HomeMy WebLinkAbout28065-10-2025 - City Council - OrdinanceOrdinance No.28065-10-2025
AN ORDINANCE ADJUSTING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE
DRAINAGE REVENUE BONDS SERIES 2023 FUND, BY INCREASING ESTIMATED RECEIPTS
AND APPROPRIATIONS IN THE RANDOL MILL HROM PROJECT (CITY PROJECT NO. 104092)
IN THE AMOUNT OF $5,970,876.00 AND DECREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE STORMWATER HAZARDOUS ROAD OVERTOPPING PROGRAMMABLE
PROJECT (CITY PROJECT NO. P00120) BY
THE SAME AMOUNT; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE
CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES
IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
That the budget of the City of Fort Worth for Fiscal Year 2025-2026, as enacted by Ordinance 27979-09-
2025, as amended, is hereby further amended to make the following adjustments to estimated receipts and
appropriations in the Drainage Revenue Bonds Series 2023 Fund, by increasing estimated receipts and
appropriations in the Randol Mill HROM project (City Project No. 104092) in the amount of $5,970,876.00 and
decreasing estimated receipts and appropriations in the Stormwater Hazardous Road Overtopping
Programmable project (City Project No. P00120) by the same amount.
[+'ix611101ZIPJ
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 27979-09-2025 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPRO ED A TO FORM AND LEGALITY:
Douglas Black (Oct 31, 202516:24:02 CDT)
Assistant City Attorney
ADOPTED AND EFFECTIVE: October 21, 2025
CITY SECRETARY
Jannette S. Goodall
City Secretary
44-a�n�
,CYo�°FoRraa�
'Cr00
0 OW
P ~o° °
0000 0Z
0
0
00 000� �CA
0
°000000 Acy
atl TEX ASaaa
Mayor & Council Map I CPN #104092
Randol Mill Road I Hazardous Roadway
Overtopping Mitigation (HROM) Project
CD#5
. J
r
L
FORT WORTH
Project Extent
Council District `
5 -Deborah Peoples J w t
`w
Z " p
5 - Deboraj$$*boples
t
WINTERSST
t
Data Source: CFW GIS, Nearmap I Map generated July 2025
0 340 680 TPW Business Support Services
Copyright 0 2025 City of Fort Worth Unavthwded reproduction d a wolabonof
apphcobfe Mws. Thisdoters[o be use for grapM1rcal rcpesentotron orYy The —acy
Feet rs not to be takenAtsed as data poduced for engrnecringpwposes a by a regrsten dI
pofesnarsolan ld surveyor TM City o1 For[ Worth assumes ro respansibi6ry for [he
aoc—y of sod data
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 10/21/25 M&C FILE NUMBER: M&C 25-0991
LOG NAME: 20SWM RANDOL MILL HROM CONSTRUCTION -KLUTZ
SUBJECT
(CD 5) Authorize Execution of a Construction Contract with Klutz Construction, LLC in the Amount of $9,644,054.75 for Construction of the Randol
Mill Hazardous Road Overtopping Mitigation Project, Amend the Transportation and Public Works Stormwater Fiscal Years 2026-2030 Capital
Improvement Program, and Adopt Appropriation Ordinances, including one to effect a Portion of Water's Contribution to the Fiscal Years 2026-
2030 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of a contract with Klutz Construction, LLC in the amount of $9,644,054.75 for construction of the Randol Mill
Hazardous Road Overtopping Mitigation project (City Project No. 104092);
2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Drainage Revenue Bonds Series 2023
Fund in the amount of $5,970,876.00 by increasing estimated receipts and appropriations in the Randol Mill Hazardous Road Overtopping
Mitigation project (City Project No. 104092) and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping
Programmable project (City Project No. P00120) by the same amount;
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects Fund in the
amount of $3,595,512.00 by increasing estimated receipts and appropriations in the Randol Mill Hazardous Road Overtopping
Mitigation project (City Project No. 104092) and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping
Programmable project (City Project No. P00120) by the same amount;
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund
in the amount of $1,308,238.00 from available PayGo residuals, for the purpose of funding the Randol Mill Hazardous Road Overtopping
Mitigation project (City Project No. 104092), and affect a portion of Water's contribution to Fiscal Years 2026-2030 Capital Improvement
Program; and
5. Amend the Stormwater Fiscal Years 2026-2030 Capital Improvement Program.
071--1tl1b -1 Eel ►F
This Mayor and Council Communication (M&C) will authorize execution of a construction contract with Klutz Construction, LLC in the amount of
$9,644,054.75 to reduce hazardous roadway flooding at a flood -prone section of Randol Mill Road, between Territory Trail and Goldeneye Lane.
The project is part of the Stormwater Hazardous Road Overtopping Mitigation (HROM) Program, which is an ongoing effort to identify hazardous
road flooding locations, prioritize them based on risk, and, where feasible, develop solutions to make them safer. The HROM program was
created in response to life -threatening and fatal incidents associated with flooded roads, usually at stream crossings. This site has experienced
severe flooding with cars washed off the road and high-water rescues.
The improvements at this location involve a realignment of the roadway away from the floodplain, raising the roadway elevation, eliminating two (2)
existing culvert crossings, adding a new culvert crossing, channel improvements, and the addition of underground stormwater drainage pipes.
Additional improvements include adding sidewalks, new sewer and water lines, trail improvements to Mallard Cove Park due to the project
impacting parkland and adding a dual turn lane to the roadway.
The project was advertised for bid in the Fort Worth Star -Telegram on May 14, 2025, and May 21, 2025. On June 11, 2025, the following bids
were received:
Bidder Amount
Klutz Contractors, LLC $9,644,054.75
(McCarthy Building Companies, Inc. $10,093,918.64
Jackson Construction, Ltd. $11,515,279.00
Construction is expected to begin in January 2026 and be completed by May 2026.
Funding for design and right-of-way acquisition for the Randol Mill project, in the amount of $2,315,000.00, was provided by M&C 22-0776, which
amended the Stormwater Fiscal Years 2022-2026 Capital Improvement Program. Funding for the relocation of Atmos facilities in conflict with the
proposed construction for the Randol Mill HROM project, in the amount of $419,000.00, was recommended as part of the September 30, 2025
M&C Agenda. Additional funding in the amount of $10,874,626.00 is needed to fully fund the project through construction.
The Water Department's share of this contract is $1,130,185.90 (Water $808,659.90; Sewer $321,526.00) and will be available in the Water and
Sewer Capital Projects Fund for the project (City Project No. 104092). The Stormwater Division's share of this contract is $8,513,868.85. In
addition to the contract cost, $720,355.00 (Stormwater; $613,330.00; Water: $75,718.00; Sewer: $31,307.00 is required for project management,
material testing, inspection and stormwater GIS/project controls, and $510,216.00 (Stormwater: $439,189.00; Water: $48,520.00; Sewer:
$22,507.00) is provided for project contingency. This project will have no impact on the Transportation & Public Works Department nor the Water
Department's operating budgets when completed. The sanitary sewer component of this project is part of the Sanitary Sewer Overflow Initiative
Program of the Water Department.
It is the practice of the Water Department to appropriate its (CIP) plan throughout the Fiscal Year, instead of within the annual budget ordinance, as
projects commence, additional funding needs are identified, and to comply with bond covenants. The actions of this M&C will appropriate funds in
support of the Water's portion of the City of Fort Worth's Fiscal Years 2026-2030 Capital Improvement Program.
Funding is available in the Unspecified All -Funds project within the W&S Capital Projects Fund for the purpose of funding the Randol Mill HROM
project.
The 2020 Stormwater Revenue Bonds, 2023 Stormwater Revenue Bond, TPW Stormwater Capital Projects fund, and W&S Stormwater Capital
Projects will fund this project.
M&C 25-0933 approved by City Council on September 30, 2025 will add additional appropriations into the Stormwater Capital Projects Fund in
the amount of $219,000.00 and Drainage Rev Bonds Series 2023 in the amount of $200,000.00.
The Funding for the Randol Mill HROM project is summarized in the table below:
Fund Existing Additional Project Total
Appropriations Appropriations
Stormwater Rev
Bonds Series 2020 — $633,000.00 $0.00 $633,000.00
Fund 52007
Stormwater Capital
Projects — Fund $1,901,000.00 $3,595,512.00 $5,496,512.00
52002
Drainage Rev Bonds
Series 2023 — Fund $200,000.00 $5,970,876.00 $6,170,876.00
52008
W&S Capital Projects $0.00 $1,308,238.00 $1,308,238.00
- Fund 56002
Project Total $2,734,000.00 $10,874,626.00 $13,608,626.00
Funding is budgeted in the Stormwater Hazardous Road Overtopping Programmable project (City Project No. P00120) with the Drainage
Revenue Bonds Series 2023 and Stormwater Capital Projects Funds for the Transportation and Public Works Department for the purpose of
funding the Randol Mill HROM project (City Project No. 104092), as appropriated.
Funding for this projects was not included in the FY2026-2030 Capital Improvement Program due to the concerns that were unknown at the time of
the development of the Capital Improvement Program. The action in this M&C will amend the FY2026-2030 Capital Improvement Program as
approved in connection with Ordinance 27979-09-2025.
This project is in COUNCIL DISTRICT 5.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the SW Hazardous Rd Overtopping programmable project within the Stormwater
Capital Projects and the Drainage Rev Bonds Series 2023 Funds and in the Unspecified All -Funds project within the W&S Capital Projects Fund
and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the
Stormwater Capital Projects Fund, Drainage Rev Bonds Series 2023 and in the W&S Capital Projects Fund for the Randol Mill HROM project, to
support execution of the construction contract. Prior to any expenditure being incurred, the Transportation & Public Works and Water Departments
have the responsibility for verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Thanaa Maksimos 6035
John Kasavich 8480
Expedited