Loading...
HomeMy WebLinkAbout060740-FP4 - Construction-Related - Contract - Western Municipal-FP4 FORTWORTHo Sewer ❑ NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Buttercup & Boswell 16" Water Main Rehab City Project No.: 105037 Improvement Type(s): Water � Original Contract Price: Amount of Approved Change Order(s) Revised Contract Amount: Total Cost of Work Complete: Clint wilson CLnt Wilson !Dec 1J, 2025 15�.2G:06 CST1 Contractor Project Manager Title Western Municipal Company Name �o.. Russell Rogers (Dec 19, 2025 16�.13:10 CST) Project Inspector � Project Manager ��� CFA Manager .:"�'"""""7': , TPW Director Developer Cost $98,221.29 $22,738.14 $120,959.43 $120,959.43 12/19/2025 Date City Secretary 60740 Contract No. Date Received 12/23/2025 AT City Cost $1,228,942.19 $114,989.37 $1,343,931.56 $1,343,931.56 12/19/2025 Date 12/22/2025 Date 12/23/2025 Date 12/23/2025 Date Total Cost $1,327,163.48 $137,727.51 $1,464,890.99 $1,464,890.99 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 This greensheet has been revised to reflect an adjustment to the total number of working days, now 128 days. Notice of Project Completion Project Name: Buttercup & Boswell 16" Water Main Rehab City Project No.: 105037 City's Attachments Final Pay Estimate � Change Order(s): 0 Yes ❑ N/A Pipe Report: x❑ Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid �� Consent of Surety �� Statement of Contract Time Contract Time: 120 WD Days Charged: 128 WD Work Work Start Date: 2/5/2024 Complete Date: 1/7/2025 Completed number of Soil Lab Test: 370 Completed number of Water Test: 36 Page 2 of 2 F���r ���Tx CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BUTTERCUP LANE & BOSWELL DRIVE 16" Contract Limits Project Type WATER City Project Numbers 105037 DOE Number 5037 Estimate Number 1 Payment Number 1 For Period Ending City Secretary Contract Number Contract Date Project Manager NA Contractor WESTERN MiJNICIPAL 402 GULF AVENUE JUSTIN � TX 76247 Inspectors G.DEYON / R. ROGERS Contract Time Days Charged to Date Contract is 100.00 1/7/2025 WD 128JD 128 Complete Monday, November 24, 2025 Page 1 of 5 City Project Numbers 105037 Contract Name BUTTERCUP LANE & BOSWELL DRIVE 16" Contract Limits Project Type WATER Project Funding UNTI' I: WATER IMPROEMENTS DOE Number 5037 Estimate Number 1 Payment Number 1 For Period Ending 1/7/2025 Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 WATER LINE GROUTING 139 CY $251.35 $34,937.65 139 $34,937.65 2 REMOVE AND SALVAGE 6" GATE VALVE 4 EA $770.98 $3,083.92 4 $3,083.92 3 REMOVE AND SALVAGE 12" GATE VALVE 3 EA $747.81 $2,243.43 3 $2,243.43 4 REMOVE AND SALVAGE FIRE HYDRANT 4 EA $5,286.86 $21,147.44 4 $21,147.44 5 6" PVC WATER PIPE 105 LF $129.02 $13,547.10 105 $13,547.10 6 8" PVC WATER PIPE 230 LF $158.16 $36,376.80 230 $36,376.80 7 12" PVC WATER PIPE 28 LF $175.80 $4,922.40 28 $4,922.40 8 16" PVC C905 WATER PIPE 2547 LF $226.74 $577,506.78 2547 $577,506.78 9 12" PVC WATER PIPE, CLSM BACKFILL 20 LF $393.14 $7,862.80 20 $7,862.80 10 ] 6" PVC C905 WATER PII'E, CLSM BACKFII.L 40 LF $397.88 $15,915.20 40 $15,915.20 11 16" DIP WATER 24 LF $275.81 $6,619.44 24 $6,619.44 12 16" DIP WATER, CLSM BACKFILL 33 LF $475.22 $15,682.26 33 $15,682.26 13 TRENCH SAFETY 3027 LF $1.00 $3,027.00 3027 $3,027.00 14 30" CASING BY OPEN CUT 33 LF $598.22 $19,741.26 33 $19,741.26 15 1" WATER SERVICE 5 EA $4,643.56 $23,217.80 5 $23,217.80 16 2" WATER SERVICE 5 EA $5,754.26 $28,771.30 5 $28,771.30 17 REMOVE 8" WATER VALVE 1 EA $90737 $907.37 1 $90737 18 SALVAGE 16" WATER VALVE 3 EA $2,366.95 $7,100.85 3 $7,100.85 19 REMOVE 2" AIR RELEASE VALVE AND VAULT 1 EA $1,872.53 $1,872.53 1 $1,872.53 ASSEMBLY 20 16" CUT IN-GATE VALVE W/ VAULT 1 EA $27,023.90 $27,023.90 1 $27,023.90 21 16"Xl6" CUT iN TEE 1 EA $19,675.85 $19,675.85 1 $19,675.85 22 6" GATE VALVE 4 EA $2,671.69 $10,686.76 4 $10,686.76 23 8" GATE VALVE 10 EA $3,577.91 $35,779.10 10 $35,779.10 24 12" GATE VALVE 1 EA $6,798.69 $6,798.69 1 $6,798.69 25 16" GATE VALVE W/ VAULT 11 EA $23,403.90 $257,442.90 11 $257,442.90 26 4"-12" PRESSURE PLUG 10 EA $926.36 $9,263.60 10 $9,263.60 27 16" PRESSURE PLUG 1 EA $4,624.75 $4,624.75 1 $4,624.75 28 2° COMBINATION AIR VALVE ASSEMBLY FOR 1 EA $14,192.38 $14,192.38 1 $14,192.38 WATER 29 6" BLOW OFF VALVE 1 EA $10,886.86 $10,886.86 1 $10,886.86 30 FIRE HYDRANT 4 EA $8,404.48 $33,617.92 4 $33,617.92 Monday, November 24, 2025 Page 2 of 5 City Project Numbers 105037 Contract Name BUTTERCUP LANE & BOSWELL DRIVE 16" Contract Limits Project Type WATER Project Funding 31 CONNECTION TO EXISTING 4"-12" WATER MAIN 32 CONNECTION TO EXISTING 16" WATER MAIN 33 DUCTILE IRON WATER FITTINGS W/ RESTRAINT(CO#1)(CO#3)(CO#7) 47 SPECIFIED REMOBILIZATION (CO#1) 38 SPECIFIED REMOBILIZATION (CO#2) 39 2" TAPPING SADDLE (CO#2) 40 CUT & PLUG SADDLE AT THE MAIN (CO#2) 41 SPECIFIED REMOBILIZATION (CO#3) 42 IMPORTED EMBEDMENT/BACKFILL, CSS (CO#3) 43 6" TRENCH DRAIN(CO#3)(CO#6) 44 SPECIFIED REMOBILIZATION (CO#4) 45 4" ASPHALT BASE. TYPE B(CO#4) (CO#7) 46 FINE GRADE EXISTING SUBGRADE(CO#4) (CO#7) DOE Number 5037 Estimate Number 1 Payment Number 1 For Period Ending 1/7/2025 2 EA $7,164.86 $14,329.72 2 $14,329.72 2 EA $10,479.86 $20,959.72 2 $20,959.72 3.4140035 TN $12,063.87 $41,186.09 3.4140035 $41,186.09 1 EA 1 EA 1 EA 1 EA 1 EA 10 CY $32,409.11 $32,409.11 $8,000.00 $8,000.00 $2,500.00 $2,500.00 $1,158.24 $1,158.24 $13,62335 $13,623.35 $155.00 $1,550.00 1 $32,409.11 1 $8,000.00 1 $2,500.00 1 $1,158.24 1 $13,62335 10 $1,550.00 0 LF 1 LS 6802.16 SY 6802.16 SY $104.00 $0.00 $8,021.55 $8,021.55 $3.20 $21,766.91 $7.00 $47,615.12 0 $0.00 1 $8,021.55 680216 $21,766.91 6802.16 $47,615.12 36 2" ASPHALT PVMT TYPE C(CO#7) -101.84 SY $26.56 ($2,704.87) -101.84 ($2,704.87) SUb-TOtal Of PCOVIOUS Ulllt $1,464,890.99 $1,464,890.99 Monday, November 24, 2025 Page 3 of 5 City Project Numbers 105037 Contract Name BUTTERCUP LANE & BOSWELL DRIVE 16" Contract Limits Project Type WATER Project Funding Contract Information Summary Original Contract Amount Chan�e Orders Change Order Number 1 Change Order Number 2 Change Order Number 3 Change Order Number 4 Change Order Number 5 Change Order Number 6 Change Order Number 7 DOE Number 5037 Estimate Number 1 Payment Number 1 For Period Ending 1/7/2025 $1,327,163.48 $33,509.11 $11,658.24 $17,861.44 $9,880.00 $78,452.55 ($9,880.00) ($3,753.83) Total Contract Price $1,464,890.98 Total Cost of Work Completed $1,464,890.98 Less % Retained $0.00 Net Earned $1,464,890.99 Earned This Period $1,464,890.99 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,464,890.99 Monday, November 24, 2025 Page 4 of 5 City Project Numbers 105037 Contract Name BUTTERCUP LANE & BOSWELL DRIVE 16" Contract Limits Project Type WATER DOE Number 5037 Estimate Number 1 Payment Number 1 For Period Ending 1/7/2025 Project Funding Project Manager NA Inspectors G.DEYON / R. ROGERS Contractor WESTERN MLTNICIPAL 402 GULF AVENUE JUSTIN � TX 76247 City Secretary Contract Number Contract Date Contract Time 120 WD Days Charged to Date 128 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $1,464,890.99 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $1,464,890.98 $0.00 $1,464,890.99 $0.00 $0.00 $0.00 $0.00 $0.00 $1,464, 890.99 Monday, November 24, 2025 Page 5 of 5 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: C FA # CITY PROJECT # FID # x# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: Buttercup Lane 8 Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 � CITY PARTICIPATION:� 105037 30114-0200431-105037-E07685 X-27912 60740 N/A CHANGE ORDER No: YES 1 Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 WATER SEWER Developer Cost City Cost Developer Cost C ORIGINAL CONTRACT §98,22129 §7,228,942.19 I $0.00 EXTRAS TO DATE $0.00 $0.00 I $0.00 CREDITS TO DATE $0.00 $0.00 I $0.00 CONTRACT TO DATE $98,221.29 $1,228,942.19 I 50.00 AMOUNT OF PROP. CHANGE ORDER $18,867.75 $14,621.36 I $0.00 REVISEDCONTRACTAMOUNT $117,109.04 $1,243,563.55 I $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,360,672.59 $0.00 REVISED COST SHARE DOv. COSt: $117,109.04 TOTAL REVISED CONTRACT CSC No. 60740-CO1 CONTRACT UNIT DRAINAGE PAVING STREET LIGHTS Developer Developer Developer ty Cost Cost City Cost Cost City Cost Cost City Cost $0.00 I $0.00 50.00 $0.00 b322,315.48 I $0.00 $0.00 $0.00 I 50.00 50.00 $0.00 I $0.00 I $0.00 $0.00 bo.00 I go.00 SO.00 Sa.00 � So.Oo I So.00 So.Oo $0.00 I $0.00 $0.00 $0.00 I $322,315.48 I $0.00 $0.00 so.00 I so.00 so.00 So.00 � go.00 I go.00 So.00 50.00 I $0.00 $0.00 $0.00 $322,315.48 I $0.00 $0.00 I$0.00 $322,315.48 I $0.00 City Cost: $1,565,879.03 $1,682,988.07 CONTRACT DAYS 120 120 3 123 Revised: 12-17-2018 Page 1 �Uments�. the �Oni�acti d make �,e fo\iow�n9 �han9e5 �n G1Z'� B1D 1TEM pUPN'(�iY e ditected to # � You � ss � � g�isk Ne/tem �;�t�n9y -- �EpSS Vatet twn 1MPR�VE 2ernob�Gza TptA�-VN1S 1: WpSER Pa9e 2 Revlsed�• 12.1i-2��8 REASONS �pR GNE''NG� �ROER �ench o�ce `t �as dete�rt�mQd that w n9 f�Om �n� d � t a�e �eW wat a\me e be � d6n9 th 6„ Wate< �me e�ater Cme to d bacKf �e� a^ �me acros ma�e� for th 5 W `an�ster P � a��ve e ent io ��aie the T�e�\n to�ati�op �� 5 a� �nkno�al that �t �°St S ex ficiPa� Go� {to� t e atlditiona\ f�me aPd �n�c�P 5tC Gfi\p1� a\ p { o� Sa�eeP ted n jhes ch �9e o`de( �s that`j'jeste�nM6me. \ G�� U �"(irt�e tt�e��natthat p�n �n���pa �ou\dn` -��e_\n P e to k � estern N`�G eX�a�aC�on of th` f�1ti�n9s a�d f�m of.�eXas, � Z�hat rea°aed agu ec uP �a�e runn�n9 down O���C , L�'C M\d,C�t�eS �°g�s���s i� ey' tNJUs�� �\\n � , � .�j ��y�.- ., Name� ��t M ager a� Pto1 GMC�V\� gy, 1: � Z�Sl�atar`J '('die: D`�GP`\'(,�: �e p,uth�n FQRM AN Name pV�O PS �� APPR ��tY p,tto��eY sv R�lan Spears er T�ue: �Fw, nss�scan� ��g�ne r_... „_ ,<_, Namg �TOIeCt ovED• � ,._. McC�a`�`e� BY'. PppR Ma�agef Ft�chard T�t\e. G�tY NaCne G�ty Pttorney MENDE�; c�W Assistant , g�. A t �CpD11 �, ,A���..w� ss�s�a� RpVA� „ .. � T�Be: pPP ( DePa��pent BY Da�aBU�g�doff �FW Wat� Name. t��e P n5�b\� e � G�tY Mana er P�o�ec �,y�✓m"8"`" R Pgs�stant � Ma�ager l t�e P�� s���a�t, � �n�W 1'd\e: ComP��an� e that � am � BY� SubY � a�u9hese * G 5�9�\n9 � a�kn9 a d ad a�a �eP°�t�n9 <eQU�remepnYra�1 Name: e� BY e moci�to a��e th�s Co E�g`nee�m9 �a�a9 {e�s���n9 a\� Pe�O� ���ds assoa�atied w`th '(it\e. P-�(ESZ Gontra�� REC� ENO�D. liance na9er N�� �y�� ��e�ea�eN�C�bJ assodacedW�thth�s MM Ma � 0 �ontract Con�P �e 5 Gooda\\ 4'!he{e a�e c�ty FUnds �F� Ja�itiy Seaetarl BY= h�kar� gand'�P Pd riame' a\ E�9`�eet Sr p�oiess�o� j�Ne: 23.10�3 M&G NUmbeT' 1211212�23 M&G qaYe PPP�Oved Revise��• 12�17-2p18 pa9e 3 CSC No. 60740-0O2 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # CITY PROJECT # FID # X# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 I CITY PARTICIPATION: 105037 30114-0200431-105037-E07685 X-27912 60740 N/A CHANGE ORDER No: YES � Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER �RAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $98,221.29 31,228,942.19 $0.00 $0.00 $0.00 50.00 $0.00 5322,315.48 $0.00 $0.00 EXTRAS TO DATE $18,887.75 $14,621.36 $0.00 b0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 50.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $117,109.04 $1,243,563.55 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER $7,520.64 a10,137.60 $0.00 30.00 $0.00 E0.00 $0.00 $0.00 $0.00 $0.00 REVISEDCONTRACTAMOUNT $118,629.68 $1,253,701.15 $0.00 E0.00 $0.00 $0.00 50.00 $322,315.48 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,372,330.83 $0.00 50.00 $322,315.48 $0.00 REVISED COST SHARE Dev. COst: $118,629.68 City COSt: $1,576,016.63 TOTAL REVISED CONTRACT $1,694,646.31 Revised: 12-17-2018 CONTRACT DAYS 120 3 123 5 128 Page 1 You are directed to make the following changes in the contract documents: PAY ITEM # 0170.0101 `g999.0003 `9999.0004 Asterisk (*) �ndicates Nsw Pay Item CITY BID ITEM # QUANTITY 38` � 39" 1 40` S UNIT 1: WATER IMPROVEMENTS CPW Unit iTEM D�SCRIPT{ON P«� UNII � �q Specifie�Remobil'¢ation � � 2" 7apping Saddle Eq Cut and Plug Saddle at the main TOTAL UMIT 1: WATER IMPROVEMENTS UNIT PRICE g8,000.00 $2,500.00 $1,15824 Developer Cost City Cost $1,520.sa $6,479.36 $0.00 $2,500.00 $0.00 $1,158.24 $1.520.64 $10,137.60 TOTAL $8,000.00 , $2,500.00 , $1,158.24 11$ •658�24 Page 2 Revised: 12-17-2018 �ontinue With tcten totChe d be SamP�gd sey�/ate OMa n ntas �readY been c�nne Q�t at stab0n �o�al�ime ��pOmP�ete sin�e the 1 the � Pv h ST tl Wiii ta ci samP1es. 12� testin9 p�0�esod t� thbe� staiie to coile cies in tne W bout'to the �e addiehneeds to �n n5firv�fiio�' pN�E�RDE� �pontadis(c�worth9tstemUandataPFin9 Q� \GO ���c�P� �ta 5v M REpSONs �OR GN eXtistin9 F° ParticiPat �� eXqS, �-�'C Th�s °haa9e °��e� 1���Pa�15 C ty �ost �fi �og`St�cS ���er ``c , M�d�G�t�es _ .;% eY-. �� ,,, � ��.��tW'�A5on �� � Nam � a er % �;! ` proectMa�' I � " ; ff�°°��es T�t�e� ���; GMCN�� By. q� onzed 5l�na<on` � F�RM AN� �EGA , t'" Name: Ov�� A51 ApPR �itY AttarneY Spears "(\t\e. �FvV - Assistant � R�a� Eng`nee� , , ,<�:,�. Name" p(0��,'Cfi . McG�aOken �yEp: 8y� R�chatd AppR Ma�ager TiUe G�W Assista�t city Name. p,gornel' MENDEp: o�. S�. Pss�stant G�tY oM �R ., � R�C ra�r�o��io. Ov�� �.:,:,e,�;. Y�Ue_ pPP� ePa��ient BY�. Da��Bu�ghdoH GFw _�ater �` Name� Ma�a�� o ectMana9eonsib\e f'� Pss�stan� �dY et lPr 1 �esp S,�g��'"�� �ana9am �he pecss co���a�t,' m�w e -(\Ne: # Co�Y�a�t�omP�ia�pe BY ov�\ed9 tiha f�on o4 th hese d �eP°�'�n9 �eQU��eme�Ys gubY � aru9 � a�kn d edm���st�a �ame: a�a9er 84 5�9n,n on`to�in9 a an�Q a� �ih �s C�nt�act Eng��erin9M foc erfoccn th enSUe�n9 a\\ P W � � F�pds associated T'�tie: A-��ES h th`5 Go��act �T� �'(hece a{e Nd G��d5 assoc�ated w`th REC��M�NDED. comPGancP Mana�e( a�e C�fY �e�e S �,00da\\ c�� .�ontra�t �Thece 3ac\ty Sec�etary � BY' \ Adh�ka�` Sand p �g��eet Natne� Sr P ofess�ona\ E pa9e 3 'Citle: 23.10�3 M�`C �umbef ' 1211212�23 M&G Date Appraved Ryv�sed� 12.17-2p18 CSC No. 60740-0O3 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # CITY PROJECT # FID # xu CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 � CITY PARTICIPATION 105037 30114-0200431-105037-E07685 x-27912 60740 N/A Russell Rogers Phone No: Sandip Adhikari Phone No: CHANGE ORDER No: YES 3 817-392-8424 CONTR.4CT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $98,221.29 $1,228,942.19 $0.00 50.00 $0.00 50.00 $0.00 $322,315.48 $0.00 $0.00 EXTRAS TO DATE $20,408.39 $24,758.96 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 E0.00 $0.00 30.00 $0.00 $0.00 $0.00 $0.00 CONTRACTTODATE $118,629.68 $1,253,701.15 $0.00 $0.00 $0.00 E0.00 $0.00 $322,315.46 $0.00 50.00 AMOUNT OF PROP. CHANGE ORDER $2,329.75 $15,531.69 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 REVISEDCONTRACTAMOUNT $120,959.43 $1,269,232.84 $0.00 50.00 $0.00 50.00 $0.00 $322,315.48 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,390,192.27 $0.00 $0.00 $322,315.48 $0.00 REVISED COST SHARE Dev. Cost: $120,959.43 City Cost: $1,591,548.32 TOTAL REVISED CONTRACT $1,712,507.75 CONTRACT DAYS 120 8 128 0 128 Revised: 12-17-2018 Page 1 page 2 Revised:l2-�7-2��8 REASONSFOR CHANGE ORDER 1 While hand digging around the existing waterline on LancasterAve. a joint on the existing line failed once the surrounding area was excavated. Afterthe initial assessment with the CoFW Inspector and valve crews it was determined that additional fittings are needed to repair the pipe, but this repair could be completed during normal buisness hours. However, the CoFW later received a call that residents of the surrounding area were without service and requested that WMC work to repair the failed joint and complete the tiein as soon as possible. The above pricing is forthe labor, equipment, fuel, and additional material needed to complete the repair & tie-in on Lancaste�Ave. Tl�is change order impacts Ciry Cost Participation GMcivil By � � Name: Ryan Spears T;tie: Project Engineer APPROVAL RECOMMENDED: CFW - Wate� DepaRment Su6� �/a..,�e P� By: Neme: Suby Varughese Title: Engineering Manager RECOMMENDED: CF,qW,���_-.'�Cont�acf Compliance Manager By: `i Name: Sandip Adhikari Title: Sr Professional Engineer M&C Number: 23-1073 M&C Date Approved: 12/12/2023 Western Municipal Construction Mid-Cities Logistics Owner, LLC of Texas, LLC - -• � _ i ,'�� � _��,., ___ ey: � _� � � � By: Name: � � ieffKnowles Name: Clint Wilson Title: � �EhQrized Signatory Titie: Project Manager APPROVED: CFW - Assistant City Manager �rha �c��kdo� gy. � ��� _. Name: Dana Burghdoff Title: Assistant City Manager APPROVED AS TO FORM AND LEGALITY: CFW - Assistanf City Attomey By. � �— , _ , �_.� Name: Richard McCracken Title: Sr. Assistant Ciry Attorney ATTEST ' Contract Compliance Manager (Project Manager): �� ��� By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ` ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract �There are City Funds associated with this Contract Revised: 12-17-2018 Page 3 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: C FA # CITY PROJECT# FID # xu CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 I CITY PARTICIPATION:I 105037 30114-0200431-105037-E07685 X-27912 60740 N/A CHANGE ORDER No: YES 4 Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 CSC N o. 60740-004 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $98,221.29 b1,228,942.19 $0.00 $0.00 $0.00 ba•DO $0.00 5322,315.48 $0.00 $0.00 EXTRAS TO DATE $22,736.14 $40,290.65 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0,00 $0.00 CREDITS TO DATE $0.00 $0.00 50.00 30.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACTTO DATE $120,959.43 51,269,232.84 $0.00 $0.00 $0.00 50.00 $0.00 $322,3'15.48 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER $0.00 $9,880.00 $0.00 $0.00 50.00 $0.00 $0.00 50.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $120,959.43 $1,279,712.84 $0.00 50.00 $0.00 50.00 $0.00 $322,315.48 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,400,072.27 $0.00 $0.00 5322,315.48 $0.00 REVISED COS7 SHARE Dev. Cost: $120,959.43 City Cost: $1,601,428.32 �, � TOTAL REVISED CONTRACT $1,722,387.75 CONTRACT DAYS 120 8 128 1 129 Revised: 12-17-2018 Page 1 -�' U�it CF`N _ t do�uments' �ake ihe fO\iowi� �han9P^ in the �Ont�ac G't�g1Dt'tEM aup,95,"('t d t° # ..-.^ �oU a�e di�ecte 43 ,.�..---".. �y�eloPet page 2 ReV\sed'.12.1i-2p18 ch ��am a�� �O�pect'd to the eX�sti�n9 � IWMG� �d\h the`�a\ e sie�n 9u�de. W esYem Mu�d Water from flOW�n9 �p th��u9 stem 9uid at �te`\ ih�s ��5a\\e�iate 9�0u 26 e u�d Wate� +s a� tihe �te�s ci on o`f �a�`caSYet � B�s ER Where 9r0 a e System U� c\pa� Constrv�t1on EORCyiANC'�' � 1 stormd�a�n 9 eSteCC1 C'� OR REP�S�NS ��<Y GOSt P aei � pat�o� W qS ��-�'C ts 0� � eX T\i�s chan9z °�d e� 1mP�� �er �LG Og�St\GS �� M\d,C�t�25� ,-�"��BY� tNJ\\son �'°. �„� . Gin '.- , k�r ; , ` �� - Name. Managet .=;� �X,, ,_ : owles Project VyA - ` �e�Y'�'- 1<<ve: p�����a��t�: GM�` Bv� $�d��� ' M p��3 � FpR Name� pVE� AS� SPears T'�tie: APPR �istant �!Y ev Rya� er �Fw.as , ,, n �re NaTne: ��O eC� E a McC�aOken ��Ep: BY". PpPR t �itY Mana9e� R�chard T�t\e: Name �lty p,tt°rneY �MMEN�E�; CFw, p,ssistan ,,.: * g�. A55`Siant pPP�������� jeni 8Y ��„�e a„� �F-" �doif 1it1e� pePaitn �ana g�r8 �a0e��' . r ana er �FvV-��{e �` Name' Gri M oectMa ns�b\e s,.��va�°" Psslstant M��a9a�ph��pe�son resp�t.'�n� Wde Cort�P�ian� 15 �pni�e^ts T�t�e. � Cant�a� \ a�knov��ea9 o fi�n9 �eQ�icem 8Y Sub �a�� hese s�9��n9 �in9 a�d admnd YeP on o41h �uact Nam�: anyge� 64 moniYo ce En��neet\n9 M fio� the e�orm Fu^ds assoc`ated w�th th15 �o � a1\ P �i0e P.(.(Eg"( ensutln9 �o�t�act 's�' � O1he�e a�e Np C�tY ds So�\atea w�th th�s ��E�� �r � REC�MM liance Man 9 Fun as a GFw - xGOntraG� �ornP �an�ette ��e atY a\\ O1he{e are C�tY � G�tY $e 8Y' p,dti�kar� S�nd1P P1ame sro�a� En �neer Pa9e 3 5� p�ofes -('�t\e'. 23.10�3 M&C NUmbet' 1211212�23 M&G Date PpProved' Revlsed �2_11-2�18 CSC N o. 60740-005 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: C FA # CITY PROJECT # FID # xu CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 I CITY PARTICIPATION:I 105037 30114-0200431-105037-E07685 X-27912 60740 N/A CHANGE ORDER No: YES 5 Russell Rogers Phane No: Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $98,221.29 $1,226,942.19 $0.00 50.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 50.00 EXTRAS TO DATE $22,738.14 E50,170.65 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 �0.00 $0.00 E0.00 $0.00 $0.00 $0.00 50.00 CONTRACTTODATE $120,959.43 $1,279,112.84 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER $0.00 §78,452.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $120,959.43 $1,357,565.39 $0.00 50.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,478,524.82 $0.00 $0.00 $322,3'15.48 $0.00 REVISED COST SHARE Dev. Cost: $120,959.43 City Cost: $1,679,880.87 � TOTAL REVISED CONTR.4CT $1,800,840.30 Revised:l2-17-2018 CONTRACT DAYS 120 9 129 5 134 Page 1 vou are directed to make the followin9 �hanges �n the coniract documents PAY ITEM # ggg9.0007 g212.0541 0170.4�01 Asterisk (') �ndicates New PaY titem GITY BVD {1EM QUAP1TiTY # 6905 46� fi905 45" � q0.• CFUV Unit UNIT t: WA7ER iMPROVEN�ENT Piice 1?EM DESCRlPsubg�ade � ���T Fire Gssde Existing SY q„ psphatt Sase. TYPe B SY gpecified Ftemob���ation v�p�ENTS ts 707AL UNiT 1: WATER iMPRO DeveloPe� ���, Cost �y�y�-� pRtc� cost �$ 335.00 $� � $0.00 g3 2p �4.00 $22,096.00 g0.o0 $8,021.55 $8,�1.55 , 0 0�78�2'55 TOTA1- $48,335.00 $22,096.00 $8.025.55 � 78�. as-� _ Page 2 Revised: 12�17`20� $ REASONS FOR CHANGE ORDER act the existing subgrade prior to 2" pavement repair 1 This is the cost to grade and comp GMcivil By: ! '� � Ryan Spears Name: Projecfi Engineer Title: ppPROVA� RECOMMENDED: CFW - Water Department s,.�� ��,� Pc` By: Name: TiCle: Suby Varughese Enginaerfng Managar RECOMMENDED: CFW-'�oniract Comp��ance Manager BY �� Name: Sandip Adhikari Title: Sr Professional Engineer M&C Number: 25-0084 M&C Date App roved: 01l28/2a25 Western Municipal Construction Mid-Cities Logistics Owner, LLC of Texas, LLC �; �,� � �- ��� ,�.1cy�J��_�gy: sy: ! g Je�fKnowles Name: Clint Wilson Name: —��c1.....� Title: Project Manager Title: ppPROVED: GFW-Assistant City Manage�' By_ ._���1`l �`< ,.; Name: Jesica McEachern Titfe: Assistant City Manager a2/2e/zozs Date: APPROVED AS TO FORM AND LEGALITY: CFW - Assistant Crry Attorney By �' � „_ Natne: Richard McCracken TiUe: S�� Assistant City Attorney * Contract Comp��ance Manager (Project Manager): ATTEST gy S�g�i�g I acknowledge that I am the person responsib�e �� ;�;� for the monitoring and administration ofre � uiremen{5_ include �, ensuring ail performance and repoRia9 q Jannette S. Goodall �There are NO City Funds associated with this Contract Gity Secretary OThere are City Funds associated with this Contract Page 3 Revised: 12-17-2018 CSC No. 60740-006 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # CITY PROJECT# FID# X# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACTTO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACTAMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 I CITY PARTICIPATION 105037 30114-0200431-105037-E07685 X-27912 60740 N/A Russell Rogers Phone No: Sandip Adhikari Phone No: CHANGE ORDER No: YES 6 817-392-8424 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost $98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $22,738.74 $128,623.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $120,959.43 $1,357,565.39 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $0.00 (59.8&0.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $120,959.43 $1,347,685.39 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $1,468,644.82 $0.00 $0.00 $322,315.48 $0.00 Dev. Cost: $120,959.43 City Cost: $1,670,000.87 $1,790,960.30 CONTRACT DAYS 120 14 134 -1 133 Revised: 12-17-2018 Page 1 changes in 1he contract documents: Yo� are directed to make the folbwin9 M PAY iTEM # 3346.300'1 Asierisk (") snd�cates New PaY �tem ICITY BID ITE I QUAN717Y # -95 43' UN�T� �MPROV� CFW Unit I UNIT PRICE I price g104.00 ITEM DESCRIPTION I UNIT g^ Trench Drain VEp��pTS �F T07AL LNIT I: WATER IMPRO Developer I C.� Cost Cost g000 ($9,880A�) 0.00 9 880.00� TOTAL � ($9 880.00) g g80.00 Page 2 Revised: 12-� T-2018 � 5`��e'it was �D�'��Sta��ed' as added `o ��e Gont�a��,ril�h GO (emo�y �he 6� ��er�h d�a�n �hat W ange otdec '�s �o G G� oRQ�R � jti�s �h S�Ncti�o� �� j e"as. �� Ep5�N5 f�� GµAN � estiet� N`un�c�pa� �On 3 � R O p�et.l4G i - BY. � ��S'� 1( ;s �s ::� Gl. <, � d,G�f�es �o9 ; f �'�/� NaTr`e � � �e� � L , —+. ow � �p ' -'', � 6.3e�� ti�4a p� "C��le ``.�y: By. ' ' �. ���ban2e PNp �EGA ��v�� g'!� F�RM c''M Nanje' APpRO�E� A AttorneY e(j!5 'C'�Lie C�w Assista�� ��y ev�• ar 5 et �_�,, �� � en G K \C�P, < � • � ra� �a���: G� EC�� gY. ,<��� d M P(Oie APpR��ti�� FC�char p,tto�ey �i8e A nt G�Y Ma�a9e� Name T P55ista�'� C�ty Ssista D P�" � ` S . MMENpE � G � � T�t�e � RE�o a�hetn PpP¢OVP pePa�ment 8Y �esic�M�� Mana9e� ecfMa�a9�o�s,b�e �FW yVatE( P� Na�ne Pss�sta�`t G�hJ e Mana98r IP�eSPe�s��o�tra�t. +n�w`�e �� �l ese S�<�e: ��� 1412p25 � contra�t COrnP�o�ed9e th ^�stra °p �f reQ�iceR1en�s eY SubY varu9�' a9ec pa�e: BY 5�0��manaokn9�anGe a�d reP°��n9 �hth\5 Go�t�act N2rt,e. Mar fo� the o vr ��g\�eer�n9 e�s�ri�9 a\� Perf FunaS asso��a<ea ��5� �t� t�`5 Gonlract 1R�e p, -�`� QihBre aie�p C�t`J EGoMMEN9��. iia��e Mana9sr ��� da�\ �e ase G�� Funds assoc`atea R �omP � G 4The ci S °� C�� «�ontra �aGdy $e�CetiarY 8Y 5a�a`p p,dh�Ka�� i�eer pa�y 3 a� Eng Name pro�ess��n S� z�t�e: � �IP �&GNumbe`" � M&c Oa�e PPPfoved' ./ Rev\sed� 12.h7'2��� CSC No. 60740-007 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: C FA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # X# FILE # INSPECTOR: PROJECT MANAGER: Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 � CITY PARTICIPATION: 105037 60740 30114-0200431-105037-E07685 X-27912 CHANGE ORDER No: YES 7 Russell Rogers Phone No: 214-980-2068 Sandip Adhikari Phone No: 817-392-8424 WATER Developer Cost City Cost ORIGINAL CONTRACT $98,221.29 $1,228,942.19 EXTRAS TO DATE $22,738.14 $128,623.20 CREDITS TO DATE $0.00 $9,880.00 CONTRACT TO DATE $12Q959.43 $1,347,685.39 AMOUNT OF PROP. CHANGE ORDER $0.00 ($3,753.83) REVISED CONTRACT AMOUNT $120,959.43 $1,343,931.56 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,464,890.99 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT CONTRACT UNIT SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $120,959.43 City Cost: $1,666,247.04 $1,787,206.47 CONTRACT DAYS 120 14 133 Revised: 12-17-2018 Page 1 You are directed to make the folbwing changes in the contract documents: PAY ITEM # 3212.0201 3311.0001 Asterisk (*) indicates New Pay Item CITY BID ITEM # 36 46 45 33 UNIT 1: WATER IMPROVEMENTS CFW Und ITEM DESCRIPTION Price QUANTITY UNIT -101.84 SY #36 3212A201 2" Asphalt Pvmt Type C -102.84 SY #46 Fine Grade Existing Subgrade -10284 SY #45 4" Asphalt Base, Type B 0.0000005 TON #33 Ductile Iron Water Fittings with Restraint TOTAL UNIT 1: WATER IMPROVEMENTS Developer UNIT PRICE Cost $26.56 $0.00 $7.00 $0.00 $3.20 $O.OD $12,063.87 $0.00 City Cost ($2.704.87) ($719 88) ($329 09) $0.01 TOTAL ($2,704.87) ($719.88) ($329.09) $0.01 j $3,753.831_ Page 2 Revised: 12-17-2018 REASONS FOR CHANGE ORDER 7 This CO is to reconcile ihe paving reconstmction quantilies to malch feld installation. GMcivil By: � � Name: Rvan Soears Tille: Proiecl Enqineer 8/1/2025 APPROVALRECOMMENDED: CFVI�- lNaler Depar�me.nt BY. a.,,. . .�,.�...- Name: Subv Varuahese Title: Enpineerinp Manaqer oa�e. os/1a/2o25 RECOMMENDED: CFW - 'Confracf Cumpliance Manayer By: � Name: Sandio Adhikari Title: Sr Pro(essional Engineer Date: �Aiisn�,s M&C Number. M&C Date Approved: Mid-Cities Logis�ics Ovmer, LLC Weslem Municipal Conslmction of Texas, LlC ey: �'�� ��"� Y ��!GC�'G'� Name: 6. Je po les Name: Clint Wilson Title: Develooer Title: Contractor Date: B/1/2025 Date: AnnroS APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Flssisfanf Cil y Manayer CFW - Assisfant Cil y Atloiney By: iA-C' � By: Name: Jesica McEachern Name: Richard McCracken Title: Assistant Citv Manaaer Title: Sr. Assisfanl Citv Atlome4 Date: 08/25/2025 Date: 08/18/2025 ATTEST �w,,.� A .,�a ��.s- Jannetle S. Goodall City Secretary Date: OS/26/2025 ' Contrect Compliance Manager (Project Manager�: By signing I acknowledge lhat I am the person responsible (or the moniforing and administralion of ihis coNracl, indude ensuring all performance and reporting requiremenis. ❑There are NO City Funds associated wilh this Con�ract �There are City Funds associated with this Contract Revised: 12-17-2018 Page 3 From: To: Cc: Subject: Date: Attachments: Adhikari. Sandio Valdes, Natalie; Pitts. Lorrie R; Harris. Melissa Devon. Garv; Roqers, Russell; Mvers. Michael A; Haaen. Ashlev N RE: Green sheet Packet 105037 Buttercup & Boswell Water Main Thursday, November 6, 2025 4:33:36 PM CSN60740 CPN105037 Buttercuo Lane Chanae Order #7 (21.odf imaae002.ona imaae003.ona imaae004.ona imaaeQ05.n� imaae006.ona CPN 105037 Buttercup Lane - EwPr�rtari Pr�;Pct Maniaal - 1fi-Tnch ��later Main Rehabilitation .odf Natalie, We discussed this with water and decided there is no need to do correction change order since city cost, developer cost and final cost of contract is not impacted. As Natalie mentioned since line item 36 was not part of water improvement and a deduction is applied in water improvements, a footnote as below in final payment request needs to be added in both water and pavinggreen sheets. Water Green sheet: City bid item 36 shown above is to be read in conjunction with final payment shown in paving green sheet city bid item 36. Pavin� Green sheet: City bid item 36 shown above is to be read in conjunction with final payment shown in water green sheet city bid item 36. ***To better assist, please provide your project CPN or IPRC Record Number in the subject line. Thank you, Sandip Adhikari, P.E. Sr. Professional Engineer, Infrastructure Plan Review Center (IPRC) Development Services Department City of Fort Worth T: 817.392.8424 C: 682.432.5559 F: 817.392.7854 100 Fort Worth Trail, Fort Worth, TX 76102 sandip.adhikariC�fortworthtexas.�ov '�Notice: Starting Oct. i, zoas, customers who choose to pay by Credit Card or Debit Card will incur a service fee of z.s%. There is no fee to pay by check, ACH, cash, or money order. * ����r ���T� . Working together to bui(d a strong community. PROJECT NAME: PROJECT NUMBER: DOE NUMBER: PIPE LAID C 900 PVC FIRE HYDRANTS: yes PIPE ABANDONED 16" ductile iron DENSITIES: NEW SERVICES: PIPE LAID PIPE ABANDONED DENSITIES: NEW SERVICES: FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: Buttercup & Boswell 16" water main rehab 105037 SIZE 16" SIZE 16" 2�� 1" SIZE SIZE WATER TYPE OF PIPE C900 pvc VALVES (16" OR LARGER) TYPE OF PIPE Ductile iron yes Copper Irrigation copper mesticdo SEWER TYPE OF PIPE TYPE OF PIPE TRANSPORTATION AND PUBLIC WORKS �i�� The City of Fort Worth • 1000 Thxockmoxton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 LF 2790 yes LF 2790 LF LF 3 3 ���������� TRANSPORTATION AND PUBLIC WORKS October 30, 2025 Western Municipal 402 Gulf Ave Justin Tx 76247 RE: Acceptance Letter Project Name: Buttercup Lane & Boswell 16" water nain rehab Project Type: water City Project No.: 105037 To Whom It May Concern: On February 24, 2025 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 6, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 6, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-8424. Sincerely, � Adhikari Sandip, Project Manager Andrew Goodman, Program Manager Cc: Ryssell Rogers, Inspector Gary Deyon, Inspection Supervisor Lorri Pitts, Senior Inspector Andrew Goodman, Program Manager GM civil Engineering &Survey, Consultant Western Municipal, Contractor Transwestern, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT sTATE o� COUNTY OF /Qi�' a'.J ��,,�'�"D ►�- BeEore me, the undersigned authority, a notary public in the state and county afaresaid, on this day personally appeared Clint Wilson, Proiect Mana�er Of Western Municipai Construction of Texas LLC, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, ftrms, associaiions, corparations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fart Worth has been paid in full; That there are no claims pending for personal injury and/or property darriages; On Contract described as; Buttercup Lane & Baswell Drive 16-In Water Main Reha6ilitation BY ����ri C 1»►� �J� I sav�. 1�/U� , Name or Title Subscribed and sworn before me on this date �__of D.�G�..�,�.. ZO?� Notary Public �tl���� � �i�rr�r����,� 1 't�+ .., � i/� //��i� Q��;.O;�Q-R� ��'� �-. � �'� : _ ��`: z - � � , �, � � - . ,9 � : � ',' �pTF O F � �`' � : _ *'it F �'•.�3553U�A' � \`� '����i+p �8 7 $ 2����``�• ���rur�Er�ttr5�`` CONSENT (�F SURETY TO FINAL PAYMENT .AIA Docua�7ent G707 Rnnri Nn qd�7dR�, 'iY7 01`UNBR (A�a�ne rsrrl a,�i(rn.aJ O�'f/NI3R �,ca-�iTr:cT CON1`RAC7'OF SUR�:'�'Y OTI-i�Ft ARCHTTEC'�'S T'120J�CT �VO.: ■ ■ :� ■ Mid-Cities Logistics Owner, LLC & City of Fort Worth Community Facilities Agreement No. 23-0166: 1900 W Loop S#1300 C4v�'RAC'!' FQR: �u�e�G�� I�n & Boswell Dr 16" water Ma�n e a i i ahon Houston, TX 77027 k'1ZO,��C.T: GONTi2ACT DA'I'�U; (A'cu��e a�ret adrh�.� Community Facilities Agreement No. 23-0166: Buttercup Ln & Boswell Dr 16" Water Main Rehabilitation Tn �ecanianc�e vrith che provlsians c�f t):e Contraec bec�veen clle Owner and the Ce>ntraecc>r as i�xiirateti above, tlie (Ar,se�i ira�uruud ntld�x� nJSurr.rl9 Colonial American Casualty and Surety Company 1299 Zurich Way Schaumburg, IL 60196-1056 on laond oi' (lnse>t rramr tr�rrl addre..s q(t;arl�rrctui ) , SURis'.('X, Western Municipal Construction of Texas, LLC 402 GulfAvenue Justin, TX 76247 � C�N���p�i )�e�•eby appi�ves of the final payment to the Contractor, and agrees tliat ftnal payment tU the Ct>ntractor shall ne�t relleve tlte Sui•ery t�f any of ics ol�Jigacions to ([�L� tr r:ut»e u�rd ud�G e.h o/Qu�nur) Mid-Cities Logistics Owner, LLC & City of Fort Worth 1900 W Loop S #1300 Houston, TX 77027 zs set f�rch in said Surery's Uond. Ilv �Y/iTNGSs �'vFi�it�0�, the 5ut�cty has hereunto sei its hand tm this date: December 5, 2025 (l�uurt Li u�i111i�,� dx ��ranrb fo/lourd ht� tlx� �rruireric drrrcc�nr! ie�ar,l Atte3i: �,! �_` {5e&��: �� . _ �,t-ti.�i.�� -� %' ��� � �_�.� , Sami E3enst�n `���a�Gysualty.ana�.,�. `¢�'� oSEAL m�^� 5 °o•. �9„ .;Qa� :���'''�; ,/„no1 ""`````�: , O�VN�ilt, Colonial American Casualtv and Suretv Companv (Ravl y ) /_ j �. � � , / (��.�z�� � �_���. !S{S„taat�r ofura�a�zra itr,r��,�«uer� Naomi Gerber, Attorney-in-Fact (P�yivari rluu+e unclli�la) C�707�--1994 t3ond Numbc►: 9437465 Obii�ce: Mid-Cities Logistics Owner, LLC & City of Fort Worth ZURICH AAIERICAN INSDR�i�`CE CO��tPANY C(}WNIAL AMERICAN CASUAL`I`Y AND SURE'I'Y CO(11PAN1' FIDE(,I'i'1' AND bEl'OSIT CON1PANY O!� MAI'21'L�1ND POt�'[:R OI`A'i'1`012NI�.Y KNOW ALL MCN I3Y T'HI;56 PRESGNI'S: 7'hat th� IUItICl1 AM�RICAN INSURANCr COMPANY, a eoiporati�n of the State al'N�w York, the COLONL�L AMGRICAN CASUALTY AND SURrTY COMPANY, a corparatioi� of the State of Illinois, and the PID�LI"I'Y AND DGPOSI'I� CC�MPANY Oi' MARYLANI> i� corporation ofthe State of tllinois (herein collectively called the "Companies"), by Rabert D. Murray, Vice President, in pursuzmce of authority gr�inted by Artiele V, Sectio�i 8, of th� By-[,tnvs of said Comphnies, which are set i'oi�th on tl7e rvverse si�ic hereof �nd t+r� hcreby certiticd ta be in liall Porce and elTect �n the dtitu hcreof, do hcr�b}� nominate, constitutc, and i�ppoint Naomi Gerber , its true 1nd lawl'ul agent and Attorney-in-[�act, to m�ke, esectrte, seal and deliver, for, and on ils bchalf as surety, and as iis act and dced: any anci all bonds nnd undertnkings, and thc cxecution ot'sueh bonds or undcrtakings in pursuanee of (hesC �resents, shall bc as binding upon said Companics, as tully and amply, to all intents and purposes, as if the}� Isad been duly executed and ackno�vledged by O�c regularly elcctcd of'licers of thc LUI2ICh1 AMEf21CAN 1NSUItANCE COMPANY at its office in Ne�a York, Nc�v York., thc rcgul�riy cicctctl of'ficcrs of thc COLON[AL AMrR1CAN CASUA[.9'Y nND StJRr'i'Y COMPANY at its officc in Q�vings Mills, Marylflnd., and the rcgularly electcd c�fficers of th� F[DLLiTY AND DF,POS[T COMPANY OP MARYLAND at its office in O�vings Mills, Maryland., in lheir a�vn proper persons. '1'he stiid Vice Presidcnt does hereby ccrtify that thc cxtract set 1'arlh on the revene side here�>f is a true copy ol'Article V, Sc;ction $, of the By-Laws of said Companics, and is now in forcc. IN �VCI'NESS WHFREQF, iha said Viea-President has haraunto subscribed hislher names and a1'fixed the Corporate Seals of the s�id ZURICH AMERICAN INSUIiANCE COIYiPANY, COLONIAL Ai�1�,RICAN CASUAL'TY AND SURE7'Y COb�IPANY, and FtDELITY AND DI:P091T' COMPANY OF RiARI't1ANU, lhis IOth da,y uf October, A.t). 2023. ,,,�����,,,,,,,,, �,,,,�������,,,,,,, ,,,,�����,,,,,,,,, ,.�`fi�,asu'+rrary .,� `�.�` �Grisu ,,�`"o �+ca� ,, �P .�, , ✓ 6, ,• r.,4',.....�.�R�i,t.�'h, ,. s� r . r P�'�R'••:r 's :` wP`:' vo ", � . �,�;........,, h ,,s q�• �.: ;`ar ��ppq '�c, ° 9,. - .?t1 p�* �,'t�. ��o y��o, - �{�SEAL"'JC7��;��SEAL�`E;;y=n "SEAI"� �- �� •c�'. .�?�:, i�� p i:+,• , ✓'' ....� ' tb '•.. �4 i (,.: �••. � F'F+ ,.� QJ� ���4i�i� � 'i'�Y�tYV'OP1�� .. .. 1111������`\`` ��il��llll��1����`� ���l�������N���•,, .� / By: Roberl D. A2ut��nv Vice President r-�� ��—/, �G�UI�iL � �� t6�CLS�_ � Bp: Dm��ta E. Broien Secr•etm>> Statc of Nlnryland ('nunty of tialtiniore ATTEST: `I,URICH r1i�IGR1CAN INSURA\CG C01U'ANY CULONI��L,111ERlC�iN CASI�:U..TI' AND SURL7'1' C011PAVY I�II)ELl'I'1' r1Nll DL';POSIT CO�[I',INY OF M�1R1'LANU On this IOth day of (7etober, A.l�. 2023, befare the subseriber, n Notap� PuUlie of the Siate of Maryland, dullr conunissioncd and qunlified, Robcrl D. Alurray, Yice Ni•esidem an�l i)r��rn F,. 13rotvn, Sccre�i�r1� ol�the Cotnpanics, to mc persontdly known to bc thC individutils and ofliccrs deseribed in and �vho exeeuted Uie preeeding instrument, find �ckno�viedged ihe exeeutic�n of sFune, and being by me duly s�v�rn, dcposeth �nd snith, th��t helshe is !he s�id ol7kcr of thc Company tiForesi3id, i�nd Ihul the seals z�f�ixed to the preceding instrumenl t�re fhe Corporiiiu 5eals of suid Compt�nics, smd Uiat ihe stiiJ Corporate Seals and the signiuure as such <�liicer ���cre duly ailTiaeJ zmd subscribed tu the said instrumenl by Ihe authority and direclion af the said Corporz�tinns. 1N'1'I:S'I'IMONI' �t�! I�I2GOf, 1 hnvc hcrcunto sct my hand and nftixcd my O(iicial Scal thc dny and ycar hrst abovc writtcn. Ce►�evieve M, Nlc�ison v`e"ef �, , '�'�ti......� q�,, :� � oT,, ;;�: z ._° �`%= GENEVIEVEM.MAISON � ="' Nu�u���,t,;'�� NOTN2Y PUBLIC ' `9'�'A '� � � rf OtRt;l:+'�i: UAL11t�1C1iCCO.JNiY.A"U �%��'CNFCGU'K�.��• LlyCcrrmis+ionc.Fi`es.�AYUARy27.10?� �������+"�� Authentieity of this bond can be eonfirmed at bondvalids�tor.zu►•iehna.eom or �110-559-3790 EXTRACT FROM BY-LAWS OF THE COMPANIES °Article V, Section 8, Attorneys-in-Fact. The Chiet' �xecutivc Officer, the President, or any Executive Vice Presidcnt or Vice President m:ry, by written instrument under the attested corporate senl, appoint attorneys-in-fact �vith authority to execute bonds, policies, recogniu�nces, stipultitions, undertakings, or other like instruments on beh�if of the Company, and may authorize any officer or any such attarney-in-fact to uffix the eorporate sezl thereto; and may with or without causc modi(y af revoke any sueh appoinm�ent or authority at �ny time." CERTIFICATE I, the undersigned, Vice President af the LURICII AMERICAN INSURANCE COMl'ANY, the COLUNIAL AMGRICAN CASUAI;I'Y AND SU[Zf'I'Y COMPANY, and the rIDELITY AND DEPOSIT COMPANY OI� MARYLAND, do hereby certify that t(ie foregoing Po�ver of Attarney is stiU in fult force and etilect on the dat� of this certific�te; and I do fiirthcr certify that Article V, Section 8, of thc By-Luws of the Companies is still in forec. 'I'hLs }'o���er of Attomey �u�d Certific�te tnay be signed by facsimile under �nd by nuthority af thc; follawin� resolution o£thc 13onrd of C�irectors of the 'I_UI2ICH AMERICAN 1NSURANCL COMPANY at a meeting duly called ttnd held on the (Sth day of December t998. IZESOLVL'•D: "'1'h�t the signature oCthe I'resident or t� Vice 1'residcnt nnd the �tiesting signature of a Secretary or an Assistant Secretary tind Qfe Seal af the Compuny m�y be stffixed by facsimil� on any Power of Attorney...Any such Po�ver or amy certificate thereof ber�ring such facsimilc signature nnd scal shall be vAlid and binding on the Comp�ny." "1'his Po�<<er of Attamcy nnd Certiticnte m�y be signed by fncsimile under and by nutharity of the fallowing resolutian of the Ba�rd of Directors of'the COLONIAL AMERICAN CASUALTY AND SURE'T'Y COMPANY at � meeting duly catled and held on the Sth day of May, 1994, and the following resolution of the Board of Directors of the FIDELI"1'Y ANU DEf'OSI'T' COMPANY (�r MARYI,AND at a meeting duly cfllleci and hcld on the lOth day of May, 19)0. IZI;SOI�VGD: "7'hat the facsimile or mechlnically repraduced sefll of the company �nd facsimile ar mechnnically reproduced signature of s�ny Vice-President, Secretary, or Assistant Secretary nf the Company, �4�hether made heretofore ar herealier, �aherever appearing upon a cerli�ed copy of any power of nttomey issued by the Gompany, shall be valid and binding upon tltc Cornpany ���ith the snme force und effect ns though manuall�� affixed. IN TL'•S"CIMONY WHGREOF, 1 have hereunto subscribed my name nnd aftixed the eorporate seals of the said Comptinies, this 5th day of December , 2025 , �,�,,, „„�.��,,,,,, �,�`'�, " ,,,,,,,,�,� „tic4�, �sua�rya>�,r°. ,cv,V!wtu����., .�`0�,5?:�=�� '0�y�'•, �`JrfO�POt�"�� G;; `�� ���POlL�� F�y i�p�OP �n9f�to�: ` vSEALm1�t;'! �`i�5[AL"� '= _" US[AlmJJ{G` e.:.���� �,?J„�' . . ?i .,�., 9, Y ��o" ' �.'�..•..::: •' Q'b `�,\ .... i ��[l�Yt4i�'�� nr�nPa��"`` �nqiqup�o�P \ nuo�. � � � P���.,� r3}�: tii�n� .���„ >>�u���� v�c� >>���s�a��,f 'TO REPOl2T A CLAIM W1TH I2EGARD 7't) A SURETY 130Nll, YLGASG SllI3M1T A COMI'LE'TE UGSCRIPTION OF 7'HG CLAIM 1NCLUDING 'I'HE I'RINC11'AL ON THE BOND, 7'HE BONll NUMBEft, ANll YOUI2 CONTAC7' INFORMATION TO: 'Ltn•ich Surety Claims 1299 Iurich Way Schaumburg, I1.60196-105G renortsfclaims�t?zurichna.com 500-(>2C-4S77 Authenticity of tlais bond cAn bc canfirn�eu at bondvt�fidt�tor,zurichna.com or d10-SS9-879[)