HomeMy WebLinkAbout063971-PM1 - Construction-Related - Contract - TDC Merrimac Partners, LLC and Cadence McShane Construction CompanyPROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SANITARY SEWER, AND STORM SEWER IMPROVEMENTS TO SERVE TRANSWESTERN WESTBEND MERRIMAC IPRC Record No. IPRC25-0059 City Project No. 105950 FID No. 30114-0200431-105950-E07685 File No. SD-0748 Mattie Parker Jesus “Jay” Chapa Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur Director, Transportation and Public Works Department Prepared for The City of Fort Worth Prepared for: The City of Fort Worth September 2025 Prepared by: Texas Registered Engineering Firm F-928 Kimley-Horn No. 064469613 CSC No. 63971-PM1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised March 20, 2020 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 11 13 Invitation to Bidders 03/20/2020 00 21 13 Instructions to Bidders 03/20/2020 00 41 00 Bid Form 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 00 43 13 Bid Bond 04/02/2014 00 45 11 Bidders Prequalification’s 04/02/2014 00 45 12 Prequalification Statement 09/01/2015 00 45 13 Bidder Prequalification Application 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 45 40 Minority Business Enterprise Goal 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions 11/15/2017 00 73 00 Supplementary Conditions 07/01/2011 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded Projects 01/10/2013 Division 01 - General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 31 20 Project Meetings 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised March 20, 2020 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project’s Contract Documents Division 02 – Existing Conditions None Division 03 – Concrete None Division 26 – Electrical None Division 31 – Earthwork None Division 32 – Exterior Improvements None Division 33 – Utilities None Division 34 – Transportation None 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised March 20, 2020 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City’s website at: http://fortworthtexas.gov/tpw/contractors/ or https://apps.fortworthtexas.gov/ProjectResources/ Division 02 - Existing Conditions Last Revised 02 41 13 Selective Site Demolition 12/20/2012 02 41 14 Utility Removal/Abandonment 12/20/2012 02 41 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 26 05 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi-Duct Conduit 02/26/2016 Division 31 - Earthwork 31 10 00 Site Clearing 12/20/2012 31 23 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabions 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 32 01 17 Permanent Asphalt Paving Repair 12/20/2012 32 01 18 Temporary Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 32 11 23 Flexible Base Courses 12/20/2012 32 11 29 Lime Treated Base Courses 12/20/2012 32 11 33 Cement Treated Base Courses 12/20/2012 32 11 37 Liquid Treated Soil Stabilizer 08/21/2015 32 12 16 Asphalt Paving 12/20/2012 32 12 73 Asphalt Paving Crack Sealants 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 14 16 Brick Unit Paving 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised March 20, 2020 32 17 23 Pavement Markings 11/22/2013 32 17 25 Curb Address Painting 11/04/2013 32 31 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast-in-Place Concrete Retaining Walls 06/05/2018 32 91 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro-Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 33 03 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 04 10 Joint Bonding and Electrical Isolation 12/20/2012 33 04 11 Corrosion Control Test Stations 12/20/2012 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2012 33 04 30 Temporary Water Services 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 33 05 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 33 05 12 Water Line Lowering 12/20/2012 33 05 13 Frame, Cover and Grade Rings – Cast Iron 01/22/2016 33 05 13.10 Frame, Cover and Grade Rings – Composite 01/22/2016 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 12/20/2012 33 05 16 Concrete Water Vaults 12/20/2012 33 05 17 Concrete Collars 12/20/2012 33 05 20 Auger Boring 12/20/2012 33 05 21 Tunnel Liner Plate 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 33 05 23 Hand Tunneling 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 12/20/2012 33 11 14 Buried Steel Pipe and Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 Large Water Meters 12/20/2012 33 12 20 Resilient Seated Gate Valve 12/20/2012 33 12 21 AWWA Rubber-Seated Butterfly Valves 12/20/2012 33 12 25 Connection to Existing Water Mains 02/06/2013 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012 33 12 40 Fire Hydrants 01/03/2014 33 12 50 Water Sample Stations 12/20/2012 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised March 20, 2020 33 12 60 Standard Blow-off Valve Assembly 06/19/2013 33 31 12 Cured in Place Pipe (CIPP) 12/20/2012 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2012 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 12/20/2012 33 31 22 Sanitary Sewer Slip Lining 12/20/2012 33 31 23 Sanitary Sewer Pipe Enlargement 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 12/20/2012 33 39 10 Cast-in-Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 Fiberglass Manholes 12/20/2012 33 39 40 Wastewater Access Chamber (WAC) 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 33 41 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 12/20/2012 33 41 12 Reinforced Polyethlene (SRPE) Pipe 11/13/2015 33 46 00 Subdrainage 12/20/2012 33 46 01 Slotted Storm Drains 07/01/2011 33 46 02 Trench Drains 07/01/2011 33 49 10 Cast-in-Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 34 41 10 Traffic Signals 10/12/2015 34 41 10.01 Attachment A – Controller Cabinet 12/18/2015 34 41 10.02 Attachment B – Controller Specification 02/2012 34 41 10.03 Attachment C – Software Specification 01/2012 34 41 11 Temporary Traffic Signals 11/22/2013 34 41 13 Removing Traffic Signals 12/20/2012 34 41 15 Rectangular Rapid Flashing Beacon 11/22/2013 34 41 16 Pedestrian Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 34 41 20.02 Freeway LED Roadway Luminaires 06/15/2015 34 41 20.03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 34 41 50 Single-Mode Fiber Optic Cable 02/26/2016 34 71 13 Traffic Control 11/22/2013 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 6 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised March 20, 2020 APPENDIX GR-01 60 00 Product Requirements END OF SECTION 00 42 43 DAP - BID PROPOSAL Page 1 of 2 1 0241.1001 Water Line Grouting 02 41 14 CY 8 $135.00 $1,080.00 2 0241.1011 Remove 4" Water Line 02 41 14 LF 310 $21.00 $6,510.00 3 0241.1118 4"-12" Pressure Plug 02 41 14 EA 5 $3,076.00 $15,380.00 4 0241.1510 Salvage Fire Hydrant 02 41 14 EA 3 $1,399.00 $4,197.00 5 0241.1514 Salvage 2" Water Meter 02 41 14 EA 3 $1,968.00 $5,904.00 6 0241.1402 Abandon 6" Water Valve 02 41 14 EA 1 $500.00 $500.00 7 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 0.5 $2,032.00 $1,016.00 8 3311.0061 4" PVC Water Pipe 33 11 12 LF 85 $127.00 $10,795.00 9 3311.0161 6" PVC Water Pipe 33 11 12 LF 165 $135.00 $22,275.00 10 3311.0461 12" PVC Water Pipe 33 11 12 LF 95 $165.00 $15,675.00 11 3312.0001 Fire Hydrant 33 12 40 EA 2 $5,522.00 $11,044.00 12 3312.0002 Water Sampling Station 33 12 50 EA 13 $500.00 $6,500.00 13 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 5 $1,500.00 $7,500.00 14 3312.2203 2" Water Service 33 12 10 EA 2 $2,989.00 $5,978.00 15 3312.2802 4" Water Meter and Vault 33 12 11 EA 2 $36,085.00 $72,170.00 16 3312.4106 12" x 6" Tapping Sleeve & Valve 33 12 25 EA 3 $3,076.00 $9,228.00 17 3312.4109 12" x 12" Tapping Sleeve & Valve 33 12 25 EA 1 $5,500.00 $5,500.00 18 3305.0109 Trench Safety 33 05 10 LF 345 $1.00 $345.00 19 0241.0100 Remove Sidewalk 02 41 13 SF 90 $10.00 $900.00 20 0241.1100 Remove Asphalt Pvmt 02 41 15 SY 255 $90.00 $22,950.00 21 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 70 $5.00 $350.00 22 3110.0102 6"-12" Tree Removal 31 10 00 EA 6 $500.00 $3,000.00 23 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 32 01 17 SY 365 $171.00 $62,415.00 24 3213.0301 4" Conc Sidewalk 32 13 20 SF 90 $19.00 $1,710.00 25 3213.0402 7" Concrete Driveway 32 13 20 SF 15 $19.00 $285.00 26 3216.0101 6" Conc Curb and Gutter 32 16 13 LF 70 $12.00 $840.00 27 3471.0001 Traffic Control 34 71 13 MO 2 $12,000.00 $24,000.00 28 9999.0013 HMAC Pvmt Removal 00 00 00 SY 250 $63.00 $15,750.00 1 0241.2012 Remove 6" Sewer Line 02 41 14 LF 230 $21.00 $4,830.00 2 0241.2201 Remove 4' Sewer Manhole 02 41 14 EA 2 $1,249.00 $2,498.00 3 3301.0002 Post-CCTV Inspection 33 01 31 LF 56 $4.00 $224.00 4 9999.0010 Trench Safety (Sewer) 33 05 10 LF 56 $2.00 $112.00 5 3331.4115 8" Sewer Pipe 33 11 10, 33 31 12, 33 31 20 LF 56 $143.00 $8,008.00 6 3339.0001 Epoxy Manhole Liner 33 39 60 VF 9 $350.00 $3,150.00 7 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 1 $7,500.00 $7,500.00 8 9999.0014 Hydraulic Slide 00 00 00 EA 1 $500.00 $500.00 9 0241.2201 Remove 4' Sewer Manhole 02 41 14 EA 2 $1,249.00 $2,498.00 TRANSWESTERN WESTBEND MERRIMAC CITY PROJECT NO. 105950 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Proposal Description UNIT PRICE BID Bidder's Application Project Item Information Unit of Measure Bidlist Item No.Specification Section No.Bid Quantity Unit Price Bid Value TOTAL UNIT I: WATER IMPROVEMENTS $333,797.00 UNIT I: WATER IMPROVEMENTS TOTAL UNIT II: SEWER IMPROVEMENTS $29,320.00 Bidlist Item No.Description Unit Price Bid ValueSpecification Section No.Unit of Measure Bid Quantity UNIT II: SEWER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 00 42 43_Bid Proposal - TWM Proposed Utilities_August 2025.xlsm 00 42 43 DAP - BID PROPOSAL Page 2 of 2 TRANSWESTERN WESTBEND MERRIMAC CITY PROJECT NO. 105950 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Proposal Description UNIT PRICE BID Bidder's Application Project Item Information Unit of Measure Bidlist Item No.Specification Section No.Bid Quantity Unit Price Bid Value 1 3312.0108 Connection to Existing 24" Water Main 33 12 25 EA 1 $10,861.00 $10,861.00 2 3312.0111 Connection to Existing 42" Water Main 33 12 25 EA 1 $8,821.00 $8,821.00 3 3349.0001 4' Storm Junction Box 33 49 10 EA 2 $8,821.00 $17,642.00 4 3125.0101 SWPPP ≥ 1 acre 31 25 00 LS 1 $22,000.00 $22,000.00 5 9999.0011 Trench Safety (Storm) 33 05 10 LF 10 $4.00 $40.00 This Bid is submitted by the entity named below: BIDDER: BY: Cadence McShane Construction Company LLC 5057 Keller Springs Rd, Suite 500 Addison, Texas 75001 TITLE: DATE: END OF SECTION UNIT III: STORM IMPROVEMENTS TOTAL UNIT III: STORM IMPROVEMENTS $59,364.00 Bid Summmary UNIT I: WATER IMPROVEMENTS Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the CONTRACT commences to run as provided in the General Conditions. UNIT II: SEWER IMPROVEMENTS Total Construction Bid UNIT III: STORM IMPROVEMENTS $422,481.00 $333,797.00 $59,364.00 $29,320.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 00 42 43_Bid Proposal - TWM Proposed Utilities_August 2025.xlsm     ProcoreGeneralContractorSignHere 120 Project Manager 8/18/2025 00 45 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT – DEVELOPER AWARDED PROJECTS 00 45 12_Prequalification Statement 2015_DAP Form Version September 1, 2015 SECTION 00 45 12 DAP – PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the “Major Work Type” box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water, Sewer, Storm Improvements Rumsey Construction LLC 4/30/2026 Paving R&R for Utility scope only Rumsey Construction LLC 4/30/2026 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Cadence McShane Construction Company BY: 7500 Dallas Pkwy Suite 600 _________________________________________ Plano, TX 75024 (Signature) TITLE: DATE: END OF SECTION     ProcoreGeneralContractorSignHere Project Manager 8/15/2025 Clayton Bozyk Water Service (16'' and under), Wastewater Service (12'' and Under) Storm Sewer (30'' and under) Paving removal/replacement for Utility Services 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 � 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 m � SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105950. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Cadence McShane Construction Com�any By: �_�.'.':) ��`� t=�t Company � (Please Print) 7500 Dallas Pkwv. Suite 600 Signature': - _� _, `_ Address Plano. TX 75024 City/State/Zip TH E STATE OF TEXAS COUNTY OF TARRANT � � Title: ..,��. 1�� P`_,",�t f� T (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared �_ r� ���� �� �: :��,�'. . known to me to be the person whose name is subscribed to tl�ie foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of C a�e.��� �1�, 5}�n e_ for the purposes and consideration therein expressed and in the capacity therein stated. GIV7F�tn-I UNDER MY HAND AND SEAL OF OFFICE this 1�� day of U.u.�jf�.yb— , 20iC5 ) ,� nn �J � —� �; a,.�,,�! `�X.4. r� (�1. � � 1 v� Ul 1�e R�.,o*,�_ ; Notary P.ublic in and for the State of Texas END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTSCPN: 106198 Revised April2, 2014 +"ir"'r'i"'+s MiCHELLE MARIE OUFUIS LEBW�C " �� �:° `'� Not�ry PuWic, 8t�t� of 7��us _+ • My Commb�ion Explre� �%��,,,_,,,��,� OctaWr 30� 2028 ' `,°,`„� �"' NOTARV ID 128895432 . ,� „� y Transwestern Westbend Merrimac 08/26/2025 005243-2 Developer Awarded Project Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current fiinds of FOUR HUNDRED TWENTY TWO THOUSAND, 40 FOUR HUNDRED & EIGHTYONE Dollars (,$422,481). 41 Article 5. CONTRACT DOCUMENT5 42 5. ] CONTENTS: 43 A.The Contract Documents which comprise the entire agreement between Developer and 44 Contractor concerning the Work consist of the following: 45 L This Agreement. 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement 3) State and Federal documents (project specific) b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit h. MBE and/or SBE Commitment Form (If required) 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment or, 62 if not attached, as incorporated by reference and described in the Table of Contents 63 of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 67 68 69 70 71 72 73 74 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Transwestem Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105950 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 4 r� 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from aud against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification nrovision is snecificallv intended to operate and be effective even if it is alle�ed or nroven that all or some of the damages bein� sou�ht were caused. in whole or in nart, bv anv act, omission or ne�li�ence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its offcers, agents, employees, subcontractors, licensees or invitees under this contract. This indemni�cation provision is snecificallv intended to onerate and be effective even if it is alle�ed or nroven that all or some of the dama�es bein� sou�ht were caused. in whole or in part, bv anv act, omission or ne�ligence of the citv. Article 7. MISCELLANEOUS 97 7.1 Terms. 98 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the 99 Construction Contract for Developer Awarded Projects. 100 7.2 Assignment of Contract. 101 This Agreement, including all of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the Developer. 103 7.3 Successars and Assigns. 104 Developer and Contractor each binds itself, its partners, successors, assigns and legal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void ar 109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 110 remaining provisions shall continue to be valid and binding upon DEVELOPER and 111 CONTRACTOR. 112 7.5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of ll4 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Transwestem Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PR01ECT5 CPN: ] 05950 Revised June 16, 2016 08/26/202508/26/2025 00 61 25 - 1 CERTIFICATE OF INSURANCE Page 1 of 1 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised July 1, 2011 SECTION 00 61 251 CERTIFICATE OF INSURANCE2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 END OF SECTION22 00 62 19 - 1 MAINTENANCE BOND Page 1 of 3 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS CPN: 105950 Revised January 31, 2012 SECTION 00 62 19 1 MAINTENANCE BOND 2 3 THE STATE OF TEXAS § 4 § KNOW ALL BY THESE PRESENTS: 5 COUNTY OF TARRANT § 6 That we, Cadence McShane Construction Company, known as “Principal” herein and 7 ____________________________________________, a corporate surety (sureties, if more than 8 one) duly authorized to do business in the State of Texas, known as “Surety” herein (whether one 9 or more), are held and firmly bound unto the Developer, TDC Acquisitions, LLC, authorized to 10 do business in Texas (“Developer”) and the City of Fort Worth, a Texas municipal corporation 11 (“City”), in the sum of_FOUR HUNDRED TWENTY TWO THOUSALND, FOUR HUNDRED 12 & EIGHTY ONE Dollars ($422,481), lawful money of the United States, to be paid in Fort 13 Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the 14 Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, 15 executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 16 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities 19 Agreement, CFA Number 25-0084 ;and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer 21 awarded the_____ day of , 20 , which Contract is 22 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 23 materials, equipment labor and other accessories as defined by law, in the prosecution of the 24 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 25 the “Work”) as provided for in said Contract and designated as WATER, SANITARY SEWER, 26 AND STORM SEWER IMPROVEMENTS TO SERVE TRANSWESTERN WESTBEND 27 MERRIMAC; and 28 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 29 accordance with the plans, specifications and Contract Documents that the Work is and will 30 remain free from defects in materials or workmanship for and during the period of two (2) years 31 after the date of Final Acceptance of the Work by the City (“Maintenance Period”); and 32 33 Liberty Mutual Insurance Company 26th August 25 00 61 19 - 2 MAINTLNANCE BOND Pagc 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 r� �s 19 NOW THEREF�RE, the conditioii oftl�is obligation is such that if Principal shall reinedy any defective Work, for which timely notice was provided by City, to a cotnpletion satisfactory to the City, then this obligation shall beeame null and void; otherwise to remain in full force and effect. PROVIDED, HC}WEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may cause any and all such defective Work to be repaired and/ar reconstructed with all associated costs thereof being bornc by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that ,if any legal action be filed on this Bond, vernie shall lie in Tarrant County, Texas or the United States District Court for the Northem District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. ciTY oF FORT woRTx TTtANSYVF.STF_RrV WESTBEND MERRIMAC STANDARD CONSTRUC"CION SPECIFICA"I'ION DOCUMENTS CITY PROJECT NO. 105950 Revised December 8, 2023 26thAugust25 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 – Definitions and Terminology .......................................................................................................... 1  1.01 Defined Terms ............................................................................................................................... 1  1.02 Terminology .................................................................................................................................. 5  Article 2 – Preliminary Matters ......................................................................................................................... 6  2.01 Before Starting Construction ........................................................................................................ 6  2.02 Preconstruction Conference .......................................................................................................... 6  2.03 Public Meeting .............................................................................................................................. 6  Article 3 – Contract Documents and Amending ............................................................................................... 6  3.01 Reference Standards ..................................................................................................................... 6  3.02 Amending and Supplementing Contract Documents .................................................................. 6  Article 4 – Bonds and Insurance ....................................................................................................................... 7  4.01 Licensed Sureties and Insurers ..................................................................................................... 7  4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7  4.03 Certificates of Insurance ............................................................................................................... 7  4.04 Contractor’s Insurance .................................................................................................................. 9  4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12  Article 5 – Contractor’s Responsibilities ........................................................................................................ 12  5.01 Supervision and Superintendent ................................................................................................. 12  5.02 Labor; Working Hours ................................................................................................................ 13  5.03 Services, Materials, and Equipment ........................................................................................... 13  5.04 Project Schedule .......................................................................................................................... 14  5.05 Substitutes and “Or-Equals” ....................................................................................................... 14  5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16  5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16  5.08 Wage Rates.................................................................................................................................. 18  5.09 Patent Fees and Royalties ........................................................................................................... 19  5.10 Laws and Regulations ................................................................................................................. 19  5.11 Use of Site and Other Areas ....................................................................................................... 19  5.12 Record Documents ...................................................................................................................... 20  5.13 Safety and Protection .................................................................................................................. 21  5.14 Safety Representative ................................................................................................................. 21  5.15 Hazard Communication Programs ............................................................................................. 22  5.16 Submittals .................................................................................................................................... 22  5.17 Contractor’s General Warranty and Guarantee .......................................................................... 23  CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ........................................................................................................................... 24  5.19 Delegation of Professional Design Services .............................................................................. 24  5.20 Right to Audit: ............................................................................................................................ 25  5.21 Nondiscrimination....................................................................................................................... 25  Article 6 – Other Work at the Site ................................................................................................................... 26  6.01 Related Work at Site ................................................................................................................... 26  Article 7 – City’s Responsibilities................................................................................................................... 26  7.01 Inspections, Tests, and Approvals .............................................................................................. 26  7.02 Limitations on City’s Responsibilities ....................................................................................... 26  7.03 Compliance with Safety Program ............................................................................................... 27  Article 8 – City’s Observation Status During Construction ........................................................................... 27  8.01 City’s Project Representative ..................................................................................................... 27  8.02 Authorized Variations in Work .................................................................................................. 27  8.03 Rejecting Defective Work .......................................................................................................... 27  8.04 Determinations for Work Performed .......................................................................................... 28  Article 9 – Changes in the Work ..................................................................................................................... 28  9.01 Authorized Changes in the Work ............................................................................................... 28  9.02 Notification to Surety .................................................................................................................. 28  Article 10 – Change of Contract Price; Change of Contract Time ................................................................ 28  10.01 Change of Contract Price ............................................................................................................ 28  10.02 Change of Contract Time............................................................................................................ 28  10.03 Delays .......................................................................................................................................... 28  Article 11 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29  11.01 Notice of Defects ........................................................................................................................ 29  11.02 Access to Work ........................................................................................................................... 29  11.03 Tests and Inspections .................................................................................................................. 29  11.04 Uncovering Work ....................................................................................................................... 30  11.05 City May Stop the Work ............................................................................................................. 30  11.06 Correction or Removal of Defective Work ................................................................................ 30  11.07 Correction Period ........................................................................................................................ 30  11.08 City May Correct Defective Work ............................................................................................. 31  Article 12 – Completion .................................................................................................................................. 32  12.01 Contractor’s Warranty of Title ................................................................................................... 32  12.02 Partial Utilization ........................................................................................................................ 32  12.03 Final Inspection ........................................................................................................................... 32  12.04 Final Acceptance ......................................................................................................................... 33  Article 13 – Suspension of Work .................................................................................................................... 33  13.01 City May Suspend Work ............................................................................................................ 33  Article 14 – Miscellaneous .............................................................................................................................. 34  14.01 Giving Notice .............................................................................................................................. 34  CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times ................................................................................................................ 34  14.03 Cumulative Remedies ................................................................................................................. 34  14.04 Survival of Obligations ............................................................................................................... 35  14.05 Headings ...................................................................................................................................... 35  00 73 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 1 – DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw – City’s on-line, electronic document management and collaboration system. 5. Calendar Day – A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) -–A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract—The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents—Those items that make up the contract and which must include the Agreement, and it’s attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non-Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions l. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project’s Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor—The individual or entity with whom Developer has entered into the Agreement. 11. Day or day – A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer – An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance – The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 16. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements—A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non-Participating Change Order—A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order—A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans – See definition of Drawings. 24. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Time. 25. Project—The Work to be performed under the Contract Documents. 26. Project Representative—The authorized representative of the City who will be assigned to the Site. 27. Public Meeting – An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 30. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site—Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions – That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent – The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions—That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 00 73 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 41. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non-Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day – A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City’s written acceptance. C. Furnish, Install, Perform, Provide: 1. The word “Furnish” or the word “Install” or the word “Perform” or the word “Provide” or the word “Supply,” or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 2 – PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non- Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 – CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non-Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 00 73 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. City’s or Engineer’s review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City’s written interpretation or clarification. ARTICLE 4 – BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor’s obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 00 73 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. The certificate of insurance shall document the City, an as “Additional Insured” on all liability policies. 2. The Contractor’s general liability insurance shall include a, “per project” or “per location”, endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers’ compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the “occurrence basis”. If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage’s and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor’s insurance. 4.04 Contractor’s Insurance A. Workers Compensation and Employers’ Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers’ Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers’ Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor’s performance of the Work and Contractor’s other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers’ compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor’s employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment – Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U” coverage’s. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on “any auto”, defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor’s Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor’s construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: ____________________________________________________________ Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a “Right of Entry Agreement” with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor’s use of private and/or construction access roads crossing said railroad company’s properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor’s operations and work cross, occupy, or touch railroad property: a. General Aggregate: _____________________________________ Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence: : _____________________________________ Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- None None None 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company’s right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company’s right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company’s property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor’s beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 – CONTRACTOR’S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor’s representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City’s written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and “Or-Equals” A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or-equal” item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. “Or-Equal” Items: If in City’s sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an “or-equal” item, in which case review and approval of the proposed item may, in City’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City’s sole discretion an item of material or equipment proposed by Contractor does not qualify as an “or-equal” item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor’s achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City’s Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No “or-equal” or substitute will be ordered, installed or utilized until City’s review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an “or-equal.” City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor’s expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City’s Cost Reimbursement: City will record City’s costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute or “or-equal” at Contractor’s expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Required for this Contract. (Check this box if there is any City Participation) Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City’s MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor’s own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract x 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates Required for this Contract. Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City’s determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and x 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor’s compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor’s responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor’s obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City’s safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor’s safety program, if any, with which City’s employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor’s duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor’s designated safety representative at the Site. 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City’s review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City’s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City’s review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2. City’s review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City’s review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor’s General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor’s warranty and guarantee. B. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor’s obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor’s obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor’s responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to City. 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City’s review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City’s review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 6 – OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City’s employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City’s employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor’s Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor’s Work. Contractor’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor’s Work except for latent defects in the work provided by others. ARTICLE 7 – CITY’S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City’s responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City’s Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor’s failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7.03 Compliance with Safety Program While at the Site, City’s employees and representatives shall comply with the specific applicable requirements of Contractor’s safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City’s Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City’s representative during construction are set forth in the Contract Documents. A. City’s Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor’s executed Work. Based on information obtained during such visits and observations, City’s Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City’s Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City’s Project Representative’s efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City’s Project Representative’s visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City’s Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City’s Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City’s Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City’s written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 – CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor’s responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 11 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City’s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory (“Testing Lab”) to perform any inspections or tests (“Testing”) for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a “fail”, “did not pass” or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor’s cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City’s observation and replaced at Contractor’s expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City’s special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor’s use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City’s written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City’s written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor’s obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 stored elsewhere. Contractor shall allow City, City’s representatives, agents, consultants, employees, and City’s other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City’s rights and remedies under this Paragraph 11.09. ARTICLE 12 – COMPLETION 12.01 Contractor’s Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor’s performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City’s satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor’s insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 – SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 – MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. 01 11 00 - 1 DAP SUMMARY OF WORK Page 1 of 3 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects CPN: 105950 Revised December 20, 2012 SECTION 01 11 001 SUMMARY OF WORK2 PART 1 -GENERAL3 1.1 SUMMARY4 A.Section Includes:5 1.Summary of Work to be performed in accordance with the Contract Documents6 B.Deviations from this City of Fort Worth Standard Specification7 1. None.8 C.Related Specification Sections include, but are not necessarily limited to:9 1.Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract10 2.Division 1 - General Requirements11 1.2 PRICE AND PAYMENT PROCEDURES12 A.Measurement and Payment13 1.Work associated with this Item is considered subsidiary to the various items bid.14 No separate payment will be allowed for this Item.15 1.3 REFERENCES [NOT USED]16 1.4 ADMINISTRATIVE REQUIREMENTS17 A.Work Covered by Contract Documents18 1.Work is to include furnishing all labor, materials, and equipment, and performing19 all Work necessary for this construction project as detailed in the Drawings and20 Specifications.21 B.Subsidiary Work22 1.Any and all Work specifically governed by documentary requirements for the23 project, such as conditions imposed by the Drawings or Contract Documents in24 which no specific item for bid has been provided for in the Proposal and the item is25 not a typical unit bid item included on the standard bid item list, then the item shall26 be considered as a subsidiary item of Work, the cost of which shall be included in27 the price bid in the Proposal for various bid items.28 C.Use of Premises29 1.Coordinate uses of premises under direction of the City.30 2.Assume full responsibility for protection and safekeeping of materials and31 equipment stored on the Site.32 3.Use and occupy only portions of the public streets and alleys, or other public places33 or other rights-of-way as provided for in the ordinances of the City, as shown in the34 Contract Documents, or as may be specifically authorized in writing by the City.35 a.A reasonable amount of tools, materials, and equipment for construction36 purposes may be stored in such space, but no more than is necessary to avoid37 delay in the construction operations.38 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects CPN: 105950 Revised December 20, 2012 b.Excavated and waste materials shall be stored in such a way as not to interfere1 with the use of spaces that may be designated to be left free and unobstructed2 and so as not to inconvenience occupants of adjacent property.3 c.If the street is occupied by railroad tracks, the Work shall be carried on in such4 manner as not to interfere with the operation of the railroad.5 1)All Work shall be in accordance with railroad requirements set forth in6 Division 0 as well as the railroad permit.7 D.Work within Easements8 1.Do not enter upon private property for any purpose without having previously9 obtained permission from the owner of such property.10 2.Do not store equipment or material on private property unless and until the11 specified approval of the property owner has been secured in writing by the12 Contractor and a copy furnished to the City.13 3.Unless specifically provided otherwise, clear all rights-of-way or easements of14 obstructions which must be removed to make possible proper prosecution of the15 Work as a part of the project construction operations.16 4.Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,17 lawns, fences, culverts, curbing, and all other types of structures or improvements,18 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or19 appurtenances thereof, including the construction of temporary fences and to all20 other public or private property adjacent to the Work.21 5.Notify the proper representatives of the owners or occupants of the public or private22 lands of interest in lands which might be affected by the Work.23 a.Such notice shall be made at least 48 hours in advance of the beginning of the24 Work.25 b.Notices shall be applicable to both public and private utility companies and any26 corporation, company, individual, or other, either as owners or occupants,27 whose land or interest in land might be affected by the Work.28 c.Be responsible for all damage or injury to property of any character resulting29 from any act, omission, neglect, or misconduct in the manner or method or30 execution of the Work, or at any time due to defective work, material, or31 equipment.32 6.Fence33 a.Restore all fences encountered and removed during construction of the Project34 to the original or a better than original condition.35 b.Erect temporary fencing in place of the fencing removed whenever the Work is36 not in progress and when the site is vacated overnight, and/or at all times to37 provide site security.38 c.The cost for all fence work within easements, including removal, temporary39 closures and replacement, shall be subsidiary to the various items bid in the40 project proposal, unless a bid item is specifically provided in the proposal.41 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects CPN: 105950 Revised December 20, 2012 1.5 SUBMITTALS [NOT USED]1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]2 1.7 CLOSEOUT SUBMITTALS [NOT USED]3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]4 1.9 QUALITY ASSURANCE [NOT USED]5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]6 1.11 FIELD [SITE] CONDITIONS [NOT USED]7 1.12 WARRANTY [NOT USED]8 PART 2 -PRODUCTS [NOT USED]9 PART 3 -EXECUTION [NOT USED]10 END OF SECTION11 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 1 SUBMITTALS Page 1 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 SECTION 01 33 00 SUBMITTALS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. General methods and requirements of submissions applicable to the following Work-related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 2 SUBMITTALS Page 2 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) “By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 3 SUBMITTALS Page 3 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City’s Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City’s Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 4 SUBMITTALS Page 4 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 7) Standard wiring diagrams 8) Printed performance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City’s Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 5 SUBMITTALS Page 5 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 6 SUBMITTALS Page 6 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non-conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor’s risk if not marked b. Submittals for each item will be reviewed no more than twice at the City’s expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative’s then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City’s discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 7 SUBMITTALS Page 7 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with “RFI” followed by series number, “-xxx”, beginning with “01” and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] Transwestern Westbend Merrimac CPN: 105950 01 33 00 - 8 SUBMITTALS Page 8 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days Transwestern Westbend Merrimac CPN: 105950 01 35 13 - 1 SPECIAL PROJECT PROCEDURES Page 1 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 SECTION 01 35 131 SPECIAL PROJECT PROCEDURES2 PART 1 -GENERAL3 1.1 SUMMARY4 A.Section Includes:5 1.The procedures for special project circumstances that includes, but is not limited to:6 a.Coordination with the Texas Department of Transportation7 b.Work near High Voltage Lines8 c.Confined Space Entry Program9 d.Use of Explosives, Drop Weight, Etc.10 e.Water Department Notification11 f.Public Notification Prior to Beginning Construction12 g.Coordination with United States Army Corps of Engineers13 h.Coordination within Railroad permits areas14 i.Dust Control15 j.Employee Parking16 B.Deviations from this City of Fort Worth Standard Specification17 1.None.18 C.Related Specification Sections include, but are not necessarily limited to:19 1.Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract20 2.Division 1 – General Requirements21 3.Section 33 12 25 – Connection to Existing Water Mains22 1.2 PRICE AND PAYMENT PROCEDURES23 A.Measurement and Payment24 1.Coordination within Railroad permit areas25 a.Measurement26 1)Measurement for this Item will be by lump sum.27 b.Payment28 1)The work performed and materials furnished in accordance with this Item29 will be paid for at the lump sum price bid for Railroad Coordination.30 c.The price bid shall include:31 1)Mobilization32 2)Inspection33 3)Safety training34 4)Additional Insurance35 5)Insurance Certificates36 6)Other requirements associated with general coordination with Railroad,37 including additional employees required to protect the right-of-way and38 property of the Railroad from damage arising out of and/or from the39 construction of the Project.40 2.Railroad Flagmen41 a.Measurement42 01 35 13 - 2 SPECIAL PROJECT PROCEDURES Page 2 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 1)Measurement for this Item will be per working day.1 b.Payment2 1)The work performed and materials furnished in accordance with this Item3 will be paid for each working day that Railroad Flagmen are present at the4 Site.5 c.The price bid shall include:6 1)Coordination for scheduling flagmen7 2)Flagmen8 3)Other requirements associated with Railroad9 3.All other items10 a.Work associated with these Items is considered subsidiary to the various Items11 bid. No separate payment will be allowed for this Item.12 1.3 REFERENCES13 A.Reference Standards14 1.Reference standards cited in this Specification refer to the current reference15 standard published at the time of the latest revision date logged at the end of this16 Specification, unless a date is specifically cited.17 2.Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.18 High Voltage Overhead Lines.19 1.4 ADMINISTRATIVE REQUIREMENTS20 A.Coordination with the Texas Department of Transportation21 1.When work in the right-of-way which is under the jurisdiction of the Texas22 Department of Transportation (TxDOT):23 a.Notify the Texas Department of Transportation prior to commencing any work24 therein in accordance with the provisions of the permit25 b.All work performed in the TxDOT right-of-way shall be performed in26 compliance with and subject to approval from the Texas Department of27 Transportation28 B.Work near High Voltage Lines29 1.Regulatory Requirements30 a.All Work near High Voltage Lines (more than 600 volts measured between31 conductors or between a conductor and the ground) shall be in accordance with32 Health and Safety Code, Title 9, Subtitle A, Chapter 752.33 2.Warning sign34 a.Provide sign of sufficient size meeting all OSHA requirements.35 3.Equipment operating within 10 feet of high voltage lines will require the following36 safety features37 a.Insulating cage-type of guard about the boom or arm38 b.Insulator links on the lift hook connections for back hoes or dippers39 c.Equipment must meet the safety requirements as set forth by OSHA and the40 safety requirements of the owner of the high voltage lines41 4.Work within 6 feet of high voltage electric lines42 a.Notification shall be given to:43 1)The power company (example: ONCOR)44 01 35 13 - 3 SPECIAL PROJECT PROCEDURES Page 3 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 a)Maintain an accurate log of all such calls to power company and record1 action taken in each case.2 b.Coordination with power company3 1)After notification coordinate with the power company to:4 a)Erect temporary mechanical barriers, de-energize the lines, or raise or5 lower the lines6 c.No personnel may work within 6 feet of a high voltage line before the above7 requirements have been met.8 C.Confined Space Entry Program9 1.Provide and follow approved Confined Space Entry Program in accordance with10 OSHA requirements.11 2.Confined Spaces include:12 a.Manholes13 b.All other confined spaces in accordance with OSHA’s Permit Required for14 Confined Spaces15 D.TCEQ Air Permit16 1.Obtain TCEQ Air Permit for construction activities per requirements of TCEQ.17 E.Use of Explosives, Drop Weight, Etc.18 1.When Contract Documents permit on the project the following will apply:19 a.Public Notification20 1)Submit notice to City and proof of adequate insurance coverage, 24 hours21 prior to commencing.22 2)Minimum 24 hour public notification in accordance with Section 01 31 1323 F.Water Department Coordination24 1.During the construction of this project, it will be necessary to deactivate, for a25 period of time, existing lines. The Contractor shall be required to coordinate with26 the Water Department to determine the best times for deactivating and activating27 those lines.28 2.Coordinate any event that will require connecting to or the operation of an existing29 City water line system with the City’s representative.30 a.Coordination shall be in accordance with Section 33 12 25.31 b.If needed, obtain a hydrant water meter from the Water Department for use32 during the life of named project.33 c.In the event that a water valve on an existing live system be turned off and on34 to accommodate the construction of the project is required, coordinate this35 activity through the appropriate City representative.36 1)Do not operate water line valves of existing water system.37 a)Failure to comply will render the Contractor in violation of Texas Penal38 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor39 will be prosecuted to the full extent of the law.40 b)In addition, the Contractor will assume all liabilities and41 responsibilities as a result of these actions.42 G.Public Notification Prior to Beginning Construction43 01 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 1.Prior to beginning construction on any block in the project, on a block by block1 basis, prepare and deliver a notice or flyer of the pending construction to the front2 door of each residence or business that will be impacted by construction. The notice3 shall be prepared as follows:4 a.Post notice or flyer and City of Fort Worth Door Hangers, 7 days prior to5 beginning any construction activity on each block in the project area.6 1)Prepare flyer on the Contractor’s letterhead and include the following7 information:8 a)Name of Project9 b)City Project No (CPN)10 c)Scope of Project (i.e. type of construction activity)11 d)Actual construction duration within the block12 e)Name of the contractor’s foreman and phone number13 f)Name of the City’s inspector and phone number14 g)City’s after-hours phone number15 2)A sample of the ‘pre-construction notification’ flyer is attached as Exhibit16 A.17 3)City of Fort Worth Door Hangers will be provided to the Contractor for18 distribution with their notice.19 4)Submit schedule showing the construction start and finish time for each20 block of the project to the inspector.21 5)Deliver flyer to the City Inspector for review prior to distribution.22 b.No construction will be allowed to begin on any block until the flyer and door23 hangers are delivered to all residents of the block.24 H.Public Notification of Temporary Water Service Interruption during Construction25 1.In the event it becomes necessary to temporarily shut down water service to26 residents or businesses during construction, prepare and deliver a notice or flyer of27 the pending interruption to the front door of each affected resident.28 2.Prepared notice as follows:29 a.The notification or flyer shall be posted 24 hours prior to the temporary30 interruption.31 b.Prepare flyer on the contractor’s letterhead and include the following32 information:33 1)Name of the project34 2)City Project Number35 3)Date of the interruption of service36 4)Period the interruption will take place37 5)Name of the contractor’s foreman and phone number38 6)Name of the City’s inspector and phone number39 c.A sample of the temporary water service interruption notification is attached as40 Exhibit B.41 d.Deliver a copy of the temporary interruption notification to the City inspector42 for review prior to being distributed.43 e.No interruption of water service can occur until the flyer has been delivered to44 all affected residents and businesses.45 f.Electronic versions of the sample flyers can be obtained from the Project46 Construction Inspector.47 I.Coordination with United States Army Corps of Engineers (USACE)48 01 35 13 - 5 SPECIAL PROJECT PROCEDURES Page 5 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 1.At locations in the Project where construction activities occur in areas where1 USACE permits are required, meet all requirements set forth in each designated2 permit.3 J.Coordination within Railroad Permit Areas4 1.At locations in the project where construction activities occur in areas where5 railroad permits are required, meet all requirements set forth in each designated6 railroad permit. This includes, but is not limited to, provisions for:7 a.Flagmen8 b.Inspectors9 c.Safety training10 d.Additional insurance11 e.Insurance certificates12 f.Other employees required to protect the right-of-way and property of the13 Railroad Company from damage arising out of and/or from the construction of14 the project. Proper utility clearance procedures shall be used in accordance15 with the permit guidelines.16 2.Obtain any supplemental information needed to comply with the railroad’s17 requirements.18 3.Railroad Flagmen19 a.Submit receipts to City for verification of working days that railroad flagmen20 were present on Site.21 K.Dust Control22 1.Use acceptable measures to control dust at the Site.23 a.If water is used to control dust, capture and properly dispose of waste water.24 b.If wet saw cutting is performed, capture and properly dispose of slurry.25 L.Employee Parking26 1.Provide parking for employees at locations approved by the City.27 01 35 13 - 6 SPECIAL PROJECT PROCEDURES Page 6 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 1.5 SUBMITTALS [NOT USED]1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]2 1.7 CLOSEOUT SUBMITTALS [NOT USED]3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]4 1.9 QUALITY ASSURANCE [NOT USED]5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]6 1.11 FIELD [SITE] CONDITIONS [NOT USED]7 1.12 WARRANTY [NOT USED]8 PART 2 -PRODUCTS [NOT USED]9 PART 3 -EXECUTION [NOT USED]10 END OF SECTION11 12 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.4.B – Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E – Added Contractor responsibility for obtaining a TCEQ Air Permit 3/11/2022 M Owen Remove references to Air Pollution watch Days and NCTCOG Clean construction Specification requirements. Clarify need for Door Hangers under in addition to contractor notification of public. 13 01 35 13 - 7 SPECIAL PROJECT PROCEDURES Page 7 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 EXHIBIT A1 (To be printed on Contractor’s Letterhead)2 3 4 5 Date:6 7 CPN No.:8 Project Name:9 Mapsco Location:10 Limits of Construction:11 12 13 14 15 16 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT17 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR18 PROPERTY.19 20 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE21 OF THIS NOTICE.22 23 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER24 ISSUE, PLEASE CALL:25 26 27 Mr. <CONTRACTOR’S SUPERINTENDENT > AT <TELEPHONE NO.>28 29 OR30 31 Mr. <CITY INSPECTOR> AT <TELEPHONE NO.>32 33 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 830634 35 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL36 37 01 35 13 - 8 SPECIAL PROJECT PROCEDURES Page 8 of 8 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised March 11, 2022 EXHIBIT B1 2 3 4 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 01 55 26 - 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 22, 2021 SECTION 01 55 26 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes : 5 1. Administrative procedures for: 6 a. Street Use Permit 7 b. Modification of approved traffic control 8 c. Removal of Street Signs 9 B. Deviations from this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sectio ns include, but are not necessarily limited to: 12 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 13 2. Division 1 – General Requirements 14 3. Section 34 71 13 – Traffic Control 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is consid ered subsidiary to the various Items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Reference Standards 21 1. Reference standards cited in this specification refer to the current reference standard 22 published at the time of the latest revision date logged at the end of this 23 specification, unless a date is specifically cited. 24 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 25 1.4 ADMINISTRATIVE REQUI REMENTS 26 A. Traffic Control 27 1. General 28 a. Contractor shall minimize lane closures and impact to vehicular/pedestrian 29 traffic. 30 b. When traffic control plans are included in the Drawings , provide Traffic 31 Control in accordance with Drawings and Section 34 71 13. 32 c. When traffic control plans are not included in the Drawings , prepare traffic 33 control plans in accordance with Section 34 71 13 and submit to City for 34 review. 35 1) Allow minimum 10 working days for review of proposed Traffic Control. 36 Transwestern Westbend Merrimac CPN: 105950 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 22, 2021 2) A t raffic control “Typical” published by City of Fort Worth, the Texas 1 Manual Unified Traffic Control Devices (TMUTCD) or Texas Department 2 of Transportation (TxDOT) can be used as an alternative to preparing 3 project/site specific traffic control plan if the typical is applicable to the 4 specific project/site. 5 B. Street Use Permit 6 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 7 a. To obtain Street Use Permit, s ubmit Traffic Control Plans to City 8 Transportation and Public Works Department. 9 1) Allow a minimum of 5 working days for permit review. 10 2) It is the Contractor’s responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 C. Modification to Approved Traffic Control 13 1. Prior to installation traffic control: 14 a. Submit revised traffic control plans to City Department Transportation and 15 Public Works Department. 16 1) Revise Traffic Control plans in accordance with Section 34 71 13. 17 2) Allow minimum 5 working days for review of revised Traffic Control. 18 3) It is the Contractor’s responsibility to coordinate review of Traffic Control 19 plans for Street Use Permit, such that construction is not delayed. 20 D. Removal of Street Sign 21 1. If it is determined that a street sign must be removed for construction, then contact 22 City Transportation and Public Works Department, Signs and Markings Division to 23 remove the sign. 24 E. Temporary Signage 25 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 26 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 27 Devices (MUTCD). 28 2. Install temporary sign before the removal of permanent sign. 29 3. When construction is complete, to the extent that the permanent sign can be 30 reinstalled, contact the City Transportation and Public Works Department, Signs 31 and Markings Division, to reinstall the permanent sign. 32 F. Traffic Control Standards 33 1. Traffic Control Standards can be found on the City’s website. 34 1.5 SUBMITTALS [NOT USED] 35 A. Submit all required documentation to City’s Project Representative. 36 Transwestern Westbend Merrimac CPN: 105950 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 22, 2021 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTA LS [NOT USED] 1 1.7 CLOSEOUT SUBMITTALS [NOT USED] 2 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 3 1.9 QUALITY ASSURANCE [NOT USED] 4 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 5 1.11 FIELD [SITE] CONDITIONS [NOT USED] 6 1.12 WARRANTY [NOT USED] 7 PART 2 - PRODUCTS [NOT USED ] 8 PART 3 - EXECUTION [NOT USED ] 9 END OF SECTION 10 11 Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 1.4 A. Added language to emphasize minimizing of lane closures and impact to traffic. 1.4 A. 1. c. Added language to allow for use of published traffic control “Typicals” if applicable to specific project/site. 1.4 F. 1) Removed reference to Buzzsaw 1.5 Added language re : submittal of permit 12 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised November 22, 2016 SECTION 01 70 001 MOBILIZATION AND REMOBILIZATION2 PART 1 -GENERAL3 1.1 SUMMARY4 A.Section Includes:5 1.Mobilization and Demobilization6 a.Mobilization7 1)Transportation of Contractor’s personnel, equipment, and operating supplies8 to the Site9 2)Establishment of necessary general facilities for the Contractor’s operation10 at the Site11 3)Premiums paid for performance and payment bonds12 4)Transportation of Contractor’s personnel, equipment, and operating supplies13 to another location within the designated Site14 5)Relocation of necessary general facilities for the Contractor’s operation15 from 1 location to another location on the Site.16 b.Demobilization17 1)Transportation of Contractor’s personnel, equipment, and operating supplies18 away from the Site including disassembly19 2)Site Clean-up20 3)Removal of all buildings and/or other facilities assembled at the Site for this21 Contract22 c.Mobilization and Demobilization do not include activities for specific items of23 work that are for which payment is provided elsewhere in the contract.24 2.Remobilization25 a.Remobilization for Suspension of Work specifically required in the Contract26 Documents or as required by City includes:27 1)Demobilization28 a)Transportation of Contractor’s personnel, equipment, and operating29 supplies from the Site including disassembly or temporarily securing30 equipment, supplies, and other facilities as designated by the Contract31 Documents necessary to suspend the Work.32 b)Site Clean-up as designated in the Contract Documents33 2)Remobilization34 a)Transportation of Contractor’s personnel, equipment, and operating35 supplies to the Site necessary to resume the Work.36 b)Establishment of necessary general facilities for the Contractor’s37 operation at the Site necessary to resume the Work.38 3)No Payments will be made for:39 a)Mobilization and Demobilization from one location to another on the40 Site in the normal progress of performing the Work.41 b)Stand-by or idle time42 c)Lost profits43 3.Mobilizations and Demobilization for Miscellaneous Projects44 a.Mobilization and Demobilization45 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised November 22, 2016 1)Mobilization shall consist of the activities and cost on a Work Order basis1 necessary for:2 a)Transportation of Contractor’s personnel, equipment, and operating3 supplies to the Site for the issued Work Order.4 b)Establishment of necessary general facilities for the Contractor’s5 operation at the Site for the issued Work Order6 2)Demobilization shall consist of the activities and cost necessary for:7 a)Transportation of Contractor’s personnel, equipment, and operating8 supplies from the Site including disassembly for each issued Work9 Order10 b)Site Clean-up for each issued Work Order11 c)Removal of all buildings or other facilities assembled at the Site for12 each Work Oder13 b.Mobilization and Demobilization do not include activities for specific items of14 work for which payment is provided elsewhere in the contract.15 4.Emergency Mobilizations and Demobilization for Miscellaneous Projects16 a.A Mobilization for Miscellaneous Projects when directed by the City and the17 mobilization occurs within 24 hours of the issuance of the Work Order.18 B.Deviations from this City of Fort Worth Standard Specification19 1.None.20 C.Related Specification Sections include, but are not necessarily limited to:21 1.Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract22 2.Division 1 – General Requirements23 1.2 PRICE AND PAYMENT PROCEDURES24 A.Measurement and Payment [Consult City Department/Division for direction on if25 Mobilization pay item to be included or the item should be subsidiary. Include the26 appropriate Section 1.2 A. 1.]27 1.Mobilization and Demobilization28 a.Measure29 1)This Item is considered subsidiary to the various Items bid.30 b.Payment31 1)The work performed and materials furnished in accordance with this Item32 are subsidiary to the various Items bid and no other compensation will be33 allowed.34 2.Remobilization for suspension of Work as specifically required in the Contract35 Documents36 a.Measurement37 1)Measurement for this Item shall be per each remobilization performed.38 b.Payment39 1)The work performed and materials furnished in accordance with this Item40 and measured as provided under “Measurement” will be paid for at the unit41 price per each “Specified Remobilization” in accordance with Contract42 Documents.43 c.The price shall include:44 1)Demobilization as described in Section 1.1.A.2.a.1)45 2)Remobilization as described in Section 1.1.A.2.a.2)46 01 70 00 - 3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised November 22, 2016 d.No payments will be made for standby, idle time, or lost profits associated this1 Item.2 3.Remobilization for suspension of Work as required by City3 a.Measurement and Payment4 1)This shall be submitted as a Contract Claim in accordance with Article 105 of Section 00 72 00.6 2)No payments will be made for standby, idle time, or lost profits associated7 with this Item.8 4.Mobilizations and Demobilizations for Miscellaneous Projects9 a.Measurement10 1)Measurement for this Item shall be for each Mobilization and11 Demobilization required by the Contract Documents12 b.Payment13 1)The Work performed and materials furnished in accordance with this Item14 and measured as provided under “Measurement” will be paid for at the unit15 price per each “Work Order Mobilization” in accordance with Contract16 Documents. Demobilization shall be considered subsidiary to mobilization17 and shall not be paid for separately.18 c.The price shall include:19 1)Mobilization as described in Section 1.1.A.3.a.1)20 2)Demobilization as described in Section 1.1.A.3.a.2)21 d.No payments will be made for standby, idle time, or lost profits associated this22 Item.23 5.Emergency Mobilizations and Demobilizations for Miscellaneous Projects24 a.Measurement25 1)Measurement for this Item shall be for each Mobilization and26 Demobilization required by the Contract Documents27 b.Payment28 1)The Work performed and materials furnished in accordance with this Item29 and measured as provided under “Measurement” will be paid for at the unit30 price per each “Work Order Emergency Mobilization” in accordance with31 Contract Documents. Demobilization shall be considered subsidiary to32 mobilization and shall not be paid for separately.33 c.The price shall include34 1)Mobilization as described in Section 1.1.A.4.a)35 2)Demobilization as described in Section 1.1.A.3.a.2)36 d.No payments will be made for standby, idle time, or lost profits associated this37 Item.38 1.3 REFERENCES [NOT USED]39 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]40 1.5 SUBMITTALS [NOT USED]41 1.6 INFORMATIONAL SUBMITTALS [NOT USED]42 1.7 CLOSEOUT SUBMITTALS [NOT USED]43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]44 01 70 00 - 4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised November 22, 2016 1.9 QUALITY ASSURANCE [NOT USED]1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]2 1.11 FIELD [SITE] CONDITIONS [NOT USED]3 1.12 WARRANTY [NOT USED]4 PART 2 -PRODUCTS [NOT USED]5 PART 3 -EXECUTION [NOT USED]6 END OF SECTION7 8 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. 9 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 01 77 19 - 1 CLOSEOUT REQUIREMENTS Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 22, 2021 SECTION 01 77 19 1 CLOSEOUT REQUIREMENTS 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes : 5 1. The procedure for closing out a contract 6 B. Deviations from this City of Fort Worth Standard Specification 7 1. None. 8 C. Related Specification Sections include, but are not necessarily limited to: 9 1. Division 0 – Biddin g Requirements, Contract Forms and Conditions of the Contract 10 2. Division 1 – General Requirements 11 1.2 PRICE AND PAYMENT PROCEDURES 12 A. Measurement and Payment 13 1. Work associated with this Item is considered subsidiary to the various Items bid. 14 No separate payment will be allowed for this I tem. 15 1.3 REFERENCES [NOT USED] 16 1.4 ADMINISTRATIVE REQUI REMENTS 17 A. Guarantees, Bonds and Affidavits 18 1. No application for final payment will be accepted until all guarantees, bonds, 19 certificates, licenses and affidavits required for Work or equipment as specified are 20 satisfactorily filed with the City. 21 B. Release of Liens or Claims 22 1. No application for final payment will be accepted until satisfactory evidence of 23 release of liens has been submitted to the City. 24 1.5 SUBMITTALS 25 A. Submit all required documentation to City’s Project Representative. 26 27 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 28 29 1.7 CLOSEOUT SUBMITTALS [NOT USED] 30 PART 2 - PRODUCTS [NOT USED] 31 32 Transwestern Westbend Merrimac CPN: 105950 01 77 19 - 2 CLOSEOUT REQUIREMENTS Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 22, 2021 PART 3 - EXECUTION 1 3.1 INSTALLERS [NOT USED] 2 3.2 EXAMINATION [NOT USED] 3 3.3 PREPARATION [NOT USED] 4 3.4 CLOSEOUT PROCEDURE 5 A. Prior to requesting Final Inspection, submit: 6 1. Project Record Documents in accordance with Section 01 78 39 7 2. Operation and Maintenance Data, if required, in a ccordance with Section 01 78 23 8 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 9 01 74 23. 10 C. Final Inspection 11 1. After final cleaning, provide notice to the City Project Representative that the Work 12 is completed. 13 a. The City will make an init ial Final Inspection with the Contractor present. 14 b. Upon completion of this inspection, the City will notify the Contractor, in 15 writing within 10 business days, of any particulars in which this inspection 16 reveals that the Work is defective or incomplete. 17 2. Upon receiving written notice from the City, immediately undertake the Work 18 required to remedy deficiencies and complete the Work to the satisfaction of the 19 City. 20 3. The Right-of-way shall be cleared of all construction materials, barricades, and 21 temporary signage. 22 4. Upon completion of Work associated with the items listed in the City's written 23 notice, inform the City that the required Work has been completed. Upon receipt of 24 this notice, the City, in the presence of the Contractor, will make a subsequent Final 25 Inspection of the project. 26 5. Provide all special accessories required to place each item of equipment in full 27 operation. These special accessory items include, but are not limited to: 28 a. Specified spare parts 29 b. Adequate oil and grease as required for the first lubrication of the equipment 30 c. Initial fill up of all chemical tanks and fuel tanks 31 d. Light bulbs 32 e. Fuses 33 f. Vault keys 34 g. Handwheels 35 h. Other expendable items as required for initial start-up and operation of all 36 equipment 37 D. Notice of Project Completion 38 1. Once the City Project Representative find s the Work subsequent to Final Inspection 39 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 40 E. Supporting Documentation 41 Transwestern Westbend Merrimac CPN: 105950 01 77 19 - 3 CLOSEOUT REQUIREMENTS Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 22, 2021 1. Coordinate with the City Project Representative to complete the following 1 additional forms: 2 a. Final Payment Request 3 b. Statement of Contract Time 4 c. Affidavit of Payment and Release of Liens 5 d. Consent of Surety to Final Payment 6 e. Pipe Report (if required) 7 f. Contractor’s Evaluation of City 8 g. Performance Evaluation of Contractor 9 F. Letter of Final Acceptance 10 1. Upon review and acceptance of Notice of Project Completion and Supporting 11 Documentation, in accordance with General Conditions, City will issue Letter of 12 Final Acceptance and release the Final Payment Request for payment. 13 3.5 REPAIR / RESTORATION [NOT USED] 14 3.6 RE-INSTALLATION [NOT USED] 15 3.7 FIELD [OR] SITE QUALITY CONTR OL [NOT USED] 16 3.8 SYSTEM STARTUP [NOT USED] 17 3.9 ADJUSTING [NOT USED] 18 3.10 CLEANING [NOT USED] 19 3.11 CLOSEOUT ACTIVITIES [NOT USED] 20 3.12 PROTECTION [NOT USED] 21 3.13 MAINTENANCE [NOT USED] 22 3.14 ATTACHMENTS [NOT USED] 23 END OF SECTION 24 25 Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 3.4 C. Added language to clarify and emphasize requirement to “Clearing ROW” 26 Transwestern Westbend Merrimac CPN: 105950 01 71 23 - 1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Project Name  City Project No. xxxxx Revised February 14, 2018 SECTION 01 71 23 1 CONSTRUCTION STAKING AND SURVEY 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes:5 1. Requirements for construction staking and construction survey6 B. Deviations from this City of Fort Worth Standard Specification7 1. See Changes (Highlighted in Yellow).8 C. Related Specification Sections include, but are not necessarily limited to:9 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract10 2. Division 1 – General Requirements11 1.2 PRICE AND PAYMENT PROCEDURES 12 A. Measurement and Payment13 1. Construction Staking14 a. Measurement15 1) This Item is considered subsidiary to the various Items bid.16 b. Payment17 1) The work performed and the materials furnished in accordance with this18 Item are subsidiary to the various Items bid and no other compensation will19 be allowed.20 2. Construction Survey21 a. Measurement22 1) This Item is considered subsidiary to the various Items bid.23 b. Payment24 1) The work performed and the materials furnished in accordance with this25 Item are subsidiary to the various Items bid and no other compensation will be26 allowed.27 3. As-Built Survey28 a. Measurement29 1) This Item is considered subsidiary to the various Items bid.30 b. Payment31 1) The work performed and the materials furnished in accordance with this32 Item are subsidiary to the various Items bid and no other compensation will be33 allowed.34 35 36 37 38 39 40 Transwestern Westbend Merrimac CPN: 105950 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1.3 REFERENCES 1 A. Definitions2 1. Construction Survey - The survey measurements made prior to or while3 construction is in progress to control elevation, horizontal position, dimensions and4 configuration of structures/improvements included in the Project Drawings.5 2. As-built Survey –The measurements made after the construction of the6 improvement features are complete to provide position coordinates for the features7 of a project.8 3. Construction Staking – The placement of stakes and markings to provide offsets9 and elevations to cut and fill in order to locate on the ground the designed10 structures/improvements included in the Project Drawings. Construction staking11 shall include staking easements and/or right of way if indicated on the plans.12 4. Survey “Field Checks” – Measurements made after construction staking is13 completed and before construction work begins to ensure that structures marked on14 the ground are accurately located per Project Drawings.15 B. Technical References16 1. City of Fort Worth – Construction Staking Standards (available on City’s Buzzsaw17 website) – 01 71 23.16.01_ Attachment A_Survey Staking Standards18 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available19 on City’s Buzzsaw website).20 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision21 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land22 Surveying in the State of Texas, Category 523 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. The Contractor’s selection of a surveyor must comply with Texas Government26 Code 2254 (qualifications based selection) for this project.27 1.5 SUBMITTALS 28 A. Submittals, if required, shall be in accordance with Section 01 33 00.29 B. All submittals shall be received and reviewed by the City prior to delivery of work.30 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 31 A. Field Quality Control Submittals32 1. Documentation verifying accuracy of field engineering work, including coordinate33 conversions if plans do not indicate grid or ground coordinates.34 2. Submit “Cut-Sheets” conforming to the standard template provided by the City35 (refer to 01 71 23.16.01 – Attachment A – Survey Staking Standards).36 37 1.7 CLOSEOUT SUBMITTALS 38 B. As-built Redline Drawing Submittal39 Project Name  City Project No. xxxxxTranswestern Westbend Merrimac CPN: 105950 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1. Submit As-Built Survey Redline Drawings documenting the locations/elevations of 1 constructed improvements signed and sealed by Registered Professional Land 2 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 – Attachment A 3 – Survey Staking Standards) .4 2. Contractor shall submit the proposed as-built and completed redline drawing5 submittal one (1) week prior to scheduling the project final inspection for City6 review and comment. Revisions, if necessary, shall be made to the as-built redline7 drawings and resubmitted to the City prior to scheduling the construction final8 inspection.9 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10 1.9 QUALITY ASSURANCE 11 A. Construction Staking12 1. Construction staking will be performed by the Contractor.13 2. Coordination14 a. Contact City and Developer’s Project Representative at least one week in15 advance notifying the City of when Construction Staking is scheduled.16 b. It is the Contractor’s responsibility to coordinate staking such that17 construction activities are not delayed or negatively impacted.18 3. General19 a. Contractor is responsible for preserving and maintaining stakes. If City20 surveyors or Developer’s Project Representative are required to re-stake for21 any reason, the Contractor will be responsible for costs to perform staking. If22 in the opinion of the City, a sufficient number of stakes or markings have been23 lost, destroyed disturbed or omitted that the contracted Work cannot take place24 then the Contractor will be required to stake or re-stake the deficient areas.25 B. Construction Survey26 1. Construction Survey will be performed by the Contractor.27 2. Coordination28 a. Contractor to verify that horizontal and vertical control data established in the29 design survey and required for construction survey is available and in place.30 3. General31 a. Construction survey will be performed in order to construct the work shown32 on the Construction Drawings and specified in the Contract Documents.33 b. For construction methods other than open cut, the Contractor shall perform34 construction survey and verify control data including, but not limited to, the35 following:36 1) Verification that established benchmarks and control are accurate.37 2) Use of Benchmarks to furnish and maintain all reference lines and grades38 for tunneling.39 3) Use of line and grades to establish the location of the pipe.40 4) Submit to the City copies of field notes used to establish all lines and41 grades, if requested, and allow the City to check guidance system setup prior42 to beginning each tunneling drive.43 5) Provide access for the City, if requested, to verify the guidance system and44 the line and grade of the carrier pipe.45 Project Name  City Project No. xxxxxTranswestern Westbend Merrimac CPN: 105950 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 6) The Contractor remains fully responsible for the accuracy of the work and 1 correction of it, as required.2 7) Monitor line and grade continuously during construction.3 8) Record deviation with respect to design line and grade once at each pipe4 joint and submit daily records to the City.5 9) If the installation does not meet the specified tolerances (as outlined in6 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct7 the installation in accordance with the Contract Documents.8 C. As-Built Survey9 1. Required As-Built Survey will be performed by the Contractor.10 2. Coordination11 a. Contractor is to coordinate with City to confirm which features require as-12 built surveying.13 b. It is the Contractor’s responsibility to coordinate the as-built survey and14 required measurements for items that are to be buried such that construction15 activities are not delayed or negatively impacted.16 c. For sewer mains and water mains 12” and under in diameter, it is acceptable17 to physically measure depth and mark the location during the progress of18 construction and take as-built survey after the facility has been buried. The19 Contractor is responsible for the quality control needed to ensure accuracy.20 3. General21 a. The Contractor shall provide as-built survey including the elevation and22 location (and provide written documentation to the City) of construction23 features during the progress of the construction including the following:24 1) Water Lines25 a) Top of pipe elevations and coordinates for waterlines at the following26 locations:27 (1) Minimum every 250 linear feet, including28 (2) Horizontal and vertical points of inflection, curvature,29 etc.30 (3) Fire line tee31 (4) Plugs, stub-outs, dead-end lines32 (5) Casing pipe (each end) and all buried fittings33 2) Sanitary Sewer34 a) Top of pipe elevations and coordinates for force mains and siphon35 sanitary sewer lines (non-gravity facilities) at the following locations:36 (1) Minimum every 250 linear feet and any buried fittings37 (2) Horizontal and vertical points of inflection, curvature,38 etc.39 3) Stormwater – Not Applicable40 b. The Contractor shall provide as-built survey including the elevation and41 location (and provide written documentation to the City) of construction42 features after the construction is completed including the following:43 1) Manholes44 a) Rim and flowline elevations and coordinates for each manhole45 2) Water Lines46 a) Cathodic protection test stations47 b) Sampling stations48 c) Meter boxes/vaults (All sizes)49 Project Name  City Project No. xxxxxTranswestern Westbend Merrimac CPN: 105950 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 d) Fire hydrants1 e) Valves (gate, butterfly, etc.)2 f) Air Release valves (Manhole rim and vent pipe)3 g) Blow off valves (Manhole rim and valve lid)4 h) Pressure plane valves5 i) Underground Vaults6 (1) Rim and flowline elevations and coordinates for each7 Underground Vault.8 3) Sanitary Sewer9 a) Cleanouts10 (1) Rim and flowline elevations and coordinates for each11 b) Manholes and Junction Structures12 (1) Rim and flowline elevations and coordinates for each13 manhole and junction structure.14 4) Stormwater – Not Applicable15 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 16 1.11 FIELD [SITE] CONDITIONS [NOT USED] 17 1.12 WARRANTY 18 PART 2 - PRODUCTS 19 A. A construction survey will produce, but will not be limited to:20 1. Recovery of relevant control points, points of curvature and points of intersection.21 2. Establish temporary horizontal and vertical control elevations (benchmarks)22 sufficiently permanent and located in a manner to be used throughout construction.23 3. The location of planned facilities, easements and improvements.24 a. Establishing final line and grade stakes for piers, floors, grade beams, parking25 areas, utilities, streets, highways, tunnels, and other construction.26 b. A record of revisions or corrections noted in an orderly manner for reference.27 c. A drawing, when required by the client, indicating the horizontal and vertical28 location of facilities, easements and improvements, as built.29 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all30 construction staking projects. These cut sheets shall be on the standard city template31 which can be obtained from the Survey Superintendent (817-392-7925).32 5. Digital survey files in the following formats shall be acceptable:33 a. AutoCAD (.dwg)34 b. ESRI Shapefile (.shp)35 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use36 standard templates, if available)37 6. Survey files shall include vertical and horizontal data tied to original project38 control and benchmarks, and shall include feature descriptions39 PART 3 - EXECUTION 40 3.1 INSTALLERS 41 Project Name  City Project No. xxxxx Transwestern Westbend Merrimac CPN: 105950 01 71 23 - 6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 A. Tolerances:1 1. The staked location of any improvement or facility should be as accurate as2 practical and necessary. The degree of precision required is dependent on many3 factors all of which must remain judgmental. The tolerances listed hereafter are4 based on generalities and, under certain circumstances, shall yield to specific5 requirements. The surveyor shall assess any situation by review of the overall plans6 and through consultation with responsible parties as to the need for specific7 tolerances.8 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical9 tolerance. Horizontal alignment for earthwork and rough cut should not exceed10 1.0 ft. tolerance.11 b. Horizontal alignment on a structure shall be within .0.1ft tolerance.12 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and13 walkways shall be located within the confines of the site boundaries and,14 occasionally, along a boundary or any other restrictive line. Away from any15 restrictive line, these facilities should be staked with an accuracy producing no16 more than 0.05ft. tolerance from their specified locations.17 d. Underground and overhead utilities, such as sewers, gas, water, telephone and18 electric lines, shall be located horizontally within their prescribed areas or19 easements. Within assigned areas, these utilities should be staked with an20 accuracy producing no more than 0.1 ft tolerance from a specified location.21 e. The accuracy required for the vertical location of utilities varies widely. Many22 underground utilities require only a minimum cover and a tolerance of 0.1 ft.23 should be maintained. Underground and overhead utilities on planned profile,24 but not depending on gravity flow for performance, should not exceed 0.1 ft.25 tolerance.26 B. Surveying instruments shall be kept in close adjustment according to manufacturer’s27 specifications or in compliance to standards. The City reserves the right to request a28 calibration report at any time and recommends regular maintenance schedule be29 performed by a certified technician every 6 months.30 1. Field measurements of angles and distances shall be done in such fashion as to31 satisfy the closures and tolerances expressed in Part 3.1.A.32 2. Vertical locations shall be established from a pre-established benchmark and33 checked by closing to a different bench mark on the same datum.34 3. Construction survey field work shall correspond to the client’s plans. Irregularities35 or conflicts found shall be reported promptly to the City.36 4. Revisions, corrections and other pertinent data shall be logged for future reference.37 38 3.2 EXAMINATION [NOT USED] 39 3.3 PREPARATION [NOT USED] 40 3.4 APPLICATION 41 3.5 REPAIR / RESTORATION 42 A. If the Contractor’s work damages or destroys one or more of the control43 monuments/points set by the City or Developer’s Project Representative, the monuments44 shall be adequately referenced for expedient restoration.45 Project Name  City Project No. xxxxx Transwestern Westbend Merrimac CPN: 105950 01 71 23 - 7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1. Notify City or Developer’s Project Representative if any control data needs to be 1 restored or replaced due to damage caused during construction operations. 2 a. Contractor shall perform replacements and/or restorations.3 b. The City or Developer’s Project Representative may require at any time a4 survey “Field Check” of any monument or benchmarks that are set be verified5 by the City surveyors or Developer’s Project Representative before further6 associated work can move forward.7 3.6 RE-INSTALLATION [NOT USED] 8 3.7 FIELD [OR] SITE QUALITY CONTROL 9 A. It is the Contractor’s responsibility to maintain all stakes and control data placed by the10 City or Developer’s Project Representative in accordance with this Specification. This11 includes easements and right of way, if noted on the plans.12 B. Do not change or relocate stakes or control data without approval from the City.13 3.8 SYSTEM STARTUP 14 A. Survey Checks15 1. The City reserves the right to perform a Survey Check at any time deemed16 necessary.17 2. Checks by City personnel or 3 rd party contracted surveyor are not intended to18 relieve the contractor of his/her responsibility for accuracy.19 20 3.9 ADJUSTING [NOT USED] 21 3.10 CLEANING [NOT USED] 22 3.11 CLOSEOUT ACTIVITIES [NOT USED] 23 3.12 PROTECTION [NOT USED] 24 3.13 MAINTENANCE [NOT USED] 25 3.14 ATTACHMENTS [NOT USED] 26 END OF SECTION 27 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 8/31/2017 M. Owen Added instruction and modified measurement & payment under 1.2; added definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 – PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. 2/14/2018 M Owen Removed “blue text”; revised measurement and payment sections for Construction Staking and As-Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth Project Name  City Project No. xxxxx Transwestern Westbend Merrimac CPN: 105950 01 71 23 - 8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 measurement criteria; revised list of items requiring as-built survey “during” and “after” construction; and revised acceptable digital survey file format 1 Project Name  City Project No. xxxxx Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 Transwestern Westbend Merrimac CPN: 105950 CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105950 Revised July 1, 2011 APPENDIX GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-4.06 Hazardous Environmental Condition at Site GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.09 Permits and Utilities GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements CITY OF FORT WORTH Transwestern Westbend Merrimac STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 106198 Revised July 1, 2011 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK Approval Spec No.Classsification Manufacturer Model No.National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K.Adeka Ultra-Seal P-201 ASTM D2240/D412/D792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH.Press-Seal Gasket Corp.250-4G Gasket ASTM C-443/C-361 SS MH 1/26/99 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non-traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc.Flowtite ASTM 3753 Non-traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non-traffic area Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) *33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) *33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. *33 05 13 Manhole Frames and Covers McKinley Iron Works Inc.A 24 AM 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged)Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus)RE32-R8FS 30" Dia. 01/31/06 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASHTO M306-04 30" Dia. 11/02/10 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/11 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products MH32FTWSS-DC 30" Dia 08/10/11 33 05 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 10/14/13 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable)East Jordan Iron Works 30" ERGO XL Assembly with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536 30" Dia 06/01/17 34 05 13 30" Dia. MH Ring and Cover (Lockable) CI SIP Industries 2280 (32")ASTM A 48 30" Dia. 12/05/23 34 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 4267WT - Hinged (32")ASTM A 48 30" Dia. 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. CAP-ONE-30-FTW, Composite, w/ Lock w/o Hing 30" Dia. 10/07/21 34 05 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) *33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. *33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. *33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. *33 05 13 Manhole Frames and Covers McKinley Iron Works Inc.WPA24AM 24" Dia. 03/08/00 33 05 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 33 05 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd.300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) *33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item #49 ASTM C 478 48" *33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc.ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc.48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 12/05/23 33 39 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 09/03/24 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. Manhole, 32" Opening and Flat top, (No Transition Cones)ASTM C 478 48" to 84" I.D. 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC Geneva Pipe and Precast (Predl Systems)48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas 03/07/23 33 39 20 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-478; ASTM C-923; ASTM C-443 03/07/23 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardscp 48" & 60" I.D. Manhole w/32" Cone 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amitech USA Meyer Polycrete Pipe Sewer -(WAC) Wastewater Access Chamber 33 39 40 12/29/23 33 39 20 Wastewater Access Chamber Quickstream Solutions, Inc.Type 8 Maintenace Shaft (Poopit) For use when Std. MH cannot be installed due to depth Water & Sewer - Manholes & Bases/Rehab Systems/Cementitious *E1-14 Manhole Rehab Systems Quadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc.Reliner MSP E1-14 Manhole Rehab Systems AP/M Permaform 4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 E1-14 Manhole Rehab System (Liner)Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Misc. Use CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:11-6-24 * From Original Standard Products List 1 Approval Spec No.Classsification Manufacturer Model No.National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:11-6-24 Water & Sewer - Manholes & Bases/Rehab Systems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Sprayroq, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion protection(Exterior)ERTECH Series 20230 and 2100 (Asphatic Emulsion) For Exterior Coating of Concrete Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 03/19/18 33 05 16, 33 39 10, 33 39 20 Coating for Corrosion protection(Exterior)Sherwin Williams RR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion) For Exterior Coating of Concrete Structures Only Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16) *33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. *33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. *33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc.LifeSaver - Stainless Steel For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc.TetherLok - Stainless Steel For 24" dia Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc.Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc.Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non_pressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 09/03/24 33 05 13 Casing Spacers Raci (Completely HDPE)Per Manufacturers Requirements (Sewer Applications Only)8" - 12" (Sewer Only) Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13) *33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co.Super Bell-Tite Ductile Iron Pressure Pipe, AWWA C150, C151 3" thru 24" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co.American Fastite Pipe (Bell Spigot)AWWA C150, C151 4" thru 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co.American Flex Ring (Restrained Joint)AWWA C150, C151 4" thru 30" *33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co.AWWA C150, C151 *33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co.AWWA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatings/Epoxy 33-39-60 (01/08/13) 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 210RS LA County #210-1.33 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications Sewer - Coatings/Polyurethane Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc.D025LTP02(Composite Body)2" Sewer - Pipes/Concrete *E1-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc.ASTM C 76 *E1-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 *E1-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL Item #95-Manhole, #98- Pipe ASTM C 76 *E1-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc.ASTM C 76 Sewer - Pipe Enlargment System (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J.Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously Sewer - Pipe/Fiberglass Reinforced/ 33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiberglass (FRP)Hobas Pipe USA, Inc.Hobas Pipe (Non-Pressure)ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP)Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 33 31 13 Glass-Fiber Reinforced Polymer Pipe (FRP)Thompson Pipe Group Thompson Pipe (Flowtite)ASTM D3262/D3754 03/07/23 33 31 13 Fiberglass Pipe (FRP)Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AWWA M45 09/03/24 33 31 13 Fiberglass Pipe (FRP)Superlit Boru Sanayi A.S.Superlit FRP ASTM D3262, ASTM D3517, ASTM 3754, AWWA C950 * From Original Standard Products List 2 Approval Spec No.Classsification Manufacturer Model No.National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:11-6-24 Sewer - Pipe/Polymer Pipe 4/14/05 Polymer Modified Concrete Pipe Amitech USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to 102", Class V 06/09/10 E1-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - Pipes/HDPE 33-31-23(1/8/13) *High-density polyethylene pipe Phillips Driscopipe, Inc.Opticore Ductile Polyethylene Pipe ASTM D 1248 8" *High-density polyethylene pipe Plexco Inc.ASTM D 1248 8" *High-density polyethylene pipe Polly Pipe, Inc.ASTM D 1248 8" High-density polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-12 DR-14 PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AWWA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AWWA C900 4" thru 12" Sewer - Pipes/PVC* 33-31-20 (7/1/13) *33-31-20 PVC Sewer Pipe J-M Manufacturing Co., Inc. (JM Eagle)SDR-26 (PS115)ASTM D 3034 4" - 15" 12/23/97*33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PS115)ASTM D 3034 4" thru 15" *33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26 (PS115)ASTM D 3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe SDR-26 (PS115)ASTM D3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" *33-31-20 PVC Sewer Pipe J-M Manufacturing Co, Inc. (JM Eagle)PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" *33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlake)Gasketed PVC Sewer Main Fittings ASTM D 3034 3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115)ASTM F679 18"- 24" 3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034 4"- 15" 3/29/2019 33 31 20 Gasketed Fittings (PVC)GPK Products, Inc.SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Westlake)SDR 26 ASTM D3034 4" - 15" 10/22/2020 33 31 20 PVC Sewer Pipe Sanderson Pipe Corp.SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Westlake)SDR 26 PS 115 ASTM F-679 18"- 36" * From Original Standard Products List 3 Approval Spec No.Classsification Manufacturer Model No.National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:11-6-24 Water - Appurtenances 33-12-10 (07/01/13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co., Inc.202B 1"-2" SVC, up to 16" Pipe 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops-Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1" 10/27/87 Curb Stops-Ball Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6101M 1½" and 2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc. FB600-7NL, FB1600-7-NL, FV23-777-W-NL, L22-77NL AWWA C800 2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc. FB600-6-NL, FB1600-6-NL, FV23-666-W- NL, L22-66NL AWWA C800 1-1/2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc. FB600-4-NL, FB1600-4-NL, B11-444-WR- NL, B22444-WR-NL, L28-44NL AWWA C800 1" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd. B-25000N, B-24277N-3, B-20200N-3, H- 15000N, , H-1552N, H142276N AWWA C800, ANSF 61, ANSI/NSF 372 2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd. B-25000N, B-20200N-3, B-24277N-3,H- 15000N, H-14276N, H-15525N AWWA C800, ANSF 61, ANSI/NSF 372 1-1/2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd. B-25000N, B-20200N-3,H-15000N, H- 15530N AWWA C800, ANSF 61, ANSI/NSF 372 1" 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc.#406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel)JCM Industries, Inc.412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel)JCM Industries, Inc.415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel)Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel)Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel)Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel)Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc.DFW37C-12-1EPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc.DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc.DFW65C-14-1EPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13) None Water - Combination Air Release 33-31-70 (01/08/13) *E1-11 Combination Air Release Valve GA Industries, Inc.Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A fl 1" & 2" *E1-11 Combination Air Release Valve Multiplex Manufacturing Co.Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" *E1-11 Combination Air Release Valve Valve and Primer Corp.APCO #143C, #145C and #147C 1", 2" & 3" Water - Dry Barrel Fire Hydrants 33-12-40 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American-Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 09/24/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 10/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company Shop Drawings No. 6461 A-423 Centurion AWWA C-502 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company Shop Drawing FH-12 A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC)Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works)WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 Approval Spec No.Classsification Manufacturer Model No.National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:11-6-24 Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13) 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 AWWA C900, AWWA C605, ASTM D1784 4"-16" 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 AWWA C900, AWWA C605, ASTM D1784 16"-18" 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR14 AWWA C900, AWWA C605, ASTM D1784 4"-16" 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR18 AWWA C900, AWWA C605, ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 4"-28" 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc.DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake)DR18 AWWA C900 16" - 24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake)DR14 AWWA C900 4"- 12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp.DR14 AWWA C900 4"- 12" Water - Pipes/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 E1-07 Ductile Iron Fittings Star Pipe Products, Inc.Mechanical Joint Fittings AWWA C153 & C110 *E1-07 Ductile Iron Fittings Griffin Pipe Products, Co.Mechanical Joint Fittings AWWA C 110 *E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB Class 350 AWWA C 153, C 110, C 111 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co.Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AWWA C153 4"-12" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AWWA C111/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle-Lock AWWA C111/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc.One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc.Megalug Series 1100 (for DI Pipe)AWWA C111/C116/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc.Megalug Series 2000 (for PVC Pipe)AWWA C111/C116/C153 4" to 24" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC)Sigma, Co.Sigma One-Lok SLC4 - SLC10 AWWA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC)Sigma, Co.Sigma One-Lok SLCS4 - SLCS12 AWWA C111/C153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC)Sigma, Co.Sigma One-Lok SLCE AWWA C111/C153 12" to 24" 08/10/98 E1-07 MJ Fittings(DIP)Sigma, Co.Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore)Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc.PVC Stargrip Series 4000 ASTM A536 AWWA C111 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc.DIP Stargrip Series 3000 ASTM A536 AWWA C111 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) EZ Grip Joint Restraint (EZD) Black For DIP ASTM A536 AWWA C111 3"-48" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore)EZ Grip Joint Restraint (EZD) Red for C900 DR14 PVC Pipe ASTM A536 AWWA C111 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore)EZ Grip Joint Restraint (EZD) Red for C900 DR18 PVC Pipe ASTM A536 AWWA C111 16"-24" * From Original Standard Products List 5 Approval Spec No.Classsification Manufacturer Model No.National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated:11-6-24 Water - Pipes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255)AWWA C515 20" and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247)AWWA C515 16" 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron)AWWA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller *E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" *E1-26 Resilient Seated Gate Valve M&H 4" - 12" *E1-26 Resilient Seated Gate Valve Mueller Co.4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co.Series A2361 (SD 6647)AWWA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co.Series A2360 for 18"-24" (SD 6709)AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co.Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co.Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co.AWWA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co.16" RS GV (SD D-20995)AWWA C515 16" 11/08/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co.Clow RW Valve (SD D-21652)AWWA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co.Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co.Clow Valve Model 2638 AWWA C515 24" to 48" (Note 3) 05/08/91 E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" *E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co.Metroseal 250, requirements SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works)EJ FlowMaster Gate Valve & Boxes 08/24/18 Matco Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" Water - Pipes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14) *E1-30 Rubber Seated Butterfly Valve Henry Pratt Co.AWWA C-504 24" *E1-30 Rubber Seated Butterfly Valve Mueller Co.AWWA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co.AWWA C-504 24" and larger 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp.Valmatic American Butterfly Valve.AWWA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson)AWWA C504 Butterfly Valve AWWA C-504 30"-54" 09/03/24 33 12 21 Rubber Seated Butterfly Valve American AVK Company AWWA C504 Butterfly Valve Class 250B AWWA C-504 24" - 48" Water - Polyethylene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polyethylene Encasment Flexsol Packaging Fulton Enterprises AWWA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind.Standard Hardware AWWA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AWWA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AWWA C105 8 mil LLD Water - Sampling Station 03/07/23 33 12 50 Water Sampling Station Kupferle Foundry Company Eclipse, Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50 09/02/24 33 12 50 Water Sampling Station Mueller Water Products, Inc.Model BSS01-36-MUDG2-CSD-NL, Freeze Proof, Hasp for Locking Access Hatch This product removed Water - Automatic Flusher 10/21/20 Automated Flushing System Mueller Hydroguard HG6-A-IN-2-BRN-LPRR(Portable) HG2-A-IN--2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) Yellow Highlight indicates recent changes The Fort Worth Water Department’s Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department’s Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department’s Standard Specifications and the Fort Worth Water Department’s Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department’s Standard Specifications or is on the Fort Worth Water * From Original Standard Products List 6