HomeMy WebLinkAbout062741-CO3 - Construction-Related - Contract - Castle Group Texas, LLCFORT WORTH. City of Fort Worth Change Order Request Project Namel Park Improvements at Marine Creek Lake, Kingsridge, and Vineyards at Heritage Oien! Project#(sJI 100577, 102318, 102323 City Sec# 62741 CSC No. 62741-CO3 Project The major works consists of the following: Installation of new playground equipmen� concrete sidewalks, shelter, ADA ramps, drainage systems, safety Description surface material, grass sod/seed and miscellaneous park amenities. Northstar Construction, LLC Change Order #I -------3 10/9/2025 Contracto� ;:::::::========: City Project Mgr . ._l _____ O_Ii_ver _Pen_ny ____ __,City lnspectorl.._ ____ E_rik _L_o_za ____ __, Dept. PARO Original Contract Amount $1,776,179.00 Extras to Date $229,934.50 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2,006,113.50 IGo to ADD & DEL Tabs to Enter CO Backup $34,880.00 Revised Contract Amount $2,040,993.50 Original Funds Available for Change Orders Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $34,880.00 CHANGE ORDERS to DA TE (INCLUDING THIS ONEJ AS " OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25"J JUmFICA110N (REASONS) FOR CHANGE ORDER Additions: Totals $1,776,179.00 $229,934.50 $2,006,113.50 $34,880.00 $2,040,993.50 $0.00 $34,880.00 I 14.91% I�'!""""""' $2,220,223.75 I Contract Time (CD) 210 60 270 0 270 1. Marine Creek Lake Park-Installed additional Double Check between City of Fort Worth property and adjacent TRWD irrigation system, and added permit fees for additionaldouble checks.2. Vineyards at Heritage Park-Regraded and replaced section of existing 4' sidewalk to fix water ponding issue. Added low water crossing at 8' sidewalk to improve drainage.3. Kingsridge Park-Extended drainage line for poJHJp emitter to ensure positive drainage from playground. Cleared high brush and weeds around existing swale andreplaced with sod. Regraded swale north of low water crossing to ensure posiitve drainage and prevent water ponding. Deletions:1.Marine Creek Lake Park-Deducted Meter Tap Fee, which was paid separately by the City. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Con1nlcla's Company Nane I Northstar Construction, LLC I I SuPIMSOI' /',d½., Progl'llll'I Manager .....-1,i.,..._, '1-.,,..u Assisllllt DinlctDr (Dept) t"'-' r� Assisllllt City Allllmey � ATTEST�>. � Jannette Goodall, City Secretary Con1nlctor (Nllne ) I Contract Signab11a Dale Luke Heimlich I "'-� J/. . 4·,,, ·--l<hco.<,.zai=,1v.-WTJ Dale Project and Contract Compliance Manager 10/13/20 o�/!"'7 Dale Senlcll' Clllltal Project Officer 10/15/20 .S'c..otr-.Pc-., Dale Dinldllr, Conncting Depar1ment (Dept) 10/20/2025 �� Dale Assisllllt City Manager 10/22/2025 Dana Buravidoff Councl Adon (If reaulrad) M&CNumber n/a 10/09/20 Dale 10/13/20 Dale 10/15/20 Dale 10/21/2025 Dale 10/24/2025 M&C Date Approved .. I d_a ___ _, FORT WORTH City of Fort Worth -1'!'�- Change Order Additions Project Name Park Improvements at Marine Creek Lake, Kingsridge, and Vineyards at Heritage Ciry Sec # 62741 Client Project # 100577, 102318, 102323 Contracto Northstar Construction, LLC PM Oliver Penny Inspecto Erik Loza Change Order Submittal #�3� Date 101912025 ADDITIONS ty nit nit ost ota Marine Creek Lake Park 1-17 Install 2" double check wl box PARD 1.00000000 EA 2,510.0 ,5 . - 8 Addition Permits for 2 Doub e Checks PARD 2.00000000 EA 600.0 Vineyards at Heritage Park 2-17 Demo and Repour Existing 4' Sidewalk @ Fremont Trail Cul-de-Sac PARD 68.00000000 SF 12.5 5. 2- 8 Addition sod at remova of existing ' sidewa k PARD .00000000 LS 225.0 5. 2-19 Low-Water Crossing at 8' Trail PARD 1.00000000 EA 2,120.0 Kingsridge Park 3-2 " Drainage Pipe Extension PARD 75.00000000 LF 44.00 3-22 PoFrup Emitter PARD 1.00000000 EA 250.00 5. 3-23 Swale Clearing PARD 1.00000000 LS $5,225.0 $5,225.00 3-24 Sod (2,000 SY/ Seeding 400 SY) PARD 1.00000000 LS $12,100.0 $12,100.00 3-25 Swa e Grading North PARD .00000000 LS 7,000.0 3-26 Seeding and Cu ex PARD 1.00000000 LS 3,500.0 ,5 . PARD $38,280.00 Sub Total Additions 38,280.00 Change Order Additions Page 2 of 4 FoKr� City of Fort Worth Change Order Deletions Project Name Park Improvements at Marine Creek Lake, Kingsridge, and Vineyards at Heritage City Sec # 62741 ClientProject# 100577, 10231$ 102323 Contracto Northstar Construction, LLC PM Oliver Penny Inspector Erik Loza Change Order Submittal #�3 Date 10/9/2025 � •� �1�1� � .. �� ����`����� - ----- - ----- �� • - -- .� .. .,.� i�������� � ��� �� � ��� �� - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - - ---- - •� ', �ii �� - - - . �-- � � ��i�� Change Order Deletions Page 3 of 4 Previous Change Orders Co# DATE AMOUNT n/a Total $0.00 Signature: � c{/�B� Email: Elisa.Winterrowd@fortworthtexas.gov