HomeMy WebLinkAbout051468-A5 - Construction-Related - Contract - VRX, Inc.CSC No. 51468-A5
ANIENDMENT No . 5
TO CITY SECRETARY CONTRACT No. 51468
WHEREAS, the City of Fort Worth (CITY) and VRX Inc. , (ENGINEER) made
and entered into City Secretary Contract No. 51468, (the CONTRACT) which
was authorized by M&C C-28834 on the 11th day of September, 2018 in the
amount of $ 165,562.26; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $114,012.00 which was authorized by M&C 21-0211
March 23, 2021; Amendment Number 2 in the amount of $27,405.92 which
was administratively authorized on June 8, 2021; Amendment Number 3 in
the amount of $111,174.66 which was authorized by M&C 22-0430 on June
14, 2022; and Amendment Number 4 in the amount of 10,668.00 which was
administratively authorized on September2l, 2023.
WHEREAS, the CONTRACT involves engineering services for
the following project:
Trentman Street Bridge Replacement over the Tributary of Lake
Arlington, CPN 100604; and
WHEREAS, it has become necessary to execute Amendment No. 5 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $24,118.00. (See
Attached Funding Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $452,940.84
OFFICIAL RECORD
CITY SECRETARY
3 • FT. WORTH, TX
All other provisions of the Contract, which are not expressly
City of Fort Worth, Texas Trentman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 1 of 4
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
ENGINEER
VRX, Inc.
C_\��--�
Jesica McEachern
Assistant City
Manager
DATE : 09/17/25
-� (
� _ - �- � - �=v -�--
Nawal (Noelle) Ibrahim, PE
VRX President
DATE: O8/29/25
APPROVAL RECOMMENDED:
��c�z�'Qo
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
i���
Gustavo Vallejo (Aug 26, 2025 09:54:14 CDT)
Gustavo Vallejo
Project Manager
City of Fort Worth, Texas Trentman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 2 of 9
APPROVED AS TO FORM AND LEGALITY:
���d�
Douglas Black (Sep 12, 2025 17:46:10 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
�(�-�ltR /� .�i$.�'�
Jannette Goodall
City Secretary
�p44Il�
a F F�R>�Il�a
p;poo°° °���L�9dd
v�o oao
PVo o=d
PPp'f °�o °° i`o
��� �FXAS4pp
��nR4644
M&C No: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Trentman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 3 of 9
FUNDING BREAKDOWN SHEET
City Secretary No . 51468
Amendment No.S
Department
TPW
STORM
Fund-Account-Center
34027-0200431-5330500-100604-002630-9999-22010203
52002-0200431-5330500-100604-002830-9999
Total:
Amount
$12,038.00
$12,080.00
$24,118.00
City of Fort Worth, Texas Trentman Street Bridge Replacement Project
Prof Services Agreement Amendment Template CPN 100604
Revision Date: November 23, 2021
Page 4 of 4
��.
May 5, 2025
VRX, INC.
4500 Mercantile Plaza Drive, Suite 300
Fort Worth, TX 76137
Firm #9690
OFFICE: 281.686.4909
Mr. Gustavo A. Vallejo
City of Fort Worth,
TPVV�Capital Delivery Division
100 Fort Worth Trail
Fort Worth, Texas 76102
Re: Amendment No. 5 Request — City Project No. 100604
Trentman Street Bridge Replacement and Pavement Rehabilitation
CONTRACT No. 51468
Dear Mr. Vallejo,
This letter is in reference to contract No. 51468 between VRX, Inc. and the City of Fort
Worth (the City) dated October 26, 2018, herein referred to as the "Contract."
This letter requests an amendment (Amendment No. 5) revising the previously approved subject
project design plans and contract documents. Specifically, this amendment includes the provision
of additional work associated with the following items.
1. Additional construction phase support services, including submittal review and responses
to requests for information. The original contract agreement scope included five (5)
submittal reviews and five (5) requests for information responses. An additional twenty
submittal reviews and six (6) requests for information responses were requested and
provided; as noted below.
2. Additional fees to reflect current labor rates for preparation of Letter of Map Revision
(LOMR).
3. Reimbursable fee for an advertisement as required in LOMR requirements.
• Additional Construction Phase Support Services: $ 12,038.00
• LOMR: $11,080.00
• Reimbursables: $ 1,000.00
v
VRX, INC.
4500 Mercantile Plaza Drive, Suite 300
Fort Worth, TX 76137
Firm #9690
OFFICE: 281.686.4909
Original Contract
Amendment No. 1
Amendment No. 2
Amendment No.3
Amendment No.4
Amendment No. 5
Total
T'Oial
$ 165,562.26
$ 114,012.00
$ 27.405.92
$ 111,174.66
$ 10,668.00
$ 24,118.00
$ 452,940.84
Description
Contact Amount
Total Contract M/WBE
Total Contract M/WBE (%)
City's M/WBE Goal (%)
Original
$ 165,562.26
$ 28,740
17.4%
15%
Revised
$ 452,940.84
$ 85,409
18.8%
15%
I sincerely appreciate your consideration of this request. Please call or email me if you have any
questions or would like to discuss the details included in this letter.
Respectfully,
�
�s2�(�y C , �Dn 1
lI
Kelly Moncrief, P.E.
Senior Project Manager
VRX
Enclosure:
Supplemental LOE
v�;�
DESCRIPTION
VRX
Construction Phase Services (Public U
Additional Submittal Reviews (20) &
Additional RFI Reviews (6)
VRX HOURS
CONTRACT HOURLY RATE
Supplemental Fee Proposal - Amendment No. 5
City of Fort Worth
Bridge Deck Replacements for
Trentman Street at Prairie Dog Creek
Project Quality Senior Project
Manaeer Manaeer Eneineer Eneineer
VRX SUBTOTAL (Public Works) $ 12,038.00
Project Engineer In TOTAL LABOR COST
ngineer Training HOURS
13.0 26.0 I 26.0 I 65.0 I$ 12,038.00
$ '242.00 I$ �192.00 I$ 2691.00 I$ 26.0.00 I 0.0 0.0 0.0 65.0 I
DESCRIPTION I
WALTER P MOORE
LOMR (Public Works) - Detailed breakdown is attached
Original SA (September 2021)
Revised proposal to reflect increase in hourly rates
Reimbursable Expense - Newspaper Notification �
WPM SUBTOTAL
PROIECT TOTAL
TOTAL I LABORCOST
HOURS
$ (68,640.00)
$ 79,720.00
$ 1,000.00
$ 12,080.00
118.00
5/5/2025
1of3
� Q
,�.• •.•, walter
� • .•.� p moore
Budget Estimate for City of Fort Worth Trentman Street Crossing at Prairie Dog Creek - LOMR
Andy
Work Item Principal Chief Water Project Senior Senior Designer Hours
Engineer Manager Engineer GIS
Task 1: Data Collection
a Receive As-Built Survey, Compaction and Denisty Reports, ESA Compliance, and 2 2 4
other required documentation from CLIENT
b Review Field Survey and Proposed Project Plans 8 8
Subtotal Task 1 0 0 2 10 0 0 12
Task25: LOMR
a Dup. Effective, Corr. Effective, Pre-Proj., Post-Proj. Models and Tables 8 16 24
b Floodway Models 6 30 36
c FEMA Forms and Supporting Documentation 16 16
c Topographic Work Map, FW Boundaries Map, Annotated FIRM, Revised Profile 2 18 36 56
e Narrative 4 6 24 34
d Coordination with FEMA 4 8 60 24 96
Subtotal Task 5 8 0 30 164 60 0 262
�
Task 3: Project Management and Coordination
a Coordination with Client (Receive and Address Client Comments) 2 2 8 12
b Coordination with City 2 4 32 38
Subtotal Task 3 � 4 0 6 40 0 0 50
FEMA LOMC Application Fee
HOURLY RATE $260.00 $225.00 $180.00 $170.00
Td AL BUDGET REQUIREMENT: �
Task
Budget
$810
$1,440
$2,250
$4,680
$6,750
$2,880
$9,810
$6,710
$17,720
$48,550
$2,410
$7,180
$9,590
$8,250
$68,640
09/10/2021
Task
Percentage
1%
2%
3%
�%
10%
4%
14%
10%
26%
71%
4%
10%
14%
100%
. '•�
,•.• •.•, walter
� • .•.� p moore
Budget Estimate for City of Fort Worth Trentman Street Crossing at Prairie Dog Creek - LOMR
Work Item I Principal Chief Water Project Engineer Senior Designer Hours Task Task
Engineer Manager GIS Budget Percentage
Task 1: Data Collection
a Receive As-Built Survey, Compaction and Denisty Reports, ESA Compliance, 2 2 4 $930 1%
and other required documentation from CLIENT
b Review Field Survey and Proposed Project Plans 8 8 $1,600 2%
Subtotat Task 1 � 0 0 2 10 0 0 12 $2,530 3°/a
Task2: LOMR
a Dup. Effective, Corr. Effective, Pre-Proj., Post-Proj. Models and Tables 8 16 24 $5,320 7%
b Floodway Models 6 30 36 $7,590 9%
c FEMA Forms and Supporting Documentation 16 16 $3,200 4%
c Topographic Work Map, FW Boundaries Map, Annotated FIRM, Revised Profile 2 18 36 56 $12,770 16%
e Narrative 4 6 24 34 $7,790 10%
d Coordination with FEMA 4 8 60 24 96 $21,280 26%
Subtotal Task 2 8 0 30 164 60 0 262 $57,950 72%
Task 3: Project Management and Coordination
a Coordination with Client (Receive and Address Client Comments) 2 2 8 12 $2,830 4%
b Coordination with City 2 4 32 38 $8,160 10%
Subtotal Task 3 I 4 0 6 40 0 0 50 $10,990 14%
Task 4: Reimbursable Expenses �
a FEMA LOMC Application Fee $8,000 10%
b Mileage $250 0%
c INewspaperNotification. $1,000 1%
Subtotal Task 4 $9,250 11 %
HOURLY RATE $350.00 $265.00 $200.00 $240.00
TOTAL BUDGET REQUIREMENT: - _ II I $$0,720 I 100%
05/05/2025
Name: Trentman Street
Summary of Requests for Information (RFI's)
Project No. (CPN): 100604
RF� �O� (Note: Onlv those completed bv VRX are shown in this document.)
VRX
Count
1
2
3
*
4
*
*
5
6
*
*
7
8
9
*
*
*
*
10
11
RFI
No.
2
3
4
5
6
7
8
9
10
11
13
14
15
17
18
19
20
21
22
N/A
*
Subject
Proposed Storm Pre-Cast
Water Line Obstruction
Substitution of Block Wall
MSE Precast Wall Texture
Unknown Utility Found
16" Concrete Encased Water Line
Clarification for Sewer Ring & Covers
Asphalt Thickness - Change in Condition
Waterline B Existing As-built
Existing Atmos Manhole in Proposed Pavement
Clarification for powel D Locations
Prop Const Joint on Wing Wall
Sonotube for Drill Shafts
Proposed Ext of Wing Wall
Type F Curb Expansion Joint
Rebar Type for Approach Slab
Conflict b/t Proposed Sanitary & Storm
Type F to C402 Rail Transition
Atmos Conflict
Bridge Pier Locations
N/A - Result of additional information needed to
complete construction
VRX, Inc. 5/5/2025
Project Name: Trentman Street
Project No. (CPN): 100604
Submittal Log (Note: Only those completed by VRX are shown in th
VRX
Count
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
No.
3
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
26
27
28
29
30
31
32
33
34
Subject
Trench Safety
PE Encasement - Water Pipe
Vinyl Pipe Wrapping Tape
Water Service Pipe
Mix Design 340-0
Mix Design 360-02
Mix Design 360-2DS
Mix Design SA6420FBSV-CN13
Substitution-Ergon-Armor
Sanitary Drawings
Quikrete
High Strength Concrete
Epoxy Substitution
MSE Liner
SEJ-M
Sealed Expansion Joint - Type M(SEJ-M)
C402 Rail (along bridge)
Walls A1, B1, C1 & D1
Prestressed Concrete Panels - Deck Panels
Prestressed Concrete Box Beams - Bridge Girders
Burnco - Crushed Limestone - Wingwall && MSE Backfill
Mix Design Bridge Sidewalk & Bridge Deck
PRD-13 Type F Rail
Conlock II Revetment System
C402 Rail (along ramp)
VRX, Inc. 5/5/2025
100604-EPAM-Engineering Agreement for
Trentman St. Bridge, Amendment #5
Final Audit Report
Created: 2025-08-26
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAATwkdt52rXZyaGtU612vcdAUz2oxqJNZN
2025-08-29
"100604-EPAM-Engineering Agreement for Trentman St. Bridge,
Amendment #5" History
-�-� Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2025-08-26 - 2:37:30 PM GMT- IP address: 204.10.90.100
Document emailed to Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) for filling
2025-08-26 - 2:50:38 PM GMT
Document emailed to noelle@vrxglobal.com for signature
2025-08-26 - 2:50:38 PM GMT
Document emailed to Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) for signature
2025-08-26 - 2:50:38 PM GMT
�� Email viewed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov)
2025-08-26 - 2:53:10 PM GMT- IP address: 208.184.124.181
C�� Document e-signed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov)
Signature Date: 2025-08-26 - 2:54:14 PM GMT - Time Source: server- IP address: 208.184.124.181
Email viewed by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov)
2025-08-26 - 3:13:37 PM GMT- IP address: 208.184.124.181
�.� Form filled by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov)
Form filling Date: 2025-08-26 - 3:14:48 PM GMT - Time Source: server- IP address: 208.184.124.181
Email viewed by noelle@vrxglobal.com
2025-08-26 - 8:06:38 PM GMT- IP address: 104.28.55.254
-� Signer noelle@vrxglobal.com entered name at signing as Nawal (Noelle) Ibrahim, PE
2025-08-29 - 4:43:56 PM GMT- IP address: 173.77.90.190
F�RTWaRTHg P°"'�"�bv
� Ado6e
AcrobatSign
� Document e-signed by Nawal (Noelle) Ibrahim, PE (noelle@vrxglobal.com)
Signature Date: 2025-08-29 - 4:43:58 PM GMT - Time Source: server- IP address: 173.77.90.190
Document emailed to Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) for filling
2025-08-29 - 4:44:01 PM GMT
Document declined by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov)
Decline reason: There is an error in the letter. The revised contract amount has a typo.
2025-08-29 - 4:47:12 PM GMT- IP address: 204.10.90.100
F�RTWaRTHg P°"'�"�bv
� Ado6e
AcrobatSign
F��R'F ��RTH�
Routing and Transmittal Slip
Transportation & Public Works
Department
D�Cj1MENT TITLE: Engineering Agreement for Trentman St. Bridge, Amendment #5
M&C: N/A
Date: 07/OU2025
To:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
11
CPN: 100604
Name
Filogonio Munoz
Nawal (Noelle) Ibrahim
Gustavo Vallejo
Gregory Robbins
Mary Hanna
Patricia Wadsack
Lauren Prieur
Douglas W. Black
Jesica McEachern
Jannette Goodall
TPW Contracts
CSO: 51468
Department Initials
TPW ��
VRX, Inc. Vendor N"`
TPW �.,�,
TPW G�
TPW �"`�'
TPw PL1N'
TPW �VI�
Legal �,,,z�
CMO '�i
CSO ,, ,,"`�
TPW
DOC#:
Date Out
08/26/25
08/29/25
08/26/25
09/08/25
09/08/25
09/10/25
09/10/25
09/12/25
Sep 17, 2025
09/18/25
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and talce the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES �No NEXT DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a�FortWorthTexas.�ov at ext. 7233 for pick up when completed.
Thank you!