HomeMy WebLinkAbout058274-A3 - Construction-Related - Contract - Kimley-Horn and Associates, Inc.CSC No. 58274-A3 AMENDMENT No.3 TO CITY SECRETARY CONTRACT No. 58274 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 58274, (the CONTRACT) which was authorized by M&C 22-0779 on the 27th day of September, 2022 in the amount of $136,836.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $12,640.00 which was administratively authorized on March 28, 2023, Amendment Number 2 in the amount of $9,255.00 which was administratively authorized November 16, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr., CPN 104218; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $21,307.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $180,038.00. City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 1 of 4 Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. CPN 104218 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 10/24/2025 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: Lauren Prieur {Oct 20, 2025 09:40:39 CDT) Lauren L. Prieur, PE ENGINEER Kimley-Horn and Associates, Inc. Scott R. Arnold, PE Vice President DATE: 10/01/2025 Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 4 Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. CPN 104218 David J. Kastendick, P.E. Senior Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Oct 21, 202517:48:21 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 3 of 4 M&C No.#: n/a M&C Date: n/a Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. CPN 104218 FUNDING BREAKDOWN SHEET City Secretary No. 58274 Amendment No Fund Dept ID Account Project CF1- CF2 - Bond p�ount ID Activity Reference 34018 0200431 5330500 104218 003830 18010201 $21,307.00 Total: $21,307.00 City of Fort Worth, Texas Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. Prof Services Agreement Amendment Template CPN 109218 Revision Date: June 13, 2025 Page 9 of 4 FORT WORTH�, ATTACHMENT "A" Scope for Enqineerinq Desiqn Related Services for Arterial Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be perFormed and address the needs of the Project. OBJECTIVE The objective of this project is to design a midblock crosswalk adjacent to OD Wyatt High School, rectangular rapid flashing beacons, and decorative grass plantings in the median. WORK TO BE PERFORMED ._ „ ._ .� . ■_ _.� ■_ ..� ..� .. - .� • -- . . . . ... . �- . City of Fort Worth, Texas Page 1 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 1 of 30 FORT WORTH�, �n c��L c i r� �i nn n �i n ����� � , . , , , , �h +h�T 'I.'I. I�A�]Yl�]/YIH/Y r�.�iC�7Tr I cn�7 mnnnnc �r��7 r�lircn4 rlcoilvn 4c�vn �n4i�ii4icc� � � nf 4he �einrL Dofer 4n T�elr 4 A fnr fi ir}her rdo}�i�c� (�nmmi �r�in�4o ir�4crr»Il�i �mnr�n 4cnvvi mcmhcrc� � T��L �r�rd nllnnn4c 4c�m roc�n� irnoc� � � �� _�� . �� � � � � . . �� �i �i. � �� . . . � �_ . . . . ■ � �� . . � � �� � . . . � �� City of Fort Worth, Texas Page 2 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 2 of 30 FORT WORTH�, , 4hc r�ccirvn r-rc-ac�r9rr. \A/i4h rocv�cn4 4n nnnrrlir�n4inr� �eii4h v�crmi44iniv �� i4hnri4ico CI�Ii�I1�ICCD oh�ll � � � mcc4 4hcir rcrv� �ircmonic �c r��r4 nf 4hc r�ccinn cnnnc o • D�rc�nr�r�cl �r�r�l \/ i Ir�l 4inr�• \A/h nnr�r�li � o�iioi4o 4n r�rn�c =� �vrn�crarrc�� T �i Ct�avn--rv��eH cvrrcrcrn+��F�c�r..nr,r« G�rvlcC� , ir�fnrvnn4inr� irlcr�4if�iir�n 4ho r�nmc nf �hc nnvv�r»r��i nnrl 4ho nnmr�nr��i rer�ree�er�4.�4i�ie - =r• ___"'�"' _' 44 Icnc�4 4hrcc /'2\ r�l�r� rc�iic�ei mco4ir�ivc� � D..,ie.�+ .. .,�+r� �..+�1,., .�,h.��e � .,+ir.i.,.,+e�-1 +., +.,Le YYY /Y\ .Y, .,+h� YYY /Y1 mnn4hhi � iv�rl�4cc nf Drnion4 C4�fi �o �or�nrFo fl\/IAI fnrmc� ilv�ir�inr� nf ' � r o i • . � � nA,,.,+hl„ �,-„�e,.+ c+.,+� �� �er,,,-+� . �2 ��� ^,T�R��al-Sf�e�s-(�� ��o; d--A�c3n+��„�, n,�--�;"��ep^ �;;��erat�tep� ��,-�� City of Fort Worth, Texas Page 3 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 3 of 30 FORT WORTH�, �ACI.I 9� r`/'1A1�`CDTIIAI 1'1CC1�_A1 /4�1 DC�C�CA�r Thc r�i �rr�nc�c nf 4hc nnr�ncr�fi �nl ydoc�inr� ic� fnr 4hc CNI(�INICCD 4n irlcr�4if�i �7o�iclnr� r � � 0 0 nn n� �.9 n�+� r„��cn+�„n ■ �� i �� � ■ � � _ � _ � � � ■ � � � � ■ � �i � � � � � � � ■ - 1 ■ - y � � � 1 ■ - � � f City of Fort Worth, Texas Page 4 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 4 of 30 FORT WORTH�, , , r�r��aw����� �:�inr��r_�•�■��t��s�:r�ar���r_r_��r_� . .■ .■ ����r.r_�■�r_r.� �� � . . . ---- " ":+ii�=� ---- - - -- " - "- - " - ■_ . . . rss:� _�samr_r_�:ti�nrarss�r.nr_��rn:�:!r_�:s�E�sr�m�srrsr�:�rn ■- - '---- '- .„ �„ „ ■_ . .■ �� r�ss: �.�n:s� ■zss�� rn r_ nzvr_� ■zssr.r_� i nsrn:�� �r-w -. � .�:�a��r_�e�r_r_*r_�t���sr:�- - -��:�e�s� .. r�■ _ - _ �rr_rr_r_�r_r.��n:r� Cc�4ivnn4cc� nf r�rnh�hlo nnr�o4ri �n4inr� nno4 � � City of Fort Worth, Texas Page 5 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 5 of 30 FORT WORTH�, . ,„ „ .. Mr��r_���a�srstz��rrs i��nn�r_rr_r_rr�s�. _ . �,rr-�ar_r.* DI'lC filco nrcn4orl frnm iJcc�inr� i�Dli lJrn�eiinivc ��iill ho i�r�lnnrdcrd �n 4hc rdocilvnn4crl r�rnicn4 fnlrlcr in +ho !'`i+��'c rJnn� �mcni m�n�ncmoni cvc4cm (cRi �ilydcrl $. T�'�ffiurrrcvvur�r�a� b. �fin ni T�.�.�i��i-r9-�cpq� �-56,�,c2� •,� n••, ��rrcv�'.cii�� €. !'`.,�-,..e�-.+� �.,I I'le ., �.,..L.,..e �. `�O ^�;���e�e+at+�ee�T;n�,�; City of Fort Worth, Texas Page 6 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 6 of 30 FORT WORTH�, �A C�2�D��� AIAIA �V 1'1CC1�_A1 /CA D�4CA�r �� CAI(�IAICC� �eiill ydc�iclnr� 4hc r�rcliminnr�i rlcc�inr� nf 4ho ir�frnc�4ri �nfi �rc �o fnlln��io Q'1 � � �i � - � � � � 1 � � � ■ - � �i T..,fFi.. !"`1,.,+r.,l I'le���..e� � , 00 t � t t . � Cno4 cr��7 nf rnrlii �c� �4 4ho Cn� i4hc�c�4 nnrncr nf Alnr+h Cirlo I'lri��o �nrd Nlnr4h I�A�ir� � �Ii��'i"vr"T�6 I��I "-aiigiiri-r2R+rr�STT� ,��--. �r. �$ ; ���ti6n-ariE"�r2iGiVuti6•, �-I •,n-aasa--vfaii 0 0 0 . . � . . � .. � o 0 f t � f • Qcnrinnc� ni�ior� nn nll r�rnr�nc�crl ncr�4orlincc� nr hnc�olir�cc� r • � (l�icr�ll r�rnion4 c�ccmcn4 I��in� i4 choc4/c\ > > > 0 0 0 � f • 0 o r f f � • f � • City of Fort Worth, Texas Page 7 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 7 of 30 FORT WORTH�, , , ,_. ._.,,__... - - - - - - - ����- . .. . .. . .„ . - - - - - ,„ „ ._ . .. , , ►�,rsr�:., _ ■. .- ■. ' �_ ��' � — _��' '� '.JO ' � � - . . . � � ■� �i • � _ � � � � � �� � � 4f4cr 4hc v�roLmir»r�i ��I�ric� hn�ic hc�y� rc�ii�`^ i �r�rl �r�v�rn�i hv }h� (�ITV 7""Cl CGTZTTG�7r .r�{7GGTITGVfGW TlT7Q�G�fPP 17�L1"f�.r�7TT� 1 f City of Fort Worth, Texas Page 8 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 8 of 30 FORT WORTH�, Tho (�ITV c�hnll c�� n4 � oi �i4�hl� nn4inr� 4imc �r�r�l r�ln4c Tho CH/YIHOCY r�ccr�lo 4n T�c-vrrr.zrrrnT.r �cc-a-vcTrravr 9ca , . � kL� � [711[itlil �E�:T_!-1 . . � � ■_ � ■_ . � � � �— . . . � . ■ � ■ � ��� . . J\ �Fl l\ I J J-iJT1 �SL'Tf:7*[„ 1f1�1i� "�Rf1 f!1 GT:T�T.T� I/T!� 1�d/1 G — _� =�:..0,.=� — — — ' ' ' _ ' ' ' ' . . � �sr_es�n �nr_n�� ��A�eet+����es .�-z��i,r�i-1rr.i�� _.� � � �� _�� .■ �■ � �� ; 411 n4hcr c�i �hmi44crJ rinni �mcn4o �r��7 �ho�Lli�+� City of Fort Worth, Texas Page 9 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 9 of 30 FORT WORTH�, , , - �. � „_ ��d\WI\IJd_�:L11f:T.Sl:1'tT�-T-T.'�f[77Jf:L1■� - I I-"l�E�:rri7'��- � - ��� `Jit- :�� �:� � _ C mmi �r�i4�i �Ao hihi4o . v8�vrcc+c�irr��iCrm�rca City of Fort Worth, Texas Page 10 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 10 of 30 FORT WORTH�, �� ��� - , . ..� • „ . r:r_� �� w � a ���_�.rn i■�tr. r_z� �■� �s�r� er.rsnr�:�:r_�s„ rrrr�:sd nsr�:tn � rr. i:sr_♦: �r.r. -„ , , -�-- . ., ., .. �� ..� , . ��� . . . ■ � �i �i ■_ � � •�� •�� . . � • » » �e�i4��� fel" onoi ne��„ ,.�.,,.e 0 � » » 0 4hc r�rnicn4 fnllJor in (�i4�i�c� �nn� �mcr�4 mnr�nnomcr�4 ovc�4cm /cQ� iilydcr\ 0 ��� � �+„r��eloCt��ie ;-pac�4'crg� 0 City of Fort Worth, Texas Page 11 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 11 of 30 FORT WORTH�, , , , - . r-�•r.ai�,ra City of Fort Worth, Texas Page 12 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 12 of 30 FORT WORTH�, . . . , , , . - „ -. - ■- . . . . , . . . .. .. _ .. ��r:r_���wi�i��-�rmi�r_n:�sr_anrr�:s��-�,�,�r.r_��n_ :r_n�a■ - . . . . -,� . . . , . . , , City of Fort Worth, Texas Page 13 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 13 of 30 FORT WORTH�, - „ _._.___.::. � Thc r�rnicn4 �eiill ho hirl nr�l�i nnno �r�rd ��einrrlcrl 4n nr�c nnr�4rnn4nr e ��Z�� �E��* (�nno4ri �n4inr� r�lnni �vnon4o ��iill n�f hc r�rir�4crJ h�i 4hc (�ITV �r�r�l vv�n�7o n�i�ilnhlc fnr � � �:e�r_�i�rs_� �nr_n� ��-c.—r�a2l�cr'� ^u City of Fort Worth, Texas Page 14 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 14 of 30 FORT WORTH�, Mr.�7�te�iTil\[y� 7�rii�ril\� 7!I.��3�� 111ri73� � � r�� •ar.�:�:ir���r.a��i��_�:�i�ssr_�:�. _ . r-�:ts_w . . . p:r�:r_�r� �r_ n:srs�:r_ �:nzss� rr_� :n r_ rrr� .,..�..�-.. --.� -�..-.� .. ��-.. . It177 - 7�:E1I . � � i . ��r���wi�i��-��irs_e�tr_rrr�. - - - - r_�r_��an�:!trs�� . . , , ■ . � . , , . • ■_ . , ;..�,;� - -- - ■ . . ■ .� �nrz _r-r_��. _ :n�:�r.r�nr_r_�:rrs��:r_ . � . - .,f.,..,,.,�-,..e �.��+h r .,+� �� � � � w City of Fort Worth, Texas Page 15 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 15 of 30 FORT WORTH�, . r:r_���r�ai����_za�ir*r.�Kt�:r_���■Tsernr.�r:rs_�nsrr.r�rs�i�:r.ra:�i■:� ■ , , ■ �. ■ - - --- - - -- -- -- - -- -- -- -- . . - - --- ---- -- - --- -- -- - -- - -- ��r:r_���wi�i��-ia�i��::�s�ss:sr.r_s�r_r_��r.s��■ _ _K�r_r_�:r= ■ . . � . . r� r �a � i � �r_" �� •� ■� �t� �:r_ ��� ��.�.� at� �� � r •����� e�:�szr.r_ .■ .■ � -■ ■ .■ « » « » — « » , « ,� — , • r�.z,:!�,�ra .. _rz,:.:■• . . _ra Il.��c r�Cv�r r filc n�mc �nmr�l��� 2r.CL.`7 �rn2L.` r�rl�nGT��� 1f if 1f f LL 71 f �.hee+�. i.�, +h'�. f'le ■ ■ ■ � . ■_ . � I.CZ7�I�1�1 7��ril\C� City of Fort Worth, Texas Page 16 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 16 of 30 FORT WORTH�, ilr�c /'l l Drc_(�nncin in�inr� ('nmm� ir�i4v �Acc4ir�iv ic �c�c�i �mcrl � YYY /Y\ e.� �hmi44.+1 re e��ic '+ e erl � YYY /Y\ DC�°c �ro �cc� imcrd � �e�r„��e +„ r,,.,+,-.,,.+,,,-�� oe�� �e�+ f,,,- i.,f,,,-w,.,+�„� C D���i i nf c�hnv� �7r��eiir�no �t�.�r v--rt� �r�i�.c�r�i'rn fn�n�4 City of Fort Worth, Texas Page 17 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 17 of 30 1' 1' . . . , . -. � � - „ � , , r 1 � r��aw�����_za�i■�:trr_� . . :�r.r_r.ir.r:s�n:s�s�re�r.r. . . �� � . � . � . � . . � . . . � �� ■_ ' ■_ . . . � . . Thc rinn� ivnor�4�4inr� c�hnll hc r�rn�ii�7o�7 ir� nnr�fnrmnr�nc �e�i+h +ho nho�Lli�+� nr�rl 0 City of Fort Worth, Texas Page 18 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 18 of 30 1' 1' . ��- ., � . . .. ' - - - :.a..�- - - - - - - ' - -- - - --:.a.-= - - - - - - - .. . �. �:�-r:r_��. . . . . . . � (�nn4nn4 Inn nf nll nnr�4�n4 nnrl ncnn4in4inr�c� �eii4h I�r�lJn�ninor nnrl/nr 4hcir rer�ree�er�4.�4i�ie - =r• ___"'�"' _' City of Fort Worth, Texas Page 19 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 19 of 30 FORT WORTH�, �. �n�ni �h,� �21�2#����� ��p vTYY�T v�nr�r�i RTi��4rvr�r�`�,vc�c-�r�Ctt�S . � City of Fort Worth, Texas Page 20 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 20 of 30 FORT WORTH�, . . . . r■��•.��r.ar�r��-�r.r���-�.�r�i=w , , . ._ _ - - -- �. , , , , r 1 1 ■ 1 ■ � ���� �� �� � � � �� � ��:.LLJ�� � � � � � r�r. _ . r�a�estn:sr.�:�tr.'r.�s�:���r.rsa:�i�Rr.�. _ . . ._ .. � r :r_s � i �r.e�:!�s�r.�� sr_�sss�� T.Tr.srr_� � -�r.'s� ��_ ��� � . � 7����1:*' �ti7T�9_' _ I_T.'S![�/_T �9_' - �1 ■ - - - -�- - - - - - - - - - - �- ��- - - �- ' � ■_ . ■ �T1�:7=T.�S� \►.1:7:��7P.►-7 ��7i�1-E�:T: � \ R:77 ��i Eff:t�TT.l-T-S�I . . . �� ?pmo nnnrr�in�� cvc4cm �c 4ho i`nn4rnl. r AI., le�� +h..., +�.,., hl,ri�l,.,+.,1 he.,..h .,�,.,.L� . li.,e .,r I.,.+.,+�.,., , � . ��- I RT.T.�:T.TS-T. rJ-�:Sl17 ff:TT�7:LTS-1 ff:T-T! - - - - - - -.v:..o."' . F ie�.ln T�f � �TT� � [l11SlA �f:T'1 City of Fort Worth, Texas Page 21 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 21 of 30 FORT WORTH�, Drn�iirJ�ah�o��ano� I I��E�Tc�r��;4CI�IG\ 4n (li �nlifii LcP I Il i` R �nrl /1 nc� n� �.,i�+„ i o.,oi n nrli �n4 nv�r�rnr�nn c in�mo �4inno /c n n��mor r �70 (`n� �r,+��/(`ITV r - v8rrcrcrcrapprvprru�c�rrvc���urrvrrsl . .ti-g � v�wrrcrr�EA�cr�, �E , 0 0 , � trcir� .�r-Gr�r��i�rtvvhnicT.�nrvraslc.�iiili4��r�rP.I- h�c�a�S���C�.�' hi �i��w�-vrT.��a rlrn�eiir�lvc� v�crmi4 rcnnrrlc� ficlrl r�n4co lYGl1/YY�]Y1�'lll� ir�fnrm�4inr� c��ic�4cm r�ln4� nrnl � r e � hic�4nrico o}n \ nr� 4hc cvio4cr�nc �r�rd �r�r�rnvivv�n4o Inn�4inn nf ovic�4iniv in�inl�icrl �'tifi'tic� ' Dc�iic�ei rcnnr�7c� fnr• c�iirdcr�nc nr ir��7in�4inn nf n�7rli4innnl ��inil�hlo rcnnrrdc�• ' • � rdi �r�lir�4o nr rnnflin4inn infnrm�4inn• nccrJ fnr rl�rifin�4inn o • � ne„ei„r ci i� .,i.,., �hee+� �n,� +,-.,��fe,- .,f,,,-,�,.,+�„� „ .,ii � „i„e,.i � �+�i�+�e� +„ , , , • , , , , •, , , ni ��4 nofr��+�c\• lir�c oi�c �r�rd nnnrli4inr�• r�i �mhor nf inir�4lv hi �ricrl nnhlcc�• �r�rl r � e cr�n.�c�e er�4 i ��li4�i I c�icl (� /ir�nL ��7cc� 4�c�Lc� �c� rdcc�nrihc�7 fnr il� inli4�i I c�icl I'l\ 1�7cr�4if�i o� irf�no fon4� ircc� frnm v�rnion4 4nr�nivrnv�hin rl�4n nr�rl frnvvi ficl�7 � � �ve{� "'��5� +h.,+ ., e � ��.,..e ., � ��-+e�-,.,�-, e l,F �� �h�� ��-F.,.+e � �+�I�+�e� e t • 4hc lvrn� ir�rl c�i �rfnno\• �7o4crvv�ir»4inn nf ir��ior4 cic�in4inr�c� nf �r��i m�r�hnlcc� nr�r�l i m�r�hnlco nr�rl �ini �140• �r�v o� irf�no m�rLir�no /'iCYI/1�IH/Y c�i �hc�i �rfnno i �4ili4icc� e � f � � •t f r • City of Fort Worth, Texas Page 22 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 22 of 30 FORT WORTH�, .t.r_,■ zn:�nr.r_ts�►rsr.r.�,:.-cEr�r.,.z,rc:...,.r,r.i . . . , , - - ` y . . . . �,• ., . . . . �� City of Fort Worth, Texas Page 23 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 23 of 30 FORT WORTH�, �ne� o, e`�nn��� , .. �.T�����p}���4 nf Tr�n�r,n �tinr� /Tvl'lilT\ D��� .. � �.. �Aco4 r�clvn4i�4c nnrl nnnr�7inn4o }n nh4nin �r�v�rn�inl nf 4hc �ivonn�i ic�c�i �ir�n 4hc � � Ci �hmi44ir�n fnrmc�Mv�r�lin�4inr�o fnr (�ITV �r,r! Tvl'lr1T rc�iic��i Ci �hmi44ir�n rc�iic�ciJ fnrmo fnr nncr�n�i rc�iic��i Dcc�v�nnrliniv 4n nncnn�i nnmmcr�4c� nr�r�l rcrv� icc�4o � '� Dnilrn�rl Dormi4 vz . r nnrccmon4 �r�r�llnr r�crmi4o � � ♦ � � � ■ � ■ ■ � � - � � ■ ■ ■ � _ � � � 411 nno4o nc�onnin4crd �n�i+h TI'll D r�l�r� rc�iic��i nr�rl ir�c�v�cn4inr�c� �ro �n ho r»i�7 h�i 4hc City of Fort Worth, Texas Page 24 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 24 of 30 FORT WORTH�, . , � .. . . :zs�:�tsm7. :e�:rr.r_�`��ar��:7t i�. - . •. • . � ... � „ - , �� �� ■_ � ... � i . i. . �. . • , -I�fT� • ._ J\WI\IJJ-l�:L11rl7Tl'1f:ES77A}f7'.�7Tr�7S1AJ17TST_TJf:�7T��ZT9Z7:T'�� - ■ _ . � . ■ . _ � . � ._ ■_ ���� .�tf�� . I�1�■111� 7A 7■3� � ._ � ' '- City of Fort Worth, Texas Page 25 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 25 of 30 FORT WORTH�, . � . . -. . . , . . . . . . .. . , , , , , , , . . .. _ . �� r:r_� �� w i� i��-�•ar.�r_er_r�:e� i r_T�:r_rr..�.��srr.r_rsrr_� rr.� �s�s. . . . . ��wi����-�•�r.�r_ar_�r��irs_�:rr rssr_rs�:ess�. - . . . . , . . . . . .. ■_ ■_ . . . .. .� _.� ..� ■_ .. , . ■_ . . . . . . ■_ . , . . . « „ , ; • City of Fort Worth, Texas Page 26 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 26 of 30 FORT WORTH�, . .. ._ �•�■������sr_r_�■�s�r_r_r.��erfsr� . . , . . . , . . . , - . ., . . . •■ . .. ■ . .T.�ro. r:=�n:!�srrr.sr,:r_t.T.�s: �:�sfr.r. n:♦: ra City of Fort Worth, Texas Page 27 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 27 of 30 FORT WORTH�, . � . -,� . �:r_tr.r�a�i��r_�r_�r_��:!tr�•�er.t•��!trs�r.�:�r� _er.ts_��:s�. - � .. _�� � � �i . �f2�fIG �f2�fIG �#IG �IG � � �� � �IG �-,91��F9� �6R�F9� �-,9#i�f9� o++�..h�Te.,+ «o„ � c....�.,ee.�.,., �°% F8°!o 8�°!0 �� �e� �e� {S�i� (�i� �� � {� � � "'� "',� (��411 �°� ��°{a F8°k} �°� #�8!{�f �ee� �E � � �E � �E � � �te�r�-aAlateK �F �F �F �F �E �ni.,�,..��c,,,.,e. � � � i4 *IF �nr.l� �i-lei-1 � �.+reo4 r�rl+�er.+ City of Fort Worth, Texas Page 28 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 28 of 30 FORT WORTH�, TASK 11. MIDBLOCK CROSSWALK DESIGN. The ENGINEER will support the bid phase of the project as follows. 11.1. Midblock Crosswalk Design Services • The ENGINEER will attend a kick-off meeting with the CITY. • The ENGINEER will perform a site visit to the proposed crosswalk location. • The ENGINEER will prepare the following 90% design sheets: Crosswalk layout sheet showing sidewalk, curb ramps, signing, striping, and rectangular rapid flashing beacons (RRFB). o Landscaping layout sheet showing decorative grass plantings in the median immediately adjacent to OD Wyatt High School. o Applicable CITY standards. • The ENGINEER will prepare a bid item summary and opinion of construction cost. • The ENGINEER will incorporate the CITY's 90% comments and finalize the plan sheets. • The ENGINEER will assist in the preparation of a construction task order for this work. • The ENGINEER will collect an additional topographic survey just for the area of the proposed midblock crosswalk. A topographic survey will not be collected for the decorative grass planting design. • The ENGINEER will prepare up to one (1) ROW/Easement document (if required). • Prepare monthly invoices and project status reports. ASSUMPTIONS • A standalone plan set will not be prepared. DELIVERABLES A. 90% plans B. Final plans C. Construction task order documents D. Pedestrian Easement Document (if required) City of Fort Worth, Texas Page 29 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 29 of 30 FORT WORTH�, ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existinq Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition, unless included as part of Section 7. • Services related to disputes over pre-qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Administration of the construction contract and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Page 30 of 30 Attachment A Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Revision Date: 05.23.2024 CPN 104218 Page 30 of 30 ATTACHMENT B COMPENSATION Design Services for Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. City Project No. 104218 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non-labor expenses, and subcontract expenses in perForming services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in perForming the PROJECT multiplied by the appropriate Labor Cateqory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category Rate $/hour Senior Pro'ect Mana er $304 Senior Professional $284 Pro�ect Mana er $244 Professional $209 Anal st III $179 Anal st II $169 Anal st I $164 Business Su ort $120 Administrative $115 Intern $100 Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non-labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. City of Fort Worth, Texas Attachment B Revised Date: 8/18/2025 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Page 1 of 4 CPN 104218 B-1 ATTACHMENT B COMPENSATION � � L3 ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. 0 C. U Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. Payment of invoices will be subject to certification by the City that such work has been performed. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: s/1s/2oz5 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Page 2 of 4 CPN 104218 B-2 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Kimley-Horn and Engineering design $16,607.00 78.0% Associates, Inc. Proposed Sub-Consultants Spooner & Associates, Topographic survey $3,200.00 15.0% Inc. Spooner & Associates, ROW/Easement Document $1,500.00 7.0% Inc. TOTAL $21,307.00 100% Pro'ect Number 8� Name Total Fee Sub Fee Design of Sidewalk Improvements at $21,307.00 $4,700.00 Campus Dr. and E. Seminary Dr. (City Pro'ect No. 104218 City of Fort Worth, Texas Attachment B Revised Date: s/1s/2oz5 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Page 3 of 4 CPN 104218 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: s/1s/2oz5 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr Page 4 of 4 CPN 104218 B-4 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. City Project No. 104218 No changes to the Standard Agreement City of Fort Worth, Texas Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. Attachment C CPN 104218 PMO Release Date: 05.19.2010 Page 1 of 1 FORTWORTH ATTACHMENT "D" PROJECT SCHEDULE A. ENGINEER Project Schedule Development ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the requirements of the Agreement and encompassing the Scope of Work defined in Attachment A to the Agreement. ENGINEER shall prepare and maintain project schedule throughout the life of the project as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned sequencing of the work activity and timing of the work. B. Schedule "Tier" Selection City has identified three "Tier" levels for project schedules as defined in City's Specification 00 31 15, to align with the size and complexity of the project as a basis for schedule development. City's Project Manager will determine the "Tier" level for the ENGINEER's project schedule as part of the negotiation of the Agreement. C. Project Baseline Schedule ENGINEER will produce an initial project schedule and submit as a"baseline" for review and acceptance by City's Project Manager as defined in City's Specification 00 31 15 which will be referred to as the Project Baseline Schedule. Updates to the baseline schedule follow the requirements of City's Specification 00 31 15. D. Project Progress Schedule ENGINEER will provide to the City, monthly updates to their project schedule indicating progress of the Work in compliance with the requirements of City's Specification 00 31 15 and said schedule will be referred to as the Project Progress Schedule. E. Master Project Schedule City will develop and maintain a master project schedule for the overall project. ENGINEER's project baseline and progress schedule submittals will be an integral part of the development and updating process of City's Master Project Schedule. City of Fort Worth, Texas Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. Attachment D CPN 104218 Revision Date: 07.20.2018 Page 1 of 1 • 3 _- iR r �i � � � � �" r h d � � --- � t ��' � '`i ' ` `�e • �y �' � � - � �li� ;: � " �'N 4 e� � "` !t � . ,. !r , d � ,.,._,r � y�., ,. .'' �r ,: Uy���� � e k � �� y. w' R ^i � , —� �� , �� r �. • � � R.t ` ._ �'�li, - • � � d �' �,�sf� ��• y( 1�. i- . '� � � ,�(,, � 1 �.. � � �d �r� _ - .4 � t� r �7°"� q� �r -����r � �` i � !.-� , , R +" � i.- ��� .?y��� ��R•� i 'N'� • ��� ��� � . . •i !� '� //// �� .iF�T � I � �� M J ,� - _ ; .y�i w►. ��� � � ' / 99' . , ;� - � • � �. � ' �� � ���� � �"�� � i �;z .%/% r ��. � I A .'�_� � � ���� � �'� M1 ��' i �r}� 4 ,��� } ' �'!!'���y� - ( ` � �� ,,'�' >� � v.i� . k � � L� � �{_"<��'`�a,,� �t� � � �,te � 9 �C' � j �: , kf ,; � ;: ;y :� ' - f �� '' �� f �r.+� ' s � � � . t� �"` . ��. � � � �k�. � .� _ �`�' o ���" � '�+�► , -� � . � �, �. , � �� r �;;��, , ,r.; � � ��� "�� t - �� � � . �. „ �,� a , �t -,�' ° � 'i� � '�,. ..aa � .� � �_,� `i� "�'r � . ��Fs� . . ' t � .� "� �;,; �� ar ., � i'u� i �- .. � � s�� ��� � � '�' y•, ,i �.AS �' _ Y� _ � / t � . . � ` � �I �' - r � �� � �"'�' � � ��L�.�,. ._ �., � —� t, � �-� ' `�� �r � �. ��, , .. . - �f�.�':ti' ;Y � �� ,y�.t'� F/:: M ��. s .'1 �t� �--_ ' � � � # '/ '. � , / + � I � � r �"�:�' `� � � r � ' �►' ' ` I '1 ,� : t x .� : �� � �� �r�� r !� � . a f; �:.'i� _ � �,���' 1� �� ��' � \ ,.A•��. '� � r / y . y �� �. f , ��{�+i�� r � ( �� 11� � I � � � ' yb �i s� � ,t,�y;t�' i � �, � R � � c .'�, r � . �� / f �1�'f � IC �„ �� � ,/a, • � i `h `� r+ •� � i � 4' `'� ', r} �R +}�: ���� { �.1 �� � � ,�,,,ta, .xa ,:ra�. +,�, �� ��i } � 4��`) � � . �, �i .� ��.-� � � � ,'�� f � .��-� � � I , � ����M�r t �iw .; ` � ;�;, ', r� � ' `� d �� � Y ��+, ` ��` (" .' , ���".=�»:#; ��`�:�,: / t ��: I �� t�1 � �� � :... � ..� �i2Y� '!• .A -;� I. �LI � , f � �Y �+ � �Y,�ii „r� ♦ �4.1 M1 � � t �,� t 1�. � • , . , � � M �..'� .,� � .� � r � �`,o'� ' I ^ �'�;�, ��'" ; , ° c� i ,::; - � •".N,�' , I � _ � � ,� , x, " v� � ': s�' r- i ' ��' ".� �' ' fit '"�` , � f , ,�:� � �: . , � � � 1, � � .,:'tlay � � � � ` r �� �`:.> � � � i � , � �� � � � �o �� � �� , _ � � ' � � / ���� ; � �_ �.,_a'-,`"�, r , � � � t; ' � � - c� A,"� � � � ~��'^ � ki `� � � � ' � �: f ' ..�' ��. . � ��� � '� � - "� � �, �' , � _ Fy i� �' � � � � +,� �. . �� �c < `�; � � � � �;�' ,,::� /� ` � � f � kl '� j � � I E � :.�� �,/ � � �., � �� _ � ; - -- - '� � � � � � 7� ,�, � ; '�� . ; �_ �,� � �, ,, , ' , i , ' ' >_ - * ra; �'� � g � � - �< -^ / / ,� ` ��..,.� � � * � � �/'b'�+'"''�� !,/ , ` � a ' : � , �� �.! � �' '�.. y' �. � �� � } 3� �C � r-T�`� , . �,y� '� �I � �:.�'�6 �... _. . .�'. i / /� �'� . ..: ' � • - r'� j � � ��--� . ; � � � �� ,r1 � .i.. . �o� T I i Y:1 all �Y:i� •�RP� iY � - _ �. T� � ..0 �.�..L. i -i"- �� :�;.. .". •._ � ,��.;.� ' -���o mi .6.i .� � .. 4. �.� �. q� �-�- �* �!--l� �� r4' '`�� . ' ... , . a � • �'. i. ' . � . � ' # �' i�: � � - ' �.t4� ' '�L�' I �1 � f � `� •K�� �� � - _ ��y +� �� � ��' Q i � ` ��` r � � �. �R �lil-. .� .� � ��`� �' � �� I.�I��� � � �{ �' � � . I � ' .r ' . .� _ ��� 'J r� � - ' .. _ . _� � � � � �. � I . u i i . � � lY� � � � : .^lls;----� ,�� v X: � 1 � . 1 � f � � �, � : . � � , � �' ��''�� *. �2 w t- ` Y ^! i, u 'lir, a � ��, f,• .�' i � � ! j _ -. , _ ' � .� F; �� ♦ � � o *yF ,,� ,�{ � � ' ll�'� °t'�/"il. �� �1 - � � �. , ,� . - % ^ � � ��,� � � ;'�, ��'rr�' • -- ` IB i" "i _ "� t�I J�"i' � � � .i� � ,� � :,� ` i .. _ �. i mi � i ` � _ �� � �` � �C� � _ ��� � -- .� �, �- ���I:lf„ � ` '" � +' ��„ �\ � w � �- . _ --- - -r . -�'' r�°jt�'�= ' '�.� � +� � � � v `►�•''�aa� -.�; j� .,�, _ ��' �'- -.`i. '�: S. - "�!�'�'' �'!�!'7",w . Q � f�o . '4 +Y .�. .. �,e 'sa.r.��a _ .i�'�T� '• F.�o�.. . ����'� �;:�b���ll��� "��'�,� �"�' � �� - � '.--�- � -�_�� �,�! "`� � �. •� ,,�'�"�`> ",��:° �'�r«�; r �+� �y ( # �� i; .r��� --?�'; ,�„� r` ;� �.,� W �,'� �' '� •:Y� � r e ne .: �+e " y;.e�': �.. ! +� f� t_ "' � � s :�.J F �� ,� ���� +� � . y `R ,.p.. � .�� ., F:. �-.--�-- 7 .�t. �� L7`. �� . s,�.. � N �i .�, �j. '� �i/ „�5 �y� *Yr'�."�� � �l'i�y s�'�rt� r � i . .:1 , -"'�,,�. � #� +, t�y � .1: ,i� �� ' i Tj�.. � # f° t�. � �Yr� a : 1 � �: �.r� i m,��„�,. � �,�Yi . � _ � �' ! ,- u � � � �i[ �� . o"� 4 � ; � ' � p• � � � _ a�� ,�✓����•��N�� �� ::�,�f.� a,afr���'� 1J" -. ..'. � I I �=5:�. �,;{� ��� ,;iiiie,� Wi1�� i�ru'�io_, r � � `F . i�;� ° o'�K �"� i i � � p '2[ �, �� � 9 � i �: i�r �� o � ,� � .;,y ��- �` - `� I , � I � °� � ' �-?� f t . "'�`�'p� r1i • vN • . �.�� ' I J s � 1�. � ,.r - �f . „y,r.. r _�, ,� - _ � c .,s-. a� � � ,�n, r�'- � �," ,�Y'S 7 �' = i � ,_ _ � r��', �J' = � �•.� � �' � �.:r '_ �'" .\� o + ,� �y -_'��. 7i.+_, „s y, vi� iir� y - , (��A � �-.. - 71 � � � �I • i � + '—'T i N 1 ►`'a'�� � F;.A Yp - "'':) :��� " �' r:� � a,� `. TM�,f�Rlel}yy ,� I 6� i • ' �� : ; ! 7 .- �*.'., V"f „�.7rp. ��.� p � �„y,���� �. � s . , , i�_��� y "+ �t': . . . . i �k . x F i' � � �-�'- ° , w ` ��'" ` � r 1 '` � ;� r;' � � � � # a � ' � ? �I i� �,� 1�1.���+7y'"ti n ,,,�, " �,. �+' � iF ,�""�.,y,�� r, �`�' . � ,f _ ' , ,� - � e - _ '�:!'1N±r"_ � � Y s+ �,� e � i � -:;'�sYC �. . n +r-. : � � � ( ;{��p �p � � I� �M �� f i� r R irll7 .�� � � �. .SS�:+e`1r� '`«'"v, "h �y�_ ._� `. / r ' � � s ��L�r�'��' _ �: � `� � r 1 . '.. � a� - N � . ,�., . +. .�Kt,�' �!'. !" '-�, � I;i� 'w'�MC L-^J� ��F �C�oy ..� i EXHIBIT F CITY OF FORT WORTH STANDARD INSURANCE REQUIREMENTS (1) INSURANCE LIMITS a. Commercial General Liability — Insured shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance as follows: $1,000,000 each occurrence $2,000,000 aggregate If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this Project or location. City shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to City. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained within the policy, unless City specifically approves such exclusions in writing. ii. Insured waives all rights against City and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with Agreement. b. Business Auto — Insured shall maintain business auto liability and, if necessary, commercial umbrella liability insurance as follows: $1,000,000 each accident (or reasonably equivalent limits of coverage if written on a split limits basis). Such insurance shall cover liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of Insured's business and/or the Project. If Insured owns no vehicles, coverage for hired or non-owned autos is acceptable. Insured waives all rights against City and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by Insured pursuant to this Agreement or under any applicable auto physical damage coverage. CFW Standard Insurance Requiremerits Page 1 of 3 R@V. 5.04.21 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr CPN 104218 c. Workers' Compensation — Insured shall maintain workers compensation and employer's liability insurance and, if necessary, commercial umbrella liability insurance as follows: Coverage A: Coverage B: statutory limits $100,000 each accident $500,000 disease - policy limit $100,000 disease - each employee Insured waives all rights against City and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by Insured pursuant to this Agreement. d. Professional Liability (Errors & Omissions) — Insured shall maintain professional liability insurance as follows: $1,000,000 - Each Claim Limit $2,000,000 - Aggregate Limit �2) Professional Liability coverage may be provided through an e ndorsement to the Commercial General Liability policy, or a separate policy specific to Professional E&O. Either is acceptable if coverage meets all other requirements. Coverage shall be written on a claims-made basis, and maintained for the duration of the contractual agreement and for five (5) years following completion of services provided. The policy shall contain a retroactive date prior or equal to the Effective Date of the Agreement or the first date of services to be performed, whichever is earlier. An annual certificate of insurance shall be submitted to City to evidence coverage. GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that Insured has obtained all required insurance shall be attached to Agreement concurrentwith its execution. Any failure to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. b. Applicable policies shall be endorsed to name City as an Additional Insured, as its interests may appear, and must afford the City the benefit of any defense provided by the policy. The term City shall include its employees, officers, officials, and agents as respects the contracted services. Applicable policies shall each be endorsed with a waiver of subrogation in favor of City with respect to the Project. c. Certificate(s) of insurance shall document that insurance coverage limits specified in this Agreement are provided under applicable policies documented thereon. Insured's insurance policy(s) shall be endorsed to provide that said insurance is primary protection and any self-funded or CFW Standard Insurance Requiremerits Page 2 of 3 R@V. 5.04.21 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr CPN 104218 commercial coverage maintained by City shall not be called upon to contribute to loss recovery. Insured's liability shall not be limited to the specified amounts of insurance required herein. d. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. City must approve in writing any alternative coverage for it to be accepted. e. A minimum of thirty (30) days' notice of cancellation or material change in coverage shall be provided to City. A ten (10) days' notice shall be acceptable in the event of non-payment of premium. f. Insurers must be authorized to do business in the State of Texas and have a currentA.M. Best rating of A:VII or equivalent measure of financial strengtf� and solvency as determined by the City's Risk Management division. g. Any deductible or self-insured retention in excess of $25,000 that would change or alter the requirements herein is subject to approval in writing by City, if coverage is not provided on a first-dollar basis. City, at its sole discretion, may consentto alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to City. h. In the course of the Agreement, Insured shall report, in a timely manner, to City's Risk Management Department with additional notice to the Contract Compliance Manager, any known loss or occurrence which could give rise to a liability claim or lawsuit against City or which could result in a property loss. City shall be entitled, upon its request and without incurring expense, to review Insured's insurance policies including endorsements thereto and, at City's discretion, Insured may be required to provide proof of insurance premium payments. Lines of coverage, other than Professional Liability, underwritten on a claims- made basis, shall contain a retroactive date coincidentwith or priorto the date of this Agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the Project until final payment and termination of any coverage required to be maintained after final payments. City shall not be responsible for the direct payment of any insurance premiums required by Agreement. m. Subcontractors of Insured shall be required by Insured to maintain the same or reasonably equivalent insurance coverage as required for Insured. Upon City's request, Insured shall provide City with documentation thereof. CFW Standard Insurance Requiremerits Page 3 of 3 R@V. 5.04.21 Design of Sldewalk Improvement at Campus Dr and E. Seminary Dr CPN 104218 Gf Z d � t O N �Y �a N� �m � � W 0 O = > � J F � � l0 C .� N � W � C l0 � i N 7 w Q 41 N �U a�i �° � r C C 01 � N � G1 � � O a � Y 3 N � N O C � .N N � � A V r � ro m� V O V ro� F N f9 t9 W M � a "' � y H u°1i o�» � u�i � o� o C r � N h h a� � � n � x o W V 0 f o� o w LL o� o W > W C ~ a x o 0 0 W W m � � � c � w � v m 0 � z 0 0 0 a w N ID N �- v ro � m co m r� n `o n o c� v r co e u� ry n J �-' � �M �M � M � �N �M � c O C i� U � o l6 ~ V n o 0 N � C E a Q J C l6 r v o 0 � w `' N � r= �_ a = a` � � o 0 w � C � .N e _ O � i a V � �� N N � � y _ � �o � v � �u o -= � aw � � o 0 0 M t — '� +-� o u = a £ J p a w '8 a � V N � V N N � N £ N ' a 'o A � a` � av o O � N � o o ,o � O - m a c Z N � � W M i � a y �O a v � v a` °a`E a � U `o a a N � � � � � F m U � N a a � O �- �t�a -a ��o o a a � � d (p N « .0 � c U U 0 � LL d 9 -a ,o o � '^ U m ' F x � � ¢ C p C O � _ 9 � � _ N 0 U � o � a � `o V m � � v O rn 3 N o a �_ � � � o � a _ o � E Y � � V � U L � o � '^ '^ N Q � � W a Y � � � a o � 'O V N a = p � � Y (9 rn Q � 7 F� 0 Z M e u� co n m H M � O � [O V V N � R ` o a .. E _ �° � — — � � ci 3 0- � � .o- .. N tp10w o - w �« F � a'� .o v F � a N a a � � tiJ (il w _ m A a mm��n v�v�� w � ww�m mm � � � O Z � N O N � r \ � � � ` �w � �. � / v E N 0 p, N tll O C m � � w ;� x `o � F v � > _ � J � � �' � t _ m v `�- �` E O o V ��� U Q a Kimley>>> Horn August 20, 2025 David J. Kastendick, P.E. City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Re: CSN 58274 Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr. CPN 104218 Amendment 3 Dear David: Page 1 Kimley-Horn and Associates, Inc. ("ENGINEER") is pleased to submit this amendment letter proposal to the City of Fort Worth ("CITY") for providing additional services consisting of bid phase services for a new unit price paving construction contract. Scope of Services The ENGINEER will provide the services specifically set forth in the attached Attachment A. Schedule ENGINEER will provide our services within a mutually agreed-upon timeframe. Compensation Refer to the attached Attachment B for the Compensation. We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. By: Scott R. Arnold, P.E. Vice President Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Campus & E S eminary Dr Sidewalk Amend #3 M&C: NIA CPN: 104218 CSO: 58274 DOC#: NIA Date: 812912025 To: Name Department Initials Date Out 1.Alexiz Ramirez TPW -Review L 10/02/2025 AR 2.David Kastendick TPW -Signature z;,<y; Octl,2025 3.Scott Arnold K-H -Signature SM Octl,2025 4.Chad Allen TPW -Signature � Oct14,2025 5.Lissette Acevedo TPW -Signature I� Oct 16, 2025 6.Patricia Wadsack TPW -Signature PLW OctlG,2025 7.Lauren Prieur TPW -Signature �Oct 20, 2025 Lauren Prieur 8.Doug Black Legal -Signature ..tL-DoulasBlack Oct 21, 2025 9.Jesica McEachem CMO -Signature � Oct 24, 2025 10.Jannette Goodall CSO -Signature J�Goodall 10/27/2025 11.TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: □YES [8'.INo RUSH: □YES [8'.INo SAME DAY: □YES [8'.INo ROUTING TO CSO: [8'.IYES □No NEXT DAY: □YES [8'.INo Action Required: D Attach Signature, Initial and Notary Tabs D As Requested [8J For Your Information [8J Signature/Routing and or Recording [8J Comment □File Return To: Please notify TPWContracts@fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! F�RT ��RTH�} City Secretary's Office Contract Routing & Transmittal Slip ContraCtor's Name: Kimley-Horn and Associates, Inc. Subj ect of the Agreement: TJ�e objecti4fe of �Jars pr�o�ec� rs fo rlesigrx �r rx�+cJbfnck cross��{alk a�ljacen[ �a 4D i�Vyatt Nrgh Sr.f�ool. t�ectatr�c�1��� r�-rJ��r! ff�sJ�rr�g be��rcoi7s_ �f�c! �lecar-t�trve c�r�ass {��ar7rif7gs �r7 �fre r7�edf�r�. M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must he attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 58274-A3 If so, provide the original contract number and the amendment nuntber. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page, fo� permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what infoNmation is Confidential and the page it is located. Effective Date: If differenl from the approval dale. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensuNe it is attached to the approving M&C or attached to the cont�act. Proj ect Number: If applicable. 104218 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processin� in the followin o� 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.