HomeMy WebLinkAbout061352-CO3 - Construction-Related - Contract - William J. Schultz Inc. dba Circle C Construction Co.CSC No. 61352-C03
FORT WORTH
Change Order Request
Project Namel Water and Sanitary Sewer Replacement, Contract 2021 WSM-C
Project No.(s)i 06004301070043010200431-103500 M&C
CitySecNo.I 61352 �----� L-� -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_�N_/_A __ �!City Pro. No.! 103500
Project Description Water and Sanitary Sewer Main replacements on Westridge Avenue.:::====================================-.------;::.====-=..----�������:::-"� ContractorlWilliam J. Schultz, Inc. dba Circle C Construction Company
City Project Mgr.I Dena Johnson, P.E.
1912/2025
City Inspector .---F-a-bi-an-□-i-az---,I
Change Order# 3 Date:
Phone Number:! 817-392-7866 Phone Number:! 817-223-8371 I
Dept. Unit I -Water Unit II A-Unit II B -Unit Ill - Paving Totals Sewer Sewer
Original Contract Amount $7,801,094.00 $1,507,159.00 $0.00 $1,049,205.00 $10,357,458.00
Extras to Date $481,684.00 $11,500.00 $443,594.00 $0.00 $936,778.00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $8,282,778.00 $1,518,659.00 $443,594.00 $1,049,205.00 $11,294,236.00
!Amount of Proposed Change Order $1,277,480.25 $202,500.00 $55,110.00 $0.00 $1,535,090.25
Revised Contract Amount $9,560,258.25 $1,721,159.00 $498,704.00 $1,049,205.00 $12,829,326.25
Orig. Funds Available for Change Orders $234,033.00 $75,358.00 $52,460.00 $361,851.00
Remaining Funds Available for this CO $0.00 $0.00 $52,460.00 $52,460.00
Additional Funding (if necessary)$1,277,480.25 $257,610.00 $1,535,090.25
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT 23.87%
$12,946,822.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
(Calandar Days)
690
190
880
0120
1,000
Change Order No. 3 will primarily provide for the following: the installation of a water main segment by hand
tunneling, in order to avoid conflict with a previously unknown storm drain pipe; additional pipe fittings to
accommodate alignment changes due to actual field conditions; around-the-clock dewatering operations due
to higher than anticipated volume of groundwater that was encountered during trenching operations;
additional 30-inch gate valve at the southern end of the project to allow for a future connection to Vickery
Boulevard; additional steel pipe casings at shallow storm drain crossings to facilitate future maintenance of the
water main; additional traffic control on the project such as additional barricades, specialty signs, plus
increased traffic control maintenance; and increased pay item quantities for sanitary sewer items.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
M&CNumber
�10-24-25.
25-0956
Consuuel1on S
r.s. Wade Miller
M&C Date Approved
Darf:
10/24/2
Date
11/08/2025
10f21i2025]
FO R"r' VV[7 RT H City of Fort Worfh
Change Order Additions
Project Name Waier and Sanitary 5ewer Repfacemenf, Contract 2021 WSM-C City Sec iVo. 61352
Project No.(s) 08004301070Q43010200431-103500 D0� No. N/A City Pro. No. 103500
Project Water and Sanitary Sewer Main replacements on Wesfritlge Avenue.
Descripiion
Coniractor Wiiliam J. 5chuitz, Inc. dba Cfrcle G Consfruction Company Change Order #! �3 Qate: 91212p25
City Project iNgr. Dena Johnson, P.�, Cily Inspector Fabian Diaz
AD�I11UN5
zts c3u� riwngs, pipe moaincauons, weiaing, aaaiuonai
4B 30" Concrete AWWA C3Q3 Water Pipe By other Tha
17 30� Gate Valve w! Vault
38 Remove Sidewalk
41 4"-12" Pressure Piug
44 Remove Goncrete Curb & Gutter
59 Temporary Asphal( Paving Repair (2" HiNAC on S" �
60 Temporary Asphalf �aving �epair (2" HMAC on 5" F
61 Temporary Asphali Paving Repair (2" HMAC on 6" F
63 4" Concreie Sidewalk
S9 6" Concrete Curb & Guffer
84 Tra�ic Control Details - Preparaiion
85 Traffic Control (Install and Maintain)
90 8" Cancrete Beneaih Existing Asphalt with 6" FiMAC
104 Dewatering far Alignment Changes
i05 Stee1 Casing BOTOC
�06 Carrier Pipe
�07 Temporary Rsphalt Gurb
108 Woatl Box Tunnel for Alignment CE�anges ar�d Fittinc
149 Additional Barricade Rental and Maintenance
3fl Traffic Conirol Install and Ma�ntain
90 Rdditional Barrieade Rental and �lainte�ance
7 4' Manhole
13 Cancrete Collar
1 A Remove Concrete Curb & Gutfer
15 6" Concrete Curb & Gutter
17 Block Sod Rep€acement (Sanilary Sewer}
22 4" Concrete Sidewalk
23 6' Wide As�half Pvmt Repair, Residential
25 Remove Fe�ce
26 6' C�ain Link, Aiuminum
27 6' Fences, Wood
34 8° Sewer Pipe, Poinl Repair
- A' Wide
- 7' Wide
_ �ytra 1A
Unit I - Water
Unit I - Water
URii I - Water
Unii 1- Water
Unii I - Waler
Unit I - Water
Unit I - Water
Unit I - Water
Unit I - Water
Unit I - Water
Unit I - Water
Unit I - Water
Unif I - Water
Unii I - Waker
Unit I - Wate�
Unit I - Waier
Unit I - Water
Unit I - Water
Unit I - Water
Unit I - Water
Unit II A - 5ewer
Unit I! A - Sewer
Unit II B - Sewer
Unit il 8 - Sewer
l�nii II B - Sewer
�1nit II 8 - Sewer
Unit II B - Sewer
Unit II B - Sewer
Unit I I B- Sewer
Unit II B - Sewer
Unit II B - Sewer
Unit Il B - Sewer
Unit !I 8 - Sewer
9Q.0 1.�
1,0 EA
95.0 SF
5.0 EA
i6i,5 LF
400.0 LF
A00.0 LF
1,035,0 SY
124.0 SF
161.5 LF
1.0 EA
7.50 �Id
69.25 SY
4.0 MO
150.0 LF
150.0 L�
250.0 l.F
20.0 LF
15.00 MO
7.5b MO
15,00 MO
1.a0 EA
1.00 EA
49.00 LF
49.00 LF'
507.00 SY
96.00 SF
248.00 LF
35.00 LF
2d.00 LF
15,OQ LF
55,0� LF
Init Cost
��25,000.00
51,85fl.00
$125,aaa.aa
�6.00
$�,OOD.00
�1
$10,5Q6.fl0
�175.00
�15,500.00
$2,'i 50.00
�1,250,
$6,250,
�5Da.0
$�SA�
�20A0
$75.00
�5.00
$150.00
Unit I - Water
Unit I I A- Sewer
Unit II B - Sewer
Unit lll - Paving
Addilians Sub Total
Page 2 of 4
FORT ��'V(7 RT H City of Fort Worth
Change Order Deletions
Projeci Name Wales antl Sanitary Sewer Replacement, Gantract 2021 WSM-C
Praject �io.(s) 0600430107D043fl10200431-10350� DOE Na. N/A
Project Description Water and Sanilary Sewer Main replacemenis on Wesfritlge Aversue.
City Sec No. 61352
City Pro. �lo. 10350Q
ConUactor ' ' � Change Order #� pate 91212025
City Projeci Mgr. Dena Johnson, P.E. City ins��cior Fabian Diaz
ITEM �DESCRIPTION
DELETIONS
D�PT Qfy Unit Unit Cast Total
Unit { - Water
Unii I! A - Sewer
11nit II S - Sewer
Unit III - Paving
Dele1'tans Sub Total
Page 3 of 4
MIWBE Breakdown for this Change Order
Previous Change Orders
10/24/2025
Water and Sanitary Sewer Replacement, Contract 2021 WSM-C
CSC 61352
CPN 103500
Chan e Order 3 Notes
Staff has reviewed the requested prices and additional calendar days and considers
them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
J)e;-1a JohMSOM.
Signature
Dena Johnson
Name of Employee
Project Manager
Title
ATTEST:
Jannette Goodall
City Secretary
City of Fot�� fllrorth, Texas
Ma�or and Council Communication
DATE: Tuesday, October 21, 2025 REFERENCE NO.: �`*M&C 25-0956
LOG NAME: 60WSSC21 WSMCC03-CIRCLE�
SUBJECT:
(CD 3) Authorize Execution of Change Order Na. 3 in the Amount o# $1,535,090.25 to a Contract with
William J. Schultz, Inc. dba Circle C Construction Company for the Water and Sanitary Sewer Replacement
Contract 202� WSM-C and Adopt Appropriatior� Ordinance to Effect a Portion of Water's Contribution to the
Fiscal Years 2026-2030 Capital Improvements Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 3 in the amount of $1,535,090.25 and an additional 120
calendar days to City Secretary No. 61352, a contract with William J. Schultz, Inc. dba Circle C
Construction Company for the Water and Sanitary Sewer Replacement Contract 2021 WSM-C
project for a revised contract amount af $12,829,326.25; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount o# $1,�35,091.00, from available PayGo
residuals within the Water and Sewer Capital Projec#s Fund, for the purpose of funding the Water
and Sanitary Sewer Replacement Confract 2021 V1lSM-C project (City Project No. 103500) and to
effect a portion of Water's Contribufion to the Fiscal Years 2026-2030 Capital Improvement
Program.
DISCUS�:
On March 19, 2024, by Mayor and Council Communication {M&C) 24-0227, the City Council authorized a
construction contract with William J. Schuftz, Inc. dba Circle C Construction Company in the amount of
$10,357,458.00 for Water and Sanitary Sewer Replacement Contract 2021 WSM-C project. The contract
was subsequently revised by Change Order No. 1 in ihe amount ofi $443,594.00, authorized by M&C 24-
0852 on October 15, 2024, which provided for ihe rerou#e and replacement of deteriorated sanitary sewer
mains located on Meadowbrook Golf Course, and Change Order No. 2 in the amount of $493,184.00,
authorized by M&C 25-0193 on March 11, 2025, which primarily provided for the replacement of previously
unknown reinforced concrete subbase beneath the asphalt surface paving that was encountered during
construction; the installation of new asphali surface by pulverizing and overlay instead of mill pul�erizing
overlay due to the existence of the reinforced cancrete base; additional 30-inch water main installation of
Westridge Avenue; and the installation of a storm drain conflict structure.
Change Order No. 3 will primarily provide for the foElowing: #he installation of a water main segment by
hand tunneling, in order to avoid conflict with a previously unknown storm drain pipe; additional pipe
fittings to accommodate alignment changes due to actual field conditions; around-the-clock dewatering
operations due to higher than anticipated volume of groundwater #hat was encountered during trenching
operations; additional 30-inch gate valve at the southern end of the project to allow for a future connection
to Vickery Boulevard; additional steef pipe casings at shallow storm drain crossings to facilitate future
maintenance of the water main; additional traffic controf on ihe project, additional barricade rental and
maintenance, specialty signs, plus increased traffic control maintenance; and increased pay item
quantities for sanitary sewer items.
It is the practice of the Water Department to apprapriate its Capital Improvement Program plan throughout
the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional
funding needs are identified, and to comply with bond covenan#s. The actions in the M&C will appropriate
funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2026-2030 Capital
Improvement Program, as follows:
Funding is available in the Unspecified All-Funds project within the Water and Sewer Capital Projects
Fund for the purpose of funding the WISS Repl Contrac# 2021 WSM-C project.
Appropriations for Water and Sanitary Sewer Replacemeni Contract 2021 WSM-C project are as depicted
below:
Fund Existing Additional project Total*
Appropriations Appropriatic�ns
W&S Capital
Projects Fund $11,753,402.00 $1,535,091.00 $13,288,493.00
56002
General Capital
Projects Fund $1,165,561.0� $0.00 $�,165,561.OD
30100
Project Total $12,918,963.40 $1,535,091.00 $�14,454,054.00
*Numbers raunded for presentation purpases.
This project is located in COUNCIL DISTRlCT 3.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are availabie in ihe Unspecified All-Funds project within the
W&S Capital Projects Fund, and upon approvai of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund, for the W/SS
REPL Contract 2021 WSM-C project to suppork #he above reeommendations and execution of the change
order. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the
availability of funds.
FUND IDENTI ERS (FIDs).:
TO
�Fund Department �ccoun Project ProgramActivit Budget Reference # moun
� Ip � � ID _ � __� -- - Year- - � �Chartfield 2j
FR�111
Fund Department ccoun Pra�ect Program ciiv�ty Budget Reference # mount
��
�p � � Ip �_�Year �Chartfield 2) _ _
CERTIFICATIONS:
Submitted for City Manager's Office by_
Originating Department Head:
Additional Information Contact:
Jesica McEachern (5804)
Chris Harder (5020)
Dena Johnson (7866}
ATTACHMENTS
1. �60WSSG21�^JSMC fl3-ClRCLEC #unds availabilityj�# {CFW Internal)
2. �nW�S��wSMGC03-CIRCL� �clf (Public)
3. 60WSSC21WSMCCQ3-CtRGLEC FID Table (WCF 09,25.25) x x (CFW Internaq
4. �fm 1295.� (CFW Internal}
5. QRD APP 6QWSSC21V11SMCCQ3-CIRC4.EC 56Q02 A026(R�).docx (Public)
6. PBS GPN 103500.q�f (CFW Internal}
a
0
�
�
�
�
�
�
�
�
�
0
W
n
�
n
r
�
n
�
5
-�
m
�
�
�AYDRAND COUhI�IL COMMUNICATION NaAP
6011�!SS2'! �!►!'SM CC03—C I RC LE
��. _ r , �; . t� - , . .t�.., . + ., ��': r �:•�
d+�r�r�+r���:r s �t�1T;p'��F.. � .�r , .yf� ,�J`�.yl..k,,,�?'ifY GEODES�kVE� '� �
� _ , �L]SEM ° ` ,��� ` ��,,w , .ywf.n ��'.•;_ .
; t} ��`•:�":., -� ' ''��a � `° � }',°�. . � _ ..
= �';5�-' . �-: c��q �� ,�.�"" �� . . p�nz,�v�, . , .
� �"� a 9G • i� ��
�i:.:T.•�r ��,,-{:�' �. �_ . -
�. 1 . G�,�-F'�� . .� p � 'C'O� iiOLIGHTON�AVE : " .r .:r•,�;
.� � .. � � •�`,�i � }�,�� �c��Y.. � � [ Y,��l �`_ r � . � � _a � � � �
. " �F.. �} i ' '
�; Q�°� . ?� 5. , �-� �'� •ti �rrr��:;-r•,,: x � ,• r -
�� C��� p� �� ''. WELi�SLEY�AVE� , �� r.� f".' _-�
�!t� •G �}-: -'. � .
'�; ' � y �p�4 `� .�;�`� ��k•� i,. � - ^.r.}r..
`` �•ti � r�q �,-�'• � , —���T`�' r�:: FLETCFiER+AVC�.0 �.
�r y q�� - Gfi� �' # -.['�.f` �,
� �.
.1 = rd � k���" . `� ,' , ,'a� `�.-,j�'�{'�. ;,T �; F"
6�h1NfLl AVE O:
�i� � � �a1 �•� �.���� !i "-' '' , '� .::+�w- - .V }Y'� � � • �u+� . ' - ' . r
� � �' � en � _
r ' lu= , � . .k�.
�� ��,y�`��� � ��'# �� �•.���$�• �.�+#r�,w' � ' .. : a KfLPATRICE('AVE � _ • 1
. �� f .� r . �, • �{,�''�-- - J - f; :
'� .�� � . �}�! �' �f:-�,a�a� .�1� r "'�.i i .
r��` . . .'��� �� l' ��� t,�, .. . : '�' P, r� � �JN. �
--i •'
p,V. �'v !d � �' � L�� - � GOO�MAN AVE� tr ` ,-� r�',7r
r1R�`4���p � . #;.�� ��� '�4 . �� 4'�. t .F �#� �. r,r�+��. , , .� � � 1�,.
'`�` � S ' �'� � �,�:- � i ;LiB&EY�AVE . .
.�4, � � oe. r.! r'-` . '
� - f ' �'= . � M- � ¢ .. • r
4i��,��J $��+� �t � t1�'ti �''��� O yl� �� �Y� �
:�"'�r'� '�,�,��� � � ' f� '�` c, o a _ .. _:Bi'ACfii�'IOR� AVE : s
i�L�����jr.���, �. ��;,,,� .SS � m , . :. ' '1*f
�* �� .� • ',, f ` ,� f � � � ,
�' R � : --��i'`'� 1 '� � � � � � � ' , ', HLIMBERT�AUE; � � _
e., s9'�;��'�i? M1� ! CJ� '�
e
'�,�.�r "r�ir.'"'i`{ �•, ,? �. - p • • , . . . •-
• �;
�,i,<;`'�' �a..���!►'• �� � G�.y', [� `' . 'FAf%NSWpRTH'AVE� �, . r
� � ��� F.��j' � � }�1 iJ �J� V u V� . f .� '�, _. '���' r
� �' � �.�� � _ �, } � �. } � : . ' i • ' � �.
,� cx��T� .�s�'�"''� . i �� • �h .n+ . � . r -_T�� 1. �,-r
ti,,. +!"��-./ �q� , x' �' I .., tr lirK (
L��+i1'� �t'x � `.i i ;� `5� • - � � �� •�
� � �� .w�; = . � ��: a • �. ; . �' � _ �' , �r. ,
• 4� �' i,��• r t r .p, _ .;-
t�: ���.ts , , � . .. . . . �•,:.
� �.�"" *���. �� '�`'�„�'' .� �� " � ��: , ,' .. ,
: � <.:�t�, �';�' t �F " ,�- �,p,�
� �_ .•■s ;i•"' �*�� � + � � P�;l�� ' . ' j � � r �i i ,.i ' C
} ' 4 ��;! x ��« �` '�'; � i � � � . - �� . � � , ' ` � ' �
c. �. � k= :-� it. I .f F•�.
.-- .-. � �r. , � •fr
��n ?�t �,� ^�t+� , r� �f �' �a. ; .
- a�ti, ���`'M� y�' ��2 ` •�'• e-�r' • �Zi
��1•� � - . -� ,. � �y r{_- . 'ri'?� ��. , � � Q; . .. . . .CY � ' - . .
i p-�
- .rl . rr-. • . �A, ,Qr ,{ J` `Qrr
� �� i.r,. : • ;� ' C � , ` "i�i'" ' � � - , �� .
�r ,��' 'r.� 1 � m. � p�• �• �� 4�k1�k' f'•' p'i•`;�. • `. � '��r���
�+ �.'p�V • N r�': i�' �5. ' f. �` , � .y ►,.-�� r .?
�' j . • �' �Y �j ! ••��y �' � ,
.A� � � �� � �Y N ��1
e [' 7a� ,[t � 4� '. �. � �� � � k� � .'��y ''� �J �: •,�
}. d p., �� 1 .f. .f . r�' a'� ��i� �� �_,•r . ti���e,� h�1�
• � ' �.� � 4' �� � i � ~ ' �
7'4,,ig T ; q . '�'��' �� -. ;�.} �' , rC.� J '� . : '�'L
..�!I . � �.. a . �; f}�'�� • � .�' � � �� ' ~ - }�
'� � y; ,,�, �� � „ '�• ��P�'��" �
� `. �p 'r �f 1 i1v�i' ��
� •y1• � y �.�' r �; � �: .t'j ' � � "�
,�} ��''� `�'�� � r �. , - -, .. + � a � - 'r`' .�
� � .� , �r � .- �
�+' . � ''��. h , } � - ,�
{ �y • . R �� ���� N��iQ`� i�' ,
. . � � oyP� :,��!
TH� r. . � � � . � ��� `� �Q���' •- :. .
FORT W4R , . . �� ,�-; � �
• _,�• �Yt r` ;,..�� „ �
,... ,,
City Secretary’s Office
Contract Routing & Transmittal Slip
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.
Contractor’s Name:
Subject of the Agreement:
M&C Approved by the Council? *Yes No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes No
If so, provide the original contract number and the amendment number.
Is the Contract “Permanent”? *Yes No
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential?*Yes No If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required?* Yes No
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number:If applicable.
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes No
Contracts need to be routed for CSO processing in the following order:
(Approver)
Jannette S. Goodall (Signer)
Allison Tidwell (Form Filler)