A` " 1 D E .a1 s Tet 972.248-7676 Fat 97'2- '14 1I4 October 15, 201 SHEET & ............. A > . ............ ... ft-LOW UZE EVA 7S, UNC stn aft°iv CA&&%JX 12M PRAMOU ORI"I"21,6mv, A,*%WWWM&POANCOM 0*0 2.I'M 00am(MI*0 toll 1 Z4132311 setim ns-vcy xw Q%NO 0211209466 * KWXT ST "M U DX NO W"MW T j w "01E,A P00'rot 0(rkr EkUvf)4v 110 NE CT7f OF FM WAN.AS ACCOW'D TN 30CLAKWO NO,OM36167L ANO S40"I HAIC)HE;�VWCK 4 APAOXWO wmy 4AAVts POW-M eSTATT f, f 2. DOOPLAdvjf4 T­ 8301 1 "'DL' I"P": .................. J­ PAST Cr 1 pt 211$0 ACK TV,*&f r" 0200"7NI z 0"WO WC DOC"a DIM350?*1 "VmvVCk(Auwml I A5CW 04 r, 4" toY UPARArt t1V%VV*00 I* O(YON LAMY M*XNN M POV#A LVT Tr 65 �oerw SPACE ro Be agwo *40 SEAgro 193k", QP CAQ.E~7AM OMELIW cowpAh,'Lp' V4 CmT-01-WAY A4RELWM1 EASCWEN13 NO. ST MA" wow 'W* R "rHIWST*DEPEW*NF 0,"0 SC"OOL DrSrRtC7 00 020"Ma A 2 wNf,BRAN DEVOk EMRGY 104 M Lp, FA m 02M2,1'SM 1A A#V %'I f3 OOUOW fK5X"T1,-PARTWn LM OOWWNT 140,02'T%2246Z7 SCALE: 1 04~300 STREET SIGNS & UGHTIN�G LUMINAIRE EXHIBIT C ()—C� EXI�STIING PLANS FOR T CONSTRUCTION OF WATER, LUMINAIRE 010 SEWER, PAVING, STREET LIGHTING, & 'UXA.S REGNw=E_N357rQE5ZM FaNIF-439 DRAINAGE IMPROVEMENT'S TOSERVE 16301 Quorum Dnve,Suite 2MB PROPOSED SIGN BLADE WILLOW IDLE, PHASE2A AdOw,Texas 7 (D,O.E NO.7129) Tel:972-248-7676 Fax:972-248-1414 '00CT01 PROPOSED STOP SIGN October 15, 2013—,$HEET 7 ENGINEER'S QUANTITY TAKE-OFF AND OPINION OF ESTIMATED COST W'ILLOW RIDGE,PHASE 2 REVISED BY JBI PARTNERS,INC.ON DECEMBER 13,2013 A FORT WORTH,TEXAS DOE 7129 JBI PROJECT NO,8ZH007 30-22477 ITEM UNIT _ ITEM TOTAL PRICE TOTAL COST ITEM NO, BID ITEM SPEC NO. §.-UNIT WATER 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 3.75 $ 4,,900.00 $18,375,00 33110261 8"PVC Water Pipe 3311 12 LF 3,261 $ 20.00 $65,220.00 7- 3311-0262 8"PVC Water Pipe,CSS Ba c k f iT, 13 11 12 LF 98 $ 37,00 $3,626.00 33110461 12""PVC Walter Pipe 333 11 12 LF 1,476 31.50 $46,494.00 3312-0001 Fire Hydrant 33 1240 EA 7 2,550.00 $17,850.00 3312.2003 1"Water Service 33 12 10 EA 109 $ 6501 00 $70,850.00, 33177103' 11/2"'Water Service 33 12 10 EA 1 $ 1,350x001 $1,350,00 331243002 6"Gate Valve 33 12 20 7 $ 750.001 $5,250.DL 33123003 8"Gate Valve 33 12 201 EA 11 $ 1,020,00 $11,220-00 33123005 12"Gate Valve 33 12'20 EA 4 $ 1,90000 $7,600-00 3�312,0117 Remove Plug&Connect to ExisVng 4"to 12"Main 331225 EA 2 $ 880,00 $1,760�00 99990000 4"Irrigation Casing LF 40 $ 13.00 $1520.00 99994001 6"Irrigation Casing LF 40_L$__ 17.50 $700-00 UNIT TOTAL $250,815.2L SEWER 02 Post-CCTV Inspection 33 01 31 LF 2,949 1.10 $3,243.90 3301.0101 Manhole Vacuum Testing�IT 33 01 30 EA 18 140,00 $2,520-00 33053004 12"Sewer Carrier Pipe 33 05 24 LF 20 $ 62.00 $1,240.00. 3331.41'15 8"Sewer Pipe 33 11 10 LF 2,949 $ 31,00 $91,419.00 33314117 "�8 Sewer Pipe,CSS Backfill 331110 LF 140, $ 47.00 $6,580.00 33391001 4'Manhoie(all depths) 333910 'EA 13, $ 2,670.001 $34,710.001 3305-0106 Adjust rim elevations on existing 4'Manhoie(all dlppths) 3305 14 IT ��A 5 I$ 1,210,00 56,0:50.00 75 $ 437��001 $32,7-75,00 �33313102 4"Standard sanitary lateral with 2-Way Cleanout 333150 33313314 Locate and aidj,ust existing sanitary service 33 3150 EA 34 $ 325..00 $11,050.00 ............. 0241,2013 Remove and Dispose 370 LF of 8"sanitary pipe 0241 14 ........ 1 1$ 740.00 $740,00 0241.20011 Remove a ncl Dispose 13 existing services 02 41 14 1 4,450,00 $4,450.00J 9999,01002 Connect to Existing Manhole "EA 670.00 $670,00 UNIT TOTAL $195,447.901 STORM DRAIN 3317.0110 Special Riprap 18"-12"rock riprap on grouted 6"bottom;18"Deep] 31 37 00 -5 Y 383 1001,00 $38,300,010 3341.0201 21"RCP,Class 111 33 4110 '165 33.00 $5,445,00 205 24"RCP,Class Ill 334110 LF 113 $ 3&00 $4,068.00 3�341.0205 24"RCP,Class IV 33�41 10, LF 53 $ 40,50 $2,146.50 3341 0302 301"RCP,Class 111 334110 LF 464 47,50 $22,040.00 3341,0309 36"RCP,Class Ill 3341 10 LF 272 60.0101 $16,a20.00 3341,.03,09 36"RCP,Class iV 33 4110 LF 33 67,00 j $2,211,00 3341.0309 42"RCP,Class Ill 33 41 10 LF 635 81,00 $51,435,00 3341.1201 5x4 Box Culvert 33 41 10 LF 400 $ 179.00 $71,600,00 3341.1302 6x4 Box Cu:lvert 33 41 10 LF 408 $ 211-00 $86,088.00 j 9999,0003 7x3 Box Culvert 334110 LF 97 $ 229= $22,213.00 9999,0004 8x3 Box Culvert 334110 LF 702 $ 248.00 $174,096.00 3349.00001 J01 4'Storm Junction Box .. 33 39 10 EA 2 $ 2,750k0 $5,500,00 3349.00,02 5"Storm Junction Box 333910, EA 1 $ 3,150.00 $3,150,00 3349.0102 �4'Manhole Riser w/Manhole Steps 33 3,9 10 EA -3 2,20,01,010 $6,6030.1 0 33493001 10"Curb Inlet EA 10 2,750,001 $27,500.00 3349.5002 15'Curb Inlet EA 4 3,715,00 $14,860.00 3349.7001 4"Drop Inlet EA 1, 2,640.00 $2,640,00 99,99-0005 FW-O Healdwaill,6x4 39 49 40 -EA 1 15,610 00 $5,6101-001, 9999.0006 FW-0 Headwall,8x3 39 49 40 1 $ 6,150.00 $6,150.0 91919,9.000!7' 2 Stage inlet erosion protection 19 90.02_�_ $1,710,90. Remove and dispose of existing headwall,rip rap,and mitered pipe to a clean, 9999.0008 024114 joint on existing 36"'RCP as per plans and City specs j, 2 11$'1,240.00 $2,480,00 T TOTAL $572,162,501 PAVING 321150400 Hydrated,Lune 321129 TN 26&J. $ 132,00 $35,389,20 3211.0502 1!8"Lime Treatment(3 5#/SY) 32 11 29 Sy 6,936 $ 2,20 $1,5,259-20 32 1129 sY io,,864 Z20 $23,900.8�O 32 11.0,501 6"'Lime Treatment(27�/_Sy_� 99!99.0009 7 1/2"Concrete Pavement 32 1313 V 6,580 $ 3 3,60 $221,088.001 3213,0101 6"Concrete Pavement 321313 SY 10,163 $ 29 00 $294,7"27'00 32110301 4"Concrete Sidewalk 32 13 20 SF 1,893 $ 4,25 $8,043,13 32110501 Barrier Free Ramp,Type R-1 32132,0 EA 14 5 850,00 $11,900.00 9999-0010 Concrete Deader LF 161 9 $1,449,00 ITm 9999.0011 qType ill Traffic Barricade LF 161 $ 29.00 $4,669,00 9999,01012 jConnect to Existing Pavement LF 70 12.00 $840,0 UNIT TOTAL $617,265.33 STREET LIGHTS 34413101 Install 15OW Metal Halide Cobra Lighting Fixture 34 41 20 EA 17 $ 3010,010 $5,1001100 34413301 Foundation TY 4 34 41 20 EA 17 $ 700.00 $11'900-00 3441,3000 j Rd,wy I Ilurn Assimby,TY 8,11,01-25�,and D-310 344120 EA 17 $ 1,325.00 $22,525-00 3441.1502 Ground Box,Small Lid Apron 3441101 EA 17 $ 430.00 $7,310,00 3�441.3011 2"COND�T PVC SCH 40(T) 2605 33 LF 3203 $ 5�25­_ $16,815.75_ 3441.1410 NO 10 Insulated Elec Condir 34 41 10 LF 9609 $ 0,60 $5,765.40 UNIT TOTAL $,69,4161.15 GRAND TOTAL $1,705,106.88