HomeMy WebLinkAbout058714-A2 - Construction-Related - Contract - James DeOtte Engineering, Inc.CSC No. 58714-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 58714
WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 58714,
(the CONTRACT) which was authorized by M&C 22-1008 on the 29th day of
November, 2022 in the amount of $ 766,497.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $124,511.00 which was authorized by M&C 25-0605 on the
24th day of June 2025; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
20SWM Cunningham Road HROM, CPN 104018; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $36,794.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $927,802.00.
3. OFFICIAL RECORD
City of Fort Worth, Texas CITY SECRETARY Cunningham Rd HROM
Prof Services Agreement Amendment Template F T. WORTH TX 104018
Revision Date: June 13, 2025
Page 1 of 4
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 12/05/25
ATTEST:
JUannette Goodall
City Secretary
APPROVAL RECOMMENDED:
of the date subscribed by the City's
ENGINEER
James DeOtte Engineering, Inc.
$rtaa, barbx
Brian Darby (Nov 14, 202508:01:18 CST)
Brian Darby
Vice President
DATE: 11/14/25
de.w.a.7 ..a..
Lauren Prieu r (Nov 26, 2025 07:23:37 CST)
Lauren Prieur
Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Berton F. Guidry, Jr., PE, CFM
Project Manager OFFICIAL RECORD
City of Fort worth, Texas CITY SECRETARY Cunningham Rd HROM
Prof Services Agreement Amendment Template F T. WORTH TX 104018
Revision Date: June 13, 2025
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C No.#: N/A
M&C Date: N/A
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas Cunningham Rd HROM
Prof Services Agreement Amendment Template 104018
Revision Date: June 13, 2025
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 58714
Amendment No. 2
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 -
Bond
Reference
Amount
52008
0200431
5330500
104018
112830
9999
36,794.00
Total:
$36,794.00
City of Fort Worth, Texas Cunningham Rd HROM
Prof Services Agreement Amendment Template 104018
Revision Date: June 13, 2025
Page 4 of 4
: Jame5-------------
`::DeOffe------ -------
-;Engineering.
ENGINEERING �nG
November 5, 2025
Mr. Bert F. Guidry, Jr., P.E., C.F.M.
Project Manager
Capital Delivery Division
Transportation / Public Works Department
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
Ref: Amendment #2 update
Cunningham Road HROM
City Project No. 104018
Mr. Guidry,
Civil Engineering
Lond Surveying
Conshucilon Monogement
Hydrologic end Hydroulic Modeling
This amendment came about due to the City providing a new, updated FEMA model.
The new model is significantly different from the model used for project development
and original handoff to James DeOtte Engineering, Inc. (JDEI). Thus, impacting several
of the contract task items. Additionally, the USACE requires that the cultural resources
investigations be updated and submitted. Due to additional services that are outside
the scope of the existing contracted agreements that have been requested by the City
to be performed as part of the referenced project, JDEI will perform the work outlined in
the following:
Additional services shall include:
Additional time on the agreement that extends the number of months.
Per our 10/29/25 meeting, all Project Management tasks will be as approved
by the project executed contract and executed Amendment 1. Invoicing will
continue until the overall project completion of the LOMR post construction
that per the updated schedule will occur in November 2028.
The hourly effort apportioned to this task is the same hours previously used and
approved in the original design agreement and Amendment # 1.
2. Revision to the easement parcels due to the updated hydraulic modeling provided
by the City.
Assumes 6 additional parcels previously prepared and submitted will need to
be modified that would be impacted by the updated grading necessary to
be Fort Worth design compliant.
The hourly effort apportioned to these tasks are the same hours previously used
and approved in the original design agreement and Amendment #1.
tax 817.930.0445 2201 Dottie Lynn Parkway St.e. 119 • Fart Worth TX, 76320 phone 817.446.6877
........................................................................................................................................................................................... .
TBPLS Finn Reg. No- 10101400 � WE Firm Beg. No. 8917
RNOIML4p�N6
Amendment #2
Cunningham Road HROM
November 5, 2025
Page 2
3. Revision the cultural resources investigations for additional USACE requirements.
Based on the recent communication from Arlo McKee with (USACE) requesting
the cultural resources investigations be revisited so that the Report of
Investigations will need to be rewritten to include the USACE project number,
designating the USACE as the lead agency, discussions about the USACE's
APE, and investigations of historic structures. This revised report must be
submitted to the USACE for review and comments, then resubmitted to the THC
to replace the currently approved THC report. Additionally, the USACE may
require a historic structures survey and/or deep mechanical investigations not
previously required by the THC.
The specific tasks to be accomplished with this Amendment are outlined within the
attached Level of Effort spreadsheet.
JDEI anticipates the fees listed above for the various elements of the project to be a not
to exceed amount of $36,794.00. All costs, associated with the identified scope of work,
will be lump sum for the scope provided and will be billed as a percentage of completed
work as determined by JDEI.
This scope of work assumes any services not specifically listed as part of this contract will
be treated as an additional service. The owner will be notified before any additional
services are performed.
Summary of previous contract amendments:
Original Contract
Amendment # 1
Amendment #2
Total Revised Contract
Sincerely,
N
Brian Darby, P.E.
Vice -President
$ 766,497.00
$ 124,51 1.00
$ 36,794.00
$ 927,802.00
fax 817.930.0445 2201 Dottie Lynn Parkway Sie. 119 • Fart Worth TX, 76320 phone 817.446.6877
........................................................................................................................................................................................... .
TORS Firm Reg. No. 10101400 � WE Fiirrn Beg. No. 8917
RNOIML4p�N6
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Cunningham Road HROM
City Project No. 104018
Amendment #2
Task No.
Task Description
Labor hours
Total Labor
Cost
Expense
Total Expense
Cost
Task Sub Total
RPLS
Project
Manager
Project
Engineer
EIT
CADD I
Survey
Administrative
Subconsultant
Travel
Reproduction
Rate
$260
$235
$170
$165
$160
$100
MWBE
Non-MWBE
1.0
Project Management
0
24
0
0
0
6
$6,240
$0
$0
$0
$0
$0
$6,240
1.2
Communications and Reporting
1.2.7
Invoicing (up to 24)
24
6
$6,240
$0
$6,240
7.0
ROW/Easement Services
121
0
0
0
72
0
$14,640
$0
$0
$0
$0
$0
$14,640
7.2
Right-of-Way/Easement Preparation and
Submittal (revise 6 additional parcels)
12
72
$14,640
$0
S14,640
Hourly Time & Material Task Efforts
9.0
Permitting
0
4
4
0
0
0
$1,620
$0
$12,995
$0
$0
$12,9951
$14,615
9.3
Archeological Survey
1 41
4
$1,6201
1 $12,9951
1
1 $12,995
$14,615
Totalsi
121
281
41
01
721
6
$22,500
$0
$12,995
$0
$0
$12,9951
$35,495
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Project Summary
Total Hours
122
Total Labor
$22,500
Total Expense
$12,995
MBE/SBE Subconsultant
$0
Non-MBE/SBE Subconsultant
$12,995
10% Sub Markup
$1,299
MBE/SBE Participation
0%
Total Project Cost
$36,794
1 of 1
Name
Begin Project
Design
Conceptual 30% Design
Re -Kick off
Amendment Scope Approval
Prepare and Submit 30% Conceptual Drawings
Amendment #1 Approval
Additional Geotechnical Investigation
Obtain additional Survey and SUE
Review 30% Conceptual Drawings (CFW SW)
Preliminary 60% Design
Prepare 60% Preliminary Drawings and Specifications
Conduct Constructability Review (Walk Through)
Scour Analysis
Bridge & Retaining Wall Design
Submit 60% Preliminary Drawings and Specifications
Review 60% Preliminary Plans and Specification (CFW)
SITE 630 - CUNNINGHAM STREET SCHEDULE
inish 12023 12024 12025 12026 12027 12028
0 days Thu 2/2/23 Thu 2/2/23
914 days Thu 2/2/23 Tue 8/4/26
659 days Thu 2/2/23 Tue 8/12/25
1 day Thu 2/2/23 Thu 2/2/23
1 day Wed 9/4/24 Wed 9/4/24
72 days Thu 9/5/24 Fri 12/13/24
172 days Mon 12/16/24 Tue 8/12/25
39 days Thu 3/2/23 Tue 4/25/23
22 days Thu 2/2/23 Fri 3/3/23
59 days Mon 12/16/24 Thu 3/6/25
238 days Fri 3/7/25 Tue 2/3/26
28 days Fri 3/7/25 Tue 4/15/25
0 days Tue 8/12/25 Tue 8/12/25
10 days Wed 12/3/25 Tue 12/16/25
15 days Wed 10/22/25 Tue 11/11/25
0 days Tue 11/11/25 Tue 11/11/25
20 days Wed 11/12/25 Tue 12/9/25
18
Begin Coordination for Community Meeting #1
40 days
Wed 12/10/25
Tue 2/3/26
19
Conduct Community Meeting #1
0 days
Tue 2/3/26
Tue 2/3/26
20
Final Design
120 days
Wed 12/10/25
Tue 5/26/26
21
Prepare and Submit 90% Design Plans and Specification
60 days
Wed 12/10/25
Tue 3/3/26
Review 90% Plans and Specifications (CFW)
Begin Coordination for Community Meeting #2
Conduct Community Meeting #2
Incorporate Comments and Submit 100% Construction
Documents
Prepare Bid Package
Permit Acquisition
TxDOT permit
Prepare and Submit Plans to TxDOT
TxDOT Review and Coordination
TxDOT follow up
Williams Encroachment Agreement
Prepare and Submit Plans to Williams
Williams Review and Coordination
Floodplain Permit
Prepare and Submit Floodplain Permit to City of Fort
Worth
City of Fort Worth Review and Coordination
USACE - 404 Permitting
20 days Wed 3/4/26 Tue 3/31/26
40 days Wed 4/1/26 Tue 5/26/26
0 days Tue 5/26/26 Tue 5/26/26
15 days Wed 4/1/26 Tue 4/21/26
10 days Wed 4/22/26 Tue 5/5/26
877 days Mon 3/27/23 Tue 8/4/26
737 days Mon 3/27/23 Tue 1/20/26
10 days Fri 4/28/23 Thu 5/11/23
37 days Mon 3/27/23 Tue 5/16/23
30 days Wed 12/10/25 Tue 1/20/26
20 days Wed 12/10/25 Tue 1/6/26
5 days Wed 12/10/25 Tue 12/16/25
15 days Wed 12/17/25 Tue 1/6/26
140 days Wed 12/10/25 Tue 6/23/26
110 days Wed 12/10/25 Tue 5/12/26
30 days Wed 5/13/26 Tue 6/23/26
80 days Wed 12/10/25 Tue 3/31/26
1 , Design
Conceptual 30% Design
2/2
m 4/25
3/3
4/28 ■ 5/11
'27 � 5/16
Page 1
100%
12/13
12/16 8F 12
12/16 3/6
3/7 4/15
12
1
10/
11/ 2
p Preliminary 60% Design
2/3
p 2/3
— p Final Design
3/3
(4 3/31
4/1 5/26
5/26
4/1 4/21
4/22 5/5
Permit Acquisition
TxDOT permit
9 Y 1/20
11 Williams Encroachment Agreement
D 12/16
7 1/6
p Floodplain Permit
D 5/12
5/13 1 6/23
r—p USACE - 404 Permitting
SITE 630 - CUNNINGHAM STREET SCHEDULE
ID
Task Name
Duration
Start
Finish
2023
tr1 tr2
tr3 tr4
2024
tr1 tr2 tr3 tr4
2025
tri tr2 tr3
2026
tr4 tr1 tr2 tr3 tr4
2027
tr1 tr2 1 Qtr3 1 Qtr4
2028
tr1 1 Qtr2
39
Prepare and Submit USACE Preconstruction Notification
(PCN)
USACE Review and Determination
TDLR (Texas Dep. Of Licensing and Regulations)
Prepare and Submit Construction Documents for Plan
Review and Project Registration
Review and Coordinate with Registered Accessibility
Specialist
City Forestry Permit
Prepare and Submit City Forestry Permit
City of Fort Worth Review and Coordination
Drainage Study/Checklist
Prepare and Submit Drainage Study/Checklist
City of Fort Worth Review and Coordination
Grading Permit
Prepare and Submit Grading Permit
City of Fort Worth Review and Coordination
ROW and Easements
ROW/Easement Preparation
Revised Easements Preparation
Amendment #2 Approval
Submit Final Easement Documents
ROW Negotiations
Additional Negotiations and/or Order Environmental Report
(If Needed)
Condemnation (If Needed)
Utility Relocation
60% Design Coordination with Franchise Utilities
Prepare and Submit Relocation Design (Utility)
Perform Relocation Construction
Construction
Advertisement and Bid
Contract Award
Construction Execution
Inspection with a TDLR Registered Accessibility Specialist
Closeout
LOMR Preparation Coordination and Submittal
20 days Wed 12/10/25
60 days Wed 1/7/26
20 days Wed 3/4/26
5 days Wed 3/4/26
15 days Wed 3/11/26
30 days Wed 12/10/25
10 days Wed 12/10/25
20 days Wed 12/24/25
45 days Mon 7/28/25
60 days Wed 8/13/25
20 days Wed 11/5/25
30 days Wed 6/24/26
10 days Wed 6/24/26
20 days Wed 7/8/26
1056 days Thu 2/2/23
24 days Thu 2/2/23
25 days Wed 9/4/24
60 days Tue 8/5/25
5 days Tue 10/28/25
180 days Tue 11/4/25
53 days Tue 7/14/26
105 days Fri 9/25/26
175 days Wed 12/17/25
20 days Wed 12/17/25
60 days Wed 3/4/26
60 days Wed 5/27/26
370 days Wed 5/6/26
30 days Wed 5/6/26
80 days Wed 6/17/26
260 days Wed 10/7/26
0 days Wed 8/11/27
140 days Wed 10/6/27
140 days Wed 10/6/27
Tue 1/6/26
Tue 3/31/26
Tue 3/31/26
Tue 3/10/26
Tue 3/31/26
Tue 1/20/26
Tue 12/23/25
Tue 1/20/26
Fri 9/26/25
Tue 11/4/25
Tue 12/2/25
Tue 8/4/26
Tue 7/7/26
Tue 8/4/26
Thu 2/18/27
Tue 3/7/23
Tue 10/8/24
Mon 10/27/2E
Mon 11/3/25
Mon 7/13/26
Thu 9/24/26
Thu 2/18/279
Tue 8/18/26
Tue 1/13/26
Tue 5/26/26
Tue 8/18/26
Tue 10/5/27
Tue 6/16/26
Tue 10/6/26
Tue 10/5/27
Wed 8/11/27
Tue 4/18/28
Tue 4/18/28
2
2
1
on
8/13
11/
10 X 1/6
1/7 3/31
rl TDLR (Texas Dep. Of Licensing and Regulations)
3/4 �3/10
3/11 1 3/31
r'1 City Forestry Permit
10 7� 12/23
/24 t 1/20
11/4
Grading Permit
6/24 7/7
7/8 8/4
ROW and Easements
10/27
11/3
7/13
7/14 9/24
2/18
1 Utility Relocation
/17 1L 1/13
3/4 5/26
5/27 8/18
Construction
5/6 Y 6/16
6/17 10/6
10/7 10/5
8/ 1
10/6
CIO
4/1
40
41
42
43
44
45
46
47
48
49
50
51
52
53
3/7
9/ 10/8
8/5
10/2
11/
1
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
Page 2
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: 104018 Cunningham Rd HROM Amendment 2
M&C: N/A CPN: 104018 CSO: 58714 DOC#:
Date:
To:
Name
Department
Initials
Date Out
I
Brian Darby — Signature
(BrianDarby@deotte-eng.com)
Consultant
$S%
Bso
11/14/25
2.
Berton Guidry - Signature
TPW Project Mgr.
BaG
11/14/25
3.
Thanaa Maksimos — Review
TPW Program Mgr.
11/14/25
4.
Lissette Acevedo — Review
TPW Sr. CPO
CCv
11/24/25
5.
Patricia Wadsack - Review
TPW Asst. Dir.
PL W'
11/25/25
6.
Lauren Prieur - Signature
TPW Dir.
11/26/25
7.
Doug Black - Signature
Legal
glas BW<k
11/26/25
S.
Jesica McEachern - Signature
CMO
CM
12/05/25
9.
Katherine Cenicola - Review
CSO
cc
12/05/25
10.
Jannette Goodall - Signature
CSO
s
12/05/25
11.
Allison Tidwell - Review
CSO
12/05/25
12.
TPW SW Contracts
TPW SW
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(& fortworthtexas.gov Call 817-229-3283 with questions. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: James DeOtte Engineering, Inc.
Subject of the Agreement
Amendment No. 2 to CSC No. 58714, an Engineering Agreement for the
Design of the Cunningham Road Hazardous Road Overtopping Mitigation Project
M&C Approved by the Council? * Yes ❑ No N
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
58714-A2
Is this entire contract Confidential? *Yes ❑ No N If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 0
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104018
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes N No ❑
Contracts need to be routed for CSO processing in the following order:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.