Loading...
HomeMy WebLinkAbout060600-CO6 - Construction-Related - Contract - Woody Contractors, Inc.FORTVVORTH .-Change Order Request Project Name!Water and S anitary Sewer Replacements Contract 2020, WSM-A Project No.(s)l5600210600430/0700430/0200431/5740010 M&C Project Description Water and Sanitary Sewer Replacements Contract 2020, WSM-A 23-0983 CSC No. 60600-COG City Sec No. !60600 :=::========: City Pro. No. I 103361 Contractor! Woody Contractors, Inc. City Project Mgr.! Clayton Torrance Phone Number:! 817-392-8528 Change Order# 6 Date: !9/26/2025 :::===::::::_ _ _:ICity Inspector Estevan Castillo _ Phone Number:! 682-263-4793 I Dept. Water Unit 1 Sewer Unit 2 Paving Unit 3 Stormwater Unit 4 Totals Conttact Time (Calandar Days) Original Contract Amount $3,541,157.00 $2,076,758.50 $793,253.50 $0.00 $6,411,169.00 500 Extras to Date S0.00 $269,380.22 S0.00 $13,600.00 $282,980.22 75 Credits to Date -Pending Change Orders (In M&C Process) -Contract Cost to Date $3,541, 157,00 $2,346,138.72 $793,253.50 $13,600.00 $6,694,149.22 575 !Amount of Proposed Change Order $0.00 $65,708.00 $0.00 $0.00 $65,708.00 035 Revised Contract Amount $3,541,157.00 $2,411,846.72 $793,253.50 $13,600.00 $6,759,857.22 610 Orig. Funds Available for Change Orders $106,235.00 $62,303.00 $39,663.50 $0.00 $208,201.50 Remaining Funds Available for this CO $106,235.00 $39,663.50 $0.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT 4.41% $8,013,961.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 6 will allow for the removal and replacement of approximately 107 LF of Ductile Iron Sanitary Sewer Pipe with_ CLSM backfill and the installation of 3 Manholes with concrete collar to resolve a conflict with the existing storm drain pipe at West Dickson Street and Hemphill Avenue. This change order will address Water Department assets that were encountered during execution of a work order on a miscellaneous TPW Storm Water Contract. Staff concurs with the contractors request for 35 additonal days on the project. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both lime and money) for all costs arising out of, or incidental to, the above Change Order. Contracto(s Com an Name Contractor Name Woody Contractors, Inc. Troy Woody M&C Number NIA Date 0/29/20 i: M&C Date Approved FOPT WORTH City of Fort Worth Change Order Additions Project Name Water and Sanitary Sewer Replacements Contract 2020, WSM-A Ciry Sec No. 60600 Project No.(s) 56002/0600430/070043010200431/5740010 DOE No. 23-09 Ciry Pro. No. 103361 Project Description Water and Sanitary Sewer Replacements Contract 2020, WSM-A Contractor Wood Contractors,lnc. Change0rder# �6 Date: 9/2612025 Cily Project Mgr. Clayton Torrance City Inspector Estevan Castillo ADDITIUNS Page 1 of 1 FoRT WC�RTH City of Fort Worth Change Order Deletions ProjeCt Name Water and Sanitary Sewer Replacements Contract 2020, WSM-A Project No.(s) 56002/0600430/0700430/0200431/5740010 DOE No. 23-0983 Project Description � Water and Sanitary Sewer Replacements Contract 2020, WSM-A City Sec No. 60600 City Pro. No. 103361 Contractor Woody Contractors, Inc. Change Order #�6� Date 9/26/2025 Ciry Project Mgr, Clayton Torrance City Inspector Estevan Castillo DELETIONS Page 1 of 1 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ���drl. � %d22G��.C'.� Signature Clayton M. Torrance, P.E. Name of Employee Professional Engineer Title F�RT aa p,p(voaoo �y�pd� d!`o -00 ATTEST: 'Q,� ��: ° d¢a nezAsad �t�tsl. /J ..�1e$>� 2`1 Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Woody Contractors, Inc. 60600 □ 103361