Loading...
HomeMy WebLinkAbout061917-FP6 - Construction-Related - Contract - Conatser Construction TxLPFORTWURTH� -FP6 City Secretary Contract No. 61917 Date Received 12/19/2025 � NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Madero Phase 10 City Project No.: 104901 Improvement Type(s): Water 0 Sewer 0 Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: .�--� Arturo Sancen (Dec 18, 202510:59:39 CST) Contractor Superintendent Title CONATSER CONSTRUCTION TxLP Company Name l�..,,✓ o .. Russell Ro�ers (Dec 18, 20Z5 1229:46 CST) Project Inspector � Project Manager a����� CFA Manager �°Q.,�....��. Laurcn Pricur (Dec 19, 2025 09:53:59 CST) TPW Director $2,795,925.00 $17,100.00 $17,100.00 $2,813,025.00 �FFICIAL RECORD CITY SECRETARY FT. WORTH, TX i2/is/2o25 Date 12/18/2025 Date 12/19/2025 Date 12/19/2025 Date 12/19/2025 Date Page 1 of 2 Notice of Project Completion Project Name: Madero Phase 10 City Project No.: 104901 City's Attachments Final Pay Estimate 0 Change Order(s): ❑x Yes ❑ N/A Pipe Report: 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid � Consent of Surety � Statement of Contract Time Contract Time: 280 WD Days Charged: 264 WD Work Start Date: 9/30/2024 Work Complete Date: 11/11/2025 Completed number of Soil Lab Test: 1266 Completed number of Water Test: 30 Page 2 of 2 F���r ���Tx CITY OF FORT WORTH F1NAL PAYMENT REQUEST Contract Name MADERO, PHASE 10 Contract Limits Project Type WATER & SEWER City Project Numbers 104901 DOE Number 4901 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date For Period Ending ll/11/2025 WD Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH � TX 76119 Inspectors G.DEYON / R.ROGERS Contract Time �8�'� Days Charged to Date 264 Contract is 100.00 Complete Friday, November 14, 2025 Page 1 of 5 City Project Numbers 104901 Contract Name MADERO, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding UNIT L• WATER IMPROVEMENTS (RESIDENTIAL) DOE Number 4901 Estimate Number 1 Payment Number 1 For Period Ending 11/11/2025 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 TRENCH SAFETY 9028 LF $1.00 $9,028.00 9028 $9,028.00 2 DUCTILE IRON WATER FITTINGS W/ RES 5.61 TN $11,500.00 $64,515.00 5.61 $64,515.00 3 8" WATER PIPE 8014 LF $56.00 $448,784.00 8014 $448,784.00 4 8" DIP WATER 5 LF $196.00 $980.00 5 $980.00 5 8" DIP WATER, CLSM BACKFILL 316 LF $216.00 $68,256.00 316 $68,256.00 6 12" WATER PIPE 473 LF $102.00 $48,246.00 473 $48,246.00 7 12" DII' WATER 57 LF $282.00 $16,074.00 57 $16,074.00 8 FIRE HYDRANT 19 EA $5,000.00 $95,000.00 19 $95,000.00 9 CONNECTION TO EXISTING 4"-12" WATER 2 EA $1,500.00 $3,000.00 2 $3,000.00 MAIN 10 8" GATE VALVE 11 12" GATE VALVE 12 1" WATER SERVICE 13 FLUSH POINT 14 8" WATERLINE BY OTHER THAN OPEN CUT 15 1.5" IRRIGATION WATER SERVICE 16 4" PVC SCHEDULE 40 SLEEVE 17 FIRE HYDRANT WITH AUTOMATIC FLUSHING DEVICE 18 24° CASING BY OPEN CUT 31 EA 2 EA 248 EA 6 EA 163 LF 2 EA 382 LF 1 EA $1,550.00 $48,050.00 $3,400.00 $6,800.00 $1,200.00 �297,600.00 $1,500.00 $9,000.00 $340.00 $55,420.00 $3,500.00 $7,000.00 $24.00 $9,168.00 $14,500.00 $14,500.00 31 $48,050.00 2 $6,800.00 248 $297,600.00 6 $9,000.00 163 $55,420.00 2 $7,000.00 382 $9,168.00 1 $14,500.00 48 LF Sub-Total of Previous Unit UNIT II: SANTI'ARY SEWER IMPROVEMENTS (RESIDE $380.00 $18,240.00 $1,219,661.00 48 $18,240.00 $1,219,661.00 Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 POST-CCTV INSPECTION 10944 LF $4.00 $43,776.00 10944 $43,776.00 2 MANHOLE VACUUM TESTING 32 EA $200.00 $6,400.00 32 $6,400.00 3 TRENCH SAFETY 10944 LF $2.00 $21,888.00 10944 $21,888.00 4 TRENCH WATER STOPS 32 EA $350.00 $11,200.00 32 $11,200.00 5 4" SEWER SERVICE (CO#1) 328 EA $900.00 �295,200.00 328 $295,200.00 6 8" SEWER PIPE - SDR 26 7991 LF $72.00 �575,352.00 7991 $575,352.00 7 8" SEWER PII'E, CSS BACKFIL,L 440 LF $82.00 $36,080.00 440 $36,080.00 Friday, November 14, 2025 Page 2 of 5 City Project Numbers 104901 Contract Name MADERO, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding DOE Number 4901 Estimate Number 1 Payment Number 1 For Period Ending 11/11/2025 8 8" DiP SEWER PIPE 552 LF $132.00 $72,864.00 552 $72,864.00 9 10" SEWER PIPE - SDR 26 774 LF $92.00 $71,208.00 774 $71,208.00 10 10" SEWERPIPE, CSS BACKFILL 88 LF $112.00 $9,856.00 88 $9,856.00 11 10" DIP SEWER 922 LF $162.00 �149,364.00 922 $149,364.00 12 10" DII' SEWER, CSS BACKFILL 44 LF $182.00 $8,008.00 44 $8,008.00 13 12"SEWERPIPE-SDR26 113 LF $106.00 $11,978.00 113 $11,978.00 14 12" DIP SEWER 20 LF $182.00 $3,640.00 20 $3,640.00 15 EPDXY MANHOLE LINER 43 VF $455.00 $19,565.00 43 $19,565.00 16 4'MANHOLE 31 EA $4,800.00 �148,800.00 31 $148,800.00 17 4' EXTRA DEPTH MANHOLE 185 VF $225.00 $41,625.00 185 $41,625.00 18 4' MANHOLE W/ HYDRAULIC SLIDE 1 EA $5,800.00 $5,800.00 1 $5,800.00 19 CONNECT TO EXISTING 8" SEWER STUB 1 EA $2,500.00 $2,500.00 1 $2,500.00 20 REMOVE CLEANOUT AND CONNECT TO 1 EA $4,500.00 $4,500.00 1 $4,500.00 EXISTING 12" SEWER 21 20" CASING BY OPEN CUT 168 LF $320.00 $53,760.00 168 $53,760.00 Sub-Total of Previous Unit �1,593,364.00 $1,593,364.00 Friday, November 14, 2025 Page 3 of 5 City Project Numbers 104901 Contract Name MADERO, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding DOE Number 4901 Estimate Number 1 Payment Number 1 For Period Ending 11/11/2025 Contract Information Summary Original Contract Amount $2,795,925.00 Change Orders Change Order Number 1 �i�,ioo.00 Total Contract Price $2,813,025.00 Total Cost of Work Completed g2,g13,025.00 Less % Retained $0.00 Net Earned $2,813,025.00 Earned This Period $2,813,025.00 Retainage This Period �0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $2,813,025.00 Friday, November 14, 2025 Page 4 of 5 City Project Numbers 104901 Contract Name MADERO, PHASE 10 Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA InspeCtors G.DEYON / R.ROGERS Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Line Fund Account Center DOE Number 4901 Estimate Number 1 Payment Number 1 For Period Ending 11/11/2025 City Secretary Contract Number Contract Date Contract Time 280 WD Days Charged to Date 264 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Amount Gross Retainage Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $2,813,025.00 Retainage This Period �0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment Net $2,813,025.00 $0.00 $2,813,025.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,813,025.00 Friday, November 14, 2025 Page 5 of 5 Docusign Envelope ID: AB09ADFB-2AC9-4391-BDE3-C1CD56600F6E DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # GITY PRQJECT # FID # X-Number FILE # INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CO TRACT AMOUNT TOTAL REV�SED CONTRACT AMOUNT PER UNIT REVISED COST SHARE ITOTAL RE1/ISED CONTRACT MADERO PHASE10 (UNIT 1) WATER, (UNIT II) SEWER, (UNIT III) STORMWATER, (UNIT I� PAVEMENT, &(UNIT V) STREET LIGHTS 24-0os I CITY PARTICIPATION:I NO 104901 FID # 30114-0200431-104901-E07685 X-27997 W-3014 Steven Wester Sandip Adhikari Phone No: 682-287-3465 Phone No: 817-392-8424 CHANGE ORDER No: 1 WATER SEWER Developa Cost CltyCoat DeveloperCost 57,219,661.00 f0.00 51,576,264.00 57,219,661.60 50.00 57,676,264.00 17,9 OC.90 57,279,667.00 f0.00 . 51,693,364.00 CONTRACT UNIT I PAVING DRAINAGE I STREET LIGHTS I Cosl GeveloperCost CIryCo� DeveloperCost tQ.00 52,508,046.76 SO.d6 52,225,892.00 50.00 52,608,046.76 f0.69 =2,223,89200 50.00 52,506,046.75 50.110 52,223,89200 51,219,667.00 S1,593,364.00 Dev. Cost: S7,812,593.75 C�ty Cost 57,812,593.75 � 14.00 3267,630.00 f0.00 Sd.00 5267.630.00 30.00 SO.Ob � 3267,630.00 f0.00 0 I 5267.630.00 i4.00 REVIEWED By Sandip Adhikari at 6:02 pm, Oct 16, 2024 CONTRACT DAYS 280 280 0 280 Docusign Envelope ID: AB09ADFB-2AC9-4391-BDE3-C1CD56600F6E You are directed to make the following changes in the contracl documenls: UNIT II: SANITARY SEWER IMPROVEMENTS {RESIDENTIAL INFRA TRUCTURE) PAY ITEM # CITY BI�D ITEM QUANTITY UNIT ITEJ'� DESCRIPTION UNIT PRICE TOTAL I 5 3331.3101 19 EA 4" Sewer Service $ 900.00 $ 17,100.00 I I TOTALUNITII:SANITARYSEWERIMPROVEMENTSfRES1DENilALINF STRUCTURE) j 17,100.00 I Asterisk (`) indicates new Pay Item REASONS FOR CHANGE ORDER This change arder inGudes the add'rtion of 19 sewer services for future Madero Phase 7 lots NO CITY FUNDS 1NVOLVED IN THIS CONTRACT. bEVELOPER IS RESPONSIBIE FOR 1 DO % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILI. BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: LJA Engineering, Inc GB Se�l2@�,�X�C Conatser Co structi BY ���ff� BY: ����1� ��41M.1. By: , 9E9B8F968FBF435... Name: Daniel Betten, P.E. Name: Bobby Samuel . 1 Name: Brock Huggins HU lI lU I I LCU Tdle:ProjectManager Tii1e: UTrecToFolLanBDeve�omenl Sianer Title: President email: dbetten(!$Ija.com email: bsamuel(�greenbrickpartners.com email: brockRDconatserconsttudion.com REVIEWED By Sandip Adhikari at 6:02 pm, Oct 16, 2024 Docusign Envelope ID: 3F7EA192-3EC8-4B31-8D1A-835D16786ABF DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # ICITY PROJECT# IFID # �X-Number IFILE # MADERO PHASE 1U (UNIT 1) WATER, (UNIT II) SEWER, (UNIT III) STORMWATER, (UNIT 11n PAVEMENT, &(UNIT � STREET LIGHTS 24-0068 I CITY PARTICIPATION:I NO 104901 �FID # 30114-0200431-1U4901-E07685 �X-27997 � W-3014 INSPECTOR: Steven Wester PROJECT MANAGER: Sandip Adhikari Phone No: 682-287-3465 Phone No: 817-392-8424 I CONTRACT UNIT I WATER SEWER I PAVING DRAINAGE Developer Cost Cky Cost Developer Cost ORIGINAL CONTRACT =1,219,661.Q0 3Q.00 51,576,264.OD EXTRAS TO DATE 50.00 SQ.OD 517,100.00 CREDITS TO DATE 50.00 fG.00 ;0.00 ICONTRACT TO DATE j1,279,661.00 iQ�QQ � 51,685,364.00 IAMOUNT OF PROP. CHANGE ORDER =0.00 SO.Oq I 50.00 IREVISED CONTRACT AMOUNT 57,219,667.00 SO.Gfl 1$7,693,364.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT 51,219,661.00 REVISED COST SHARE IDev. Cost: TOTAI REVISED CONTRACT I CFIY Coq �peveloper Cost City Cosl Developer Cost ;0.00 52,608,D46.76 f0.Q0 52.223,89Z00 50.00 f0.D0 tQ,iiO 50.00 f0;00 s0.00 j�� ;0.00 56.00 i2,506,046.75 50.00 52,223,89200 ;@.770 �18,360.r..-:: ;D�qO . 3,W6.00 S�.OG 52,489,696.75 I SO.DD 52,226,937.00 CHANGE ORDER No: 2 Clty Cost f0.00 SO.OU ��� S0.o0 so.vo SD.OD STREE7 LIGHTS CONTRACT DAYS Developer j :ost Cily Coq 526T,630.OQ SP.00 50.00 58.00 50.00 � 9p 5267,630.00 f0.00 S 7,500.00 50.00 5269,13U.00 f0.tl0 s7,598,364.00 52,489,696.75 ;2,226,837.00 � 5269,730.00 57,798,788.75 Cky Cwl: S�DAO j7,798,788.75 REVIEWED By Sandip Adhikari at 5:27 pm, May 01, 2025 F 280 0 0 280 0 280 Docusign Envelope ID: 3F7EA192-3EC8-4B31-8D1A-835D16786ABF You are directed to make the following changes in the contract documents: UNIT III: DRAINAGE IMPROVEMENTS (RESIDENTIAL INFRASTRUCTUREI CITY BID ITEM PAY ITEM # # QUANTITY UNIT 5 3341.D208 � -43 LF 8 3341.0309 I 43 LF ITEM DESCRIPT19N 27" RCP, Class �II 36" RCP, Class III TOTAL DRAINAGE UNIT III: DRAINAGE IMPROVEMENTS (SENDERA RANCH BOULEVARD SOUTH SECTION - MASTER INFRASTRUCTUREI CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM D $CRIPTIQ N 7` 0241.3014 9 LF Remo�e �i�Storm Line 8" 0241.42D1 1 EA Remove 4' Drop Inlet 9' 0241.4800 14 SY Remave Rip Rap TOTAL DRAINAGE UNIT PRICE TOTAL $ 105.00 $ 4,515.00) $ 130.00 $ �.590.00 ; 1,075.00 � UNIT PRICE TOTAL $ 30.00 $ 270.00 $ 1,000.00 $ 1,ODO.OD $ 50.00 $ 700.40 I $ 1.970.00 UNIT IV: PAVING IMPROVEMENTS iSENDERA RANCH BOULEVARD NORTH SECTION - MASTER INFRASTRUCTUREI CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE I 1 3211.0400 -1 TN Hydrated Lime (42 Ibs/sy1 $ 275.00 $ Z 3211.0502 -47-� gy 8" Lime Treatment �$ 5.00 $ I 3 3213.0105 -86 I SY 10" Conc Pvmt � 6 3291.0100 15 � CY T I$ 94.00 $ q p,soil � $ 28.00 $ I 7 3292.0100 I 90 I SY Block Sod Placement $ 8.00 $ 9 9999.0026 � -3 I LF Construct Std. Pvmt. Header '$ 25.00 $ 10 9999.0031 I -9 i LF � Saw-Cut Curb I$ 20.00 $ 15 9999.0036 I -1 � EA I TYPE II-CR 4" RPM I$ 4.00 I$ 16 � 9999.0037 I 72 LF I REFL PAV MRK N I(V�(6"j SNG �SLD) �$ 5.00 �$ 17 I 9999.0038 I -10 I LF I REFL PAV MRK TY I(W1�6")� NG�(8�2K� �$ 5.00 I$ 18 I 9999.0039 I 6 I LF I REFL PAV MRK TYI(W}( 8�'1 SNG (�LD I$ 15.00 I$ UNIT N: PAVING IMPROVEMENTS (SENDERA RANCH BOULEVARO NORTH SECTION - MASTER INFRASTRUCTURE� § UNIT IV: PAVING IMPROVEMENTS 1SENDERA RANCH BOULEVARD SOUTH SECTION - MASTER INFRASTRUCTURE} CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE 1 3211.0400 -1.8 TN Hvdrated Lime f42 Ibs/sy) $ 275.00 $ 2 3211.o502 -86 SY � 8" Lime Treatment $ 5.00 $ 3 3213.0105 -88 SY I 10" Conc Pvmt �$ 94.00 $ 5 3291.0100 17 CY To oil �$ 28.00 $ 6 I 3292.0100 100 SY I Block Sod��acement �$ 8.00 $ 16 � 9999.0050 -84 LF I Remove REFL PAV MRK TY I�j 6"1{SNG�fSLD� $ 5.OD $ �� I 9999.0051 -25 LF I Remove REFL PAV MRKTY I(1M(�8l')fSNG1{SLDI �$ 15.00 $ 21 I 9999.0036 16 � EA I TYPE II-CR 4" RPM I$ 4.00 I$ 2z I 9999.0037 -740 I LF I REFL PAV MRK TY I W}i6")iSNG){SLD� I$ 5.00 $ 24 � 9999.0039 I S1 I LF f REFL PAV MRK TY��11V��18"�(SNG)(SLD1 1$ 15.00 �$ 27' 9999.0054 300 i LF I REFL PAV MRK TY V1%)(8" ($NG){�LD] �$ s.00 I g 28" 9999.0055 7 I SY 1 Removal of 1" Conc vmt I$ 40.00 I$ UNIT N: PAVING IMPROVEMENTS �SENDERA RANCH BOULEVARD SOUTH SECTION - MASTER INFRASTRUCTUREi S REVIEWED TOTAL (275.00) (235.OD) (S,a84.00) 420.00 720.00 ;75.001 (180.00� (4.001 360.00 (50.00J yD.00 (7,313.00] TOTAL f495.001 {430.00) f8.272.001 476.00 800.00 (420.00) (375.001 64.00 (3,700.001 f765.001 1,80D.00 280.00 �11,037.00S By Sandip Adhikari at 5:27 pm, May 01, 2025 Docusign Envelope ID: 3F7EA192-3EC8-4B31-8D1A-835D16786ABF UNIT V: STREET LIGHTING IMPROVE ENTS (SENDERA RANCH BOULEVARD NORTH SECTION - MASTER INFRASTRUCTUREI CITY BID ITEM PAY ITEM # # QUANTITY UNIT JI ITEM DESCRIPTION UNIT PRICE I TOTAL I 1' 9999.0056 2 I EA I Relocate Ground Box I$ 750.00 I$ 1,500.00 I I UNIT V: STREET LIGHTING IMPROVEMENTS fSENDERA RANCH BOULEVARD NORTH SECTION - MASTER INFRASTRUCTURE)I S 1,500.00 I Asterisk (') indicates new Pay ttem REASONS FOR CHANGE ORDER This change order inGudes median pavement revisions, ground box relocation and striping revisions to Sendera Ranch Bhrd. It also upsizes a segment of stortn pipe to align with the stortn drain calculffiions. NO CfTY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FpR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: LJA Engineering, Inc ev: ��.fl'I � Name: Daniel Betten, P.E. Tdle: ProjeG Manager email: dbetten(�Ija.com Signed by: GBTM Sendera LLC �jb�i�� Sa.w,U.t,(, BY: acaeoraoaroruob... Name: Bobby Samuel raie: Authorized Signer bsamuel@greenbrickpartners email: REVIEWED Conatser Construction BY� ��. a�►� Name: Adam Bu� Titie: Manager COemail: adam�conatserconstruction.com By Sandip Adhikari at 5:28 pm, May 01, 2025 PROJECT NAME: PROJECT NUMBER: DOE NUMBER: PIPE LAID 8" pvc c 900 8" ductile iron 12"pvc c900 12" ductile iron FIRE HYDRANTS: 20 PIPE ABANDONED N/A DENSITIES: NEW SERVICES: PIPE LAID 8"sdr26 DIP 8" sewer 10" sdr 26 10 " dip sewer 12" sdr 26 12" dip sewer PIPE ABANDONED N/A DENSITIES: NEW SERVICES: FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: Madero 10 104901 SIZE g�� g�� 12" 12" SIZE 1" 1.5" SIZE g�� g�� 10" 10" 12" 12" SIZE 4" WATER TYPE OF PIPE c900 ductile iron c900 ductile iron VALVES (16" OR LARGER) TYPE OF PIPE yes copper copper SEWER TYPE OF PIPE sdr 26 DIP sewer sdr 26 DIP sewer sdr 26 DIP TYPE OF PIPE yes sdr 26 TRANSPORTATION AND PUBLIC WORKS �i�� The City of Fort Worth • 1000 Thxockmoxton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 LF 8014 5 473 57 N/A LF 248 2 LF 7991 552 774 922 113 20 LF 328 F�RT�ORTH� `--� TRANSPORTATION AND PUBLIC WORKS November 11, 2025 Conatser Construction 5327 witchita st Fort Worth Texas 76119 RE: Acceptance Letter Project Name: Madero 10 Project Type: Water,sewer,paving, storm drain, street lighting City Project No.: 104901 To Whom It May Concern: On November 11, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on November 11, 2025, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-8424. Sincerely, � Sandip Adhikari, Project Manager Andrew Goodman, Program Manager Cc: Russell Rogers, Inspector Gary Deyon , Inspection Supervisor Lorrie Pitts, Senior Inspector Andrew Goodman, Program Manager LJA Engineering, Consultant Conatser Construction, Contractor CBTM Senderra LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFf�fDAVI'� STAT� �F TFXAS c.c�u�v�r� c��' �r����v'�' Bcfc�re me, the under�igned n�thnrity, � Notary Public in the state ar�d r.otu��y afc�resaid, t�n ihis day persnnally �ppctued E3rock H�ggirt�, Fresi�ena ofCor�at�r 1�Eanagem�nt C'rroup, Inc., genera� p�rtr�cr of Conatser L'o�.ictinn T7C. �, known to mt to bc a cre�iblt pcsson, whv hcing !�y n1e dul� swartt, up�r� �is c�sth d�posc� snd said: T`ltat all per�t�, iirms, assn�tations. cor�x�ratia�s or t�th�� c�rganiz.atior�s furnishing 1�bor andlnr mr�t�rials harre b�en paid in k"ull; T�aR thc wagc stale cstabCish«1 by ttee C�ty CauRcil in tkte City �f Forl Vlrorkh, has bc;cn paid in full; and '1'hut lhere � no cluims �ending ltar �r�c�nat �r�jury andlc�r pro�4ri}� dama�cs; {ln t`on#r�cl dcscrihc:c� �s: NiADERD PH. 1D WATER, �A3VI'I'1�RY 5EVff�R, I�itAI1wIAGE, PAYIN� 8c �Tf�EET LIG�r-i'�" ih'IPR�VEMENTS CFA PR] # ��-OOGS cl•ry ��a��c7r � r�ua��o� CITY OF �ORT V�iOR'I'H �TATE OF TE3�A� CC7NA'TSF.R CUN5TR�lCTIUN TX, L� . � Bres�ck Huggi �ubscribcd end swnrn [a bcfnre me this 7"" day af Nu�crnbcr, 2�25. � �� kJl7H�I�IN� R�SE �O�F PLl��IG li1 T"arrant Caunty, Tcxa� Ma IaRr nw4P:. 71F �E 0� llii�s ; �GA 1.i,���79+7� " roAMA �3fr 11_zG-�OZs � C���EN1` OF $i�FiE��r c�iVN��liii� TO FINI#L P�IYM�NT C�}�ma whf� th� }�mtrican In:tituts of �.�., x� ao��c ��a� PaE}.f��7: ;��In�, ��rt����Madera PkAa�se 10 Fdrl VIfOrEh, TX TQ {Oyvnerj �TFA SEFI❑�RA LLC ANQ TH� CfTY OF €�Ri WORT!-I ;�01 F#e��artcra Dr � $ude 368�1�! � TX 7$(�2� 9ond No 0283758 � A�C�IlT��T'$ �HOJECT NO: cF►ti2}�oe� CDNTRACT FQR: VI�In�e9 $ Pdvu�g fOr Madero Phise 1Q � CQN�FiA�X RATE: C�i�1TF�ACTOR: CONATSER CONSiftUC1�09� Tx. �_P jn �ctardaaoe with tt�e pravisiv� s of the Contract betwxn the �mer aad t�e Ca�tr�sctor as i�dis�ted sbn►►e, dx Iltir+* Yetirrrt �rre+� �+m rddrr�a ad 91r�ty Co+nP��v1 S�RlCLFY �lVSURAfVCE C0�1�AHY 4T5 5�amb0at Ro$d Greerrrrich CT 06830 . $URETY C�1VI�ANY �R �QI7� of R+�'� �r�re +r�nr �nd rddrnr or eo�retpr> CO�NqTS€it GON5TRU�TIDN T7(. L.P. 53271N��r:+ta St Fort Worth T][ 7$i�9-8+D35 . C�NTRACTOR, herrby appr�rrs af tfte fi�ta� paym�u# ta the Ca��actaf, and ��s that �nal p�yme�t ta thc Co�tractar al��li not rn�i+evc thc Sue�ety Comptny of a�y of its obligalions ta nw� �r fi.� +�w.a�... o� o,�,�t �',B�hA S�N�EfiA L�C Ahlp TFtE �IT4` OF FDRT VYDftT�! 5501 Fi��I�rTAr'i ar'., 5�uflB �04W �I�a T�C T5024 , OVYHER� ��et farth �n tix said 5urety Compan�: ba�. lN WtT7�SS, W�iEREOF, #ht 5ureky Comp�y h�s }►crcunto Se[ n5 hsnd this 11tGE3l: ��� e �' ($�'1��: � d8y of NCvernber, 2�25 �ERKLEY INSI}RANCE �OMPAk�Y S�raRy Company ������� e.dr �lgfl�iL�Cp p�ed141�lOCI� �CpL�GSl+11�#�YC RobCi �41�a1e� Title 1�ttGFnlY-In-F 2CCt �IOTE: Thy f4M�n M to a u�d q s Oa1r0�� �De�s'*w+S Uo- AU4 40CWNE� OJ40. C�TRACTOR'$ AFPIR�YIT G�F PAYM�T OF 4EET$ A�IG G4,A�N5. C�rr� E��tlon 4WNER � ARCHITE�T � cor�T�ac�ro� � su��r�r � QTHER ONE PA4E