HomeMy WebLinkAboutContract 61521-R161521-Rl City Secretary Contract No. __ _
FIRST RENEWAL OF CITY SECRETARY CONTRACT NO. 61521
A NON-EXCLUSIVE PROFESSIONAL ENGINEERING SERVICES AGREEMENT
BETWEEN THE CITY OF FORT WORTH AND SIMON ENGINEERING &
CONSULTING, INC.
This FIRST RENEWAL OF CITY SECRETARY CONTRACT NUMBER 61521
("First Renewal"), is made and entered into by and between the City of Fort Worth, a home-rule
municipal corporation of the State of Texas ("City"), acting by and through its duly authorized
Assistant City Manager, and SIMON ENGINEERING & CONSUL TING, INC., a Texas
corporation ("Engineer"), acting by and through its duly authorized representative.
WHEREAS, the City and Engineer entered into a Non-Exclusive Professional
Engineering Services Agreement for the City's Small-Scale Infrastructure Program, City Secretary
Contract Number 61521 ("Agreement"); and
WHEREAS, the Agreement provides for a one-year Initial Term with four optional one
year renewal periods; and
WHEREAS, City and Engineer desire to renew and extend the Agreement for the first
one-year renewal term;
NOW, THEREFORE, in consideration of the mutual covenants and agreements
contained herein and other good and valuable consideration, City and Engineer do mutually
covenant and agree to renew and extend the Agreement as follows:
1.
City and Engineer agree to renew and extend the Agreement for the first one-year renewal
term, effective beginning on June 8, 2025 and expiring on June 7, 2026.
2.
a.All terms and conditions of the Agreement that are not expressly amended pursuant
to this First Renewal shall remain in full force and effect.
b.All terms in this First Renewal that are capitalized but not defined shall have the
meanings assigned to those terms in the Agreement.
FIRST RENEWAL OF CITY SECRETARY CONTRACT NO. 61521 Page 1 of2
A NON-EXCLUSIVE PROFESSIONAL ENGINEERING SERVICES AGREEMENT
BETWEEN THE CITY OF FORT WORTH AND SIMON ENGINEERING & CONSUL TING, INC.
City Secretary Contract No. ___ _
IN WITNESS WHEREOF, the parties have executed this First Renewal to be effective
on June 8, 2025.
CITY OF FORT WORTH
Jesica L. McEachem
Assistant City Manager
Date:_1_0/_2_4/_2_02_s __
Recommended by:
Dalton Harrell (Oct 20, 2025 10:46:50 CDT)
D.J. Harrell, Director
Development Services Department
APPROVED AS TO FORM AND LEGALITY:
Stephen Hines
Senior Assistant City Attorney
M&C: 24-0187
Form 1295: NIA
ATTEST
ri� Jannette S. Goodall
City Secretary
SIMON ENGINEERING
& CONSUL TING, INC.
Voranique V. Simon
President
Date: 10/06/2025
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Tablisha Taylor
Acting Contract Services Administrator
FIRST RENEWAL OF CITY SECRETARY CONTRACT NO. 61521 Page 2 of2
A NON-EXCLUSIVE PROFESSIONAL ENGINEERING SERVICES AGREEMENT
BETWEEN THE CITY OF FORT WORTH AND SIMON ENGINEERING & CONSUL TING, INC.
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 03/19/24
M&C FILE NUMBER: M&C 24-0187
LOG NAME: 06SSIP ENGINEERING CONTRACTS AND APPROPRIATION
SUBJECT
(ALL) Authorize Non-Exclusive Agreements with Baird Hampton & Brown, Inc.; Kimley Horn and
Associates, Inc.; Westwood Professional Services, Inc. dba Peloton Land Solutions, Inc., a
Westwood Company; Shield Engineering Group, PLLC; and Simon Engineering & Consulting,
Inc. in a Combined Annual Amount Up to $2,000,000.00 for the Initial Term with Four One-Year
Renewal Options for the Development Services Department, Adopt Appropriation Ordinance, and
Amend the Fiscal Years 2024-2028 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize non-exclusive agreements with Baird Hampton & Brown, Inc.; Kimley Horn and
Associates, Inc.; Wesfinrood Professional Services, Inc. dba Peloton Land Solutions, Inc., a
Westwood Company; Shield Engineering Group, PLLC; and Simon Engineering &
Consulting, Inc. in a combined annual amount up to $2,000,000.00 with four one-year renewal
options for engineering services for the Development Services Department's Small-Scale
Infrastructure Program;
2. Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the General Capital Projects Fund in the amount up
to $14,700,000.00, subject to receipt of funds, for the purpose of funding the Small-Scale
Infrastructure Program programmable project (City Project No. P00151); and
3. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to authorize execution of
engineering agreements and appropriate funds necessary to start the Development Services
Department's Small-Scale Infrastructure Program (Program). The Program is being created to
provide engineering design and construction services for the installation of small-scale or infill
developer-led projects, including 800 feet or fewer of water, sewer, storm services, sidewalk and
four (4) or fewer pedestrian/streetlight installations. The engineering and construction cost will be
funded entirely by Developers.
The Development Services Department conducted a Request for Qualifications to establish a
standing list of qualified engineering firms which the Development Services Department will use to
provide engineering services for projects in the Small-Scale Infrastructure Program.
The Request for Qualifications was advertised in the Fort Worth Star-Telegram on September 21,
2022 and September 28, 2022. The City received fourteen (14) responses.
An evaluation panel consisting of representatives from the Development Services Department
reviewed and scored the submittals based on the following criteria: (a) project understanding
(30%); (b) project team and experience (45%); (c) related local projects (15%); and (d) readiness
to proceed (10%).
The scores are listed in the table below. No guarantee was made that a specific amount of
services would be requested.
Bidders
Evaluation Factors
a b c d Total
Score
Rank
Shield Engineering Group, 30 45 15 10 100 1
PLLC
Peloton Land Solution, Inc, a 30 45 15 10 100 2
Westwood Company
Baird, Hampton & Brown 30 44 15 10 99 3
Kimley Horn 30 42.5 15 10 97.5 4
Simon Engineering & 2g 44 14 10 97 5
Consulting, Inc.
LJA Engineering 29 44 14 9.5 96.5 6
Cobb Fendley 29 42.5 13.5 9.5 94.5 7
Mas Consulting Engineering 26 44 14.5 10 94.5 8
& Consulting Inc.
Multatech 27.5 42.5 15 9 94 9
Bartlett & West 26 45 10 7.5 88.5 10
James DeOtte Engineering, 30 40 10 7.5 87.5 11
Inc.
DEC Engineering Excellence 27.5 40 10 7.5 85 12
Arredondo, Zepeda & Brunz,
LLC
RLG Consulting Engineers
22.5
12.5
40 11.5 9
45 14.5 9
�
:
13
14
After evaluation, the panel concluded that Baird Hampton & Brown, Inc.; Kimley Horn and
Associates, Inc.; Wesfinrood Professional Services, Inc. dba Peloton Land Solutions, Inc., a
Westwood Company; Shield Engineering Group, PLLC; and Simon Engineering & Consulting,
Inc are the most qualified engineering firms for the Program.
To facilitate the administration of the Small-Scale Infrastructure Program, the attached
appropriation ordinance is necessary. The ordinance appropriates the full projected annual amount
of up to $14,700,000.00 in the General Capital Projects Fund, subject to receipt of funds, for the
purpose of funding the Small-Scale Infrastructure Program programmable project (City Project No.
P00151). Having a full year's appropriation authority will support awarding the current design and
engineering contracts as well as annual contracts for related construction services, which are
currently out for bid.
The appropriation is subject to receipt of funds from developers, which will prevent over spending
with movement of spending authority to a child project contingent on the actual receipt or availability
of funds, ensuring that it is tied to the funds received for each project. The authority granted by the
attached ordinance is subject to certain restrictions. Specifically, the total amount of all transfers
cannot exceed the annual appropriation for the programmable project, and each transfer is
contingent upon the receipt of funds from the developer. Given the mid-year start of the program,
it's projected that the actual receipts and appropriations for Fiscal Year 2024 will be in the
neighborhood of $7,375,000.00.
Funding for this project was not included in the Fiscal Years 2024-2028 Capital Improvement
Program (CIP) because funding for the program had not been determined at the time of its
development. The actions in this M&C will amend the Fiscal Years 2024-2028 Capital Improvement
Program as approved in connection with Ordinance 26453-09-2023.
Fund FY 2024 Budget Change Revised
Name Appropriations Authority Increase FY2024
Budget
Small-Scale
Infrastructure This
Program - $0.00 M&C �14,700,000.00 $14,700,000.00
City Project
No. P00151
This task order contract will serve current and future capital projects as-needed, and a funds
availability verification will be performed by Development Services Contract Compliance Managers
prior to task order assignment.
FUNDING: The maximum combined annual amount allowed under these engineering and design
agreements will be $2,000,000.00; however, the actual amount used will be based on the needs of
the department and the available budget.
DVIN BE: Small Scale Infrastructure Program received a waiver for the Program as there will not
be any fiscal City Participation, it does not meet Ordinance, Section 20-368 requirements.
AGREEMENT TERMS: Upon City Council approval, the agreements shall begin upon execution
and expire one year from that date.
RENEWAL TERMS: The agreements may be renewed for four additional one-year terms. This
action does not require specific City Council approval provided that the City Council has
appropriated sufficient funds to satisfy the City's obligations during the renewal term.
ADMINISTRATIVE CHANGE ORDER: An administrative change order or increase may be made
by the City Manager to the amount allowed by relevant law and the Fort Worth City Code and does
not require specific City Council approval as long as sufficient funds have been appropriated.
Staff intends to go out to bid for the construction contractors in April 2024 and an M&C for the
selection of the contractors June 2024.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption
of the attached appropriation ordinance, funds will be deposited into the General Capital Projects
Fund as appropriated for the Small-Scale Infrastructure Program programmable project. The
Development Services Department (and Financial Management Services) is responsible for the
collection and deposit of funds due to the City. Prior to any expense being incurred, the
Development Services Department also has the responsibility to validate the availability of funds.
Submitted for City Manager's Office by: Dana Burghdoff 8018
Originating Business Unit Head:
Additional Information Contact:
D.J. Harrell 8032
Ty Thompson 2120
Evelyn Roberts 7838
,FORTWORTH
��
DOCUMENT TITLE:
FIRST RENEWAL OF CITY SECRETARY CONTRACT NO. 61521
A NON-EXCLUSIVE PROFESSIONAL ENGINEERING SERVICES AGREEMENT
BETWEEN THE CITY OF FORT WORTH AND SIMON ENGINEERING & CONSULTING, INC.
M&C: 24-0187 CPN N/A CSO# � DOC#
Remarks: Contract documents are being routed to execute a contract with Simon Engineering
& Consulting, Inc, such to provide engineering services on an as-needed (task order) basis for
projects relating to the installation of small-scale or infill developer-led projects, for the
Development Services Department's Small-Scale Infrastructure Program.
DATE to 1St Reviewer: INITIALS DATE OUT
1. Voranique Simon, Simon ��s io/os/2o2s
2. Tablisha Taylor � 10/06/2025
3. Steve Hines, Le al � �o/os/Zo2s
4. Cannon Henry, Asst. Dir. �� �o/�2�zozs
5. D.J. Harell, Dir. „� �0��o�2o2s
6. Jesica McEachern, ACM �t 10/24/2025
7. Katherine Cenicola �� 10/24/2025
8. Jannette Goodall, City Sec � �o�z4�zozs
9. Allison Tidwell, CS Office � 1o�27�zoz5
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: ❑Yes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No
ROUTING TO CSO: X Yes ❑ No
Action Reguired;
❑ As Requested
❑ For Your Information
X Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑Yes X No
❑ Attach Signature, Initial and Notary Tabs
Please call Tablisha Taylor at ext. 6250 for questions. Thank you.