SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMB TEAM RANCH DEVCO LLC
This SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER
63595 (“Second Amendment”) is made and entered into by and between the City of Fort Worth,
a home-rule municipal corporation of the State of Texas (“City”), and PMB Team Ranch Devco
LLC, a Texas limited liability company (“Developer”).
WHEREAS, the City and Developer entered into a Community Facilities Agreement for
the construction of public infrastructure Improvements for a project generally described as Aledo
Road Infrastructure, City Project Number 105498 (“CFA”); and
WHEREAS, the City and Developer previously amended the CFA to increase City
Participation and correct the cost summary table, which was formalized under City Secretary
Contract Number 63595-A1 (“First Amendment”); and
WHEREAS, the Agreement includes City Participation in an amount not to exceed
$2,902,950.92, but inadvertently omitted City participation for public bid advertisement costs and
IPRC plan review fees; and
WHEREAS, City and Developer desire to amend the CFA to increase the City
Participation in the CFA to include public bid advertisement costs and IPRC plan review fees in
an amount up to $18,391.67 as authorized by City Council on October 21, 2025 (Mayor and
Council Communication No. 25-0973).
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends City Secretary
Contract No. 63595:
1.
The sixth recital of the CFA is amended in its entirety and read as follows:
WHEREAS, the City Participation includes reimbursement to Developer in amounts not
to exceed $2,379,415.57 for construction costs, $44,785.90 for material testing costs, $411,620.14
for design costs, $12,282.49 for public bid advertisement costs, and $6,109.18 for IPRC plan
review fees. The remaining City Participation in the amount of $67,129.31 shall not be paid to
Developer, but will be used by City to pay for the City’s portion of construction inspection service
SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 2 of 4
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
fees, administrative material testing fees, and water lab testing fees; and
2.
Section 37, subsection (a) of the CFA is amended in its entirety to be and be read as follows:
37.
City Participation; Fiscal Funding Limitation.
(a) The City shall reimburse Developer for 82.1% of the cost of the oversized 16-inch water
main and 93.3% of the cost of the oversized sewer mains, subject to the adjustments set
forth in subsection (g), in amounts not to exceed $2,379,415.57 for construction costs,
$44,785.90 for material testing costs, $411,620.14 for design costs, $12,282.49 for public
bid advertisement costs, and $6,109.18 for IPRC plan review fees. The remaining City
Participation in the amount of $67,129.31 shall not be paid to Developer but will be used
by City to pay for the City’s portion of construction inspection service fees, administrative
material testing fees, and water lab testing fees. Developer must register as a vendor of the
City in order for the City Participation to be paid to Developer. The City Participation for
construction costs was calculated as follows:
A. Construction
Developer
Cost City Cost Total Cost
1. Water $207,670.61 $952,500.39 $1,160,171.00
2. Sewer $92,406.49 $1,286,794.81 $1,379,201.30
3. Paving $12,350.44 $171,984.56 $184,335.00
Adjustment for Paving by Tarrant Co $31,864.19 ($31,864.19)$0.00
Total Construction Cost $344,291.73 $2,379,415.57 $2,723,707.30
3.
Section 39 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of
this Second Amendment, which is attached hereto and incorporated herein by reference.
4.
a.All other provisions of the CFA, which are not expressly amended herein, shall remain
in full force and effect.
b.All terms in this Second Amendment that are capitalized but not defined shall have the
meanings ascribed to those terms in the CFA.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 3 of 4
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
IN TESTIMONY WHEREOF, the City and Developer have executed this instrument by
their duly authorized representatives to be effective on the date signed by the City’s Assistant City
Manager.
CITY OF FORT WORTH
Jesica McEachern
Assistant City Manager
Date:
Recommended by:
Dwayne Hollars
Sr. Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Jessika Williams
Assistant City Attorney
M&C No. 25-0973
Date: 10/21/2025
Form 1295: 2025-1305258
ATTEST:
Jannette S. Goodall
City Secretary
DEVELOPER
PMB Team Ranch Devco LLC
a Texas limited liability company
By: PMB Team Ranch Manager LLC
a Texas limited liability company
Taylor Baird
Manager
Date:
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including all
performance and reporting requirements.
Kandice Merrick
Contract Manager
SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 4 of 4
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
Exhibit A
39.
Cost Summary Sheet
Project Name: Aledo Road Infrastructure
CFA No. 25-0037 IPRC No. 24-0059 City Project No.105498
Items Developer's Cost City's Cost Total Cost
A. Water and Sewer Construction
1. Water Construction 207,670.61$ 952,500.39$ 1,160,171.00$
2. Sewer Construction 92,406.49$ 1,286,794.81$ 1,379,201.30$
Water and Sewer Construction Total 300,077.10$ 2,239,295.20$ 2,539,372.30$
B. TPW Construction
1.a Street Paving 12,350.44$ 171,984.56$ 184,335.00$
1.b Street Paving - Adjustment for Paving by Tarrant County 31,864.19$ (31,864.19)$ -$
2. Storm Drain -$ -$ -$
3. Street Lights Installed by Developer -$ -$ -$
4. Signals -$ -$ -$
TPW Construction Cost Total 44,214.63$ 140,120.37$ 184,335.00$
Total Construction Cost (excluding the fees):344,291.73$ 2,379,415.57$ 2,723,707.30$
Estimated Construction Fees:
C. Construction Inspection Service Fee 8,302.50$ 59,197.50$ 67,500.00$
D. Administrative Material Testing Service Fee 1,016.96$ 7,251.04$ 8,268.00$
E. Material Testing Cost Contingency -$ 44,785.90$ 44,785.90$
F. Water Testing Lab Fee 95.48$ 680.77$ 776.25$
G. Design Services 56,599.86$ 411,620.14$ 468,220.00$
H. Public Bid Advertisement Costs 1,722.63$ 12,282.49$ 14,005.12$
I. IPRC Plan Review Fees 856.82$ 6,109.18$ 6,966.00$
Total Estimated Construction Fees:68,594.25$ 541,927.02$ 610,521.27$
TOTAL PROJECT COST 412,885.98$ 2,921,342.59$ 3,334,228.57$
Financial Guarantee Amount
Bond = 100%344,291.73$ X
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA
Create New From This M&C
DATE:10/21/2025 REFERENCE
NO.:
**M&C 25-
0973 LOG NAME:60ALEDO ROAD CFA
AMENDMENT 2
CODE:C TYPE:CONSENT PUBLIC
HEARING:NO
SUBJECT: (CD 3) Authorize Execution of Second Amendment to a Community Facilities Agreement
with PMB Team Ranch Devco LLC, Increasing City Participation in an Amount Up to
$18,391.67, and Authorize a Waiver of the Community Facilities Agreement Amendment
Fee
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of the Second Amendment to City Secretary Contract No. 63595,
a Community Facilities Agreement with PMB Team Ranch Devco LLC, increasing City
participation in an amount up to $18,391.67 for the Aledo Road project (City Project No.
105498); and
2. Authorize a waiver of the Community Facilities Agreement amendment fee.
DISCUSSION:
On April 8, 2025, Mayor and Council Communication (M&C) 25-0291, the City Council authorized the
execution of a Community Facilities Agreement (CFA) with PMB Team Ranch Devco, LLC, with City
particiation in an amount up to $2,704,245.59, for the Aledo Road project (City Project No.
105498) and appropriated funds for the project. The M&C did not include the City's participation on
the paving improvements for the project.
On June 24, 2025, M&C 25-0642, the City Council authorized the first amendment to the CFA
increasing the City participation in an amount up to $198,705.33 for the paving costs and associated
construction inspection service fees, administrative material testing service fees, and water testing lab
fees, as well as waiving the CFA amendment fee. The Citys participation in the project does not
include the City's portion of the Infrastructure Plan Review Center (IPRC) fees or public bid
advertisement costs. The Water Department is requesting to increase City participation in an
amount up to $12,282.49 for the IPRC fees and $6,109.18 for public bid advertisement costs for a total
amount of $18,391.67. Contingency funds that were previously appropriated for the project will be
used to cover the additional costs.
The following table shows the cost sharing breakdown for the project between all parties:
A. Construction Developer
Cost City Cost Total Cost
1. Water $207,670.61 $952,500.39$1,160,171.00
2. Sewer $92,406.49$1,286,794.81$1,379,201.30
3. Paving $12,350.44 $171,984.56 $184,335.00
G. Adjustment for Paving by Tarrant Co $31,864.19 ($31,864.19) $0.00
Contingency $0.00 $343,300.29 $343,300.29
Inspections & Testing
B. Construction Inspection Fee $8,302.50 $59,197.50 $67,500.00
C. Admin Material Testing Fee $1,016.96 $7,251.04 $8,268.00
Page 1 of 3M&C Review
10/28/2025http://apps.cfwnet.org/council_packet/mc_review.asp?ID=33835&councildate=10/21/2025
Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount
Fund Department
ID
Account Project
ID
Program Activity Budget
Year
Reference #
(Chartfield 2)
Amount
D. Water Lab Fee $95.48 $680.77 $776.25
E. Material Testing Cost Contingency $0.00 $44,785.90 $44,785.90
F. Design Services $56,599.86 $411,620.14 $468,220.00
G. IPRC Plan Review Fees $1,722.63 $12,282.49 $14,005.12
H. Public Bid Advertisement Costs $856.82 $6,109.18 $6,966.00
Total Project Cost $412,885.98$3,264,642.88$3,677,528.86
Funding for the infrastructure Improvements for public water and sewer mains Aledo Road project is
as depicted below:
FUND Existing Appropriations Additional
Appropriations
Project Total*
CFA Developer
- Fund 30114
$9,319.46 $0.00 $9,319.46
W&S Rev
Bonds Series
2022-Fund
56020
$3,515,725.00 $0.00 $3,515,725.00
Water/Sewer
Bond 2016 -
Fund 56005
$224,504.00 $0.00 $224,504.00
Total $3,749,548.46 $0.00 $3,749,548.46
* Numbers rounded for presentation purposes.
Funding is budgeted in the Water & Sewer Revenue Bonds Series 2022 Fund for the Water
Department for the purpose of funding the CFA-Aledo Road Stage 1 project, as appropriated.
By approval of this M&C, the City Council finds that the waiver of the community facilities agreement
amendment fee serves a public purpose because the amendment allows the City to reimburse the
Developer for the Citys portion of the IPRC fees and public bid advertisement costs for the project and
the project is for the design and construction of public infrastructure that will be owned and maintained
by the City. The City Council further finds that adequate contractual controls are in place to carry out
such public purpose.
This project is in COUNCIL DISTRICT 3.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the W&S Rev Bonds Series 2022 Fund for the CFA-Aledo Road Stage 1 project to
support the approval of the above recommendations and execution of the amendment . Prior to an
expenditure being incurred, the Water Department has the responsibility of verifying the availability of
funds.
TO
FROM
Page 2 of 3M&C Review
10/28/2025http://apps.cfwnet.org/council_packet/mc_review.asp?ID=33835&councildate=10/21/2025
Submitted for City Manager's Office by:Jesica McEachern (5804)
Originating Department Head:Chris Harder (5020)
Additional Information Contact:Suby Varughese (8009)
Melissa Harris (8428)
ATTACHMENTS
60ALEDO ROAD CFA AMEND 2 Updated FID.xlsx (CFW Internal)
60ALEDO ROAD CFA AMENDMENT 2 funds availability.pdf (CFW Internal)
Aledo M&C exhibits.pdf (Public)
Form 1295 Certificate 2025-1368417 (1).pdf (CFW Internal)
PBS CPN 105498.pdf (Public)
Page 3 of 3M&C Review
10/28/2025http://apps.cfwnet.org/council_packet/mc_review.asp?ID=33835&councildate=10/21/2025
F�RT ��RTH�}
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: PMB Team Ranch Devco LLC
Subject of the Agreement: cFA Amendment
M&C Approved by the Council? * Yes 8 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 63595
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? XYes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If�different from lhe approval dale.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. 105498
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processin� in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the infor7nation is required and if the information is nol provided, the contract will be
returned to the department.