Loading...
HomeMy WebLinkAbout055855-CO3 - Construction-Related - Contract - Crescent Contractors, Inc.FO R T WO R T I�[ —�� Project Name:� VCWRF South Influent Lift Station Project No.(s):I 56020 / 0700430 / 5740010 I 001780 DOE No. � n/a City Secretary Copy 55855-0O3 City Sec No.: � 55855 City Proj. No.: � 100075-2 Projeci Description: A new 120 MGD Lift Station, 66" FRP forcemain, odor control, diversion structure, an adtlition of fine and coarse screens to Heatlworks, power supply to new facility, necessary piping, electrical, controls and appurtenances Contractor:� Crescent Contractors, Inc � City Project Mgr.� Farida Goderya I Phone Number:l 817-392-8214 � Dept. Sewer Water Original Contract Amount Extras to Date Cretlits to Date Pentling Change Ortlers (in M&C Process) Contract Cost to Date �Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $19,993,000.00 $270,890.00 $20,263,890.00 -$282,000.00 $19,981,890,00 $399,860.00 $128,970.00 Change Order # I 3 � Date: I City Inspector: � Kevin Sitlebottom & Alan � Phone Number:� 817-874-9330 � Totals CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER $19,993,000.00 $270,890.00 12I1812025 � Contract Time (Calendar days) 639 0270 .$20,263,890.00 �09 -$282.000.00 �92 $19, 981, 890.00 1, 501 $399,860.00 $128,970.00 1.35% $24,991,250.00 Chan�e Order No. 03 (CO3) includes one CMR and two PCMs with a total cost of $47,000 and additional time. The ontractor has also requested an extension of the substantial and final completion dates. The contractual substantial completion date was November 1, 2023. The City will accept an early substantial com letion date based on when the lift station was started up on July 31, 20Z4 (273 days after contractual subs�antial completion). The contractual final completion date was January 1, 2�024. Provided that the Contractor provides outstandin O&M manuals and spare parts as part of warrant requirements, the City is willing to extend the fina� completion date and waive liquidated damages. �or purposes of the equipment warranty, the City will establish the equipment warranty date as August 15, 2025. The extended time period for completion has resulted in additional costs to the City, including a substantial settlement to the Biosolids vendor and $56,000 for additional third party construction management. In lieu of �I'guidated dama es and in order to compensate the City for actual costs incurred, the Contractor will provide a 329,000 CREDI�to the City. As part of this Change Order No. 3, the City agrees to accept the CREDIT, agrees to extend the Substantial Completion Date to July 31, 2024, establishes an equipment warranty date of August 15, 2025, and waives liquidated damages for late delivery. It is anticipated a final payment request will be submitted by the Contractor following approval of this Change Order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Crescent Contractors, Inc Inspector , L�.: ���� Assistant Director (Water Dept) �'�,�t� �. ���„ Assistant City Attorney '� M&C Number � TS a! N/A I City of Fort Worth Change Order Request Contractor Name " Contractor Signature Date Ryan Glanz ��-0����� �, 12 . 19 . 25 �2.�9.2t Date Project Manager ,� 12/19/25 Fa,�,�,ola, Go-�,e,�,ya Date Construction Supervisor (TPW Dept) 12/19/2025 Date Assistant City Manager 12/19/202 �;���'r �,_ : Council Action (If Required) M&C Date Approved � N/A Date 12/19/2025 Date Date 12/22/2025 OFFICIAL RECORD ICITYSECRETARY FT. WORTH, TX FORT �fIRT�-I City of Fort Worth Change Order Additions Project Name � VCWRF South Influent Lift Station � City Sec No.: � 55855 � Project No.(s): � 56020 / 0700430 / 5740010 / 001780 � DOE No. � n/a � City Proj. No.: � 100075-2 � Project A new 120 MGD Lift Station, 66" FRP forcemain, odor control, diversion structure, an addition of fine and coarse Description screens to Headworks, power supply to new facility, necessary piping, electrical, controls and appurtenances Contractor � Crescent Contractors, Inc � Change Order: � J Date: � 12/18/2025 � City Project Mgr. � Farida Goderya � City Inspector � Kevin Sidebottom & Alan � ADDITIONS TEM DE R PT N DEPT Qty Unit Unit Cost Total CMR-12.oCMR-12.2 -- Fine Screen Channel Modifications PCM-03 PCM -03 -- Meter Vault Ladder & Access Hatch PCM -04 PCM-04 -- Fence Gate and Flex base Settlement Credit for delays, in Lieu of Liquidated Damages Sewer Sewer Sewer Sewer 1.00 1.00 1.00 1.00 -$329,000.0 -$329,000.00 ISewer �Water $20,000.0 $20,000.00 $10,000.0 $10,000.00 $17,000.0 $17,000.00 ($282,000.00) Page 1 of 1 �Additions Sub Total I F��-� �r� �T� c�ty of Fo�t wo�tn y�`� Change Order Deletions Project Name Project No.(s): Project Description Contractor City Project Mgr. VCWRF South Influent Lift Station � City Sec No.: � 55855 � 56020 / 0700430 I 5740010 I 001780 � DOE No. I n/a � City Proj. No.: � 100075-2 � A new 120 MGD Lift Station, 66" FRP forcemain, odor control, diversion structure, an addition of fine and coarse � screens to Headworks, power supply to new facility, necessary piping, electrical, controls and appurtenances Crescent Contractors, Inc � Change Order: �3 Date � 12/1812025 � �.���� �.,�u�u,,,�„� � ��„�a� � �,,,��Qu„� �� Farida Goderya City Inspector: ,����� DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total ISewer IWater Page 1 of 1 IDeletions Sub Total MIWBE Breakdown for this Change Order MWBE Sub Same as Original Contract Multiple Tvqe of Service Amount for this CO $47,000.00 Total $47,000.00 Previous Change Orders Co # DATE AMOUNT C01 8/1512023 $78,090.00 CO2 9/26/2023 $192,800.00 Total I $270,890.00 I Page 1 of 1 CDM Sm�th 801 Cherry Street, Unit 33, Suite 1820 Fort Worth, Texas 76102 tel: 817 332-8727 April 13, 2024 Farida Goderya, PhD, P.E. Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 Subject: Village Creek Water Reclamation Facility South Flow Lift Station Project CPN 100075-2 CMR-12.2 Fine Screen Channel 6 Modifications Dear Farida: Transmitted here within please find a copy of Crescent's February 2, 2024 price proposal for CMR 12.2 to modify the fine screen channel no. 6 walls and protective lining to allow for Andritz fine screen installation. The fine screen channel walls are not plumb and the width of the channel varies from 60.125" to 59.25". The fine screen was manufactured with and unit width of 58.375" however the bolt-to-bolt width is 60" and therefore the screen is too wide. Additionally, there are overhead concrete beams that Crescent had to clear to install and which caused damage to the roughly top 5- ft of the t-lock liner when Crescent tried to install the screen. The City has agreed to pay a shared cost $20,000 for Crescent to modify the fine screen channel walls and lining to allow installation of the fine scree. There are no additional calendar days requested. CDM Smith has reviewed the price proposal and is of the opinion that the cost is fair and reasonable. CDM Smith recommends the City accept this cost and issue a Change Order in the amount of $20,000. Please advise if the Water Department desires this CMR-12.2 be incorporated into a Change Order. Sincerely, ��b.�.�,�V.--� Amy Robinson, P.E., BCEE, CCM Project Manager CDM Smith Inc. cc: Alan Cossabone, Freese & Nichols Ryan Glanz, Crescent Constructors .. t,r WATER r ENVIROHMENT r TRANSPORTATION + ENERGY t fACILITl�S I 2560 Technoloc,�y Drive #400 Plano, TX 75074 CONTRACT MODIFICATION REQUEST: PROJECT: VILLAGE CREEK LIFT STATION PROJECT NO. 100075-2 ATTENTION: CITY OF FORT WORTH 1000 THROCKMORTON STREET FORT WORTH, TX 76102 ATTN: FARIDA GODERYA Attention: The following change in contract on this project is proposed: A breakdown of cost SHALL be attached. Work shall not commence until authorized by the OWNER. Description of the Proposed Change & Clarifications Pricing for the following: Modifications to existing Fine Screen Channel #6 (RFI 50) (1) Remove Existing T-loc liner (2) Demo and remove 1" of existing concrete to facilitate Andritz Fine Screen installation (3) Install new ARC 791 liner in area of concrete removal (4) Install SS batten bars at edges of existing T-loc liner TOTAL AMOUNT I $ , $79, 7.00 All work shall be in accordance with the terms, stipulations, and conditions of the �$20,00.0� original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: Increased By 0 Calendar Days Decreased � Unchanged � '� ACCEPTED my Robinson, PE, BCEE, CC � REJECTED CDM Smith, Inc. CMR-12.2 DATE: 02.02.24 Ryan Glanz Crescent 02/13/2024 Date This CMR 12.2 is approved on the basis that the City of Fort Worth has accepted to pay $20,000 of the total CMR cost. CHANGE ORDER SUMMARY Front Sheet VILLAGE CREEK LIFT STATION CHANGE DESCRIPTION: CONTRACT MODIFICATION REQUEST # CMR-12 Description DIRECT COSTS LABOR BURDEN & FRINGES 55% SUBTOTALS ��IV I�\r\� I VI\ IVIr\��f\l/1 IJ�U ��r�T� t,�,�T�� t i��,�,��u� ��� ;�u��� BONDS & INSURANCE 3% TOTAL� CLARIFICATIONS: 1 2 3 4 Labor Material 11,200 9,596 6,160 17,360 9,596 Job #: � 202�-05 � Equipment Subcontract - 50,000 50,000 Total 70,796 6,160 76,956 �,JwJ L,JbG 2,505 (4) 86, 0 Cut Fee to zero ($6,543) New Total = $79,457.00 I �2�,��.0� I CDM Sm�th 801 Cherry Street, Unit 33, Suite 1820 Fort Worth, Texas 76102 tel: 817 332-8727 October 18, 2023 Farida Goderya, PhD, P.E. Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 Subject: Village Creek Water Reclamation Facility South Flow Lift Station Project CPN 100075-2 PCM-03 Flow Meter Vault Ladder and Hatch Dear Farida: Transmitted here within please find a copy of Crescent's September 12, 2023 price proposal for the adding one hatch and access ladder to the flow meter vault. The selected flow meter requires access to both sides of the meter for maintenance. Currently there is only access to one side of the meter. The additional hatch and ladder will provide access to the other side. The cost associated with this work is $10,000 with no additional days. CDM Smith has reviewed the price proposal and is of the opinion that the cost is fair and reasonable. CDM Smith recommends the City accept this cost and issue a Change Order in the amount oi $10,000. Please advise if the Water Department desires this PCM-03 be incorporated into a Change Order. Sincerely, ���.�..�,���--a Amy Robinson, P.E., BCEE Project Manager CDM Smith Inc. cc: Alan Cossabone, Freese & Nichols Ryan Glanz, Crescent Constructors .. t,r WATER r ENVIROHMENT r TRANSPORTATION + ENERGY t fACILITl�S I 2560 Technolor�y Drive #400 Plano, TX 75074 CONTRACT MODIFICATION REQUEST: PROJECT: VILLAGE CREEK LIFT STATION PROJECT NO. 100075-2 DATE: � 09.12.23 � ATTENTION: CITY OF FORT WORTH 1000 THROCKMORTON STREET FORT WORTH, TX 76102 ATTN: FARIDA GODERYA Attention: The following change in contract on this project is proposed: A breakdown of cost SHALL be attached. Work shall not commence until authorized by the OWNER. Description of the Proposed Change & Clarifications Pricing for the following: PCM-03: Add 2nd Hatch and ladder to FM Vault to enable plant access to both sides of the flow meter. TOTAL AMOUNT I $ 10,000 All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: Increased By 0 Calendar Days Decreased � Unchanged � u PCM-003 Ryan Glanz Crescent ACCEPTED � � � City of Fort Worth Date � REJECTED CHANGE ORDER SUMMARY Front Sheet VILLAGE CREEK LIFT STATION CHANGE DESCRIPTION: CONTRACT MODIFICATION REQUEST # PCM-003 Description DIRECT COSTS LABOR BURDEN & FRINGES 55% SUBTOTALS CONTRACTOR MARKUP 15% CONTRACTOR MARKUP 5% (SUBS) BONDS & INSURANCE 3% TOTAL� CLARIFICATIONS: 1 2 3 4 Labor Material 896 7,130 493 1,389 7,130 Job #: � 2021-05 � Equipment Subcontract Total - - 8, 026 493 - 8,519 1,278 294 (91) - 10,000 2560 Technoloc,�y Drive #400 Plano, TX 75074 CONTRACT MODIFICATION REQUEST: PCM-oo4 PROJECT: VILLAGE CREEK LIFT STATION DATE: � 08.19.24 � PROJECT NO. 100075-2 ATTENTION: CITY OF FORT WORTH 1000 THROCKMORTON STREET FORT WORTH, TX 76102 ATTN: FARIDA GODERYA Attention: The following change in contract on this project is proposed: A breakdown of cost SHALL be attached. Work shall not commence until authorized by the OWNER. Description of the Proposed Change & Clarifications Pricing for the following: PCM-04: Add 14' Wide double swing gate and flexbase drive to Flow meter vault TOTAL AMOUNT I $ 17,000 � Ryan Glanz Crescent All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: � Increased � By 0 Calendar Days Decreased � Unchanged � � ACCEPTED � � � � City of Fort Worth Date � REJECTED CHANGE ORDER SUMMARY Front Sheet VILLAGE CREEK LIFT STATION CHANGE DESCRIPTION: CONTRACT MODIFICATION REQUEST # PCM-004 Description DIRECT COSTS LABOR BURDEN & FRINGES 55% SUBTOTALS CONTRACTOR MARKUP 15% CONTRACTOR MARKUP 5% (SUBS) BONDS & INSURANCE 3% TOTAL� CLARIFICATIONS: 1 2 3 4 Labor Material 3,360 3,675 1,848 5,208 3,675 Job #: � 202�-05 � Equipment 3,560 Subcontract 2, 7 00 3,560 2,100 Total 12,695 1,848 14,543 1,866 105 495 (10) 17,000 .Contract Compliance Mana�er By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. °�,.; - - ---- >. , � : _. ` a . � - , _ _. � _ g_ e .�--p�,- --- _ -- -� Signature Farida Goderya, PhD, PE Name of Employee Senior Project Manager Title �a ATTEST. F FOR;�4a doo= �dd o° �� �p.� d fo [ Pp *0�8 d ���A. /J � Q �� *p �aa4 pEXP?aap Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX F�RT��RTHo City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Crescent Contractors, Inc. Subject of the Agreement: Village Creek Water Reclamation Facility South Influent Lift Station M&C Approved by the Council? * Yes ❑ No ❑✓ If �so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 55855 If �so, provide the original contract number and the amendment number. Is the Contract "PermanenY'? *Yes 0 No ❑ If �unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: N/A Expiration Date: N/A If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No ❑✓ *If �so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 100075-2 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑✓ No ❑ Contracts need to be routed for CSO processin� in the followin� order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.