Loading...
HomeMy WebLinkAbout063253-CO1 - Construction-Related - Contract - Evolving Texas, LP, Bowers Homes, LLC, and Atlantic Construction Group, LLCIPROJECT NAME: ICONTRACT: I CFA # I CITY PROJECT # I CITY SECRETARY CONTRACT # IFID# IX# IFILE # INSPECTOR: PROJECT MANAGER: IORIGINAL CONTRACT IEXTRAS TO DATE ICREDITS TO DATE I CONTRACT TO DATE IAMOUNT OF PROP. CHANGE ORDER I REVISED CONTRACT AMOUNT I TOTAL REVISED CONTRACT AMOUNT PER UNIT IREVISED COST SHARE ITOTAL REVISED CONTRACT DEVELOPER-AWARDED-PROJECT CHANGE ORDER East Powell Townhomes WATER, SEWER, AND PAVING IMPROVEMENTS 20-0081 I CITY PARTICIPATION: 102692 63253 30114-0200431-102692-E07685 X-26470 W-2708 YES CSC No. 63253-CO1 CHANGE ORDER No: 1 Brandon Gibson Phone No: 214-779-2335 George Marquez Phone No: 817-392-6826 WATER SEWER Developer Cost $44,570.00 $0.00 $0.00 $44,570.00 $o.00 $44,570.00 City Cost Developer Cost $0.00 $75,416.00 $0.00 $0.00 $0.00 $0.00 $0.00 $75,416.00 $o.00 So.00 $0.00 $75,416.00 CONTRACT UNIT DRAINAGE Developer City Cost Cost City Cost $61,525.00 $14,490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $61,525.00 $14,490.00 $0.00 $o.00 $o.00 So.00 $61,525.00 $14,490.00 $0.00 $44,570.00 $136,941.00 $14,490.00 Dev. Cost: $350,899.58 City Cost: $412,424.58 $216,423.58 STREET LIGHTS Developer Cost City Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $61,525.00 $0.00 WORKING DAYS 40 40 40 40 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX PAVING Developer Cost City Cost $241,954.40 $0.00 $0.00 $0.00 $0.00 $0.00 $241,954.40 $0.00 ($25,530.82) $0.00 $216,423.58 $0.00 Revised: 12-17-2018 Page 1 You are directed to make the follow ng changes in the contract documents: PAY ITEM # 6 9 10 *19 '20 CITY BID ITEM # QUANTITY 0241.1100 (1057) 3211.0502 (1789) 3211.0400 (215) 0241.1700 1057 3211.0703 1398 I Asterisk (') indicates New Pay Item UNIT SY SY TN SY SY UN T IV: PAVING IMPROVEMENTS ITEM DESCRIPTION Asphalt Removal 8" Hydrated Lime Treatment Hydrated Lime Pavement Pulverization 10" Cement Treatment CFW Unit Price TOTAL UNIT IV: PAVING IMPROVEMENTS Developer UNIT PRICE Cost Ciry Cost $16.00 ($16,912.00) $0.00 $6.00 ($1Q734.00) $0.00 $220.00 ($47,300.00) $0.00 $15.14 $16,002.98 $0.00 $23.90 $33,412.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($25.530.821 0.00 � TOTAL ($16,912.00) ($10,734.00) ($47,300.00) $16,002.98 $33,412.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ($25,530.82' Revised: 12-17-2018 Page 2 � REASONS FOR CHANGE ORDER Pavement Des�gn clianged ro pavemcN pulvorizafion �n leur ol aspl;alt pavemen! remov3l and tlre proposed subg�atle of 8" of bme was ch,nnged io 10"0! 4% Porfland Concrele Stabi6zatron .� RECOMMENDED: Evr,lvin:i T �xai`. L� E��.��'c�f%' � .y/ Name Chandler Davis Title: Proiect Manauer APPROVAL RECOMMENDED: CFW - Water !)eparimeM M� s�6 u�,L,, P� �:�� Br. � Name:Suby Varughese T�ue: Enqineerinq Manaqer APPROVED: APPROVED: Bcwers H C / Atlanfic �:'�rr.s,��rcG��r� ��•r�r�p, LLC Date: ln��i��(.riZ�J Bv_ ���/ Dale: CJ ���> l�i� BY ��ll'��;,�� 4'�V� Date � Q�ZO�ZQZJ r _ Name. Todd Bowers Name: Uzziel Montelonao TiUe: Managing Member Title: CEO APPROVED: APPROVED AS TO FORM ANO LEGALI7V: CFW - Assistant C,ly M1eanager CFW Assistant City Atlorney Nov 6, 2025 �, Nov 20, 2025 � NOV 11, 2025 Date: Bv: ��� �=- �� Date: Bv: � Date: Name: Jesica McEachern Name: Richard McCracken r;,ie: Assistant City Manager r;i�� Assistant City Attorney RECOMMENDED� CFW - 'Contract CompGance Manayer Bv��82� /�26��LG�� oate: 11/6/2025 Name: GeorQe Marquez� P.E.: Tille: CFW Pro�ect Manager tu18C Number. H�A M8C Dale Approved: N!A o�F FORThdd ATTEST >:� °�n°o, o�a sa e �� � �� op°aap° °`�` ua�e: 12/22/2025 -Y , Name: Jannelle 5. Goodall TiUe: Ci[y Secretary CC c ' Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contrect, and ensuring all performance and reporling requirements. ❑There are NO City Funds associated with this Conlracl CThere are City Funds associated with this Contract �FFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-�7-2018 Paye 3 F�RT��RTHo City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name Atlantic Construction Group, LLC Subject of the Agreement: CSN (63253) Pavement design was changed to pavement pulverization in lieu of asphalt pavement removal and thE proposed subgrade of 8" of lime was change to 10" of 4% Portland Concrete Stabilization. M&C Approved by the Council? * Yes ❑ No ❑✓ If �so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No ❑✓ If �so, provide the original contract number and the amendment number. Is the Contract "PermanenY'? *Yes 0 No ❑ If �unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 12/19/2025 Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No ❑✓ *If �so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 102692 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑✓ No ❑ Contracts need to be routed for CSO processin� in the followin� order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.