Loading...
HomeMy WebLinkAbout063128-FP1 - Construction-Related - Contract - Trophy Construction-FP1 City Secretary 63128 Contract No. FORTWORTHo Date Received 12/31/2025 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Longvue Baptist Church City Project No.: 105310 Improvement Type(s): 0 Paving ❑ Drainage ❑x Street Lights Original Contract Price: $46,975.21 Amount of Approved Change Order(s): $-16,501.75 Revised Contract Amount: $30,473.46 Total Cost of Work Complete: $30,473.46 Chase Patterson Contractor Owner Title Trophy Construction Company Name Ti-o� 6cr�dheF Project Inspector �a�rTwa�r' ran,��.., ,�, ,, n�s� Project Manager e�� CFA Manager ��7� �a�ro� Pr�o�,r (oo�si, zazs ia�ai_as csT) TPW Director 12/30/2025 Date 12/31/2025 Date 12/31/2025 Date 12/31/2025 Date 12/31/2025 Date ❑ Turn Lane 4FFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Longvue Baptist Church City Project No.: 105310 City's Attachments Final Pay Estimate ❑x Change Order(s): 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid � Consent of Surety ��' Statement of Contract Time Contract Time: 23 WD Days Charged: 36 WD Work Start Date: 10/22/2025 Work Complete Date: 12/19/2025 Completed number of Soil Lab Test: 28 Completed number of Water Test: 5 Page 2 of 2 F���r ���Tx CITY OF FORT WORTH F1NAL PAYMENT REQUEST Contract Name LONGVUE BAPTIST CHURCH Contract Limits Project Type PAVING City Project Numbers 105310 DOE Number 5310 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date For Period Ending 12/19/2025 WD Project Manager NA Contractor PATCON SERVICES LL,C PO BOX 2423 WEATHERFORD � TX 76086 Inspectors T. GARDNER / R. DAVIS Contract Time 1 �� Days Charged to Date 36 Contract is 100.00 Complete Friday, December 26, 2025 Page 1 of 4 City Project Numbers 105310 Contract Name LONGVLTE BAPTIST CHURCH Contract Limits Project Type PAVING Project Funding UNIT N: PAVING IMPROVEMENTS DOE Number 5310 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 EMBANKMENTBYPLAN 303 CY $51.00 $15,453.00 303 $15,453.00 2 6" CONCRETE DRIVEWAY 191 SY $74.94 $14,313.54 191 $14,313.54 3 SEEDING, HYDROMULCH 258 SY $2.74 $706.92 258 $706.92 Sub-Total of Previous Unit �30,473.46 $30,473.46 UNIT V: STREET LIGHTING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 NO 6 TRIPLEX OH INSULATED ELEC COND 0 LF $13.75 $0.00 0 $0.00 (CO#2) 2 137-WATT ATB2 COBRA HEAD) (CO#2) 0 EA $2,400.00 $0.00 0 $0.00 3 FURNISH/INSTALL 40' WOOD LIGHT POLE 0 EA $2,902.00 $0.00 0 $0.00 (CO#2) 4 FURNISH/INSTALL 8' WOOD LIGHT POLE ARM 0 EA $577.00 $0.00 0 $0.00 (CO#2) Sub-Total of Previous Unit �o.00 �o.00 Friday, December 26, 2025 Page 2 of 4 City Project Numbers 105310 Contract Name LONGVLTE BAPTIST CHURCH Contract Limits Project Type STREET LIGHTING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 2 Total Contract Price DOE Number 5310 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 $46,975.21 ($16,501.75) $30,473.46 Total Cost of Work Completed $30,473.46 Less % Retained $0.00 Net Earned $30,473.46 Earned This Period $30,473.46 Retainage This Period �0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $30,473.46 Friday, December 26, 2025 Page 3 of 4 City Project Numbers 105310 Contract Name LONGVLTE BAPTIST CHURCH Contract Limits Project Type STREET LIGHTING Project Funding Project Manager NA InspeCtors T. GARDNER / R. DAVIS Contractor PATCON SERVICES LLC PO BOX 2423 WEATHERFORD, TX 76086 Line Fund Account Center DOE Number 5310 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 City Secretary Contract Number Contract Date Contract Time 15 WD Days Charged to Date 36 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Amount Gross Retainage Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $30,473.46 Retainage This Period �0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment Net $30,473.46 $0.00 $30,473.46 $0.00 $0.00 $0.00 $0.00 $0.00 $30,473.46 Friday, December 26, 2025 Page 4 of 4 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # X# FILE # INSPECTOR: PROJECT MANAGER: Longvue Baptist Church (A) WATER, (B) SEWER, (C PAVING, (D) DRAINAGE, AND (E) STREET LIGHTS CFA25-0o16 CITY PARTICIPATION:I 105310 63128 30114-0200431-105310-E07685 X-28088 K-3239 CHANGE ORDER No: NO 2 RANDELL DAVIS Phone No: 817-360-6317 RAM TIWARI Phone No: 817-392-2237 CONTRACT UNIT WATER SEWER DRAINAGE Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost ORIGINAL CONTRACT $44,343.98 I $0.00 I $79,680.60 $0.00 $35,153.76 $0.00 EXTRAS TO DATE $1,685.38 I $0.00 I $0.00 $0.00 I $0.00 $0.00 CREDITS TO DATE $0.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 CONTRACT TO DATE $46,029.36 I $0.00 I $79,680.60 $0.00 I$35,153.76 $0.00 AMOUNT OF PROP. CHANGE ORDER $0.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 REVISED CONTRACT AMOUNT $0.00 I $0.00 I $0.00 $0.00 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER U N IT $46,029.36 $79,680.60 $35,153.76 REVISED COST SHARE Dev. Cost: $191,337.18 City Cost: TOTAL REVISED CONTRACT $191,337.18 PAVING STREET LIGHTS eveloper Developer ost City Cost Cost City Cost $30,473.46 $0.00 $16,501.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $30,473.46 $0.00 $16,501.75 $0.00 $0.00 $0.00 ($16,501.75) $0.00 $0.00 $0.00 $0.00 $0.00 $30,473.46 $0.00 $0.00 WORKING DAYS 23 23 0 23 REVIEWED By Ram Tiwari at 11:20 am, Dec 17, 2025 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents CITY BID ITEM PAY ITEM # # QUANTITY 1 3441.1403 345 2 3441.3051 2 3 3441.3321 2 4 3441.3323 2 � Asterisk (*) indicates New Pay Item UNIT I: WATER IMPROVEMENTS CFW Unit UNIT ITEM DESCRIPTION Price UNIT PRICE EA No 6 Triplex OH Insulated Electrical Conduit -$13.75 Furnish/Install LED Lighting Fixture (137 watt EA ATB2 Cobra Head) -$2400.00 EA Furnish/Install 40' Wood Light Pole -$2,902.00 EA Furnish/Install 8' Wood Light Pole Arm -$577.00 TOTAL UNIT I: WATER IMPROVEMENTS Developer Cost ($4,74375) ($4,800.00) ($5,804.00) ($1,154.00) $0.00 $0.00 $0.00 ($16,501.75) City Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 � TOTAL ($4,74375) ($4,800.00) ($5,804.00) ($1,154.00) $0.00 $0.00 $0.00 ($16,501.75) � REVI EWED By Ram Tiwari at 11:20 am, Dec 17, 2025 Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER RECOMMENDED: (Consu(ling Engrneer) By S.f� i' ��� Name: Edward Chadwick, BHB Title: PM Baird Hampton 8, Brown APPROVAL RECOMMENDED: CFW - Water Department By: Not Applicable Name: Not Applicable Title: Not Applicable RECOMMENDED: CFW - "Contract Comp/iance Manager By: Name: Title: M�C Number: MR,C Date Approved: Crty lnspector has recommened the temporary (ighting not be installed due to a conflict with existing trees that would require the removal of the trees. There is a problem wrth the contractor being able to acqurre the fixtures that the city says they must install. They are on back order. And no one knows when fhey wrll come in. Thrs is hindering the developer. APPROVED: (Developer) Date: %z�`/�at� By: �,i.., ;""�-,f.-� « � � Name: Brian Fisher Title: PasrodGC �a�•.� Date: Date: N/A N/A APPROVED: CFW - Assistant City Manager By: Not Applicable Name: Not Applicable Title: Not Applicable ATTEST Date: / _'/ /z �� �' APPROVED: (Contractor) By: � Name: Chase Patterso� Title: PM Date: 12/ l 5/2025 APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attomey Date: By: Not Applicable Date: Name: Not Applicable Title: Not Applicable By: Not Applicable Date: Name: Jannette S. Goodall Title: City Secretary ' Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the moniroring and administra(ion of this contract, and ensuring all performance and reporting requirements. Q There are NO City Funds associated with this Con[ract ❑ There are City Funds associated with ihis Contract i . REVIEWED By Ram Tiwari at 11:20 am, Dec 17, 2025 . , Revised: 12-17-2018 Page 3 sq� � � _______________________________________________ --------- — -------------------------- � �LD WEATHERFORDROAD � \ REVIEWED By Ram Tiwari af f f:20 am, Oec f], }035 � _ _��o� � ,� ��.,R._ � — � RIIIIPMENT PROCUREMENT NOTES GENERALNOTES- AE uG oiaECnv rv0a H�aO iRA Gn� w��DSioE Ou EXISTING GAS WELL SITE � ELECTRICALLEGEND I I SYMBOL I DESGRIP110N I sg owaaovo�EmouulEoslaEErucHlrrPEzois.reieunorv�sEErvorEi ag isnrvcslREElucnlroaEr�wiry - BRANCHCIPCURCONDUITANDCONDUGi0R5.51ZE5A51N01CAiED Q LE-MOUNTE�IRANSFORMER EpUIPMENT QUANTIN SCHEDULE OLE QU ENiIN WMirvaia[rvv[ qFo32n9�'PrzOvoio[ RE4UANITitt v LL Maunrv.m wo z nam SUMMA DUITANDCABLES C �' a rzElix� ° a'°X� � a� 3 a � vxov. unsr. ll EETI w 3 u:� z eie,6 Auzuvi z�REN corvom�nuarvnnes�ir� _„____, � RGVISIONS No p P A � p ReMo�o �eoM coNmnc, - �Pac cod� �snoisozs K' a p s p N 0 =0 60 90 cenPwc scn� i" = ao'-o. (zz'.aa') i° = eo._o. (ir'.n') wnewuc ro aN*eacroa cna i-eoo-aaa-e�n (reras an) oe owere unutt �ocnriaN see�cEs 4a r�ouas eaioe ro WNSiRI1CilON PCiINiY BAIRD HAMPiON PND e Nor reFSPaNs�e� Fore rx ALL IXISiING UiILIiIES OR DEPICiING E%Ar,OWIN LOGilONS ON ALL DRAWINGS `��f��.��� ���� F S; � GENERAL lRllltt N�iE ��: � ' ��� L UTLItIFS MP NOi BE SH WN ON iHE PUNS. LOGilONyOF IXISiING UiILIiIES �2�69t : f DEPICiED ON iHE PUNS ARE APPRO%IMAiE li ����;. ErySf�.�,� � SHAIL BE iHE WNiRACiORS RESPONSiBIIM i0 1�1 yj•�,A�'CG� vERIFY ALL uiILIIY LOCPiloxS PRIOR ia �% ��p n l� _.. CONSiRUCiION. uTLIiIFS DAMAGED BY inE d"^�� ����� iw�CtOR oURING CONSiRUCiION SnALL BE �2/�p/2025 REPNftED Ai iHE CONiFACi0R5 ENPENSE CONSTRUCTION N07ES ONS (e�]) 8�1-8296 o(el�) FeE o vJ&P(e�]) 2� IC (91�)'631 -621a NEEie,°i)�JJ �en� so ea ALL omeR Fnaunes � eoo oic ress HORIZONTAL & VERTICAL CONTROL rem gi Tem gz MnG N wiiry Hq mnG ry in N 6954114 44 N 6954068.29 E'22�352018 E'.22�4212 &5 Cltt PFOJECT b105310 K-}23g Flp �30114-0200431-105310-E0�6&5 MAPSCO N0. iAk-0]2F CITY OF FORT WORTH, TEXAS � WATER, TRANSPORTATION AND � PUBLIC WORKS DEPARTMENTS z U F LONGVUE BAPTIST CHURCH � 0-1 W � STREET LIGHT PLAN � z DESIGNED [� SCALE DATE SHEET O oRAwN eHe ��^ oa/2e/zoza SL1.00 a a � $ L� LENGiH � a• 2 3§' 0.0. END arR�s 2J- t �i TWE RISE 22B 5'6' � 33A 5'6' �0' � BOL� � 24A 5'6' 12' II HOLE � 25A 5'6' 15' � ss 3' is' I TRUSS TYPE LUMINAIRE SUPPORT 1RU55 ARN SINGLE ARM ` INSTALL BLANN PLAiE VMEN USING SINGLE ARM � POLE � REFER TO HANDHOLE � DETAIL / � BASE PLAiE _ � O � GROUND LINE SWGLE PIECE STEEL POLE SHAFT FOR POLE TWE No's 8, 11. 18, 18A k 19 HANDHOLE DETAIL FORT WORTH .Q REVIEWED By Fam Tiwan at f f:30 am, Dec 1], 3035 � 96' 96" � �e� s�a���r e� s�A���r sEcnoN sccnorv� ` 4,t2, 2 36' 0.�. END P 3. 4't2' e � BOLT HOLE TYPE 3]A ARM T1'FE 33B ARM SINGLE MEMBER WMINAIRE SUPPORT ARM SINGLE PIECE SIEEL POLE p� 7 SHPFi �IAMEIER GAUGE SHNFT� TOP rourvonnory x . soraaM 3.s' •1m[ t 8 1J.5' 3.5' �T1PE 2 IB 33.5' . 38" •ttPE 3 IBF 46' 16.0' ti �TWE fi ' ER .i4 41� 20-�60Z I ) •T1PE 8 516' 0.81' 0.50'� i�T�� �� ��I ---i--- e"�_—�—_— n �n—_—�—_— � � � �� / >z' 3§'y10' GALVANIZED � s,�E� MA����E ao�r 1, ,. K1T1 PREDRILLED HOLES � DGABVAN ZEID � T S1EEL WASHER � M FOOi WOOD POLE OUNT BRACHEi 30 �- � R��fa HOLE J SOULRE WPSHER � c screEws ��� SECONDART LINES — _ WOOD POLE ARM MOUNTING DET SINGLE PIECE DAVIT POLE MOUNTING M ORILLED TYPE SHA TM GAUGE SHAFi NUMBER � F1�� SIZE AT SPA� (MIN.) GOUNDAPON BASE iYPE D25-6 25 ).5' 6' p11 �ME 4 D30-6 30 6.0' 6' reR>> �E 2 so -r. on�r '.nH6n o D60-9 � 60 95' 9' /I N�� � E 5 OIIBLE D NT AHM �40-9T� N/A � N/A � 9' I q11 � • GER }q p� 20-0622 POLE WALL IRI�i � \ ccci�NPIRE TO MEEi icnnorvs s snowry roa AR1ER AL OR RE�SI�ENIIAL ONS. EFERENCE BURSAW FOR LAiEST SPECIFlCAlI0N5. 2. LED LUMINAIRE TO NEET 10 TEAR STAN�ARD WARRANTY 3. LED LUMINAIRE TO BE LABELED vnTM wnllncE vcR nrvs STANDARDS. 4 LED LIIMINPIRE TO BE APPROVEO BY T/PW SIREET LIGMTS PRIOR TO INSTALLAl10N. I 6 9 I I iENON z �b' o.o. H� 5' RISE MTG. HGi. HORIZONTAL SOUNT�NG DETAIL DOSPECIFIEO AS SPECIFlED II�I M ' II SECONDARY LINES 1 �DOUBLE ARM OP 9' SPAN I I/ DANT POLES SHNLL BE 1 . r 2 PIECE POLES I I�i' s L n � TW I �i 1 �I 06.625' x 0.25' WAL� PIPE OR iUBING TIMBER I 11MBER POLES SHALL BE CRISSO 1REAiED CLA55 5 30' OF 35' POLES ONLT. PRESSURE TREAiED POLES SHALL NOT BE USED. 4'x8' NAND�HOLE WITH Y�' T ED HOLE FOR GROIIND GROUND LINE GROUNO LINE , DAVIT POLE CITY OF FORT WORTH, TE� STREET LUMINAIRE POLE AND FIXTURE DETAILS REVISED: 07-09-2014 34 41 20-D621 NO;ESL�riNcoErai�SwEEreForeNs r��v.aEFEkros'aEE' � RGVISIONS No p P A � p eEMo�eo raoM wN.encr - �Pec wwz �zi onon K' a p s Q i0 WNiRFf,iOR LL i-eoo-aaa-e�n (rrras aii) oR orNEre ViNtt LOCAiION SERNCFS 48 HOURS PRIOR i0 WNSiRI1CilON PCiINiY BAIRD HAMPiON PND B NOt kFSPON51Bl£ FOk IM ALL IXISiING UiILIiIES OR DEPICiING E%Ar,OWIN LOGilONS ON ALL DRAWINGS `��f��.��� ���� cENERnI lrtutt No.E %�J••••'s••'E:•w"'o••y A UTLItIFS MPY NOi BE SHOWN ON iHE i,?�OMh ., .ILS N� PUNS. LOGiION OF IXISiING UiILIiIES g�µ �2�69t : f SHALL BE �iHE CONi ACiORS RESPONSiBILIIY i0 ,I��1�1<3'yj� ��C�� VERIFY ALL IIiILIIY LOCPilOxS PRIOR i0 �% �f ��_.. CONSiRUCiION. uTLIiIFS DAMAGED BY inE d"^��- rrucrore ourew� caNsrreucnaN sn�u ee ivior2o25 REPNftED Ai iHE CONiFACi0R5 ENPENSE CONSTRUCTION N07ES vJp ft �(g ,)FgTD OPE�FAl10N5 (e�]) 8�1-8296 &L(e�]�) C �5-4366 - 39 l 1�621a NEE(el�)�J3B-68I9 (el]) 50 63 ALL OIHER FpCiIJTIES I 800 01G TE55 HORIZONTAL & VERTICAL CONTROL .eq s, ,eM sN c N wirH Hq nc w N 6954114 44 N 6954068.29 E'22�352018 E'.22�4212 &5 Cltt PFOJECT b105310 K-}23g Flp �30114-0200431-105310-E0�6&5 MAPSCO N0. iAk-0]2F CITY OF FORT WORTH, TEXAS � WATER, TRANSPORTATION AND � PUBLIC WORKS DEPARTMENTS z U F- F LONGVUE BAPTIST CHZJRCH � W W � STREET LIGHT DETAILS � z �DESIGNED [� SCALE DATE "HEET O OanwN B11B "�" 04/29/2024 $L2.00 F�RT�VORTH� `--� TRANSPORTATION AND PUBLIC WORKS December 22, 2025 Patcon Services PO. Box 2423 Weatherford Tx. 76068 RE: Acceptance Letter Project Name: Lomgvue Baptist Church Project Type: Paving City Project No.: CPN 105310 To Whom It May Concern: On December 23, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 23, 2025, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817/392/2237. Sincerely, �a�r �wa�r' ��mr�,,. �„ , ,. ,,,o�s1 Ram Tiwari, Project Manager Cc: Ariel Duarte, Inspector Troy Gardner, Inspection Supervisor Ariel Duarte, Senior Inspector Andrew.Goodman, Program Manager Baird Hampton and Brown, Consultant Patcon Services LLC, Contractor Longvue Baptist Church, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFFIDAVIT STATE OF Texas COLJNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Chase Patterson, Owner Of Patcon Services, LLC, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; CPN 105310 - Longvue Baptist Church BY ����— Chase Patterson Subscribed and sworn before me on this date 23 of December, 2025. �(�� ��t�DiW �G�'�.�i'�li Notary Public ° Tarrant, Texas =o��� H�THER CqR$pN EMERY 3 ID #13088gq15 j .� My Commissbn Expires � °F November 02, 2028 CONSENT OF SURETY TO FINAL PAYMENT AIA Document G707 (Instructions on reverse side) TO OWNER: (Naine a�zd address) Longvue Baptist Church and City of Fort Worth, Texas PROJECT: (Name and address) Longvue Baptist Church Public Improvements OWNF.R ❑ ARCHITF.CT ❑ CONTRACTOR ❑ SURF.TY ❑ OTHF.R ❑ ARCHITECT�s PxoJFCT No.: City Project No. 105310 CONTRACT FOR: CONTRACT DATED: Longvue Baptist Church Public Improvements In accordance with the provisions of the Contract be[ween the Owner and the Contractor as indicared above, the (lnsert raame Unc! addre,+� of Sureh'1 Lexington National Insurance Corporation 11426 York Road, 2nd Floor Cockeysville, Maryland 21030 , SURETY, on bond of (Insert nanie and addrexc q/�Contrador�) Patcon Services LLC PO Box 2423 Weatherford, TX 76086 , CONTRACTOR, hereby approves of the final payment to [he Contractor, and agrees that final payment to the Contractor shall not relieve the Surery of any of its obligations to (Insert na�ne and adclres, of Ou ��rer) Longvue Baptist Church and City of Fort Worth, Texas , OWNER, as set forth in said Surety's bond. IN WITNF.SS WHEREOF, the Surery has hereunto set its hand on this date: 12�30�ZOZ�j (buert in u�ritiny the inortth,%llou�ec{ h�� the rutnienc da[e and i�ear.) ,,,,,���,��,,,,, ; .�P.��pNAL �NS,''�,,� ; �o�': pQ`P �qq�'Q"y�� ; 'z'z 1989 op�= = y't: : o = : > ; i.a: A[[esL• `�„�,� ��" - � •F�ORIDP o`�`` r ��., �n. v �����iininuu��`� (Seal): � �-�� Lexington National Insurance Corporation �Siu�ery9 .�u� i���/y'�/�� (Sig�za[tuz ofuidbor' erl -epreseitlutrre) Zach Mat r, Attorney-in-Fact (Po�inted nante ancl ti[le) CAUTION: You should sign an original AIA document that has this caution printed in red. An � � original assures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. AIA DOCUMENT G707 • CONSF.N"I' OF SL`RE1Y 7'O FINAI. PAYMF.N'P • 1�)ti EDITION •`AIA �O1994 • THE AMERICAN INSTITLTE OF ARCHITECTS, 1735 NF.W YOItK AVENCF., NW, WASH- ' tNG1'oN, D.C. 20006-5292 • WARNING: Unlice�sed photocopying violates U.S. copy- `'� right laws and will subject the violator to legal prosecution. G707-1994 IMPORTANT NOTICE —THIS POWER OF ATTORNEY IS VOID IF "LNIC Original" WATERMARK IS NOT PRESENT POWER OF ATTORNEY Lexington National Insurance Corporation Lexington National Insurance Corporation, a corporation duly organized under the laws of the State of Florida and having its principal administrative office in Baltimore County, Maryland, does hereby make, constitute and appoint: Zach Mefferd, Zach Matter, Havilah Watson, Jimmy Brown, Tina Bockholt, Tyler Webb, Isaac Wood as its true and lawful attorney-in-fact, each in their separate capacity, with full power and authority to execute, acknowledge, seal and deliver on its behalf as surety any bond or undertaking of $6.000.000 or less. This Power of Attorney is void if used for any bond over that amount. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Board of Directors of the Company on June 5, 2025: Be it Resolved, that the Chief Executive Officer, President or any Vice-President shall be and is hereby vested with full power and authority to appoint suitable persons as Attorney-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and on the behalf of the Company, to execute, acknowledge and deliver any and all bonds, policies, contracts, Consents of Surety, undertakings, indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any all notices and documents cancelling or terminating the Company's liability thereunder and also such instruments and documents which the business of the Company may require, and such instruments and documents so executed by such Attorney-in-Fact shall be binding upon the Company as if signed by the Chief Executive Officer and sealed by the Corporate Secretary. RESOLVED further, that the signature and attestations of the Chief Executive Officer, President or any Vice-President of the Company may be affixed to any such Power of Attorney or to any certificate relating to the Power of Attorney by electronic means or by facsimile, and the seal of the Company may be embossed, stamped, affixed electronically or by facsimile to any such Power of Attorney. Any such power so executed and sealed shall be valid and binding on the Company. IN WITNESS WHEREOF, the Company have caused this instrument to be signed and their corporate seal to be hereto affixed. `��P.�yONAL,lNiG� '. c �; PP�9 v i _ o: O 9�':2�, s _x�.z 1989 o:d_ ,///�(. � _ �_� '�j�.�'RORIO�• D`` � ���— �� niuma•oo Ronald A. Frank, Chief Executive Officer State of Maryland County of Harford County, SS: Before me, a notary public, personally appeared, Ronald A. Frank, Chief Executive Officer of Lexington National Insurance Corporation, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under the PENALTY of PERJURY under the laws of the State of Maryland that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Commission Expires: 01/8/28 ,,,�'P: 's c ti_�qe.,.,. �S�.�osARy:i=: �� �%�,,�, crr��ets: •, m z �I �� d i � (�i���l�i.���/'�/ � �`' '' °'-0�-zoxR � : : R..r'UBL\G %•�3 otary -•,�Ro-�o���°� I, Lisa R. Slater, Secretary of Lexington National Insurance Corporation, do hereby certify that the above and foregoing is true and correct copy of a Power of Attorney, executed by said company, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witness Whereof, I have hereunto set my hand and affixed the seal of said Compan at Baltimore, Maryland this 3Oti1 day of December 2025 Corporate Seal: ���a���������� � l/� � `��.�P.��pNAL /NSG,,��� Tsa R. later, Secretary : � : PP �R`'•;pv �: : �' � 9m ; m ' -z:Z 1989 oe�= F:\Inic\Power of Attorney form C� X; j O= i�%�; � � � a; '���'�. •'��ORIDP•�.�`�: �'��nn i n��a�°