064416 - Construction-Related - Contract - Tri-County Electrical Cooperative
PROJECT CONSTRUCTION ESTIMATE CSC No. 64416 DESIGNED FOR �. CTRIC City of Fort Worth PROJECT #: PT43918 STAKED BY: Dallas Riney PROJECT NAME: City of Fort Worth 10800 ALTA VISTA RD DESIGN DATE: 01/07/2025 INSTALLATION ASSEMBLY STATUS DESCRIPTION CITY MATERIAL COST CONSTRUCTION COST UNIT COST 1/0UC Install CONDUCTOR - 110 PRIMARY UG 235 $ 1,341.15 $ 941.33 $ 2,282.47 C1-2 Install 30 XARM CONST, SINGLE SUPPORT USING SADD 1 $ 505.26 $ 640.10 $ 1,145.36 M2-11 Install GROUNDING ASSEMBLY GROUND ROD TYPE W1#4 1 $ 76.17 $ 318.86 $ 395.03 M5-16B Install BRACKET FIBERGLASS THREE PHASE 3WAY 1 $ 317.42 $ 311.31 $ 628.73 P45-3 Install POLE -45FTCLASS 3WOOD 1 $ 1,057.03 $ 1,703.14 $ 2,760.17 P-SET Install POLE - SET 1 $ 146.55 $ 255.69 $ 402.24 UBD-P6 Install 6" BORE DIRT 65 $ - $ 3,623.29 $ 3,623.29 UC1 Install 30 RISER 110 1 $ 2,181.69 $ 4,757.18 $ 6,938.87 U M 1-3 Install 3 PH TRANSFORMER PAD 72X96(75-500KVA) 1 $ 2,319.60 $ 3,554.65 $ 5,874.26 UM50-C-4 Install CONDUIT - CONTINUOUS 4"" 130 $ 795.99 $ 263.32 $ 1,059.31 UM51-P-4 Install CONDUIT -PV> 4""SWEEP 48""-90 4 $ 269.83 $ 50.72 $ 320.55 UM52-P-4 Install CONDUIT -PV> CONDUIT 4""COUPLING 4 $ 80.08 $ 24.71 $ 104.79 UM6-19 Install PORTABLE FEED THRU BUSHING 200A 1 $ 359.54 $ 75.46 $ 435.00 UM6-39 Install RISER -STANDOFF BRACKET KIT18"" 4 $ 456.92 $ 150.92 $ 607.85 UM6-39.4 Install RISER -STANDOFF BRACKET STRAPS 4"" 4 $ 57.30 $ 79.10 $ 136.40 UM8-7A Install CT METER INSTALLATION 3PH SINGLE SERV 1 $ - $ 479.15 $ 479.15 UVG150-3P208 Install XFRMR, CONV - 150 KVA PM - 208/120 - 14. 1 $ 14,291.38 $ 1,168.07 $ 15,459.45 UVG17 Install XFRMR THREE PHASE PADMOUNTASSEMBLY RADIA 1 $ 1,071.47 $ 1,735.90 $ 2,807.37 UVM6-33 Install ARRESTER - RISER 18KV 3 $ 319.37 $ 610.66 $ 930.03 SUBTOTAL: $ 25,646.75 $ 20,743.S6 $ 46,390.31 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 01/28/2026 1 PROJECT CONSTRUCTION ESTIMATE DESIGNED FOR 1ECTRic City of Fort Worth PROJECT #: PT43918 STAKED BY: Dallas Riney PROJECT NAME: City of Fort Worth 10800 ALTA VISTA RD DESIGN DATE: 01/07/2025 TOTAL COSTS Total Material Cost: $ 25,646.75 Total Construction Cost: $ 20,743.56 Total Project Costs: $ 46,390.31 Miscellaneous Sales: $ 0.00 Miscellaneous Credit: $ 0.00 Sub Total: $ 46,390.31 Total Taxes: $ 0.00 GRAND TOTAL: $ 46,390.31 THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 01/28/2026 2 TRI-COUNTY ELECTRIC COOPERATIVE Field Services: 817-752-8172 TO: PROJECT #: PT43918 C ity of fort Worth DATE: 10/30/2025 EXPIRES: 01/28/2026 BY: Kylie FOR: 10800 ALTA VISTA RD JOB COSTS Project Costs: 5 46,390.31 Miscellaneous Sales: S 0.00 Total Costs: $ 46,390.31 JOB CREDITS Miscellaneous Credit: 5 0.00 Total Cost: S 46,390.31 Tax: 5 0.00 Expires On: January 28, 2026 Grand Total: 5 46,390.31 Cost Estimate TYPE PRI SVC SEC CONS POLES TRANSF LIGHTS METERS INSTALL OH 0 0 0 0 1 1 0 1 INSTALL UG 65 0 0 0 RETIRE OH 0 0 0 0 0 0 0 0 RETIRE UG 0 0 0 0 AZLE GRANBURY KELLER SEYMOUR 600 N W Parkway 1623 Weatherford Hwy 4900 Keller Hicks Rd 419 North Main Street Azle, TX 76020 Granbury, TX 76048 Keller, TX 76244 Seymour, TX 76380 THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 01/28/2026 3 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH ALW"--/L Villerie Washington (Dec 3, 2025 08:51:00 CST) Valerie Washington Assistant City Manager Date: 12/03/2025 ATTEST: Jannette Goodall City Secretary APPROVED AS TO FORM AND LEGALITY By:_Stephen HT-nes (Dec 3, 2025 02:31:29 CST) Steve M. Hines Sr. Assistant City Attorney BY: CONSULTANT Tri-County Electrical Cooperative, Inc. Danny Mitch etlrNov17,202508:37:15 CST) Danny Mitchell Field Services Lead Date: 11/17/2025 APPROVAL RECOMMENDED: Marilyn Marvin Director Property Management M&C No.: M&C Date: Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: City of Fort Worth, Texas Standard Agreement for Professional Services Revision Date: March 8, 2024 Name: Nikita N. Watts Title: Sr. Capital Project Officer OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Fire Station No. 37 104186 George, Nicholas From: Woclerks@tcectexas.com <Woclerks@tcectexas.com> Sent: Wednesday, November 5, 2025 3:37:42 PM To: George, Nicholas L <Nicholas.George@fortworthtexas.gov> Subject: RE: RE: TEMP STEELE & FREEMAN 10800 ALTA VISTA RD This message is from an external organization. This message came from outside your organization. Report Suspicious From: WOClerks(sbtcectexas.com WOClerks(@tcectexas.com Sent: Wednesday, November 5, 2025 10:50 AM To: George, Nicholas L Nicholas.George(@fortworthtexas.gov Subject: TEMP STEELE & FREEMAN 10800 ALTA VISTA RD Dear Steele & Freeman Inc, Thank you for your interest in doing business with Tri-County Electric Cooperative! We are excited to work with you! Your cost estimate has been approved for Work Order job PT43918. Your cost estimate has been approved for Work Order job PT43918. The Aid to Construction total is $46390.31. This estimate is valid for 90 days. When you are ready to proceed with this project, please contact the Field Services Support team via email or phone number listed below. Please understand we cannot move this job into the construction phase until this contract is made. Our construction lead times mayvary and projects are completed in the order in which they are received. Additionally, we will need you to complete the following links: https://submit.tcectexas. com/Forms/holdharmLess.pdfhttps://urldefense.com/v3/ https:/submit.tcec texas.com/Forms/hold harmless. pdf :!!FBD41 DuKplh01ME!NXriLyWW2Xe7gVLsZglsIDSXHWLPj59vc0h AUOtcgdSEM4-i-uld0uG13sUhNCFgJkhyhCxckUOVYHy4Ll11 MMldt38FLKLFrfY$ Please note that we will not be able to begin the construction process until the meter base has been set and installed to TCEC specifications. To help with this, our specification sheets can be found on our website at https://tcectexas.com/new- constructionhttps://urldefense.com/v3/ https:/tcectexas.com/new- construction :!!FBD41 DuKplh01ME!NXriLyWW2Xe7gVLsZglsIDSXHWLPj59vcOhAUOtcgdSEM4-i- uld0uG13sUhNCFgJkhyhCxckUOVYHy4lll1 MMLdt38FgbFJFeo$. Please ensure the installation meets these requirements prior to scheduling construction to avoid any delays. Once all of the links are completed you can contact the Field Services Support team by phone at 817-752-8172 or email mail to:woclerks@tcectexas.com Monday- Friday, 8 a.m. — 5 p.m. to assist you with making your required payment. Thank you, Work Order/Field Services Support team 817-752-8172 1 woclerks@tcectexas.commailto:woclerks@tcectexas.com Disclaimer: If, for any reason, construction has not commenced due to the fault of the member within 90 regular days from the date of this notice, all costs, credits, and requirements are subject for reconsideration. This could result in changes to the terms outlined, including the imposition of additional fees/charges as deemed necessary byTri-County Electric Cooperative. FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Tri-County Electrical Cooperative Subject of the Agreement: The following is in reference to Work Order PT43918 for permanant power services at Fire Station No. 37 at 10800 Alta Vista Rd CPN104186 (new construction) M&C Approved by the Council? * Yes ❑ No If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes © No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No © If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104186 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes © No ❑ Contracts need to be routed for CSO processing in the followin order:. 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.