Loading...
HomeMy WebLinkAbout046273-A7 - General - Contract - Scientel Solutions, LLCCSC No. 46273-A7 SEVENTH AMENDMENT TO FORT WORTH CITY SECRETARY CONTRACT NO. 46273 This Seventh Amendment to Fort Worth City Secretary Contract No. 46273 ("Seventh Amendment") is made between the City of Fort Worth ("City,") a Texas home rule municipality, and Scientel Solutions LLC ("Vendor,") a Delaware Company. City and Vendor are each individually referred to herein as a "party" and collectively referred to as the "parties." WHEREAS, on December 17, 2014, the Parties entered into City Secretary Contract No. 46273 to provide support and maintenance of the City's Public Safety Microwave and MPLS Network (the "Agreement"); WHEREAS, on August 8, 2022, Mayor and Council Communication ("M&C") 22-0549, authorized the execution of the Fifth Amendment to include an additional five-year term, one three-year renewal option, and one two-year renewal option; WHEREAS, the Parties desire to clarify that the Agreement is currently in the five-year term authorized by M&C 22-0549; WHEREAS, on December 9, 2025, M&C 25-1105 authorized the execution of an amendment to the Agreement to include the purchase and installation of two additional microwave links, including all necessary equipment, configuration, and ongoing maintenance and support services; WHEREAS, it is now the collective desire of the parties to include pricing in accordance with Exhibit A-3, Northwest Tower Site Addition, for a revised total annual contract amount not to exceed $7,941,132.56; NOW THEREFORE, known by all these present, City and Vendor, acting herein by and through their duly authorized representatives, agree to the following terms, which amend the Agreement as follows: I. AMENDMENTS 1. The Agreement is hereby amended to clarify that the Parties are currently in the five-year term as authorized under M&C 22-0549 and the Fifth Amendment, which expires on December 31, 2027, and that the Agreement includes one three-year renewal option, beginning January 1, 2028 and expiring December 31, 2030, and one two-year renewal option, beginning January 1, 2031 and expiring December 31, 2032. 2. The Agreement is hereby amended to include Exhibit A-3, Northwest Tower Site Addition, attached to this Seventh Amendment, which includes the purchase and installation of two new microwave links, at a one-time cost of $279,472.86. In addition, ongoing maintenance and support services for the new links will be provided at an annual cost of $32,500.00, beginning January 1, 2027 and continuing through December 31, 2032. OFFICIAL RECORD CITY SECRETARY Seventh Amendment to Fort Worth City Secretary Contract No. 46273 FT. WORTH, TX Paget of 4 3. The total contract amount is hereby amended to a revised contract amount not exceed $7,941,132.56. IL MISCELLANEOUS All other terms, provisions, conditions, covenants and recitals of the Agreement not expressly amended herein shall remain in full force and effect. [Signature Page Follows] Seventh Amendment to Fort Worth City Secretary Contract No. 46273 Page 2 of 4 Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth G U&&— By. Dianna Giordano (Dec 16,202509:43:33 CST) Name: Dianna Giordano Title: Assistant City Manager Date: 12/16/2025 Approval Recommended: Name: Kevin Gunn Title: Director, IT Solutions Department Attest: agonnnpn� �s°t 0000 o.. 't d By: A 00 o oO�i d Name: Jannette S. Goodall ova* Title: City Secretary aaa4Exasoap VENDOR: Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. L�Grr* By: Lawrence Crockett (Dec 12, 2025 15:42:17 CST) Name: Larry Crocket Title: Sr. IT Solutions Manager Approved as to Form and Legality: Candace Paaligrg By: Candace ftliara(Dec L5,-510:5. CST) Name: Candace Pagliara Title: Sr. Assistant City Attorney Contract Authorization: M&C: 25-1105 Approval Date: 12/09/2025 Form 1295: 2025-1377693 Scientel Solutions, LLC. By: @o�v Name: Nelson Santos Title: CEO Date: 12-11-2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Seventh Amendment to Fort Worth City Secretary Contract No. 46273 Page 3 of 4 EXHIBIT A-3 Northwest Tower Site Addition (Attached) Seventh Amendment to Fort Worth City Secretary Contract No. 46273 Page 4 of 4 scientel S O L U T 1 O N S i HE UNIVERSAL INTEGRATOR_ City of Fort Worth, Texas Contract CSC 46273, Amendment #7 - Northwest Tower Site Addition September 24, 2025 Submitted To: City of Fort Worth Texas Larry Crockett Senior Manager / Radio Services Division Lawrence.Crockett@fortworthtexas.gov 275 W. 13th Street Fort Worth, Texas 76102 Submitted By: Scientel Solutions LLC 1120 Jupiter Road, Suite 180 Plano, TX 75074 Proposal No. SC100917v6 1 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVER5AL INTEGRATOR_ Table of Contents 1. Executive Summary...........................................................................4 2. Scope of Services............................................................................... 5 A. Design.....................................................................................................5 i. Eagle Mountain................................................................................................... 6 ii. New Northwest Tower........................................................................................7 iii. North Beach........................................................................................................ 7 B. Proposal Assumptions............................................................................ 7 3. Equipment Supported........................................................................8 A. System Monitoring................................................................................. 8 4. System Support & Preventative Maintenance...................................8 A. Preventative Maintenance Inspections................................................... 9 B. System Upgrades.................................................................................. 10 5. Technical Support & Corrective Maintenance..................................10 A. Response Time Table............................................................................ 10 B. Support Scope of Services.................................................................... 11 C. Assumptions......................................................................................... 11 D. Exclusions............................................................................................. 11 E. Force Majeure & Non-Warranties......................................................... 11 F. Support Records................................................................................... 12 6. Project Responsibilities....................................................................13 7. Pricing..............................................................................................15 Appendix A: Path Calculations..............................................................16 Proposal No. SC100917v6 2 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel SO L U T I ON S THE UNIVERSAL INTEGRATOR_ Proposal No. SCl00917v6 3 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVERSAL INTEGRATOR.. 1. Executive Summary Scientel Solutions, LLC (Scientel) prides itself in being The Universal Integrator - for all types of advanced technology solutions both locally and abroad. We do this through longstanding partnerships with the world's leading technology companies. We are locally based in Plano, Texas. Scientel has been designing, engineering, implementing, and maintaining network -based projects in both the Public and Private sectors for over 25 years. Your needs match our strengths. Part of that strength comes from an endless desire to learn, build, and share new technology; the other part can be attributed to delivering a superior product and ultimately a purely excellent customer experience. In addition to being certified in the products and solutions in this proposal, Scientel technicians and engineers are also certified in Genetec and have deployed systems on Command Central, Harris, EF Johnson, Tait and many others. We are customer focused and remain vendor neutral. Scientel is proposing an amendment to Fort Worth Contract 46273. This amendment would cover the addition of two microwave links to the network and would include the support and maintenance of these two new microwave links to be coterminous with the existing Fort Worth Contract 46273. This amendment includes the following: ➢ System Monitoring ➢ System Support & Preventative Maintenance ➢ Technical Support and Corrective Maintenance ➢ MPLS Network System Configuration Services ➢ NSP Analytics ➢ System Upgrades ➢ Contract Terms ➢ Pricing Terms In the following pages, Scientel articulates in detail, your valued offering through our best -in -class design, engineering, implementation, and support. Scientel has certified engineers and technicians in all best of breeds in our proposal. Thank you for the opportunity to continue working with the City of Fort Worth, Texas on your mission critical applications. Sincerely, Scientel Solutions, LLC Proposal No. SC100917v6 4 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVERSAL INTEGRATOR.. 2. Scope of Services A. Design Scientel has designed this update to the existing Fort Worth Regional Radio System to include the new Northwest Tower site. The scope of work for turn -key services to install and support 1 new microwave link from the New Northwest Tower site to North Beach and relocating the existing North Beach to Eagle Mountain microwave link to New Northwest Tower to Eagle Mountain. Path Surveys: Detailed microwave path surveys will be conducted upon contract award to determine or verify site coordinates, ground elevation, on -path obstructions (location and height), tower information, and other parameters required to engineer the final design of the radio links. The present and anticipated future effect of on -path obstructions, such as tree growth, is evaluated and incorporated into the path design where applicable. Microwave path surveys include the following responsibilities: Responsibilities: Scientel COFW • Provide documents relating to previous path calculations and frequency coordination; X • Provide information to the surveyors to locate the proposed Microwave sites X • Arrange for surveyor access to the proposed Microwave sites X • Verify site elevations above sea level; X • Verify site longitude and latitude; X • Provide existing tower description and information; X • Provide general survey observations, comments and site photographs; X • Provide site layouts including towers with antennas at proposed center lines. X Proposal No. SC100917v6 5 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVER5AL INTEGRATOR_ Scientel's geodetic coordinates will be accurate to within 1-second of latitude and 1-second of longitude. Ground elevations are accurate to within 5-feet and that on -path obstructions at critical points are identified and present heights are accurate to within 5-feet. Path Design: Upon contract award and subsequent completion of detailed path surveys, Scientel will perform final path design. The Project can move to the implementation stage based on the recommendations within the final design report. Path design services include the following responsibilities: Responsibilities Scientel COFW • Select frequency band and capacity requirements for each path; X • Determine antenna centerline heights; X • Design paths to protect against ground -based reflections; X • Select radio types, antenna sizes and types, power output, and X protection scheme required to meet Fort Worth's availability and capacity requirements; • Calculate path availability using industry accepted models for X predicting outages and countermeasure improvements associated with normal atmospheric multi -path fading, up -fading, rain fading and obstruction fading; • Submit a final path design report, including system maps, path profiles X and availability calculations. In addition to warranty exclusions set forth in the Agreement, Scientel is not responsible for excessive outages or degraded performance due to abnormal fading conditions that include, but are not limited to: Formation of extreme radio refractivity gradients associated with: o Exceptionally large temperature inversions, o Abnormal temperature/humidity layers, o Fog formation, o Signal trapping caused by surface or atmospheric ducting; Reflections from unidentifiable off path terrain features or new physical structures; Rain fading due to rainfall rates that are in excess of the published rates or charts used to predict rain induced outages; If Scientel suspects abnormal propagation conditions are causing degraded system performance, Scientel will reasonably assist the City of Fort Worth in verifying the conditions leading to the degraded system performance. After the problem has been identified, Scientel will support the City of Fort Worth in identifying possible solutions to the problem, and assess the incremental improvement expected from corrective actions. Eagle Mountain o Scientel will perform all necessary cable runs utilizing waveguide and fibers as applicable. o Scientel will de -install the 6ft diversity antenna and waveguide currently facing North Beach. Proposal No. SC100917v6 6 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVER5AL INTEGRATOR_ o Scientel will realign the 6ft antenna at 130' so it is now facing New Northwest Tower. o Scientel will verify data connectivity. o Upon system installation completion, Scientel will conduct a formal Site Acceptance Test (SAT). ii. New Northwest Tower o Scientel will perform all necessary cable runs utilizing waveguides and fibers as applicable. o Scientel will install new 19" rack. o Scientel will install Nokia Power Distribution Unit and connect to existing 120Vac power outlet. o Scientel will install licensed Nokia Wavence MPT radios in new 19" rack. o Scientel will install dehydrator and manifold on new dehydrator wall shelf. o Scientel will terminate waveguide on Nokia Wavence MPT radio and on 6ft antenna at 175' facing Eagle Mountain. o Scientel will align the link facing Eagle Mountain. o Scientel will terminate waveguide on Nokia Wavence MPT radio and on 6ft antenna at 175' facing North Beach Tower. o Scientel will align the link facing North Beach Tower. o Scientel will install a Nokia 7705 and verify data connectivity. o Upon system installation completion, Scientel will conduct a formal Site Acceptance Test (SAT). North Beach o Scientel will perform all necessary cable runs utilizing waveguide and fibers as applicable. o Scientel will connect Nokia Wavence MPT to existing Power Distribution Unit. o Scientel licensed Nokia Wavence MPT radio in existing 19" rack. o Scientel will de -install the 6ft main antenna and waveguide currently facing Eagle Mountain. o Scientel will de -install the 6ft diversity antenna and waveguide currently facing Eagle Mountain. o Scientel will terminate waveguide on Nokia Wavence MPT radio and on 6ft antenna at 147' facing New Northwest Tower. o Scientel will align the link facing New Northwest Tower. o Scientel will verify data connectivity. o Upon system installation completion, Scientel will conduct a formal Site Acceptance Test (SAT). All path profiles and link path calculations are included in Appendix A B. Proposal Assumptions • Mounting locations to be approved by City of Fort Worth and Scientel, respectively. • Scope of work allows for coordinated scheduled deployment and site access, any interruptions to project schedule may be subject to change order. • All work is to be performed during non -rush hour traffic timeframes. Proposal No. SC100917v6 7 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVERSALINTEGRATOR- • No Building Permits and no special zoning or land development permits will be required. • All proposed FCC frequencies and required channel bandwidths are available. • All preliminary path designs are preliminary until detailed physical path surveys are complete • Scientel will reuse all existing antennas (main and diversity) from the existing North Beach to Eagle Mountain path. 3. Equipment Supported Scientel Solutions LLC will continue to support all of the equipment detailed in Fort Worth Contract 46273 as well as the new equipment that being installed for the Eagle Mountain to New Northwest Tower site and New Northwest Tower site to North Beach microwave links. Additionally, support coverage will extend to new microwave and MPLS components that are to be installed to replace end -of - support units. A detailed list of the new equipment will be provided to the City of Fort Worth upon completion of installation. Please refer to tables below: Future Equipment from time of implementation Model Description Quantitj Nokia Wavence 9500 Microwave Radio Transceiver Svstem & Accessories 2 (1 links A. System Monitoring Scientel Solutions securely integrates an SNMP monitoring solution to provide visual, audible, email, and text alerts to the Network Operations Center (NOC) at our headquarters in Aurora, IL to ensure expedited notification and response to network events. We utilize incident management software for ticketing and reporting which allows Scientel Solutions to report on key performance metrics (KPIs). Once the team is made aware of a change in network conditions, the engineer will begin to ticket, notify appropriate parties, and triage the situation. Once the situation is assessed, the engineer will determine if the issue can be resolved remotely or if a member of staff is required to be dispatched to the location. Throughout the lifecycle of the incident, the ticket and documentation are updated, allowing Scientel to keep accurate statuses for awareness and escalations. Our NOC is here to support The City of Fort Worth on a 24x7x365 basis. Scientel Solutions also coordinates with other vendors and the city to implement and track changes and improvements in the network. We offer personalized services to meet the needs of the City of Ft. Worth. Scientel's NOC will utilize Fort Worth's NSP Server that will automatically generate tickets as problems arise on a proactive basis for priorities 1-3. Priority 4, tickets can be generated by calling our 24x7x365 NOC number or by submitting an email to the NOC email address: • Toll -Free Number: 866-583-1733 • Email Address: Support@ScientelSolutions.com 4. System Support & Preventative Maintenance Scientel Solutions will conduct physical maintenance inspections (indoor, infrastructure, and network hardware & software) on a quarterly basis with fifteen days advance notice to The City of Fort Worth. Proposal No. SC100917v6 8 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVER5AL INTEGRATOR_ The scheduled inspections shall take place at the agreed upon time and locations, upon the conclusion of these inspections Scientel and The City of Fort Worth will conduct a quarterly business review meeting. A. Preventative Maintenance Inspections These quarterly inspections to cover the following: • Site Inspections o Physical inspections of equipment o Onsite alarms o Aux. equipment; DC Power Plants, Dehydrators, L&A • System Performance o NSP Server performance and health checks ■ Server Hardware Health Check ❖ Hard Drive performance verification ❖ Storage Controller Firmware verification Storage Controller performance verification VMWare software patching if required ■ Critical software patching NSP Patch Release review and update as required ■ Database Check Storage usage and optimization o Wavence 9500 ■ Radio link performance 0 7705 MPLS Units • Software Validation o Review current software version for critical patches & debugs o Scientel Solutions will include critical Firmware Patches for all hardware and software running and covered by this proposal • Manufacturer Warranties & Technical Support Coverages o Maintain manufacturer technical support and hardware repair warranties on all covered components o Scientel will process all hardware warranty claims and process repair requests • Spare Equipment o Scientel will maintain and store all spare components at their facility. o On -hand spare equipment inventory shall include a spare unit for each active component within the defined Fort Worth system. o Spares Inventory List to be provided to the City of Fort Worth upon start of each term, or at any inventory adjustment. o No new spares are being procured as part of this proposal • System Records o Scientel will maintain records of all support and maintenance activities and make available to the City of Fort Worth within five business days of request. Proposal No. SC100917v6 9 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T 1 O N S THE UNIVERSAL INTEGRATOR B. System Upgrades All major software upgrades will happen in alternating years in order to maintain the manufacturer Gold Level Support requirements while minimizing how often the network is impacted for the software upgrades. During those years the latest release of software will be installed system wide. Task Year 2026 2027 Software Update Complete System 0% 100% System Maintenance and Dispatch Support 100% 100% s. Technical Support & Corrective Maintenance Upon receipt of notification of an issue from Scientel's monitoring system, Scientel will utilize, categorize, and troubleshoot the failure as necessary. Scientel will determine the severity level of the project and respond based on the timetable noted in section 5A. Scientel will serve as a Level 1 call center while providing level 2 & 3 Support. A. Response Time Table Performance Metric �r Description Performance Target Incidents that cause 100% outage of any designated critical circuit, one or more Response within 2 hours 95% of the Priority 0 communication sites, or two (2) or more time microwave links. Response within 24 hours 80% of the Incidents that cause a 100% failure of one Priority 1 time; within 1 business day 100% of the (1) microwave link. time Incidents causing non -outage microwave Response within 1 business day 80% of Priority 2 link failure. 100% failures of designated the time; within 2 business days 100% non -priority connections. of the time Cosmetic or Information incidents. 100% Response within 2 business days 80% of Priority 3 failure of designated non -essential T-1 and the time; within 4 business days 100% Ethernet circuits. of the time Priority 4 Non -system affecting scheduled Events Agreed on a case -by -case basis. Proposal No. SC100917v6 10 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVER5AL INTEGRATOR_ B. Support Scope of Services The Scientel Solutions Customer Lifecycle Management Program is designed to support the system on a 24 hour, 7 days a week basis. As part of the maintenance and support Scientel shall provide network monitoring services, which will include the monitoring of all devices listed in section 2. Scientel will provide services to create custom reports, as available, from the NSP that can not only be generated for quarterly system performance reviews but also ad -hoc generation as well. These services will also cover implementing additional features available with future firmware upgrades. NSP will also have a dashboard interface that will be accessible to the City of Fort Worth, and Scientel will assist Fort Worth Radio Shop personnel with guidance on accessing and utilizing the interface. C. Assumptions • Network performance service levels encompass end to end systems only. No customer supplied devices (excluding devices purchased for client by Scientel solutions in connection with the system) are considered in this measurement. • Scientel will monitor the status of all MPLS equipment connecting the sites above. • All spares will be warehoused at Scientel facility to minimize any outage time caused due to equipment failures. D. Exclusions • Transmission (waveguide) Lines, antennas, and dehydrator units are exempt from this contract. • DC Power System equipment used to provide electrical power to specified covered devices are exempt from this contract. E. Force Majeure & Non -Warranties All work authorized by client to be performed by Scientel in a Force Majeure & Non -Warranty related items that is otherwise not covered by the system or equipment warranty or is not within the base services provided hereunder shall be billed at an hourly rate of $120.00/hr, 4 hour minimum and $150.00 trip charge. (Weekdays outside the hours of 8AM-5PM Central Time, M-F) Saturday work shall be billed at an overtime rate of $180.00/hr, 4 hour minimum and a $150.00 trip charge plus expenses, Sunday and holiday work shall be billed at an overtime rate of $240.00/hr, 4 hour minimum and $150.00 trip charge with the addition of out of pocket expenses. Unless necessary to ensure the effective functionality of the system, Scientel Solutions shall not perform any non - warranty, emergency, or after-hours work unless it has first provided a written estimate to client and has received a written authorization (e.g. purchase order) from client to perform the work. For any emergency work necessary to ensure the effective functionality of the system, Scientel shall provide prompt notice to client of the need to perform such work. Scientel shall not revise the hourly technician billing rate during the term of this agreement without the prior written consent of the client. Proposal No. SC100917v6 11 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVER5AL INTEGRATOR_ Definition of Force Majeure- The "Event of Force Majeure" means an event beyond the control of Scientel Solutions which prevents Scientel Solutions from complying with any of its obligations under this contract, including but not limited to: • Acts of God (such as, but not limited to, fires, explosions, earthquakes, drought, tidal waves, and floods) • War, hostilities, invasion, act of foreign enemies, mobilization, requisition, or embargo • Rebellion, revolution, insurrection, or military or usurped power, or civil war • Contamination by radioactivity from any nuclear fuel, or from any nuclear waste from the combustion of nuclear fuel, radio -active toxic explosive, or other hazardous properties of any explosive nuclear assembly or nuclear component of such assembly • Riot, commotion, strikes, go slows, lockouts or disorder, unless solely restricted to employees of the supplier or of his subcontractors • Act or threats of terrorism. Definition of Non -Warranty- Warranty that does not apply to: damage caused by accident, abuse, misuse, water, flood, fire, or other acts of nature or external causes; damage caused by service performed by anyone who is not an authorized service provider of Scientel; or damage to a product that has been modified without written permission of Scientel. Support Records • Scientel shall maintain the "inspection checklist" for three years after the project is completed. • At the conclusion of the project, Scientel shall update "inspection checklist" as deemed warranted by the Scientel individual currently maintaining the checklist • Scientel shall maintain all documentation necessary to support the system during the term of this agreement and shall provide such documentation to the client upon reasonable request. Proposal No. SC100917v6 12 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVERSAL INTEGRATOR.. 6. Project Responsibilities Scientel Solutions Responsibilities: Scientel will designate a Project Manager who will direct Scientel's efforts and serve as the primary point of contact for the client. The Scientel Project Manager will have significant authority to make certain decisions relative to the project, on behalf of Scientel, and will have direct access to Scientel's executive management for resolving problems beyond the Project Manager's immediate authority. The responsibilities of the Scientel Project Manager include: • Participate with the client in daily progress review meetings and submit status reports that identify the activities of the previous review period, as well as activities planned for the upcoming review period, including an updated Project Schedule. Maintain project communications with the client's Project Manager(s). • Participate in weekly conference calls or face-to-face meetings and issue a mutually agreed upon agenda for each call or meeting. • Manage the efforts of Scientel staff and coordinate activities with client's project team members. • Measure, evaluate and report the progress against the Project Schedule. • Resolve deviations from the Project Schedule. • Monitor the project to ensure that support resources are available as scheduled and as identified in the contract. • Assume accountability for all Scientel contractor and subcontractor supplied tasks within the Project Schedule, if any. • Coordinate and oversee the installation of all hardware and software. • Review and administer change control procedures through the client's Project Manager, commonly referenced as a "Project Change Request" (PCR), issued by the Scientel Project Manager. • Work with the client Manager(s) in designing and approving the format of an action item log to be used in conjunction with the Project Schedule. The purpose of the log is to identify outstanding issues, provide continual status updates on specific tasks and to identify responsibilities of the parties. • Prepare and submit regular status reports that identifies the activities and milestones completed in the previous month and activities planned for the current month and the next month, including progress and payment milestones, and an updated Project Schedule. • In the event that Scientel must replace or substitute a Project Manager, Scientel will immediately notify the client of such a change and will provide the client with a resume of the person Scientel intends to substitute or change. • Provide and coordinate lift trucks and trained/authorized operators as well as licensed electricians to install devices as required. If tower crews are required per the defined type of installation in the summary section, it is the responsibility of Scientel. • Provide wall penetrations, conduit, cable trays and other supporting equipment necessary for the routing of power, grounding, and networking cables. • Prepare Method of Procedure (MOP) request for all service affecting work activities. • Schedule on -site work activities affected by MOP approval(s) based on the work activity and time of day and day of the week restrictions designated in the approval. Proposal No. SC100917v6 13 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T I O N S THE UNIVERSAL INTEGRATOR.. Customer Responsibilities: The client will designate a Project Manager who will direct the client efforts and serve as the primary point of contact for Scientel. The client's Project Manager(s) will have significant authority to make certain decisions relative to the project, on behalf of the client, and will have direct access to the client's executive management for resolving problems beyond the Project Manager's immediate authority. The responsibilities of the client's Project Manager(s) include: • Maintain project communications with Scientel's Project Manager. • Identify the efforts required of the client's staff to meet the client task requirements and milestones in the Statement of Work and Project Schedule. • Measure and evaluate progress against the Project Schedule. • Monitor the project to ensure that support resources are available as scheduled. • Participate in Progress Reviews meetings. • Provide timely responses to issues related to project progress raised by Scientel's Project Manager. • Approve and release payments in a timely manner predicated on project deliverables. • Ensure that all appropriate client personnel attend and actively participate in Progress Reviews, conference calls, and other project meetings. • Assign one or more personnel who will work with Scientel staff as needed for the duration of the project, including at least one system administrator. • Ensure acceptable Standard Change Request and Approval Letter(s) are approved by authorized signature(s). • Provide building access to Scientel personnel to all facilities where the system is to be installed during the project. Temporary identification cards should be issued to Scientel personnel if required for access to client facilities. Access must be available after business hours where required by Scientel, or as necessary to meet the project schedule. • Provide any required parking permits to Scientel personnel for restricted access entry and/or parking. • Obtain all zoning, site access, and other permits (including, but not limited to, easements, impact studies, planning commission approval, variances, etc) necessary for this project and any other agreements required to gain use of sites. • Provide the appropriate fire inspection and building inspection certificates. • Provide adequate space, electrical power, communications lines, and environmental appropriations for the communications equipment to be installed by Scientel. • Review and approve or revise delivered design documents within ten days of submission. • The client must inform Scientel of all relevant rules, regulations, and requirements for installation. Should these conditions impact the project schedule and limit installation, the client may incur additional cost. Proposal No. SC100917v6 14 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel S O L U T 1 O N S i HE UNIVERSAL NTEGRATOR 7. Pricing Payment Milestones: • 20% on PO • 20% on Detailed Design Review Acceptance • 40% on Equipment Delivery • 10% on Equipment Installation • 10% on Acceptance On -Going Support Payment Schedule Coverage for a period of 1 year beginning on the commissioning of the one new link and one modified link to be coterminous with the existing Fort Worth Contract 46273. Original Term Milestone Period Covered �ffLce&d)ue Date Amount @$ ee Renewal Term 1— 3 Years Milestone Period Covered Invoice Date Due Date Amount 1 01/01/2028 - 12/31/2028 01/01/2028 02/01/2028 $32,500.00 2 01/01/2029 - 12/31/2029 01/01/2029 02/01/2029 $32,500.00 3 01/01/2030 - 12/31/2030 01/01/2030 02/01/2030 $32,500.00 Renewal Term 2 — 2 Years 61- .. . WEP www_m 1 01/01/2031 - 12/31/2031 01/01/2031 02/01/2031 $32,500.00 2 01/01/2032-12/31/2032 01/01/2032 02/01/2032 $32,500A0 Proposal No. SC100917v6 15 09/24/2025 Scientel Solutions LLC Proprietary & Confidential Appendix A: Path Calculations 1050 1000 $_ 950 850 800 w 750 700 0 1 2 New NW Tower Site Latitude 32 59 25.62 N Longitude 097 24 53.97 W Azimuth 120.810 Elevation 850 ft ASL Antenna CL 175.0 ft AGL 3 4 5 Path Length (8.84 mi) Frequency (MHz) = 6175.0 K = 1.33, 1.00 %F1 = 100.00, 60.00 scientel S O L U T 1 O N S i HE UNIVERSAL INTEGRATOR 6 7 8 North Beach Latitude 32 55 28.91 N Longitude 097 17 03.77 W Azimuth 300.880 Elevation 761 ft ASL Antenna CL 147.0 ft AGL Preliminary: Requires Field Verification New NW Tower Site North Beach Latitude 32 59 25.62 N 32 55 28.91 N Longitude 097 24 53.97 W 097 17 03.77 W True Azimuth (°) 120.81 300.88 Vertical Angle (°) -0.19 0.10 Elevation ft 849.95 760.60 Antenna Model UHX6-59 JR) UHX6-59 JR) Antenna Gain (dBi) 38.80 38.80 Antenna Height (ft) 175.00 147.00 TX Line Model EW63 EW63 TX Line Unit Loss (dB/100 ft) 1.44 1.44 TX Line Length (ft) 225.00 197.00 TX Line Loss (dB) 3.23 2.83 Connector Loss (dB) 0.20 0.20 TX Filter Loss (dB) 1.80 1.80 RX Filter Loss dB 2.10 2.10 Frequency (MHz) 6175.00 Polarization Vertical Path Length (mi) 8.839 Free Space Loss (dB) 131.34 Atmospheric Absorption Loss (dB) 0.14 64.25 64.25 Net Path Loss dB Configuration HSB (1:10) Diplexer HSB (1:10) Diplexer Main Main Proposal No. SC100917v6 16 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel SO L U T I ON S THE UNIVERSAL INTEGRATOR_ New NW Tower Site North Beach Radio Model WVCE61-L-128F30S- WVCE61-L-128F30S- 163 163 TX Power (dBm) 35.00 35.00 Emission Designator 30MOD7W 30MOD7W EIRP (dBm) 68.57 68.97 RX Threshold Criteria 1 E-6 BER 1 E-6 BER RX Threshold Level dBm -74.50 -74.50 Receive Signal (dBm) -29.25 -29.25 Thermal Fade Margin (dB) 45.25 45.25 Dispersive Fade Margin (dB) 57.00 57.00 44.46 44.46 Effective Fade Margin dB Climatic factor 2.00 Terrain roughness (ft) 30.38 C factor 3.82 Average annual temperature °F 65.52 Annual multipath availability (%) 99.99995 99.99995 Annual multipath unavailability (sec) 15.08 15.08 99.99990 Annual 2 way multipath availability (%) Annual 2 way multipath unavailability 30.17 sec Proposal No. SCI00917v6 17 09/24/2025 Scientel Solutions LLC Proprietary & Confidential 1050 1000 _ 950 850 800 w 750 700 0 1 2 Eagle Mountain Latitude 32 51 30.20 N Longitude 097 25 12.60 W Azimuth 1.890 Elevation 805 ft ASL Antenna CL 130.0 ft AGL 3 4 5 Path Length (9.11 mi) Frequency (MHz) = 6175.0 K = 1.33, 1.00 %F1 = 100.00, 60.00 �scientel S O L U T I O N S THE UNIVERSAL INTEGRATOR_ 6 7 8 9 New NW Tower Site Latitude 32 59 25.62 N Longitude 097 24 53.97 W Azimuth 181.890 Elevation 850 ft ASL Antenna CL 175.0 ft AGL Preliminary: Requires Field Verification Eagle Mountain New NW Tower Site Latitude 32 51 30.20 N 32 59 25.62 N Longitude 097 25 12.60 W 097 24 53.97 W True Azimuth (0) 1.89 181.89 Vertical Angle (0) 0.06 -0.16 Elevation ft 804.51 849.95 Antenna Model UHX6-59 JR) UHX6-59 JR) Antenna Gain (dBi) 38.80 38.80 Antenna Height (ft) 130.00 175.00 TX Line Model EW63 EW63 TX Line Unit Loss (dB/100 ft) 1.44 1.44 TX Line Length (ft) 180.00 225.00 TX Line Loss (dB) 2.59 3.23 Connector Loss (dB) 0.20 0.20 TX Filter Loss (dB) 1.80 1.80 RX Filter Loss dB 2.10 2.10 Frequency (MHz) 6175.00 Polarization Vertical Path Length (mi) 9.106 Free Space Loss (dB) 131.60 Atmospheric Absorption Loss (dB) 0.15 64.27 64.27 Net Path Loss dB Configuration HSB (1:10) Diplexer HSB (1:10) Diplexer Main Main Proposal No. SCI00917v6 18 09/24/2025 Scientel Solutions LLC Proprietary & Confidential scientel SO L U T I ON S THE UNIVERSAL INTEGRATOR_ Eagle Mountain New NW Tower Site Radio Model WVCE61-L-128F30S- WVCE61-L-128F30S- 163 163 TX Power (dBm) 35.00 35.00 Emission Designator 30MOD7W 30MOD7W EIRP (dBm) 69.21 69.07 RX Threshold Criteria 1 E-6 BER 1 E-6 BER RX Threshold Level dBm -74.50 -74.50 Receive Signal (dBm) -29.27 -29.27 Thermal Fade Margin (dB) 45.23 45.23 Dispersive Fade Margin (dB) 57.00 57.00 44.44 44.44 Effective Fade Margin dB Climatic factor 2.00 Terrain roughness (ft) 31.40 C factor 3.66 Average annual temperature °F 65.55 Annual multipath availability (%) 99.99995 99.99995 Annual multipath unavailability (sec) 15.87 15.87 99.99990 Annual 2 way multipath availability (%) Annual 2 way multipath unavailability 31.74 sec Proposal No. SC100917v6 19 09/24/2025 Scientel Solutions LLC Proprietary & Confidential 12/11 /25, 9:34 AM M&C Review Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FoRiWbRmIr- Create New From This M&C REFERENCE **M&C 25- 04SCIENTEL DATE: 12/9/2025 NO.: 1105 LOG NAME: MICROWAVE LINK ADDITIONS CODE: C TYPE: CONSENT PUBLIC NO HEARING. SUBJECT: (ALL) Authorize Execution of Amendment to Agreement with Scientel Solutions, LLC for the Addition of Two Microwave Links, Including Equipment, Installation, and Ongoing Maintenance, with Initial Cost of $279,472.86 and an Increase to the Recurring Annual Maintenance Cost by $32,500.00, for a Revised Total Contract Amount Up to $7,941,132.56, for the Information Technology Solutions Department RECOMMENDATION: It is recommended that the City Council authorize the execution of an amendment to City Secretary Contract No. 46273 with Scientel Solutions, LLC, utilizing Houston Galveston Area Council Contract No. CW1019, for the addition of two microwave links, including equipment, installation, and ongoing maintenance, with a one-time cost of $279,472.86 and an increase to the recurring annual maintenance cost by $32,500.00, for a revised total contract amount up to $7,941,132.56, for the Information Technology Solutions Department. DISCUSSION: On December 9, 2014, City Council, through Mayor and Council Communication (M&C) C-27128, authorized a ten-year professional services agreement with Scientel Wireless, LLC (Scientel), utilizing the Houston -Galveston Area Council (HGAC) Contract No. CW10-14, in an amount not to exceed $2,097,700.00 for maintenance of the City's Public Safety Microwave System. On June 26, 2018, City Council, through M&C P-12212, authorized the execution of the Second Amendment to City Secretary Contract (CSC) No. 46273 for additional maintenance services and system upgrades to the City's Public Safety Microwave System in the amount of $381,037.60, for a revised total contract amount of $2,478,737.60. On April 30, 2020, the City executed the Third Amendment to CSC No. 46273 to upgrade the microwave system software at a one-time cost of $9,500.00, for a revised total contract amount of $2,488,237.60. On October 12, 2021, City Council, through M&C 21-0775, authorized the execution of the Fourth Amendment to CSC No. 46273 for additional maintenance services and system upgrades to the City's Public Safety Microwave System, utilizing successor HGAC Contract No. CW10-19, with a one-time cost of $76,618.55 and an additional annual maintenance cost of $8,000.00, for a revised total contract amount of $2,572,856.15. On August 9, 2022, City Council, through M&C 22-0549, authorized the execution of the Fifth Amendment to CSC No. 46273 for additional maintenance services and system upgrades to the City's Public Safety Microwave System, increasing the contract amount through 2032 by $4,860,315.73, for a revised total contract amount of $7,433,171.88. On June 27, 2023, City Council, through M&C 23-0532, authorized the execution of the Sixth Amendment to CSC No. 46273 to purchase replacement hardware at a one-time cost of $33,492.55, for a revised total contract amount of $7,466,659.70 as amended. This M&C is to request authorization to execute the Seventh Amendment to CSC No. 46273 to purchase and install two new microwave links, including equipment, configuration, and cutover services, and for the purchase of annual ongoing maintenance and support for these links. One link will be established between the future Northwest radio tower site and North Beach radio tower, and the apps.cfwnet.org/council_packet/mc_review.asp?ID=33967&councildate=12/9/2025 1 /3 12/11 /25, 9:34 AM M&C Review second link will relocate the existing link between the North Beach and Eagle Mountain radio towers to run between the Northwest radio tower site and Eagle Mountain radio tower. The initial purchase and implementation cost for the new microwave links is $279,472.86. Ongoing maintenance and support services for these new links have been quoted at $32,500.00 annually, beginning January 1, 2027 through December 31, 2032. This annual cost is in addition to the existing maintenance services and ensures continuity of service while aligning with the renewal options already authorized under CSC No. 46273. Upon City Council approval, the revised total contract amount will be in an amount up to $7,941,132.56, with expected annual amounts described below. Year I Current Amount I Revised Amount 2015 F $ 210,754.15 2016 210,754.15 2017 210,754.15 2018 370,072.75 2019 1 247,257.15 F_ 247,652.09 F_ 322,770.63 F-2381152.08 2020 2021 2022 2023 783,492.55 2024 750,000.00 2025 750,000.00 2026 750,000.00 $ 1,029,472.86 2027 1 750,000.001 782,500.00 2028 1 325,0-00.001 F-325,000.00E— F-3251000.00E— 357,500.00 357,500.00 357,500.00 2029 2030 2031 325,000.00 357,500.00 2032 F-325,000.001 357,500.00 Total $ 7,466,659.70 $ 7,941,132.56 Funding is budgeted in the Tax Note Series 2023 Fund for the Information Technology Solutions Department for the purpose of funding the NW Radio Tower project. COOPERATIVE PURCHASE: State law provides that a local government purchasing an item under a cooperative purchasing agreement satisfies State laws requiring that the local government seek competitive bids for purchase of the item. Cooperative contracts have been competitively bid to increase and simplify the purchasing power of local government entities across the State of Texas. Except as expressly modified herein, all other terms and conditions of the existing agreement shall remain unchanged and in full force and effect as stated below. SUCCESSOR CONTRACTS: The City will initially use the Houston -Galveston Area Council (HGAC) cooperative agreement to make purchases authorized by this M&C. In the event the cooperative agreement is not renewed, staff would cease purchasing at the end of the last purchase agreement coinciding with a valid cooperative contract. If the City Council were to not appropriate funds for a future year, staff would stop making purchases when the last appropriation expires, regardless of whether the then -current purchase agreement has expired. If the cooperative agreements are extended, this M&C authorizes the City to purchase similar products under the extended contract. In the event a cooperative agreement is not extended, but vendor and cooperative purchasing agency execute new cooperative agreement(s) with substantially similar terms, this M&C authorizes the City to purchase the products under the new contract(s). If this occurs, in no event will the City continue to purchase goods and services under the new agreement beyond December 2032 without seeking Council approval. apps.cfwnet.org/counciI_packet/mc_review.asp?ID=33967&counciIdate=12/9/2025 2/3 12/11 /25, 9:34 AM M&C Review ADMINISTRATIVE CHANGE ORDER: An administrative change order or increase may be made by the City Manager up to the amount allowed by relevant law and the Fort Worth City Code and does not require specific City Council approval as long as sufficient funds have been appropriated. AGREEMENT TERM: Upon City Council approval and execution of the amendment, the current term of the agreement shall expire December 31, 2027. RENEWAL OPTIONS: The Agreement may be renewed for one additional three-year term beginning January 1, 2028 and expiring December 31, 2030 and for one additional two-year term beginning January 1, 2031 and expiring December 31, 2032, at the amounts listed in the table above, unless modified by a subsequent amendment adjusting the contract amount. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Tax Notes Series 2023 Fund for the NW Radio Tower project to support the approval of the above recommendation and execution of the amendment. Prior to any expenditure being incurred, the Information Technology Solutions Department has the responsibility to validate the availability of funds. TO F Department ID FROM Fund Department ID Account Project Program Activity Budget Reference # Amount ID I I I Year (Chartfield 2) Account Project Program Activity Budget I Reference # Amount ID I I I Year (Chartfield 2) Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: ATTACHMENTS Dianna Giordano (7783) Kevin Gunn (2015) Donlen Ruffin (2017) 04SCIENTEL MICROWAVE LINK ADDITIONS FID table.xlsx (CFW Internal) Form 1295 Certificate 101443542.pdf (CFW Internal) GL0019-07 - Project Budget Summary_.pdf (CFW Internal) apps.cfwnet.org/council_packet/mc_review.asp?ID=33967&councildate=12/9/2025 3/3 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Scientel Solutions LLC Subject of the Agreement Amendment No. 7 to CSC No. 46273 with Scientel Solutions LLC M&C Approved by the Council? * Yes 8 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ CSC 46273-A7 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes ❑ No 8 If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: December 31, 2027 If applicable. Is a 1295 Form required? * Yes 8 No ❑ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following _ order: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.