HomeMy WebLinkAbout062924-CO1 - Construction-Related - Contract - McClendon Construction Company, Inc.Contract Time (CD) 300 300 7 307 Date Date Date Date Date N/A ATTEST: ____________________________________________ Jannette Goodall, City Secretary Original Contract Amount M&C Date Approved Contractor's Company Name Contractor (Name)Contract Signature Senior Capital Project Officer Director, Contracting Department (Dept) DateProgram Manager DateAssistant Director (Dept) Assistant City Manager $2,092,822.65 0.00% $2,616,028.31 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT N/A Additional Funding (if necessary) JUSTIFICATION (REASONS) FOR CHANGE ORDER DateAssistant City Attorney The proposed change order is needed for the contractor to address recommendations from Transportation Management in regards to the streetlights for the 103312: S Hulen St & W Risnger Rd Intersection Improvement project, as well as RFI #4. This project includes streetlight modifications, including removing the existing streetlight on the north median of the intersection. Salvaging of this pole will cause the intersection to lose lighting as the service for about 17 streetlights is located on this pole. This proposal will allow installation of additional ground boxes and services for the streetlights to be connected in a way that will maintain lighting during and after construction. (RFI #4) Existing 2" conduit on the south of the intersection is in conflict with subgrade. This RFI provides additional quantity for new conduit to be relocated outside of the road base. Additional funding is not being requested as part of this change order because there is a construction allowance in the contract which will be able to cover the additional items needed. The contractor has honored the pricing of the existing contract for all of the current bid items. The seven days requested are to provide time for the contractor to complete the additional work including material procurement of the additional quantities. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Council Action (if required) M&C Number Inspector/Inspection Supervisor Date Project and Contract Compliance Manager $2,092,822.65 Original Funds Available for Change Orders $2,092,822.65 Extras to Date $2,092,822.65 Credits to Date City Sec #South Hulen Street and West Risinger Road Intersection Improvements Project TPWDept.Totals Project Description Intersection improvements including paving, traffic signal and ADA improvements at the intersection of South Hulen Street and West Risinger Road. Change Order #McClendon Construction Company, Inc. Fanta Kaba Pedro GuerreroCity Inspector Remaining Funds Available for this CO Pending Change Orders (in M&C Process) MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $0.00 Contract Cost to Date $0.00 Amount of Proposed Change Order $2,092,822.65 Revised Contract Amount $2,092,822.65 $0.00 City of Fort Worth Contractor 62924 Client Project #(s)103312 Date 8/22/2025 City Project Mgr. Change Order Request 1 Project Name EA 212.00000000 433.00000000 4.00000000 $56,534.00 $56,534.00 Sub Total Additions Date TPW ADDITIONS 3441.1408 NO 6 Insulated Elec Condr56 Client Project # 103312 1 8/22/2025 Fanta Kaba InspectorContractor Change Order Submittal # McClendon Construction Company, Inc.PM Pedro Guerrero City of Fort Worth Change Order Additions Project Name South Hulen Street and West Risinger Road Intersection Improvements Project City Sec # 62924 LF 58 59 84 85 92 $8,967.00 TotalUnit Cost $3.50 Unit TPW TPW $5,724.00 $16,454.00 $1,600.00 TPW TPW TPW 3441.1414 NO 8 Bare Elec Condr 3441.1503 Furnish/Install Ground Box Type D, w/Apron 3441.1507 Remove Ground Box 2605.3016 2" CONDT PVC SCH 80 (B) 2605.3016 2" CONDT PVC SCH 80 (T) Qty 2,562.00000000 DEPTITEMDESCRIPTION TPW 854.00000000 8.00000000 LF EA LF LF $2,989.00 $20,800.00 $3.50 $2,600.00 $27.00 $38.00 $400.00 Change Order Additions Page 2 of 4 McClendon Construction Company, Inc. PM Fanta Kaba Inspector Pedro Guerrero $56,534.00 Total LS Qty 0.23555833 DEPTITEMDESCRIPTION TPW9999.0004 Construction Allowance100 Unit Cost $240,000.00 Unit City of Fort Worth Change Order Deletions Project Name South Hulen Street and West Risinger Road Intersection Improvements Project City Sec # 62924 DELETIONS Client Project # 103312 1 8/22/2025Change Order Submittal # Contractor Sub Total Deletions Date TPW $56,534.00 $56,534.00 Change Order Deletions Page 3 of 4 CO #DATE AMOUNT M/SBE for this Change Order Previous Change Orders $0.00Total Type of Service Amount for this COM/SBE Sub N/A $0.00Total CONSTRUCTION CONTRACT ROUTING & TRANSMITTAL SLIP | Eff 06.21.23, mdhm Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE:S Hulen St & W Risinger Rd Intersection Improvements Project – Construction CO #1 Request M&C: 25- 0090 CPN: 103312 CSO: 62924 DOC#: 1 Date: To: Name Department Initials Date Out 1.Ann Estes TPW 2. Dan McClendon Vendor 3.Pedro Guerrero TPW 4. Fanta Kaba TPW 5. Chad Allen TPW 6. Lissette Acevedo TPW 7. Patricia Wadsack TPW AD 8. Lauren Prieur TPW Director 9. Doug Black Legal 10. Jesica McEachern CMO 11 Jannette Goodall CSO 12 TPW Contracts TPW CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts ALSO List: - Bus Sppt: Ann Estes; Prg Mgr: Chad Allen; Sr CPO: Lissette Acevedo DOCUMENTS FOR CITY MANAGER’S SIGNATURE: All documents received from any and all City Departments requesting City Manager’s signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, will review and take the next steps. NEEDS TO BE NOTARIZED: YES No RUSH:YES No SAME DAY:YES No NEXT DAY:YES No ROUTING TO CSO: YES No Action Required: Attach Signature, Initial and Notary Tabs As Requested For Your Information Signature/Routing and or Recording Comment File Return To: Please notify TPWContracts@fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!