Contract No
CSO EC D
NA V 2 ' 25_ PH3.1
SECOND AMENDMENT TO CITY SECRETARY CONTRACT NO. 62419
•
This second amendment (the "Second Amendment") is made and entered into by and
between the City of Fort Worth (hereafter "City"), a Texas municipal corporation, and Child
Care Associates, a Texas nonprofit corporation (hereafter "Developer"). City and Developer
may be referred to individually as a "Party" and jointly as "the Parties".
RECITALS
WHEREAS, the City entered into an agreement with Developer to utilize resources
received by City from the United States Department of the Treasury through the Coronavirus
State and Local Fiscal Recovery Funds Program, a part of the American Rescue Plan Act
("ARPA"), more specifically described in City Secretary Contract No. 62419 (the "Agreement");
WHEREAS, the City and Developer executed a First Amendment (City Secretary Contract
No. 62419-A1) to the Agreement ("First Amendment"), effective April 1, 2025, for the purpose
of adding the development budget details contemplated by Exhibit "B-1" to the Agreement;
WHEREAS, subsequent to the First Amendment, the Developer identified increased site
work, infrastructure, and modular building costs necessary for completion of the Child Care
Associates Early Learning Facility (the "Child Development Facility") located in the Stop Six
Neighborhood (the "Project"), creating an additional financing need;
WHEREAS, on August 26, 2025, the City Council authorized the reallocation of
$629,070.00 in ARPA State and Local Fiscal Recovery Funds to support unforeseen but necessary
Project development and construction costs, as set forth in Mayor and Council Communication
(M&C) 25-0780;
WHEREAS, on September 16, 2025, the City Council further authorized the use of
Fiscal Year 2025 interest earnings in the amount of $870,930.00 to help cover a shortfall in
the development of the Child Development Facility, as set forth in M&C 25-0812;
WHEREAS, together these actions provide a total increase of $1,500,000.00 in funding
for the Project, to go toward completion of site work and the purchase and installation of the
modular facility, as further detailed in the updated Exhibits attached hereto;
WHEREAS, the Parties now desire to amend the Agreement again to update the (1) Budget
(Exhibit "B"), (2) Development Budget (Exhibit "B-1"), and (3) Construction and Reimbursement
Schedule (Exhibit "C") to reflect the additional funding and the adjusted timing of disbursements.
NOW THEREFORE, City and Developer do hereby agree to the following:
I.
Amendment to the Agreement
NOW THEREFORE, for valuable consideration, the receipt and sufficiency of which
is hereby acknowledged, the Parties agree as follows:
A. Exhibit "B" (Budget) is hereby deleted in its entirety and replaced with the one -
page document attached hereto as Exhibit "B" (Budget).
B. Exhibit "B-1" (Development Budget) is hereby deleted in its entirety and replaced
with the one -page document attached hereto as Exhibit "B-1" (Development
Budget).
C. Exhibit "C" (Construction and Reimbursement Schedule) is hereby deleted in
its entirety and replaced with the one -page document attached hereto as Exhibit
"C" (Construction and Reimbursement Schedule), which reflects the addition of
$1,500,000.00 in City funding and adjustments to the timing of payments to
Developer.
II.
Effective Date
This Amendment is effective as of October 31, 2025, regardless of the date of execution.
III.
Terms Not Amended Are Unchanged
All terms and conditions of the Agreement not amended herein remain unaffected and in
full force and effect, are binding on the Parties and are hereby ratified by the Parties. Capitalized
terms not defined herein shall have the meanings assigned to them in the Agreement.
[Signatures Follow on Next Page]
Second Amendment to CSC No. 62419
ARPA CONSTRUCTION CONTRACT
Child Care Associates
Stop Six Project
ACCEPTED AND AGREED:
DEVELOPER
By:
Kar. addell, Chief Executive Officer
ATTEST:
44.Ana�
' 10° Fol#P00
040°
o�f.�
13
By: \ oy�
Ja ette Goodall, Ci $fir o°.Z' d
C: 21-0814; 25- S0.aicli081 °o' ° a
1295 Certification No. � Air 4
4ati�a44a
RECOMMENDED:
By: — -w.•
Kacey Thomas, Neighborhood Services Director
DAV
CITY OF FORT WORTH:
By:
Dana Burgh
APPROVE
LEGALIT
CONTRACT COMPLIANCE ADMINISTRATOR:
By signing, I acknowledge that I am the person responsible
for the monitoring and administration of this contract,
including ensuring all performance and reporting
requirements
ua Hezlep, Neighborho . ► evelopment Coordinator
Second Amendment to CSC No. 62419
ARPA CONSTRUCTION CONTRACT 1
Child Care Associates
Stop Six Project
e ie L.
Senior Assistant City Attorney
tant City Manager
FORM AND
01 Ai,. RECORD
::J.. t1ETARY
►RTh, TX
IN WITNESS WHEREOF, Lender has executed this First Amendment to Promissory
Note as of the date set forth above.
LENDER:
CITY OF FORT WORTH
Dana Burghc�(jff, As' .tant City Manager
FIRST AMENDMENT TO PROMISSORY NOTE — ARPA FUNDS
Child Care Associates
Child Development Facility in Stop Six
Page 3
EXHIBIT "B" - BUDGET
Account
Grant Budget
Increase
B
Total
SUPPLIES AND SERVICES
Office/Program Supplies
2001
$600.00
Management Fees
2002
$41,592.00
Planning and Coodination
2003
$167,708.00
Design Plans, Generated
Renderings & Scope of Work
2004
$90,000.00
CONSTRUCTION
Modular Building
4001
$3,851,100.00
GC
4002
$475,000.00
$157,740.00
Equipment Furnishings, FFE
4004
$100,000.00
Playground (plumbing, dirt work,
equipment)
4005
$174,000.00
Parking lot
4006
$100,000.00
Civil Soil Work
4007
$1,342,260.00
BUDGET TOTAL
$5,000,000.00
$1,500,000.00
$0.00
$6,500,000.00
Page 1
rI
11:1
F�1
Child Care Studio at Stop Six - Project Budget
U
V
Resources/
0
0
0
0 r-+ c L.()
0 c-1 CO d'
0 LC) CO O)
O 0) N O
o o co
tfr
rn
ci
c0
42o-
0
p o 0
co co N CO
co
st
M co
c-I
0
0
O
O
O
10
c-i
a
cc
CO CD N 0
CD I ((CD 0 LO o
co c-1 O
c-i O)
O
O
O
0)
N
cco o r 0 CD o LOf) Op p .�-1
N p CO c-1 O c-I p p i''
' ' d O) c-1 O OO 6 O c-I
N M N It .N-I N N
n)
O
O
O
O
O
u?
0
LG
f0
h0-
o o i o
( s 0)
Cf' c-i
O
O
O
L() 0 0 0 0 0 0 0 LO c-1 M In
MIt
N o W 0 0 d' O o COO 10 (OD 0))
d' O O) O O O ui O O 4 cv O
N M co d- cN-i CO CO 0 (-I
M .-1
ff} fA f e 69- <fl {f} {f} ' 4 b4 fPr
c-1
O
O
M
N
to
N
N
c0
a)
c
Budget Line item
N
N
O
U
Land Purchase
N
M
M
69- 69-
N N
U U
c . 2
c c O
E E
o
r-I 2-4 0
w Iv
0.
Q 0
o. U
Cr)
a) 06
U
OD
O C
m •
a) i
a)
a
uq C
a)
C N CC
O U
'+_, CO
C 0_ u
m (0
a "O o. O
O C CO cam.) a) C
a)
o
U m O 19 0
-O = m C N
C O. c C
CtS
etS bO Q. o 0
C V) m C
C 0 o ( bA
iii
(E = a
a. O m
SUBTOTAL - Planning and Coordination
Stop Six Construction
Assessment/ Procurement and Contracting
Modular Building
Engineeered Slab Foundation
GC Pronghorn Flats
Huckabee Architect Fees
JRJ CIVIL SOIL WORK
Playground allowance
Building Signage (interior and exterior)
>,
0
OD
bA
c
0
U
FFE/ Equipment
Classroom Supplies & Furniture
Kitchen, MISC Rooms, Other
IT Security Alarm & Equipment &Installation
a3
0
O
0
O
O
0
O
O
1n
f»
2)
u-
LL
CC
CO
EXHIBIT "C"
CONSTRUCTION AND REIMBURSEMENT SCHEDULE
CHILD CARE ASSOCIATES
Activity
ARPA Funds
Total Costs for Stop Six Child Development
Facility
$6,500,000.00
PHASE I
COMPLETED by:
February 28, 2025
• Contract signed
• Procurement for Architectural &
Engineering*
• Architectural & Engineering Fees
*Contractor/subcontractor/vendor searches under
the Federal System for Award Management
(www.sam.gov) must be submitted prior to any
$500,000.00*
reimbursement under the Phase.
PHASE II
COMPLETED BY:
August 30, 2025
Construction/Rehabilitation of the Child
Development Facility:
• Procurement for Construction
Contractor*
• Construction Costs
• 25% Completion of Project
*Contractor/subcontractor/vendor searches under
the Federal System for Award Management
(www.sam.cov) must be submitted prior to any
$500,000.00*
reimbursement under the Phase.
PHASE III
COMPLETED BY:
December 31, 2025
Mobilization of Funds for Soil Work and
Modular Building
$1,500,000.00
PHASE IV
COMPLETED BY:
February 28, 2026
Construction / Rehabilitation of the Child
Development Facility:
• Construction Costs
• 75% Completion of Project
*Contractor/subcontractor/vendor searches under
the Federal System for Award Management
(www.sam.gov) must be submitted prior to any
$1,500,000.00*
reimbursement under the Phase.
ARPA CONSTRUCTION CONTRACT — EXHIBIT-C
Child Care Associates
Stop Six Project
PHASE V
COMPLETED BY:
June 30, 2026
Construction/Rehabilitation of the Child
Development Facility:
• Construction Costs
• 85% Completion of Project
*Contractor/subcontractor/vendor searches under
the Federal System for Award Management
(www.sam.gov) must be submitted prior to any
$2,000,000.00*
reimbursement under the Phase.
PHASE VI
FINAL PAYMENT
COMPLETED BY:
October 31, 2026
Completion/Close Out of the Child
Development Facility:
• Construction Costs
• 100% Complete of Project
• Punch List/Final Inspections by
Neighborhood Services Department
Inspectors
• Rehabilitation Completed
• Final Reimbursement Forms to
include Section 3 Report per CBDG
contract Section 10 and 14.11.3
$500,000.00*
TOTAL ARPA FUNDS
$6,500,000.00
*Developer will only be reimbursed for eligible expenses. The amounts and activities are
estimates and are subject to change.
ARPA CONSTRUCTION CONTRACT — EXHIBIT-C
Child Care Associates
Stop Six Project
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1of1
Complete Nos, 1 - 4 and 6 if there are interested parties,
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties,
OFFICE USE ONLY
CERTIFICATION OF FILING
Certificate Number:
2021-807064
Date Filed:
09/28/2021
Date Acknowledged:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
Child Care Associates
Fort Worth, TX United States
2 Name of governmental entity or state agency that is a party to the contract for which the form Is
being filed.
City of Fort Worth
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
American Rescue Plan Act (ARPA
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
Intermediary
5 Check only if there is NO Interested Party.
El
6 UNSWORN DECLARATION
My name is l a! kL4.Q pi..itkOt. I N , and my date of birth is
My address is ,
(street) (city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct. C - L J n
Executed in l l.11NT .}�'y County, State of ) AS , on Ilia clay of pr 7�20 /0'.
` (month) (year)
gnature o uthorized agent o ntracting business entity
(Doclar�
orms provided by Texas Ethics Commission
www.ethics.state,tx,us
Version V1.1.191b5cdc
11/6/24, 8:04AM M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 10/19/2021
REFERENCE
NO.:
19ARPAALLOCATIONS TO
M&C 21-0814 LOG NAME: HOUSING AND HUMAN
SERVICES PROJECTS
CODE: C TYPE: NON- PUBLIC NO
CONSENT HEARING:
SUBJECT: (CD 5, CD 8, and CD 9) Authorize Allocation of Funds from the American Rescue Plan Act
in the Aggregate Amount of $10,100,000.00 to Child Care Associates for the Expansion of
Early Childhood Learning Centers in the Stop Six Choice Neighborhood Initiative Hub and
Gwendolyn C. Gragg Child Development Center, to the Housing Authority for the City of
Fort Worth, Texas Doing Business as Fort Worth Housing Solutions for the Design and
Construction of Underground Power Lines and the Removal of Power Poles in
Connection with Four Phases of the Cavile Place/Historic Stop Six Choice Neighborhood
Initiative Redevelopment, and to Fort Worth Area Habitat for Humanity, Inc., Doing
Business as Trinity Habitat for Humanity for the Purchase, Replat, Design, and
Development of Fourteen Single -Family Lots in the Vicinity of John Peter Smith Hospital,
Authorize Execution of Related Contract Documents, and Find that the Expenditures
Serve Public Purposes and that Adequate Controls are in Place
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize allocation of $10,100,000.00 of American Rescue Plan Act Funds, Subtitle M (Coronavirus State and
Local Fiscal Recovery Funds) to the agencies listed in Tables 1 and 2 below;
2. Authorize the City Manager, or his designee, to execute contracts with the agencies listed in Tables 1 and 2
below;
3. Authorize the City Manager, or his designee, to amend contract as necessary for completion of the project
provided any amendment is within the scope of the project and complies with City policies and all applicable
laws and regulations governing the use of federal grant funds; and
4. Find that the expenditures serve the listed public purposes and that the contracts provide adequate controls to
ensure the public purposes are fulfilled.
DISCUSSION:
In March 2021, President Biden signed the American Rescue Plan Act (ARPA), providing aid and relief to various sectors
of the national economy. The City of Fort Worth will receive a total allocation of ARPA funds in an amount exceeding
$173.7 million, to be disbursed in two batches or "tranches." The first tranche was received May 19, 2021, and the
second tranche is expected to be received on or after May 19, 2022. Subsequently, on June 22, 2021, the City Council
approved Mayor and Council Communication (M&C) 21-0445, establishing a general framework for the use of ARPA
funds. Funding must be obligated by December 31, 2024 and fully expended by December 31, 2026.
Allocation of ARPA Subtitle M Funding
Responding to the negative economic impact of the coronavirus pandemic is a specifically identified use of ARPA dollars
under Section 603(c)(1)(A) of Title VI of the Social Security Act (added by ARPA). Treasury Department guidance
specifically notes that these Fiscal Recovery Funds can be deployed for a broad range of uses to address "the
disproportionate....economic impacts of the crisis on the hardest -hit communities, populations, and households" and to
provide services and additional investments in Qualified Census Tracts, such as the ones in which the identified projects
are located. Therefore, it has been determined that paying for the listed activities in order to improve access to quality,
affordable housing and child care services are eligible uses of funds as a response to negative economic impact and an
investment in housing and neighborhoods in a Qualified Census Tract.
Several local agencies submitted proposals for affordable housing and human services projects totaling $31.4 million.
City staff has reviewed these proposals with respect to financial feasibility, community need, and eligibility under ARPA
Section 9901, Subsections 603(c)(1)(A) and 603(c)(1)(C), providing funding to aid disproportionately impacted
communities and to support governmental services adversely impacted by the pandemic. As a result, City
staff recommends that we allocate funding to seven projects as follows.
TABLE 1: First Tranche of ARPA Funding
Agency
Child Care
Associates
Funding
Amount
ARPA
Funding Address
Category
Non-
2400 E. 1st St.,
$2,000,000.00 Revenue 76111
Recovery
Council Funding Use
District
Renovation for Early Learning
;Center in Riverside: Gwendolyn C.
1Gragg Child Development Center;
8 'renovation project to include three
,additional classrooms (total of 8
;classrooms) and expanded services for
;infants and toddlers
Offic'al site of the Cty of Fort Wo.ti ,
FORT WORTI I
apps.cfwnet.org/council_packet/mc review.asp?ID=29362&councildate=l0/19/2021 1/3
11/6/24, 8:04AM M&C Review
Fort Worth
Housing
Solutions
$400,000.00
Fort Worth Non -
Area Habitat $1,500,000.00 Revenue
for Humanity Recovery
TOTAL
Agency
Child Care
Associates
$3,900,000.00'
Funding
Amount
Cowan Place:
5400/5420 E.
Rosedale St.,
76105
Neighborhood
surrounding JPS
Hospital
!Infrastructure expenses related to
;neighborhood redevelopment for the
,Stop Six Choice Neighborhood
5 ,Implementation Program; design and
construction work associated with
underground power lines and the
!elimination of power poles
Purchase of fourteen (14) detached
platted lots for the development of
126 or more affordable townhomes
south of John Peter Smith Hospital and
within NEZ Six (properties are 1701 St.
!Louis, 1720 Galveston, 1719
;Galveston, 1716 Galveston, 1715
!Galveston, 1709 Galveston, 1703
(Galveston, 1724 S. Main, 1720 S.
!Main)
9
TABLE 2: Second Tranche of ARPA Funding
ARPA il !
Funding Address Co
Category District
Non- 5100 Block of
$5,000,000.00 Revenue Avenue G,
Recovery , 76105
$400,000.00
Fort Worth
Housing $400,000.00 Revenue Phase 3: Not
Solutions Recovery Yet Named
Revenue
Recovery
Revenue Phase 4: Not
1
$400,000.00 Recovery Yet Named
TOTAL $6,200,000.00
Funding Use
Building a new Early Learning Center at
the future/proposed Stop Six Hub to
expand access to infant, toddler and three-
s year old services in Stop Six; the ARPA
investment would draw $9.2M in quality early
learning services from Child Care Associates
at no charge to low-income families in Stop
Six over ten (10) years
;Infrastructure expenses related to
Hughes ;neighborhood redevelopment for the Stop
House Six Choice Neighborhood Implementation
4830/4908 E. 5 'Program Hughes House; design and
Rosedale St., ;construction work associated with
76105 !underground power lines and the elimination
Iof power poles
Infrastructure expenses related to
neighborhood redevelopment for the Stop
Six Choice Neighborhood Implementation
Program Phae 3; design and construction
work associated with underground power
lines and the elimination of power poles
Infrastructure expenses related to
neighborhood redevelopment for the Stop
Six Choice Neighborhood Implementation
Program Phase 4; design and construction
work associated with underground power
lines and the elimination of power poles
5
5
By approval of this M&C, the City Council finds that the expenditure of the funds on the listed projects serve vital public
purposes for residents of Fort Worth and that the contracts executed between the parties will provide adequate controls
to ensure the public purposes are fulfilled. Specifically, funds provided to Fort Worth Housing Solutions and Trinity
Habitat for Humanity serve the public purpose of supporting the provision of quality, affordable housing in the City that
meets all required zoning, codes, and infrastructure requirements. Additionally, the funds provided to Child Care
Associates will provide needed child care services and programming to residents in need of such critical services.
Approval of this M&C will allocate $10,100,000.00 in the American Rescue Plan Act project in the Grants Operating
Federal Fund budget. Necessary reporting and documentation requirements will be followed to ensure the City can
comply with all reporting requirements of the ARPA legislation.
The following chart reflects the current status for allocation of the City's ARPA funding under Subtitle M and incorporates
each ARPA M&C on the October 19, 2021 Council Agenda:
ALLOCATION OF ARPA SUBTITLE M FUNDING
Description Amount M&Cs
Total CFW ARPA
Subtitle M
Funding
$173,745, 090,.00'',21-0445
apps.cfwnet.org/council_packet/mc_review.asp?ID=29362&councildate=10/19/2021 2/3
11/6/24, 8:04 AM
Allocations
Approved To -Date
Pending
Allocation
Pending
Allocation
M&C Review
$6,000,000.00 25ARPA-VFW-TDG
$300,000.00
25ARPA-WRMC MURAL PLAQUES
$1,000,000.00 13ARPA-ADMINISTRATION
Pending
Allocation
Pending
Allocation
Pending
Allocation
Pending
Allocation
$3,000,000.00
$4,245,533.42
$2,400,000.00
$10,100,000.00
17ARPAALLOCATION CDFI
FRIENDLY AMERICA
17ARPAALLOCATIONS EVANS &
ROSEDALE REDEVELOPMENT
17ARPAALLOCATIONS UNTHSC
TECHSTARS
19ARPA ALLOCATIONS TO
HOUSING AND HUMAN SERVICES
PROJECTS (This M&C)
Remaining
Unallocated $146,699,556.58
Balance
Fort Worth Housing Solutions does not require a Form 1295 because it is a governmental entity.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations, funds will be available in the current
operating budget, as appropriated, of the Grants Operating Federal Fund. This is an advance grant. The Neighborhood
Services Department shall be responsible for ensuring that only expenditures allowable under the American Recovery
Act, with appropriate documentation, are charged to this funding source.
TO
Fund
FROM
Fund
Department
ID
Account
Department Account
ID 1
Project
ID
Project
ID
Submitted for City Managers Office by:
Originating Department Head:
Additional Information Contact:
Program
Activity
Budget
Year
Reference # [Amount
(Chartfield 2)
Program 1 Activity
Budget
Year
Reference #
(Chartfield 2)
Fernando Costa (6122)
Victor Turner (8187)
Amy Connolly (7556)
Sharon Burkley (5785)
Amount
ATTACHMENTS
Form 1295 Certificate City of Fort Worth Child Care Associates ARPA Stop Six Hub 10.4.2021.pdf (CFW Internal)
Form 1295 ARPA Child Care Associates.pdf (CFW Internal)
Form 1295 ARPA Habitat.pdf (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp?ID=29362&councildate=10/19/2021 3/3
10/29/25, 9:55 AM
CITY COUNCIL
Create New From This
AGENDA
M&C
DATE: 8/26/2025 REFERENCE
NO.:
CODE: C TYPE:
SUBJECT:
**M&C 25-
0780
M&C Review
LOG NAME:
u1f1,:i4 . ,2 Ali chi
19CHILD CARE
ASSOCIATES ARPA
ALLOCATION
PUBLIC
CONSENT HEARING: NO
(CD 5) Authorize Reallocation of American Rescue Plan Act State and Local Fiscal
Recovery Funds Up to $629,070.00 to Support Construction of Child Care Associate's
Early Childhood Learning Facility in the Stop Six Neighborhood
r,,,t ��Thruh,
FORT II
RECOMMENDATION:
It is recommended that City Council authorize reallocation of American Rescue Plan Act Funds,
Subtitle M (Coronavirus State and Local Fiscal Recovery Funds) in an amount Up to $629,070.00 to
support development and construction of Child Care Associate's Early Childhood Learning Facility in
the Stop Six neighborhood.
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize reallocation of $629,070.00 of American
Rescue Plan Act (ARPA) State and Local Fiscal Recovery Funds (SLFRF) funds to support
unforeseen but necessary development and construction costs creating a financing gap for the Child
Care Associate (CCA) Early Childhood Learning Facility in the Stop Six Neighborhood (the "Project").
The City of Fort Worth received ARPA SLFRF in an amount exceeding $173.7 million, consisting of
$87,024,408.00 to be spent in the areas of Public Health and Negative Economic Impacts (Non -
Revenue Recovery), and $86,720,682.00 to assist the City of Fort Worth (City) with the provision of
governmental services (Revenue Recovery).
Per U.S. Treasury requirements, the full amount was allocated to ARPA eligible initiatives established
in M&C 21-0445 on June 22, 2021, and contracts were executed to obligate funds by the established
deadline of December 31, 2024. Current Treasury guidelines allow identified ARPA residual revenue
to be reallocated to established ARPA projects to cover shortfalls in funding as a result of unforeseen
but necessary expenditures.
Originally planned as part of the community center "hub," this Project was initially allocated
$5,000,000.00 in Non -Revenue RecoveryARPAfunding on October 19, 2021, by M&C 21-0814 as a
way of improving access to quality affordable child care services in a qualified census tract, which was
identified as a means of responding to the negative economic impact of the coronavirus pandemic
(Section 603(c)(1)(A) of Title VI of the Social Security Act (added by ARPA) and Treasury Department
guidance).
Due to space limitations and competing demands at the hub, a stand-alone facility was pursued, an
option supported by then -Councilwoman Bivens. Fort Worth Housing Solutions (FWHS) identified two
parcels in the vicinity as a possible site for the Project. While FWHS initially expected to provide the
land at a minimal cost, CCA ultimately had to pay over $450,000.00 for the lots. Although the site lacks
utilities and infrastructure, the CCA Foundation Board authorized the land purchase at an increased
price to keep the Project on track. Zoning and City Council approvals are complete, and the Project is
scheduled for completion by December 2026.
CCA received infrastructure bids totaling approximately $1,900,000.00, much higher than anticipated,
due to soil preparation and water retention requirements. These costs now account for nearly a third of
the project budget and have created a projected shortfall of $1,500,000.00.
The Financial Management Services Department (FMS), in coordination with department project
managers, has identified residual ARPA Non -Revenue Recovery funds in the following completed or
apps.cfwnet.org/council_packet/mc_review.asp?I D=33640&councildate=8/26/2025 1/6
10/29/25, 9:55 AM M&C Review
substantially completed ARPA projects:
Project M&C Amount
ARPA Administration 21-0805 $ 75,000.00
Highland Hills Park Improvements 23-0517 500,000.00
Gragg Child Development Facility 21-0814 53,778.00
MMA Streetlights 22-0789 292.00
Total Available for Reallocation $ 629,070.00
In addition to the proposed reallocated ARPA funding, a separate M&C on today's agenda seeks
authorization to use $870,930.00 in Fiscal Year 2025 interest earnings for this learning facility, for a
total additional funding amount of $1,500,000.00
Summary of ARPA Allocations To -Date
The following chart reflects the current status for allocation of the City's ARPA funding under Subtitle M
and incorporates each ARPA M&C on the August 26, 2025, Council Agenda:
STATUS AMOUNT M&C
Total CFW j $173,745,090.00 21-0445 362021 AMERICAN RESCUE PLAN
ARPA
Subtitle M
Funding
Allocations
Approved
To -Date
Allocations'
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
6,000,000.00 21-0794 25ARPA-VFW-TDG
1,000,000.001 21-0805 13ARPA-ADMINISTRATION
4,245,533.00 21-0810 17ARPAALLOCATIONS EVANS & ROSEDALE
REDEVELOPMENT
2,400,000.001 21-0811 17ARPAALLOCATIONS UNTHSC TECHSTARS
10,100,000.001 21-0814 19ARPAALLOCATIONS TO HOUSING AND HUMAN
SERVICES PROJECTS
3,000,000.001 21-0809 19ARPAALLOCATION CDFI FRIENDLY AMERICA
300,000.00 21-0820 25ARPA-WRMC MURAL PLAQUES
6,400,000.00'21-0935 21ARPA-PEG FUNDING -FUTURE CITY HALL
apps.cfwnet.org/council_packet/mc_review.asp?ID=33640&councildate=8/26/2025 2/6
10/29/25, 9:55 AM
Allocations I
Approved
To -Date
Allocations
Approved
j To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved !
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations !,
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved I
To -Date
I Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations;
Approved
To -Date
Allocations
Approved
To -Date
Allocations I
Approved
To -Date
M&C Review
8,000,000.00 21-0908 23ARPA-VACCINATIONS AND TESTING
4,560,000.00
21-0913 25ARPA-
P E D\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\_CAPITAL\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\_R E STO R E
52,000,000.00 I 21-0934 21ARPA-FWCC EXPANSION FUNDING & PROJECT
;MANAGEMENT
3,000,000.00
22-0268 17ARPA CENTER FOR TRANSFORMING LIVES
5,000,000.00 122-0270 19ARPAALLOCATION FOR PERMANENT SUPPORTIVE
HOUSING
7,091,047.00 ; 22-0368 04ARPANEIGHBORHOOD WIFI CARES
RATIFICATION/ARPA ALLOCATION
3,595,000.00 22-0366 04ARPA INFRASTRUCTURE PROGRAM
3,675,000.00 ! 22-0367 04ARPA CYBERSECURITY PROGRAM
16,000,000.00 122-0789 MMA INFRASTRUCTURE — STREETLIGHTS &
PEDESTRIAN SAFETY
2,500,000.00 22-0789 MMA INFRASTRUCTURE — COBB & HIGHLAND HILLS
PARKS
3,200,000.00 122-0789 TARRANT AREA FOOD BANK FACILITY
2,000,000.00 j 22-0789 POLICE AND FIRE COVID WORKER'S COMPENSATION
CLAIMS
1,458,372.00 22-0789 POLICE COVID HEALTH EXPENDITURES
750,000.00 22-0789 VISIT FORT WORTH SPECIAL EVENT FUNDING
4,411,080.00 22-0789 UNITED WAY ONE SECOND COLLABORATIVE
apps.cfwnet.org/council_packet/mc_review.asp?ID=33640&councildate=8/26/2025 3/6
10/29/25, 9:55 AM
Allocations;
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations!
Approved
To -Date
Allocations
; Approved
To -Date
Allocations'
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Reclaimed
Allocations
Allocations ,
Approved I
To -Date
Allocations
Approved
To -Date
Allocations I
Approved
To -Date
Reclaimed
Allocations;
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations i
Approved
To -Date
8,000,000.00
M&C Review
22-0789 DEEPLY AFFORDABLE HOUSING INFRASTRUCTURE &
DRAINAGE
1,500,000.00 22-0789 FORT WORTH ZOO ROAD REPAIR, EROSION CONTROL,
BROADBAND
200,00-0.00
22-0789 TX WESLEYAN ON -CAMPUS PUBLIC UTILITY
RELOCATION
1,925,000.00 22-0789 WILL ROGERS MC AIR HANDLER REPLACEMENT
5,950,000.00
22-0789 WILL ROGERS MC CONCOURSE, LOBBY AND
RESTROOM UPDATES
2,000,000.00 ! 23-0284 ARPA FWTC INNOVATION PARTNERSHIP
$50,000.00 23-0518 6OWSTAMUS ILA
$100,000.00 i 23-0609
ARPA\\\\\\\_CENTRAL\\\\\\\_MULTIMODAL\\\\\\\MOBILITY\\\\\\\HUB
-4,216,902.00 23-0609
ARPA\\\\\\\_CENTRAL\\\\\\\_MULTIMODAL\\\\\\\_MOBILITY\\\\\\\_HUB
4,500,000.00
23-0925 RFP 22-0146 BROADBAND ENHANCEMENTS CH CITY
596,275.00 24-0180 WSTAMUS-MCO
515,000.00 24-0458 2020INT IMPROV N. BEACH ST/WESTERN CENTER BLVD
APPROPRIATION
-5,207,163.00 I 24-0459 13UPDATE AMERICAN RESCUE PLAN ALLOCATIONS
2,020,500.00 24-0496 21MEADOWBROOK GOLF COURSE MAINTENANCE
FACILITY
1,000,000.00 24-0567 20INTERMODAL PKWY CONSTRUCTION CONTRACT
2,307,939.00 24-0781 20ARPA NON -REV TRANSPORTATION ALLOCATIONS
apps.cfwnet.org/council_packet/mc_review.asp?ID=33640&councildate=8/26/2025 4/6
10/29/25, 9:55 AM
Reclaimed
Allocations
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
To -Date
Allocations
Approved
i To -Date
Reclaimed
Allocations
Reclaimed
Allocations
M&C Review
-1,288,733.00 24-0807 13ARPA COBB PARK RECLAIM AND IMPACT FEE
ALLOCATIONS
1,504,959.00 24-0896 2020ARPA NON -REV TRANSPORTATION ALLOCATIONS
567,000.00 24-0920
04ARPA\\\_NEIGHBORHOOD\\\_WIFI\\\_AND\\\_INFRASTRUCTURE
1,035,000.00
183.00
0.00
24-1142 80SECURITY LIGHTING IMP AT 21 PARK SITES
24-1036 04ARPA\_INFRASTRUCTURE\_AMEND
04ARPA ITS INFRASTRUCTURE PROGRAM -WINDOWS
0.00 19CHILD CARE ASSOCIATES ARPA ALLOCATION (This M&C)
$0.00 Unallocated Balance
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the American Rescue Plan Act
project within the Grants Operating Federal Fund and the ARPA HH Park Rd/Prking Improv project
within the Grants Cap Projects Federal Fund, and upon approval of the above recommendation, funds
will be available in the Grants Operating Federal Fund for the Child Care Associate's Early Childhood
Learning Facility. Prior to any expenditures being incurred, the Neighborhood Services Department
shall be responsible for ensuring funds are available and that only expenditures allowable under the
American Rescue Plan Act are charged to the ARPA funding source.
TO
Fund
FROM
Department Account
ID
Fund Department Account
ID
Project Program
ID
Project Program
ID
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
Activity
Activity
Budget
Year
Reference #
ChartfieId 2)
Amount
Budget Reference # Amount
Year (Chartfield 2)
Dana Burghdoff (8018)
Kacey Thomas (8187)
Joshua Hezlep (2635)
Chad LaRoque (2661)
apps.cfwnet.org/council_packet/mc_review.asp?ID=33640&councildate=8/26/2025 5/6
10/29/25, 9:55 AM M&C Review
ATTACHMENTS
CCA reallocation funding.pdf (CFW Internal)
FORM 1295 ARPA CHILD CARE ASSOCIATES (1).pdf (CFW Internal)
Funding Availablility Stop Six Reallocation.docx (CFW Internal)
Stop Six Reallocation FID Table.xlsx (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp?ID=33640&councildate=8/26/2025 6/6
9/30/25, 9:27 AM
M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 9/16/2025 REFERENCE
NO.:
CODE: G
SUBJECT:
LOG NAME:
PUBLIC
HEARING:
(ALL) Amend Mayor and Council Communication 25-0003 to Correct the Source of
Appropriations for the Risk Financing Fund, Enact Budget Adjustments to Recognize
Unrestricted Interest Income in the General Fund Rather than Debt Service,
Approve Transfers to the Grants Operating Federal Fund, Group Health Fund,
and General Capital Projects Fund in Fiscal Year 2025, and
Adopt Appropriation Ordinances
FORTWORTH
03INTEREST EARNINGS
APPROPRIATION
TYPE:
RECOMMENDATION:
It is recommended that the City Council:
**M&C 25-
0812
CONSENT
NO
1. Amend Mayor and Council Communication 25-0003 to correct the source of the
$5,000,000.00 appropriation in the Risk Financing Fund as being Fiscal Year 2024 assigned
fund balance rather than interest earnings;
2. Authorize the use of Interest Earnings from Fiscal Year 2025 in the amount of
$27,623,122.00 for immediate and potential future appropriation as follows:
a. $870,930.00 for the Childcare Associates Early Learning Center;
b. $6,500,000.00 for a contribution to the Cowgirl Hall of Fame;
c. $3,100,000.00 for the Health Fund;
d. $3,129,070.00 to Panther Island Project;
e. $14,023,122.00 to fund balance
4. Adopt the attached appropriation ordinance adjusting the General Fund by recognizing and
utilizing $27,623,122.00 in receipts from unrestricted interest earnings to increase
appropriations by $13,600,000.00 for transfers funding one-time special projects and other
capital needs and to reduce the use of fund balance by $14,023,122.00, thereby contributing
to unassigned fund balance;
5. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
in the Grants Operating Federal Fund in the amount of $870,930.00, transferred from
General Fund interest earnings, for the purpose of funding Healthy Childhood: Child Care
project (City Project No. 103165);
6. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
in the Group Health Fund in the amount of $3,100,000.00, transferred from General Fund
interest earnings, for the purpose of satisfying reserve requirements in the Group Health
Fund;
7. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
in the General Capital Projects Fund in the amount of $3,129,070.00, transferred from
General Fund, interest earnings for the purpose of funding Panther Island Bridges Phase 1
project (City Project No. 106351);
8. Designate $14,023,122.00 as Fiscal Year 2025 fund balance from Fiscal Year 2025 interest
earnings in the General Fund; and
9. Amend the Fiscal Year 2025 Operating Budget.
DISCUSSION:
apps.cfwnet.org/council_packet/mc_review.asp?ID=33672&councildate=9/16/2025 1/4
9/30/25, 9:27 AM M&C Review
The purpose of this Mayor and Council Communication (M&C) is to amend M&C 25-0003 to correct
the source of the $5,000,000.00 appropriations appropriation in the Risk Financing Fund
(Recommendation 5) s as being Fiscal Year 2024 assigned fund balance rather than interest earnings
and to enact budget adjustments to reallocate resources and appropriate unrestricted interest earnings
to provide funding for one-time special projects and other capital needs.
Allocation of Unrestricted Interest - Department Additional Appropriations
This M&C proposes utilizing $27,623,122.00 in unrestricted interest earnings for a variety of projects
and uses as detailed below.
GENERAL FUND
Cowgirl Hall of Fame contribution: $6,500,000.00
Reason: City Council previously adopted a resolution to support the Cowgirl Museum's expansion
project to preserve and promote the City's diverse history and culture through the City's high -quality
museums.
Contribution to Fund Balance: $14,023,122.00
Reason: To the extent the unrestricted interest earnings are not specifically allocated and appropriated
elsewhere in this M&C, staff recommends those dollars (estimated to be $14,023,122.00) be allocated
to reduce budgeted use of fund balance in the General Fund, thereby increasing the unassigned fund
balance. This action supports ongoing efforts to maintain structurally sound reserves and ensure fund
balance growth remains proportionate to anticipated expenditure growth in the proposed FY2026
budget. The allocation also supports the City's financial resiliency and strengthens its position with
credit rating agencies.
OTHER FUNDS
Group Health Fund: $3,100,00.00
Reason: Staff recommends allocating $3.1 million of current -year interest earnings to support the
Health Fund's financial restoration plan. This contribution is aligned with the goal of restoring the fund
to compliance with its minimum reserve requirements. The allocation provides targeted, near -term
relief to strengthen the fund's long-term sustainability and ensure continued financial stability for the
City's self -insured health plan.
General Capital Projects- General Panther Island Bridges Phase 1 (Project 106351): $3,129,070.00
Reason: Funds will be used toward professional services, project management, inspection, material
testing, and local participation direct costs of bridge projects that will serve as crossings for the Tarrant
Regional Water District (TRWD) phased construction of the Panther Island canals. The local
participation represents the City of Fort Worth's match to the contributions from multiple regional
partners, such as the North Central Texas Council of Governments (NCTCOG) and the Texas
Department of Transportation (TxDOT), to this initiative.
Grants Operating Federal- Childcare Associates Early Learning Center: $870,930.00
Reason: Funds will be used to help cover a shortfall in the development of a new Early Learning
Center to expand access to infant, toddler, and three -year -old services in the Stop Six neighborhood.
M&C 25-0780, which passed on 8/26, reallocated approximately $690,000.00 of additional funds for
this Childcare Associates project in the Stop Six neighborhood, for a total additional allocation of $1.5
million.
Description
Childcare Associates Early Learning Center funded by
FY2025 interest earnings
Cowgirl Hall of Fame funded by FY2025 interest earnings
Health Fund funded by FY2025 interest earnings
Panther Island funded by FY2025 interest earnings
$870,930.00
$6,500,000.00
$3,100,000.00
$3,129,070.00
apps.cfwnet.org/council_packet/mc_review.asp?ID=33672&councildate=9/16/2025 2/4
9/30/25, 9:27 AM
Fund balance contribution/Reduction of Use of Fund
Balance
Total
M&C Review
$14,023,122.00
$27,623,122.00
1
Recognition of Interest Earnings
The City generates investment income by prudently investing idle cash from operations, "pay as you
go" capital funds, and bond funds in compliance with state law and City policy.
The existing practice, in compliance with the current Revenue Policy, is to allocate investment income
from governmental funds, derived from resources other than bond or debt proceeds, either in the
City's General Debt Service Fund or in the General Fund (to one-time capital projects or contributing
to unassigned fund balance )as recommended by the City Manager.
The latest FY 2025 analysis has identified $27,623,122.00 of urnestricted and unpledged surplus
interest and investment income. Staff recommends for City Council to authorize the recognition of this
unpledged and unencumbered investment income in the General Fund rather than the Debt Service
Fund in FY 2025, so that such funds can be used to fund one-time initiatives and/or capital projects as
detailed herein. Recommendation 2 of this M&C assigns this amount for such one-time projects.
Going forward, staff will monitor collection of investment income from general government operations
to identify any surplus that can be used for other lawful purposes. Given the variable nature of
investment income, any surplus will generally be prioritized to fund one-time initiatives, capital
projects, or to accumulate cash which can be used to pay off debt prior to maturity to achieve debt
service savings.
This action does not encompass income derived from the investment of debt proceeds, which
continues to be allocated to the appropriate Debt Service Fund in accordance with legal and policy
requirements. Nor does it include investment earnings attributable to purpose -restricted funds such as
Water & Sewer, Stormwater, Crime Control Prevention District, etc. or to funds that are subject to other
legal or policy constraints. Those funds will continue to receive their appropriate allocation of
investment income.
Current Fiscal Year Interest Earnings Budget
GENERAL FUND
Purpose
FY2025 Adopted
Budget
Budget
Increase
FY2025 Revised
Budget
Employees
Supporting
Debt
$500,000.00
$0.00
$500,000.00
Cowgirl HOF
$0.00
$6,500,000.00
$6,500,000.00
CCA
$0.00
$870,930.00
$870,930.00
Health Fund
$0.00
$3,100,000.00
$3,100,000.00
Panther Island
$0.00
$3,129,070.00
$3,129,070.00
Fund Balance
$0.00
$14,023,122.00
$14,023,122.00
Total
$500,000.00
$27,623,122.00
$28,123,122.00
Approval of this M&C will amend the Fiscal Year 2025 Adopted Budget, as approved with Ordinance
27107-09-2024.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and the adoption
of the attached appropriation ordinances, funds will be available in the FY2025 operating and capital
budgets as appropriated. Prior to any expenditure being incurred, the participating departments have
the responsibility to validate the availability of funds.
apps.cfwnet.org/council_packet/mc_review.asp?ID=33672&councildate=9/16/2025 3/4
9/30/25, 9:27 AM M&C Review
TO
[Fund
Department
ID
Account
Project
ID
Program
Activity
Budget I Reference #
Year (Chartfield 2)
Amount
FROM
Fund
Department
ID
Account
Project
ID
Program
Activity
Budget
Year
Reference #
(Chartfield 2)
Amount
Submitted for City Manager's Office by_ Dianna Giordano (7783)
Originating Department Head: Christianne Simmons (6222)
Additional Information Contact:
ATTACHMENTS
03INTEREST EARNINGS APPROPRIATION funds availability.pdf (CFW Internal)
03INTERESTEARNINGSAPPROPRIATION FID .xlsx (CFW Internal)
ORD.APP 03INTEREST EARNINGS APPROPRIATION 10100 A025(R3).docx (Public)
ORD.APP 03INTEREST EARNINGS APPROPRIATION 21001 A025(4).docx (Public)
ORD.APP 03INTEREST EARNINGS APPROPRIATION 30100 A025(R6).docx (Public)
ORD.APP 03INTEREST EARNINGS APPROPRIATION 60109 A025(R5).docx (Public)
apps.cfwnet.org/council_packet/mc_review.asp?ID=33672&councildate=9/16/2025 4/4
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Child Care Associates
Subject of the Agreement: Second Amendment to City Secretary Contract No. 62419
M&C Approved by the Council? * Yes 8 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 62419
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No D
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 10/31/2025 Expiration Date: 12/31/2026
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ® No 0
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No 0
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)