HomeMy WebLinkAbout061723-CO1 - Construction-Related - Contract - Fain Group, Inc.CSC No. 61723-COI FORTWORTH. City of Fort Worth Change Order Request Project Name Trinity Trail East- Phase 2 Trail Project City Sec # 61723 Client Project #(s) 101767 Project The major work consists of the following: Installation of a new 12-foot wide trail, construction of a pedestrian bridge over the West Fork of the Trinity River, Description and a mid -block crossing with signage and lighting. Contractor Fain Group, Inc. Change Order# 1 Date 5/15/2025 City Project Mgr. Oliver Penny City Inspector Jason Inocencio Dept I PARD I I I I Totals Original Contract Amount $3,571,216.00 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $3.571.216.00 Revised Contract Amount $3,579,541.00 1 $3,579,541.00 1 365 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $8,325.00 1 $8,325.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.23% MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,464,020.00 ORDER ditions: 1. Upsized Reinforced Concrete Pipe Wye from 36" to 42" to connect to existing 42" Reinforced Concrete Pipe. 2. Added Asbestos survey for existing bridge demolition that was missing from Bid Items. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name Contractor (Name ontract Signature Fain Group; Inc. Noel Sanchez ^^°zS�d 05/15/2025 for/Ins ection Supervisor Date -? — 05/16/2025 Project and Contract Compliance Manager °P r Date 05/16/2025 Program Manager Date Senior Capital Project Officer Date 05/19/2025 05/29/2025 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date 05/29/2025 05/30/2025 Assistant City Attorney JIM ;istant City Manager Date 05/30/2025 06/02/2025 Council Action if required) M&C Number N/A ATTEST: A &_Q, Jannette Goodall, City Secretan M&C Date Approved NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth 1' 11— Change Order Additions Project Name Trinity Trail East- Phase 2 Trail Project City Sec # 61723 Client Project# 101767 Contracto Fain Group, Inc. PM Oliver Penny Inspector Jason Inocencio Change Order Submittal # Date 5/15/2025 AUUI I IUM MMUNIM - ..ice II�i.Xf'1.11II1 1000010 ----- 1000010 ----- MEMINIM ----- 1000010 ----- 1000010 ----- 1000010 ----- 1000010 ----- 1000010 ----- 1000010 ----- 1000010 ----- 1000010 ----- 1000010 ----- •DII Sub Total Addfions :$8, rG$%�rID1 Change Order Additions Page 2 of 4 FORT WORTH City of Fort Worth Change Order Deletions Project Name I Trinity Trail East- Phase 2 Trail Project City Sec # 61723 Client Project# 101767 Contracto Fain Group, Inc. PM Oliver Penny Inspector Jason Inocencio Change Order Submittal # Date 5/15/2025 Change Order Deletions Page 3 of 4 MISBE for this Change Order Signature: �0.I` Email: joel.mcelhany@fortworthtexas.gov Signature: Douglas Black (May 30, 2025 17:23 CDT) Email: Douglas.Black@fortworthtexas.gov Signature: 49v fa-, Email: Dave.Lewis@fortworthtexas.gov Signature: n"W- 8wu^ Da na Burghdoff(Jun ,20251 Al CDT) Email: Dana.Burghdoff@fortworthtexas.gov FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: The Fain Group Subject of the Agreement: change order #1 M&C Approved by the Council? * Yes ❑ No If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes © No ❑ 61723-Col If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes © No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No © If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 101767 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes © No ❑ Contracts need to be routed for CSO processing in the following order: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.