Loading...
HomeMy WebLinkAbout063609-CO1 - Construction-Related - Contract - Stabile and Winn, Inc.CSC No. 63609-COI FORT WORTH City of Fort Worth '�4� Change Order Request Project Name 104315 - 2022 Bond Yr 3 - Contract 14 City Sec # 63609 Client Project #(s) 104315 Project Description Combined Street Paving Improvements, Water and Sanitary Sewer Main Replacements for 2022 Bond Year 3 - Contract 14 Contracto Stabile and Winn, Inc. Change Order # 1 Date 11/3/2025 City Project Mgr. Gustavo A.Va lbjo City Inspector Eric Tinner Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Unit 1: Water Uinit2: Sewer Unit 3: Paving Unit4: Storm Totals Contract Time (CD) $3,991,669.50 $1,545,989.00 $4,194,365.00 $70,205.00 $9,802,228.50 500 $3,991,669.50 $1,545,989.00 $4,194,365.00 $70,205.00 $9,802,228.50 500 Amount of Proposed Change Order $0.00 $4,478.00 $0.00 $0.00 $4,478.00 15 Revised Contract Amount $3,991,669.50 $1,550,467.00 $4,194,365.00 $70,205.00 Original Funds Available for Change Orders $119,750.00 $46,380.00 $209,835.00 $70,000.00 Remaining Funds Available for this CO $119,750.00 $46,380.00 $209,835.00 $70,000.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $9,806,706.50 515 $445,965.00 $445,965.00 0.05% L $12,252,785.63 JUSTIFICATION (REASONS) FOR CHANGE ORDER IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL:Fumish all labor and material as per the proposed Change Order #1. This change order includes additional pay items for the removal and reinstallation of the recently installed sanitary sewer line L-3032E on Race Street, from Station 1+00 to Station. 3+00 to allow for proper connection to an existing sanitary sewer service. The original plans indicated this service connection at Station 2+59; however, field verification revealed the service was located at approximately Station 3+00. As a result, the main must be realigned and extended to capture the existing service. In addition, this change order includes the substitution of five (5) planned 4-inch PVC sanitary sewer services with 4-inch ductile iron pipe (DIP) sewer services along line L- 3425 on W Beach Street. This modification is required because the existing storm line was found to be higher than shown on the design plans, resulting in insufficient cover (less than 2 feet) over the proposed PVC service lines. The use of DIP will ensure adequate structural integrity and compliance with City standards. Time: City staff supports the Contractor's request for an additional fifteen (15) calendar days to complete the added scope of work. Cost: Staff has reviewed the contractor's proposed unit prices and compared them to pricing from recent similar projects and Unit 1 Water bid items. Based on this review, the proposed costs are deemed fair and reasonable. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting reouirements. Contractor's Company Name Contractor (Name) Contract Signature Date Stabile and Winn, Inc. Jerry Henderson 11/13/2025 nspectorllns ectnervsorSupervisor Date Project and Contract Compliance Manager Date f�-=--�_ »•�e 11/13/2025 11/21/2025 ram Man Gregory�Rubb ns �nev 21 Date 11/21/2025 Senior Capital Project Officer 4— Date 11/21/2025 ssistant Direct Date Director, Contractin De artment De t) Date PatriciaL W.d'-kN., 11/25/2025 _ 11/25/2025 flomey Date 11/26/2025 Assistant City Manager Date 12/04/2025 Council Action (if required I&C Number I N/A M&C Date Approved NIA ATTEST: Jannette Goodall, City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth V---- Change Order Additions Project Name 104315 - 2022 Bond Yr 3 - Contract 14 City Sec # 63609 Client Project# 104315 Contrado Stabile and Winn, Inc. PM Gustavo A. Vallejo Inspector Eric Tinner Change Order Submittal# F-77 Date 11/3/2025 ADDITIONS �- �i�� 11 �3•bldfixib] 0241.2013 Remove 8" Sewer Line II Remove , ICI � ®�®`���Yl•I:i�Yrl 0170.0101 Construction Staking 3331.3106 4- DIP Sewer Service Change Order 1 III 1 11 1 11 FORT City of Fort Worth Change Order Deletions Project Name 104315 - 2022 Bond Yr 3 - Contract 14 City Sec # 63609 Client Project# 104315 Contracto Stabile and Winn, Inc. PM Gustavo A. Vallejo Inspector Eric Tinner Change Order Submittal # O1 Date 11/3/2025 DELETIONS Change Order Deletions Page 3 of 3 104315-CNCO-2022 Bond Year 3 Contract 14 — Change Final Audit Report Order#1 Created: 2025-11-13 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Signed Transaction ID: CBJCHBCAABAAYgKDY5dRNhiPehe5eUdzNng2d-xC690H 2025-12-05 "104315-CNCO-2022 Bond Year 3 Contract 14 — Change Order #1 rr History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-11-13 - 6:52:21 PM GMT- IP address: 204.10.90.100 Document emailed to Ann Estes (ann.estes@fortworthtexas.gov) for filling 2025-11-13 - 7:15:24 PM GMT C+ Document emailed to Jerry Henderrson (ferry@stabilewinn.com) for signature 2025-11-13 - 7:15:24 PM GMT P4 Document emailed to Eric Tinner (Eric.Tinner@fortworthtexas.gov) for signature 2025-11-13 - 7:15:24 PM GMT Email viewed by Jerry Henderrson Qerry@stabilewinn.com) 2025-11-13 - 7:21:48 PM GMT- IP address: 12.89.161.150 e3' Document e-signed by Jerry Henderrson (ferry@stabilewinn.com) Signature Date: 2025-11-13 - 7:23:34 PM GMT - Time Source: server- IP address: 12.89.161.150 Email viewed by Eric Tinner(Eric.Tinner@fortworthtexas.gov) 2025-11-13 - 7:24:07 PM GMT- IP address: 166.205.54.40 00 Document e-signed by Eric Tinner (Eric.Tinner@fortworthtexas.gov) Signature Date: 2025-11-13 - 7:26:23 PM GMT - Time Source: server- IP address: 166.205.54.40 Email viewed by Ann Estes (ann.estes@fortworthtexas.gov) 2025-11-13 - 8:04:16 PM GMT- IP address: 104.47.65.254 &0 Form filled by Ann Estes (ann.estes@fortworthtexas.gov) Form filling Date: 2025-11-13 - 8:25:51 PM GMT - Time Source: server- IP address: 204.10.90.100 FORT WORTH, I Po— ed by Adobe Acrobat Sign Pi. Document emailed to Troy Gardner (troy.gardner@fortworthtexas.gov) for signature 2025-11-13 - 8:25:54 PM GMT + Document emailed to Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) for signature 2025-11-13 - 8:25:55 PM GMT �► Document emailed to thang.sum@fortworthtexas.gov for filling 2025-11-13 - 8:25:55 PM GMT Email viewed by thang.sum@fortworthtexas.gov 2025-11-13 - 8:26:22 PM GMT- IP address: 204.10.90.90 d� Signer thang.sum@fortworthtexas.gov entered name at signing as Thang Sum 2025-11-13 - 8:30:45 PM GMT- IP address: 204.10.90.100 C� Form filled by Thang Sum (thang.sum@fortworthtexas.gov) Form filling Date: 2025-11-13 - 8:30:47 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) 2025-11-13 - 9:14:27 PM GMT- IP address: 208.184.124.181 Email viewed by Troy Gardner (troy.gardner@fortworthtexas.gov) 2025-11-13 - 9:47:23 PM GMT- IP address: 104.47.64.254 d Document e-signed by Troy Gardner (troy.gardner@fortworthtexas.gov) Signature Date: 2025-11-13 - 9:57:37 PM GMT - Time Source: server- IP address: 204.10.90.100 d� Document e-signed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) Signature Date: 2025-11-21 - 9:51:33 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) for signature 2025-11-21 - 9:51:38 PM GMT d, Document e-signed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) Signature Date: 2025-11-21 - 9:59:28 PM GMT - Time Source: server- IP address: 208.184.124.181 �. Document emailed to Mary Hanna (Mary.Hanna@fortworthtexas.gov) for signature 2025-11-21 - 9:59:31 PM GMT Email viewed by Mary Hanna (Mary.Hanna@fortworthtexas.gov) 2025-11-21 - 10:34:27 PM GMT- IP address: 104.47.64.254 d� Document e-signed by Mary Hanna (Mary.Hanna@fortworthtexas.gov) Signature Date: 2025-11-21 - 10:35:14 PM GMT - Time Source: server- IP address: 204.10.90.100 �+ Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature 2025-11-21 - 10:35:17 PM GMT FoRTWORTH, I Paweredby Adobe Acrobat Sign E1 Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L. Wadsack 2025-11-25 - 5:27:44 PM GMT- IP address: 208.184.124.181 E1 Document e-signed by Patricia L. Wadsack(patricia.wadsack@fortworthtexas.gov) Signature Date: 2025-11-25 - 5:27:46 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2025-11-25 - 5:27:50 PM GMT Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) 2025-11-25 - 5:30:41 PM GMT- IP address: 104.47.65.254 E1 Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2025-11-25 - 5:31:18 PM GMT - Time Source: server- IP address: 76.227.105.128 Document emailed to Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) for approval 2025-11-25 - 5:31:21 PM GMT Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2025-11-25 - 5:35:43 PM GMT- IP address: 104.47.65.254 E1 Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2025-11-25 - 5:39:58 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2025-11-25 - 5:40:01 PM GMT E1 Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov) Signature Date: 2025-11-26 - 10:07:27 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Jesica McEachern (jesica.mceachern@fortworthtexas.gov) for signature 2025-11-26 - 10:07:30 PM GMT Oj� Document e-signed by Jesica McEachern (jesica.mceachern@fortworthtexas.gov) Signature Date: 2025-12-04 - 7:16:41 AM GMT - Time Source: server- IP address: 204.10.90.100 Document approval automatically delegated to Cristian Chavez (cristian.chavez@fortworthtexas.gov) by Katherine Cenicola (katherine.cenicola@fortworthtexas.gov) 2025-12-04 - 7:16:43 AM GMT + Document emailed to Cristian Chavez (cristian.chavez@fortworthtexas.gov) for approval 2025-12-04 - 7:16:44 AM GMT E Document emailed to Katherine Cenicola (katherine.cenicola@fortworthtexas.gov) for approval 2025-12-04 - 7:16:44 AM GMT FoRTINaRTH, Paweredby Adobe Acrobat Sign E1 Document approved by Katherine Cenicola(katherine.cenicola@fortworthtexas.gov) Approval Date: 2025-12-04 - 1:57:23 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Jannette Goodall Qannette.goodall@fortworthtexas.gov) for signature 2025-12-04 - 1:57:31 PM GMT Email viewed by Jannette Goodall (jannette.goodall@fortworthtexas.gov) 2025-12-04 - 2:08:57 PM GMT- IP address: 104.47.64.254 E1 Document e-signed by Jannette Goodall Qannette.goodall@fortworthtexas.gov) Signature Date: 2025-12-04 - 2:09:48 PM GMT - Time Source: server- IP address: 208.184.124.181 Form filling automatically delegated to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) by Allison Tidwell (allison.tidwell@fortworthtexas.gov) 2025-12-04 - 2:09:51 PM GMT Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov) for filling 2025-12-04 - 2:09:52 PM GMT Document emailed to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) for filling 2025-12-04 - 2:09:52 PM GMT E1 Form filled by Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) Form filling Date: 2025-12-05 - 2:39:55 PM GMT - Time Source: server- IP address: 208.184.124.181 Agreement completed. 2025-12-05 - 2:39:55 PM GMT FoRTWORTH, I Paweredby Adobe Acrobat Sign FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2022 Bond Year 3 Contract 14 — Change Order #1 M&C: CPN: 104315 CSO: 63609 DOC#: Date: 10/15/2025 To: Name Department Initials Date Out 1. Ann Estes TPW - initial aE 11/13/25 2. Jerry Henderson Contractor - signature �d✓ 11/13/25 3. Eric Tinner TPW - signature Er 11/13/25 4. Gustavo Vallejo TPW - signature GI A 11/21/25 5. Thang Sum Water - signature rTS 11/13/25 6. Greg Robbins TPW - signature GR 11/21/25 7 Mary Hanna TPW - signatures 11/21/25 8 Patricia Wadsack TPW - signature 11/25/25 9 Lauren Prieur TPW - signature jelpa- 11/25/25 10. Doug Black Legal - signature ,W= 11/26/25 11. Jesica McEachern CMO - signature CA 12/04/25 12. Jannette Goodall CSO - signature -OL, 12/04/2025 13. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ®No RUSH: DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No ROUTING TO CSO: ❑YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(?.FortWorthTexas.gov at ext. 7233 for pick up when completed. Thank you! FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Stabile and Winn, Inc. Subject of the Agreement See justification on Change Order Form. M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104315 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following _ order: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.