HomeMy WebLinkAbout063334-CO2 - Construction-Related - Contract - McClendon Construction Company, Inc.CSC No. 63334-C02
FORT-WORTH City of Fort Worth
Change Order Request
Project Name:! Keller Hicks Phase 2 -Park Vista to Lauren Way I City Sec No.: ::I =6=3=334=========�Project No.(s):! 103276 DOE No. �I _N_/_A-�I City Proj. No.: .... ! _1_03_2_76 _____,
Project Description: Keller Hicks Phase 2 Park Vista to Lauren Way -Roadway, Drainage, Waterline, Illumination And Traffic SignalImprovements
Contractor: McClendon Construction Company, Inc.
City Project Mgr. I Mitch Aiton ::-· ===============� Phone Number:I 682-715-9424
Dept. Water• Unit II
Original Contract Amount $910,370.55 Extras to Date $856,825.55 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1,767,196.10
IAmount of Proposed Change Order $0.00 Revised Contract Amount $1,767,196.10 Original Funds Available for Change Orders $168,079.00 Remaining Funds Available for this CO $168,079.00 Additional Funding (if necessary)
Change Order# Q Date:
City Inspector: I Buddy Phillips
Phone Number:I 972-822-4773
TPW • Unit 1,111 Totals
$9,703,337.45 $10,613,708.00 $856,825.55
$9,703,337.45 $11,470,533.55
$0.00 $9,703,337.45 $11,470,533.55 $200,000.00 $368,079.00 $200,000.00 $368,079.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 8.07%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $13,267,135.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
10/13/2025
Contract Time
(Calender days) 780 90
870
870
Subsequent to conduction preconstruction valve shut-off with the valve crew, It was determined that additional
homes and businesses were identified that required additional temporary water, necessitating additional
temporary water lines from nearby fire hydrants. In addition, change order two will provide $6,170.00 to
compensate the contractor for a math error on change order 1. The city agreed with the contractor for
$862,995.55 for Change Order 1; however, $856,825.55 was the value sent to council for approval. Pay item 11-
61 will compensate for that difference.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Com an Name Contractor Name Contractor Si nature Date
Mcaendon Construction Company, Inc.
lnsoector .. _ ...
""<kl)'Pllllllporo<>T.1,>o:>'ll.1;]0tllC111)
Director (Water Dept)
,ba�egbi:z, t!a,�, Christopher Harder (Oct 29, 2025 09:45:02 CDT)
Senior Assistant City Attorney ·-� �
M&C Number I N/A
Justin Blair Justin Blair (Oct 22, 2025 16:37:57 CDT)
Date Project Manager
10/23/2025 WJd,,/£.:!i!m Mitche11Aiton(Oct23,202513:43:09CDT)
Date Construction Supervisor (Water)
10/29/2025 T�yGaU:11et
Date Assistant City Manaaer
10/29/2025 �
Council Action If Required)
!ATTEST: r'-M&C Date Approved Jannette Goodall City Secretary I
10/22/2025
Date
10/23/2025
Date
10/27/2025
Date
11/03/2025
N/A I
F" 1p,-r' VIVO 1�zrr x City of Fort Worth
A up_- Change Order Additions
Project Name I Keller Hicks Phase 2 - Park Vista to Lauren Way City Sec No.: 63334
Project No.(s): 1 103276 1 DOE No.1 N/A I City Proj. No.: 103276
Project Keller Hicks Phase 2 Park Vista to Lauren Way - Roadway, Drainage, Waterline, Illumination And Traffic Signal
Description Improvements
Contractor McClendon Construction Company, Inc. Change Order:2 Date: 1 10/13/2025
City Project Mgr. Mitch Aiton City Inspector I Buddy Phillips
ADDITIONS
DEPT I Qty JUnit I Unit Cost I Total
II-60 Temp. Water for Added Line (Bid Set) Water - Unit II 1.00 LS $27,500.00 $27,500.00
II-61 Compensation to Contractor Water- Unit II 1.00 LS $6,170.00 $6,170.00
lWater- lnit II $33,670.00
JTPW - Unit I,III
Page 2 of 4
JAdditions Sub Total $33,670.00
F"P'-r0P'-Fx City of Fort Worth
Change Order Deletions
Project Name Keller Hicks Phase 2 - Park Vista to Lauren Way City Sec No.: I 63334
Project No.(s): 103276 1 DOE No. I N/A City Proj. No.: 103276
Project Description
Keller Hicks Phase 2 Park Vista to Lauren Way - Roadway, Drainage, Waterline, Illumination And Traffic Signal
Improvements
Contractor McClendon Construction Company, Inc. Change Order: F2--J Date 10/13/2025
City Project Mgr. Mitch Aiton City Inspector: I Buddy Phillips
DELETIONS
ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost JTotal
II-23 Contingency Allowance - Water Improvements Water - Unit II 0.6734 LS $50,000.00 $33,670.00
(Water - Unit II $33,670.00
ITPW - Unit (,III
Page 3 of 4 IDeletions Sub Total $33,670.00
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
N/A N/A N/A
Total $0.00
Previous Change Orders
co # DATE AMOUNT
9/16/2025 $856,825.55
Total I $856,825.55 I
Page 4 of 4
103276-CNCO-Keller Hicks Ph 2 CO #2
Interim Agreement Report 2025-10-27
Created: 2025-10-22
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAA SXbCsm47DfbJStAc-01SwOx2WECWaV
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"103276-CNCO-Keller Hicks Ph 2 CO #2" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2025-10-22 - 9:17:56 PM GMT- IP address: 204.10.90.100
Document emailed to Justin Blairablair@mcclendonconstruction.com) for signature
2025-10-22 - 9:28:53 PM GMT
Document emailed to Buddy Phillips (Buddy.Phillips@fortworthtexas.gov) for signature
Email viewed by Buddy Phillips (Buddy.Phillips@fortworthtexas.gov)
2025-10-22 - 9:31:32 PM GMT- IP address: 107.77.199.200
Email viewed by Justin BlairOblair@mcclendonconstruction.com)
2025-10-22 - 9:36:56 PM GMT- IP address: 47.37.93.50
Document e-signed by Justin Blairablair@mcclendonconstruction.com)
Signature Date: 2025-10-22 - 9:37:57 PM GMT - Time Source: server- IP address: 47.37.93.50
Document e-signed by Buddy Phillips (Buddy.Phillips@fortworthtexas.gov)
Signature Date: 2025-10-23 - 6:39:17 PM GMT - Time Source: server- IP address: 72.158.228.41
Document emailed to Emanuel Nieto (Emanuel.Nieto@fortworthtexas.gov) for signature
2025-10-23 - 6:39:19 PM GMT
Document emailed to Mitchell Aiton (mitchell.aiton@fortworthtexas.gov) for signature
2025-10-23 - 6:39:20 PM GMT
FoRTWORTHq I Paw -"Y
Adobe
Acrobat Sign
Document e-signed by Mitchell Aiton(mitchell.aiton@fortworthtexas.gov)
Signature Date: 2025-10-23 - 6:43:09 PM GMT - Time Source: server- IP address: 208.184.124.181
FoRTWORTHg I Paw -"Y
Adobe
Acrobat Sign
FORT WORTH,,
Routing and Transmittal Slip
,Transportation & Public Works.
Department
DOCUMENT TITLE: Keller Hicks Ph 2 CO #2
M&C: N/A CPN:
103276 CSO:
63334
DOC#: N/A
Date: 10/16/2025
To: Name
Department
Initials
Date Out
1. Justin Blair
McClendon - Signature
B BB
10/22/25
2. Buddy Phillips (Inspector)
TPW - Signature
aP
10/23/25
3. Troy Gardner (Const Super)
TPW - Signature
o1
10/27/25
4. Mitch Aiton (PM Sign)
TPW - Signature
.MA
10/23/25
5. Tony Sholola
Water - Approval
-/-,3
10/29/25
6. Chris Harder (Director)
Water - Signatures
10/29/25
7. Doug Black
Legal - Signature
Douglas - 110/29/25
8. Jesica McEachern (ACM)
CMO - Signature
11/03/25
9. Jannette Goodall
CSO - Signature
Nov 3, 2025
CC: Program Manager, Sr. CPO,
TPW BSPAP Recon Team,
TPW Records
Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContracts(&fortworthtexas.2ov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!
FORT WORTH,
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: McClendon Construction Company, Inc.
Subject of the Agreement: Please see justification on change order.
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103276
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO nrocessin2 in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.