HomeMy WebLinkAbout061324-CO5 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 61324-005
FORT WORTH City of Fort Worth
Change Order Request
Project Name Historic Southside Improvements City Sec # 61324
Client Project #(s) 1102932
Project
Water, Sanitary Sewer, Storm Drain and Street Paving Improvements
Contractor Woody Contractors, Inc. Change Order # 5 Date 10/15/2025
City Project Mgr. I Jose Orozco City Inspector Sergio Garcia
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Unit 1: Water
Unit 2: Sewer
Unit 3: Paving
Unit 4: Storm
Totals
Contract Time
(CD)
$6,020,770.70
$2,077,370.40
$4,958,218.25
$623,399.00
$13,679,758.35
450
$14,432.00
$235,643.40
$0.00
$0.00
$250,075.40
100
1 $6,035,202.70
1 $2,313,013.80
1 $4,958,218.25
$623,399.00
1 $13,929,833.75
1 550
Amount of Proposed Chanqe Order
1 $0.00
1 $0.00
1 $0.00
1 $0.00
1
1 0
Original Funds Available for Change Orders $180,623.00 $62,321.00 $240,000.00 $35,000.00 $517
Remaining Funds Available for this CO $166,191.00 $0.00 $240,000.00 $35,000.00 $441
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 1.83%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1 $17,099,697.94
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and materials necessary to perform the work outlined in Change Order #5.
Change Order #5 provides for additional flatwork bid items for work on Vickery Boulevard and Evans Avenue, including ADA ramps, sidewalk, and valve/manhole adjustments,
which were not originally included in Units 1 (Water), 2 (Sewer), and 4 (Storm).
Cost: All bid items associated with this change order are already included in the contract under other units, and the contractor has agreed to honor the existing bid prices. This
change order will utilize a portion of the remaining construction allowance for a $0 cost change order.
Time: No additional calendar days are required.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor (Name) Contract Signature
Date
Woody Contractors, Inc.
Troy Woody I -'.
11/25/2025
Inspector/Inspection Supervisor
Project and Contract Compliance Manager
Date
AML
12/01/2025
12/01/2025
Program Manager
Date
Senior Capital Project Officer
Date
f&-
12/10/2025
Assistant Director LQe
Date
Director Contracting Department (Dept)
Date
Patricia L. Wadsack (Dec 12,202515:00:12 Cyr)
2/12/2025
'" -&
12 12 2025
/ /
Assistant City A
Date
12/12/2025
anager
Date
12/16/2025
Council Ac
pop'a���Ilq M&C Number N/A
EST: 0.
F FORTN°o�0
Ov1.
o=d
Jannette Goodall, City Secretary000* dd
o d
M&C Date Approved N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
� 1`-- Change Order Additions
Project Name Historic Southside Improvements City Sec # 61324
Client Project 102932
Contractor Woody Contractors, Inc. PM Jose Orozco InspectorF Sergio Garcia
Change Order Submittal # 0 Date 10/15/2025
ADDITIONS
ITEM
DESCRIPTION
DEPT
Oty
Unit
Unit Cost
Total
93
3305.0 07 Manhole Adjustment, Minor w/Concrete Collar
Unit : Water
12.00000000
EA
$1,500.00
8,000.00
1-94
3305.0111 Valve Box Adjustment
Unit 1: Water
3.00000000
EA
$1,000.00
2-74
9999.0007 Modified Ramp Type R-1
Unit 2: Sewer
1.00000000
EA
$4,125.00
, 25.00
2-75
3213.0506 Barrier Free Ramp, Type P-1
Unit 2: Sewer
1.00000000
EA
$3,225.05
5.
2-76
3213.0311 4" Conic Sidewalk, Adjacent to Curb
Unit 2: Sewer
1,008.00000000
SF
$14.00
, 12.00
4-28
3305.0111 Valve Box Adjustment
Unit 4: Storm
1.00000000
EA
$1,000.00
4-29
3305.0107 Manhole Adjustment, Minor w/Concrete Collar
Unit 4: Storm
4.00000000
EA
$1,500.00
$6,000.00
Change Order Additions Page 2 of 3
Unit 1: Water
$21,000.00
Unit 2: Sewer
$21,462.00
Unit 3: Paving
$0.00
Unit 4: Storm
$7,000.00
Sub Total Additions
$49,462.00
Fox_ T� H City of Fort Worth
Change Order Deletions
Project Name I Historic Southside Improvements City Sec # 61324
Client Project# 1 102932
Contractor Woody Contractors, Inc. PM Jose Orozco Inspector Sergio Garcia
Change Order Submittal # = Date 10/15/2025
DELETIONS
NEEMAM, I I I
Unit 1: Water
111 11
Unit 2: Sewer
11
Unit 3: Paving
1 11
Unit 4: Storm
111 11
Sub Total Deletions
$49,462.00
Change Order Deletions Page 3 of 3
FORT WORTH.,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Historic Southside Improvements Change
Order 5
M&C: CPN: 102932 CSO: 61324 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Ann Estes
TPW
4-
Nov 24, 2025
2.
Troy Woody twood, 2020kaol.com
Vendor
Troy Woody
Nov 25, 2025
3.
Sergio Garcia
TPW
12)t
Dec 1, 2025
4.
Don Watson
TPW
oo.a
Dec 2, 2025
5.
Jose Orozco
TPW
JA10A0
Dec 1, 2025
6.
Greg Robbins
TPW
Dec 10, 2025
7
Mary Hanna
TPW
Dec 10, 2025
8
Patricia Wadsack
TPW
Dec 12, 2025
9
Lauren Prieur
TPW
ePe
Dec 12 2025
10.
1 Doug Black
Legal
Dec 12, 2025
11.
Jesica McEachern
CMO
(i
12/16/2025
12.
Jannette Goodall
CSO
Dec 16, 2025
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room,
TPW Contracts ALSO List: - Bus Sppt: Ann Estes; Prg Mgr Greg Robbins; Sr CPO — Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
ttAPPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take
NEE�xS PSIDE NOTARIZED: DYES ®No
RUSH: DYES ®No SAME DAY: DYES [—]No NEXT DAY: [—]YES [—]No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(&fortworthtexas.l!ov for pickup when complete. Call ext. 7233 or ext. 8363
with questions. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement: Change Order No. 5 to CSC No. 61324, a
Contract for Historic Southside Improvements Project
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 102932
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following _ order:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.