HomeMy WebLinkAbout055855-CO3 - Construction-Related - Contract - Crescent Contractors, Inc.FO R T WO R T I�[
—��
Project Name:� VCWRF South Influent Lift Station
Project No.(s):I 56020 / 0700430 / 5740010 I 001780
DOE No. � n/a
City Secretary Copy
55855-0O3
City Sec No.: � 55855
City Proj. No.: � 100075-2
Projeci Description:
A new 120 MGD Lift Station, 66" FRP forcemain, odor control, diversion structure, an adtlition of fine and coarse screens
to Heatlworks, power supply to new facility, necessary piping, electrical, controls and appurtenances
Contractor:� Crescent Contractors, Inc �
City Project Mgr.� Farida Goderya I
Phone Number:l 817-392-8214 �
Dept. Sewer Water
Original Contract Amount
Extras to Date
Cretlits to Date
Pentling Change Ortlers (in M&C Process)
Contract Cost to Date
�Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$19,993,000.00
$270,890.00
$20,263,890.00
-$282,000.00
$19,981,890,00
$399,860.00
$128,970.00
Change Order # I 3 � Date: I
City Inspector: � Kevin Sitlebottom & Alan �
Phone Number:� 817-874-9330 �
Totals
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
$19,993,000.00
$270,890.00
12I1812025 �
Contract Time
(Calendar days)
639
0270
.$20,263,890.00 �09
-$282.000.00 �92
$19, 981, 890.00 1, 501
$399,860.00
$128,970.00
1.35%
$24,991,250.00
Chan�e Order No. 03 (CO3) includes one CMR and two PCMs with a total cost of $47,000 and additional time.
The ontractor has also requested an extension of the substantial and final completion dates.
The contractual substantial completion date was November 1, 2023. The City will accept an early substantial
com letion date based on when the lift station was started up on July 31, 20Z4 (273 days after contractual
subs�antial completion). The contractual final completion date was January 1, 2�024.
Provided that the Contractor provides outstandin O&M manuals and spare parts as part of warrant
requirements, the City is willing to extend the fina� completion date and waive liquidated damages. �or
purposes of the equipment warranty, the City will establish the equipment warranty date as August 15, 2025.
The extended time period for completion has resulted in additional costs to the City, including a substantial
settlement to the Biosolids vendor and $56,000 for additional third party construction management. In lieu of
�I'guidated dama es and in order to compensate the City for actual costs incurred, the Contractor will provide a
329,000 CREDI�to the City.
As part of this Change Order No. 3, the City agrees to accept the CREDIT, agrees to extend the Substantial
Completion Date to July 31, 2024, establishes an equipment warranty date of August 15, 2025, and waives
liquidated damages for late delivery.
It is anticipated a final payment request will be submitted by the Contractor following approval of this Change
Order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Crescent Contractors, Inc
Inspector
, L�.: ����
Assistant Director (Water Dept)
�'�,�t� �. ���„
Assistant City Attorney
'�
M&C Number
�
TS
a!
N/A I
City of Fort Worth
Change Order Request
Contractor Name " Contractor Signature Date
Ryan Glanz ��-0����� �, 12 . 19 . 25
�2.�9.2t
Date Project Manager ,�
12/19/25 Fa,�,�,ola, Go-�,e,�,ya
Date Construction Supervisor (TPW Dept)
12/19/2025
Date Assistant City Manager
12/19/202 �;���'r �,_ :
Council Action (If Required)
M&C Date Approved � N/A
Date
12/19/2025
Date
Date
12/22/2025
OFFICIAL RECORD
ICITYSECRETARY
FT. WORTH, TX
FORT �fIRT�-I City of Fort Worth
Change Order Additions
Project Name � VCWRF South Influent Lift Station � City Sec No.: � 55855 �
Project No.(s): � 56020 / 0700430 / 5740010 / 001780 � DOE No. � n/a � City Proj. No.: � 100075-2 �
Project A new 120 MGD Lift Station, 66" FRP forcemain, odor control, diversion structure, an addition of fine and coarse
Description screens to Headworks, power supply to new facility, necessary piping, electrical, controls and appurtenances
Contractor � Crescent Contractors, Inc � Change Order: � J Date: � 12/18/2025 �
City Project Mgr. � Farida Goderya � City Inspector � Kevin Sidebottom & Alan �
ADDITIONS
TEM DE R PT N DEPT Qty Unit Unit Cost Total
CMR-12.oCMR-12.2 -- Fine Screen Channel Modifications
PCM-03 PCM -03 -- Meter Vault Ladder & Access Hatch
PCM -04 PCM-04 -- Fence Gate and Flex base
Settlement Credit for delays, in Lieu of Liquidated Damages
Sewer
Sewer
Sewer
Sewer
1.00
1.00
1.00
1.00
-$329,000.0 -$329,000.00
ISewer
�Water
$20,000.0 $20,000.00
$10,000.0 $10,000.00
$17,000.0 $17,000.00
($282,000.00)
Page 1 of 1 �Additions Sub Total I
F��-� �r� �T� c�ty of Fo�t wo�tn
y�`� Change Order Deletions
Project Name
Project No.(s):
Project Description
Contractor
City Project Mgr.
VCWRF South Influent Lift Station � City Sec No.: � 55855 �
56020 / 0700430 I 5740010 I 001780 � DOE No. I n/a � City Proj. No.: � 100075-2 �
A new 120 MGD Lift Station, 66" FRP forcemain, odor control, diversion structure, an addition of fine and coarse �
screens to Headworks, power supply to new facility, necessary piping, electrical, controls and appurtenances
Crescent Contractors, Inc � Change Order: �3 Date � 12/1812025 �
�.���� �.,�u�u,,,�„� � ��„�a� � �,,,��Qu„� ��
Farida Goderya City Inspector: ,�����
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
ISewer
IWater
Page 1 of 1 IDeletions Sub Total
MIWBE Breakdown for this Change Order
MWBE Sub
Same as Original Contract Multiple
Tvqe of Service
Amount for this CO
$47,000.00
Total $47,000.00
Previous Change Orders
Co # DATE AMOUNT
C01 8/1512023 $78,090.00
CO2
9/26/2023
$192,800.00
Total I $270,890.00 I
Page 1 of 1
CDM
Sm�th
801 Cherry Street, Unit 33, Suite 1820
Fort Worth, Texas 76102
tel: 817 332-8727
April 13, 2024
Farida Goderya, PhD, P.E.
Fort Worth Water Department
200 Texas Street
Fort Worth, Texas 76102
Subject: Village Creek Water Reclamation Facility
South Flow Lift Station Project
CPN 100075-2
CMR-12.2 Fine Screen Channel 6 Modifications
Dear Farida:
Transmitted here within please find a copy of Crescent's February 2, 2024 price proposal for CMR
12.2 to modify the fine screen channel no. 6 walls and protective lining to allow for Andritz fine
screen installation. The fine screen channel walls are not plumb and the width of the channel varies
from 60.125" to 59.25". The fine screen was manufactured with and unit width of 58.375" however
the bolt-to-bolt width is 60" and therefore the screen is too wide. Additionally, there are overhead
concrete beams that Crescent had to clear to install and which caused damage to the roughly top 5-
ft of the t-lock liner when Crescent tried to install the screen. The City has agreed to pay a shared
cost $20,000 for Crescent to modify the fine screen channel walls and lining to allow installation of
the fine scree. There are no additional calendar days requested.
CDM Smith has reviewed the price proposal and is of the opinion that the cost is fair and
reasonable. CDM Smith recommends the City accept this cost and issue a Change Order in the
amount of $20,000. Please advise if the Water Department desires this CMR-12.2 be incorporated
into a Change Order.
Sincerely,
��b.�.�,�V.--�
Amy Robinson, P.E., BCEE, CCM
Project Manager
CDM Smith Inc.
cc: Alan Cossabone, Freese & Nichols
Ryan Glanz, Crescent Constructors
..
t,r
WATER r ENVIROHMENT r TRANSPORTATION + ENERGY t fACILITl�S I
2560 Technoloc,�y Drive #400
Plano, TX 75074
CONTRACT MODIFICATION REQUEST:
PROJECT: VILLAGE CREEK LIFT STATION
PROJECT NO. 100075-2
ATTENTION: CITY OF FORT WORTH
1000 THROCKMORTON STREET
FORT WORTH, TX 76102
ATTN: FARIDA GODERYA
Attention:
The following change in contract on this project is proposed:
A breakdown of cost SHALL be attached.
Work shall not commence until authorized by the OWNER.
Description of the Proposed Change & Clarifications
Pricing for the following:
Modifications to existing Fine Screen Channel #6 (RFI 50)
(1) Remove Existing T-loc liner
(2) Demo and remove 1" of existing concrete to facilitate Andritz Fine Screen installation
(3) Install new ARC 791 liner in area of concrete removal
(4) Install SS batten bars at edges of existing T-loc liner
TOTAL AMOUNT I $ ,
$79, 7.00
All work shall be in accordance with the terms, stipulations, and conditions of the �$20,00.0�
original Contract Documents. If the work herein provided for is Approved by
Change Order, the time of completion will be:
Increased By 0 Calendar Days
Decreased
� Unchanged �
'� ACCEPTED my Robinson, PE, BCEE, CC
� REJECTED CDM Smith, Inc.
CMR-12.2
DATE: 02.02.24
Ryan Glanz
Crescent
02/13/2024
Date
This CMR 12.2 is approved on the basis that the City of Fort Worth has accepted to pay $20,000 of the
total CMR cost.
CHANGE ORDER SUMMARY
Front Sheet
VILLAGE CREEK LIFT STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST # CMR-12
Description
DIRECT COSTS
LABOR BURDEN & FRINGES 55%
SUBTOTALS
��IV I�\r\� I VI\ IVIr\��f\l/1 IJ�U
��r�T� t,�,�T�� t i��,�,��u� ��� ;�u���
BONDS & INSURANCE 3%
TOTAL�
CLARIFICATIONS:
1
2
3
4
Labor Material
11,200 9,596
6,160
17,360 9,596
Job #: � 202�-05 �
Equipment Subcontract
- 50,000
50,000
Total
70,796
6,160
76,956
�,JwJ
L,JbG
2,505
(4)
86, 0
Cut Fee to zero ($6,543)
New Total = $79,457.00
I �2�,��.0� I
CDM
Sm�th
801 Cherry Street, Unit 33, Suite 1820
Fort Worth, Texas 76102
tel: 817 332-8727
October 18, 2023
Farida Goderya, PhD, P.E.
Fort Worth Water Department
200 Texas Street
Fort Worth, Texas 76102
Subject: Village Creek Water Reclamation Facility
South Flow Lift Station Project
CPN 100075-2
PCM-03 Flow Meter Vault Ladder and Hatch
Dear Farida:
Transmitted here within please find a copy of Crescent's September 12, 2023 price proposal for the
adding one hatch and access ladder to the flow meter vault. The selected flow meter requires access
to both sides of the meter for maintenance. Currently there is only access to one side of the meter.
The additional hatch and ladder will provide access to the other side. The cost associated with this
work is $10,000 with no additional days.
CDM Smith has reviewed the price proposal and is of the opinion that the cost is fair and
reasonable. CDM Smith recommends the City accept this cost and issue a Change Order in the
amount oi $10,000. Please advise if the Water Department desires this PCM-03 be incorporated into
a Change Order.
Sincerely,
���.�..�,���--a
Amy Robinson, P.E., BCEE
Project Manager
CDM Smith Inc.
cc: Alan Cossabone, Freese & Nichols
Ryan Glanz, Crescent Constructors
..
t,r
WATER r ENVIROHMENT r TRANSPORTATION + ENERGY t fACILITl�S I
2560 Technolor�y Drive #400
Plano, TX 75074
CONTRACT MODIFICATION REQUEST:
PROJECT: VILLAGE CREEK LIFT STATION
PROJECT NO. 100075-2
DATE: � 09.12.23 �
ATTENTION: CITY OF FORT WORTH
1000 THROCKMORTON STREET
FORT WORTH, TX 76102
ATTN: FARIDA GODERYA
Attention:
The following change in contract on this project is proposed:
A breakdown of cost SHALL be attached.
Work shall not commence until authorized by the OWNER.
Description of the Proposed Change & Clarifications
Pricing for the following:
PCM-03: Add 2nd Hatch and ladder to FM Vault to enable plant access to both sides of the flow meter.
TOTAL AMOUNT I $ 10,000
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by
Change Order, the time of completion will be:
Increased By 0 Calendar Days
Decreased
� Unchanged �
u
PCM-003
Ryan Glanz
Crescent
ACCEPTED � � �
City of Fort Worth Date
� REJECTED
CHANGE ORDER SUMMARY
Front Sheet
VILLAGE CREEK LIFT STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST # PCM-003
Description
DIRECT COSTS
LABOR BURDEN & FRINGES 55%
SUBTOTALS
CONTRACTOR MARKUP 15%
CONTRACTOR MARKUP 5% (SUBS)
BONDS & INSURANCE 3%
TOTAL�
CLARIFICATIONS:
1
2
3
4
Labor Material
896 7,130
493
1,389 7,130
Job #: � 2021-05 �
Equipment Subcontract Total
- - 8, 026
493
- 8,519
1,278
294
(91)
- 10,000
2560 Technoloc,�y Drive #400
Plano, TX 75074
CONTRACT MODIFICATION REQUEST: PCM-oo4
PROJECT: VILLAGE CREEK LIFT STATION DATE: � 08.19.24 �
PROJECT NO. 100075-2
ATTENTION: CITY OF FORT WORTH
1000 THROCKMORTON STREET
FORT WORTH, TX 76102
ATTN: FARIDA GODERYA
Attention:
The following change in contract on this project is proposed:
A breakdown of cost SHALL be attached.
Work shall not commence until authorized by the OWNER.
Description of the Proposed Change & Clarifications
Pricing for the following:
PCM-04: Add 14' Wide double swing gate and flexbase drive to Flow meter vault
TOTAL AMOUNT I $ 17,000 �
Ryan Glanz
Crescent
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by
Change Order, the time of completion will be:
� Increased � By 0 Calendar Days
Decreased
� Unchanged �
� ACCEPTED � � � �
City of Fort Worth Date
� REJECTED
CHANGE ORDER SUMMARY
Front Sheet
VILLAGE CREEK LIFT STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST # PCM-004
Description
DIRECT COSTS
LABOR BURDEN & FRINGES 55%
SUBTOTALS
CONTRACTOR MARKUP 15%
CONTRACTOR MARKUP 5% (SUBS)
BONDS & INSURANCE 3%
TOTAL�
CLARIFICATIONS:
1
2
3
4
Labor Material
3,360 3,675
1,848
5,208 3,675
Job #: � 202�-05 �
Equipment
3,560
Subcontract
2, 7 00
3,560
2,100
Total
12,695
1,848
14,543
1,866
105
495
(10)
17,000
.Contract Compliance Mana�er
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
°�,.; - - ----
>. ,
� : _.
` a . � - , _ _.
� _ g_ e .�--p�,- --- _ -- -�
Signature
Farida Goderya, PhD, PE
Name of Employee
Senior Project Manager
Title
�a
ATTEST. F FOR;�4a
doo= �dd
o° �� �p.� d
fo
[ Pp *0�8 d
���A. /J � Q �� *p
�aa4 pEXP?aap
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
F�RT��RTHo
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Crescent Contractors, Inc.
Subject of the Agreement: Village Creek Water Reclamation Facility South Influent Lift Station
M&C Approved by the Council? * Yes ❑ No ❑✓
If �so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 55855
If �so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 0 No ❑
If �unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A Expiration Date: N/A
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No ❑✓
*If �so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. 100075-2
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ❑✓ No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be