HomeMy WebLinkAbout063360-CO1 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 63360-COI
FORT WORTH.,: City of Fort Worth
Change Order Request
Project Name 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project #(s) 104213
Water, sewer and paving improvements on various streets
Contractor Woody Contractors, Inc. Change Order # 1 Date 10/27/2025
City Project Mgr. I Justina Samaan City Inspector Hector Montoya
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Unit 1: Water
Unit 2: Sewer
Unit 3: Paving
Totals
Contract Time
CD
$4,051,626.25
$1,071,153.50
$4,005,068.00
$9,127,847.75
450
$4,051,626.25
$1,071,153.50
$4,005,068.00
$9,127,847.75
450
Amount of Proposed Change Order
$0.00
$0.00
$0.00
15
Revised Contract Amount $4,051,626.25 $1,071,153.50 $4,005,068.00
Original Funds Available for Change Orders $202,581.00 $53,558.00 $200,254.00
Remaining Funds Available for this CO $202,581.00 $53,558.00 $200,254.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$9,127,847.75
465
$456,393.00
$456,393.00
I 0.00%
1 $11,409,809.69
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and materials as specified in Charge Order #1. Change Order #1 includes
a bid item for an additional 300 LF of temporary water service. The original design assumed several existing water lines could be backfed; however, field investigation
revealed that they were not. To maintain continuous water service to residents, additional temporary connections were necessary. Change Order #1 also includes new bid
items for 1.5" water meters and services. The plans called for the replacement of 1" and 2" water meters and services only. Field verification showed that several existing
meters were 1.5" in size, requiring the addition of new bid items for 1.5" meters and services. The change order also includes new bid items for additional water line stubouts
that are required to accommodate an upcoming Water Department project, ensuring system compatibility, minimizing future service interruptions, and cutting new paved
streets.
Time: The change order will add 15 additional days to the project contract time due to the installation of the additional temporary water line and service adjustments, which
resulted in schedule impacts. Here's a breakdown of the delays: 5 calendar days (7/24/25-7/28/25) for installing the additional temporary water line, 2 calendar days for
meter procurement, and 8 calendar days for installing the permanent water line adjustments.
Cost: Staff has reviewed the contractor's proposed new unit prices and compared them to pricing from recent similar projects under construction at the time of the change
order, and has determined that the contractor's proposed pricing is fair and reasonable. This change order will reduce the water construction allowance bid item to pay for the
laddotonnal 'one item I
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Compan lContract Si nature
Woody Contractors, Inc. Troy Woody
Inspector/inspection Supervisor
Date
Project and Contract Compliance Manager
)ate
Date
_
11/04/2025
><--C
11/06/2025
Program Manager
Date
Senior Capital Project Officer
Date
11/06/2025
11/07/2025
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Patricia wadsacK
Patricia L. Wad, ov"! ack (N, 202514:54:02 CST)
11/07/2025
a��7
11/11/2025
ssistant it
Date
Assistanti a er
Date
11/11/2025
11/22/2025
Council Action if required)
boo�v�n�n M&C Number N/A M&C Date Approved N/A
ATTEST: ' 81J.° '� °�YQd
a A— pro ° °DyOp
per°
Jannette Goodall, City Secretary pv' o =A
0 2tl o °
a
aaa� tEZAs4ap
�nuoa'a'�'
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
1 T--- Change Order Additions
Project Name 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project# 104213
Contracto Woody Contractors, Inc. PM Justina Samaan Inspector Hector Montoya
Change Order Submittal # Date 10/27/2025
AUUI I IUNS
r1��pI1I1IIIIIIIIl10•a
'� ' 1I1 111111LU
IIIIAII]
1 r E
MM�IM
'�� 111 I1INEIRS1112IIAIII
1 r I
MM�IM
'� 111111MEME1.11III,,II
1 . ' PTC Hater •
,
1 11��sm,"I'Il➢I
1➢ill�i
-' 1 P
MMMVK- II 1 II
i_
000 . /1,
��MMMMWW
lhI1I1w"
MMI -
'� I1 I1
�ri'1.x I
: . - .. -
�=E
MENE!(IDIIIIIII, II11MM�'
'� - I 1 11
NEEL311[IIIIAII]
1 - Y. - ..
,
(IDIIIIIII, II11MM�'
'Z1111
NEIRSI ,1AI11
11 Mice
1 11��ux1I4441NImMERi
'� 1 I 1
iMENUAAI11
�'..�3201.0400Temporary1
1���III
MERiMEN'�
1 r
'- 111 1 I
MEMEMMEN
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010
1000010Unit
11000010
1: Water
11
Unit 2: Sewer
1 11
Unit 3: Paving
1II
Sub Total Additions
11
Change Order Additions Page 2 of 3
FoeT� City of Fort Worth
Change Order Deletions
Project Name 1 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project# F 104213
Contracto Woody Contractors, Inc. PM Justina Samaan Inspector Hector Montoya
Change Order Submittal # Date 10/27/2025
Change Order Deletions Page 3 of 3
FORT WORTH,,,,
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE• 2022 Bond Year 2 Contract 12 — Change Order 1
M&C: 25-0425 CPN: 104213 CSO: 63360 DOC#:
Date: 10/27/2025
To:
Name
Department
Initials
Date Out
1.
Alexandra Ripley
TPW - initial
11/05/2025
2.
Troy Woody
Contractor - signature
-y—dy
11/06/2025
3.
Hector Montoya
TPW - signatures
11/04/2025
4.
Gary Deyon
TPW - signature
11/06/2025
5.
Justina Samaan
TPW - signatures
11/06/2025
6.
Greg Robbins
TPW - signatureL
11/06/2025
7
Mary Hanna
TPW - signatures
11/07/2025
8
Patricia Wadsack
TPW - signature
p(-,�/'
11/07/2025
9
Lauren Prieur
TPW - signatures
Lauren PH—
11/11/2025
10.
Doug Black
Legal - signature
Douglas �
Black
11/11/2025
11.
Jesica McEachern
CMO - signature
CA
11/22/2025
12.
Jannette Goodall
CSO - signature
a a''necoada
11/25/2025
13.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH:DYES ®No SAME DAY: DYES ®No NEXT DAY:DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractskFortWorthTexas. og_v at ext. 7233 for pick up when completed.
Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement:
2022 Bond Year 2 Contract 12 - Change Order 1
M&C Approved by the Council? * Yes ❑ No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ® No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes IN No ❑
If unsure, see back page for permanent contract listing.
63360, 1
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
104213
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ® No D
Contracts need to be routed for CSO processing, in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.