Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
063997-PM1 - Construction-Related - Contract - CB-Direct Bonds Ranch, LP and Pennington Concrete & Utilities LLC
PROJECT MANUAL FOR THE CONSTRUCTION OF Copper Ranch Infrastructure IPRC Record No. 25-0044 City Project No. 106150 FID No. 30114-0200431-106150-E07685 File No. #K-3365 X File No. X-28518 Mattie Parker Jesus “Jay” Chapa Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur Director, Transportation and Public Works Department Prepared for The City of Fort Worth 2025 PREPARED BY SPIARS ENGINEERING, INC. 2575 LONE STAR CIRCLE, SUITE 434 FORT WORTH, TX 76177 F-2121 CSC No. 63997-PM1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 11 13 Invitation to Bidders 03/20/2020 00 21 13 Instructions to Bidders 03/20/2020 00 41 00 Bid Form 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 00 43 13 Bid Bond 04/02/2014 00 45 11 Bidders Prequalification’s 04/02/2014 00 45 12 Prequalification Statement 09/01/2015 00 45 13 Bidder Prequalification Application 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 45 40 Minority Business Enterprise Goal 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions 11/15/2017 00 73 00 Supplementary Conditions 07/01/2011 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded Projects 01/10/2013 Division 01 - General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 31 20 Project Meetings 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project’s Contract Documents Division 02 - Existing Conditions Date Modified 02 41 13 Selective Site Demolition 02 41 14 Utility Removal/Abandonment 02 41 15 Paving Removal Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 03 34 13 Controlled Low Strength Material (CLSM) 03 34 16 Concrete Base Material for Trench Repair 03 80 00 Modifications to Existing Concrete Structures Division 26 - Electrical 26 05 00 Common Work Results for Electrical 26 05 10 Demolition for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems Division 31 - Earthwork 31 10 00 Site Clearing 31 23 16 Unclassified Excavation 31 23 23 Borrow 31 24 00 Embankments 31 25 00 Erosion and Sediment Control 31 36 00 Gabions 31 37 00 Riprap Division 32 - Exterior Improvements 32 01 17 Permanent Asphalt Paving Repair 32 01 18 Temporary Asphalt Paving Repair 32 01 29 Concrete Paving Repair 32 11 23 Flexible Base Courses 32 11 29 Lime Treated Base Courses 32 11 33 Cement Treated Base Courses 32 11 37 Liquid Treated Soil Stabilizer 32 12 16 Asphalt Paving 32 12 73 Asphalt Paving Crack Sealants 32 13 13 Concrete Paving 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 13 73 Concrete Paving Joint Sealants 32 14 16 Brick Unit Paving 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 17 23 Pavement Markings 32 17 25 Curb Address Painting 32 31 13 Chain Fences and Gates 32 31 26 Wire Fences and Gates 32 31 29 Wood Fences and Gates [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 32 32 13 Cast-in-Place Concrete Retaining Walls 32 91 19 Topsoil Placement and Finishing of Parkways 32 92 13 Hydro-Mulching, Seeding, and Sodding 32 93 43 Trees and Shrubs Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 33 01 31 Closed Circuit Television (CCTV) Inspection 33 03 10 Bypass Pumping of Existing Sewer Systems 33 04 10 Joint Bonding and Electrical Isolation 33 04 11 Corrosion Control Test Stations 33 04 12 Magnesium Anode Cathodic Protection System 33 04 30 Temporary Water Services 33 04 40 Cleaning and Acceptance Testing of Water Mains 33 04 50 Cleaning of Sewer Mains 33 05 10 Utility Trench Excavation, Embedment, and Backfill 33 05 12 Water Line Lowering 33 05 13 Frame, Cover and Grade Rings - Cast Iron 33 05 13.10 Frame, Cover and Grade Rings - Composite 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 05 16 Concrete Water Vaults 33 05 17 Concrete Collars 33 05 20 Auger Boring 33 05 21 Tunnel Liner Plate 33 05 22 Steel Casing Pipe 33 05 23 Hand Tunneling 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 33 05 26 Utility Markers/Locators 33 05 30 Location of Existing Utilities 33 11 05 Bolts, Nuts, and Gaskets 33 11 10 Ductile Iron Pipe 33 11 11 Ductile Iron Fittings 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 33 11 14 Buried Steel Pipe and Fittings 33 11 15 Pre-Stressed Concrete Cylinder Pipe 33 12 10 Water Services 1-inch to 2-inch 33 12 11 Large Water Meters 33 12 20 Resilient Seated Gate Valve 33 12 21 AWWA Rubber-Seated Butterfly Valves 33 12 25 Connection to Existing Water Mains 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 33 12 40 Fire Hydrants 33 12 50 Water Sample Stations 33 12 60 Standard Blow-off Valve Assembly 33 31 12 Cured in Place Pipe (CIPP) 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 33 31 22 Sanitary Sewer Slip Lining 33 31 23 Sanitary Sewer Pipe Enlargement 33 31 50 Sanitary Sewer Service Connections and Service Line 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 33 39 10 Cast-in-Place Concrete Manholes 33 39 20 Precast Concrete Manholes 33 39 30 Fiberglass Manholes 33 39 40 Wastewater Access Chamber (WAC) 33 39 60 Epoxy Liners for Sanitary Sewer Structures 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 41 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 33 41 12 Reinforced Polyethlene (SRPE) Pipe 33 46 00 Subdrainage 33 46 01 Slotted Storm Drains 33 46 02 Trench Drains 33 49 10 Cast-in-Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls Division 34 - Transportation 34 41 10 Traffic Signals 34 41 10.01 Attachment A – Controller Cabinet 34 41 10.02 Attachment B – Controller Specification 34 41 10.03 Attachment C – Software Specification 34 41 11 Temporary Traffic Signals 34 41 13 Removing Traffic Signals 34 41 15 Rectangular Rapid Flashing Beacon 34 41 16 Pedestrian Hybrid Signal 34 41 20 Roadway Illumination Assemblies 34 41 20.01 Arterial LED Roadway Luminaires 34 41 20.02 Freeway LED Roadway Luminaires 34 41 20.03 Residential LED Roadway Luminaires 34 41 30 Aluminum Signs 34 71 13 Traffic Control [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City’s website at: http://fortworthtexas.gov/tpw/contractors/ or https://apps.fortworthtexas.gov/ProjectResources/ Division 02 - Existing Conditions Last Revised 02 41 13 Selective Site Demolition 12/20/2012 02 41 14 Utility Removal/Abandonment 12/20/2012 02 41 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 26 05 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi-Duct Conduit 02/26/2016 Division 31 - Earthwork 31 10 00 Site Clearing 12/20/2012 31 23 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabions 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 32 01 17 Permanent Asphalt Paving Repair 12/20/2012 32 01 18 Temporary Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 32 11 23 Flexible Base Courses 12/20/2012 32 11 29 Lime Treated Base Courses 12/20/2012 32 11 33 Cement Treated Base Courses 12/20/2012 32 11 37 Liquid Treated Soil Stabilizer 08/21/2015 32 12 16 Asphalt Paving 12/20/2012 32 12 73 Asphalt Paving Crack Sealants 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 14 16 Brick Unit Paving 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 32 17 23 Pavement Markings 11/22/2013 32 17 25 Curb Address Painting 11/04/2013 32 31 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast-in-Place Concrete Retaining Walls 06/05/2018 32 91 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro-Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 33 03 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 04 10 Joint Bonding and Electrical Isolation 12/20/2012 33 04 11 Corrosion Control Test Stations 12/20/2012 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2012 33 04 30 Temporary Water Services 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 33 05 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 33 05 12 Water Line Lowering 12/20/2012 33 05 13 Frame, Cover and Grade Rings – Cast Iron 01/22/2016 33 05 13.10 Frame, Cover and Grade Rings – Composite 01/22/2016 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 12/20/2012 33 05 16 Concrete Water Vaults 12/20/2012 33 05 17 Concrete Collars 12/20/2012 33 05 20 Auger Boring 12/20/2012 33 05 21 Tunnel Liner Plate 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 33 05 23 Hand Tunneling 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 12/20/2012 33 11 14 Buried Steel Pipe and Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 Large Water Meters 12/20/2012 33 12 20 Resilient Seated Gate Valve 12/20/2012 33 12 21 AWWA Rubber-Seated Butterfly Valves 12/20/2012 33 12 25 Connection to Existing Water Mains 02/06/2013 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012 33 12 40 Fire Hydrants 01/03/2014 33 12 50 Water Sample Stations 12/20/2012 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 7 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 33 12 60 Standard Blow-off Valve Assembly 06/19/2013 33 31 12 Cured in Place Pipe (CIPP) 12/20/2012 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2012 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 12/20/2012 33 31 22 Sanitary Sewer Slip Lining 12/20/2012 33 31 23 Sanitary Sewer Pipe Enlargement 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 12/20/2012 33 39 10 Cast-in-Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 Fiberglass Manholes 12/20/2012 33 39 40 Wastewater Access Chamber (WAC) 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 33 41 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 12/20/2012 33 41 12 Reinforced Polyethlene (SRPE) Pipe 11/13/2015 33 46 00 Subdrainage 12/20/2012 33 46 01 Slotted Storm Drains 07/01/2011 33 46 02 Trench Drains 07/01/2011 33 49 10 Cast-in-Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 34 41 10 Traffic Signals 10/12/2015 34 41 10.01 Attachment A – Controller Cabinet 12/18/2015 34 41 10.02 Attachment B – Controller Specification 02/2012 34 41 10.03 Attachment C – Software Specification 01/2012 34 41 11 Temporary Traffic Signals 11/22/2013 34 41 13 Removing Traffic Signals 12/20/2012 34 41 15 Rectangular Rapid Flashing Beacon 11/22/2013 34 41 16 Pedestrian Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 34 41 20.02 Freeway LED Roadway Luminaires 06/15/2015 34 41 20.03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 34 41 50 Single-Mode Fiber Optic Cable 02/26/2016 34 71 13 Traffic Control 11/22/2013 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 8 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 Appendix GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-4.06 Hazardous Environmental Condition at Site GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements END OF SECTION [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 42 43 DAP - BID PROPOSAL Page 1 of 4 1 3311.0441 12" Water Pipe 33 11 10, 33 11 12 LF 1,600 $ 63.15 101,040.00$ 2 3311.0451 12" DIP Water 33 11 10 LF 150 $ 106.48 15,972.00$ 3 3311.0141 6" Water Pipe 33 11 12 LF 280 $ 32.05 8,974.00$ 4 3312.3002 6" Gate Valve 33 12 21 EA 15 $ 2,093.91 31,408.65$ 5 3312.3005 12" Gate Valve 33 12 20 EA 19 $ 4,915.12 93,387.28$ 6 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 1 $ 3,717.14 3,717.14$ 7 3312.0001 Fire Hydrant 33 12 40 EA 5 $ 5,416.49 27,082.45$ 8 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TN 10.0 $ 2,952.11 29,521.10$ 9 3305.0005 12" Waterline Lowering 33 05 12 EA 6 $ 4,320.17 25,921.02$ 10 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 2 $ 3,718.64 7,437.28$ 11 3312.2203 2" Water Service 33 12 10 EA 12 $ 3,615.67 43,388.04$ 12 3305.1004 24" Casing By Open Cut 33 05 22 LF 25.0 $ 250.93 6,273.25$ 13 3312.0002 Water Sampling Station 33 04 40 LS 1 $ 4,543.00 4,543.00$ 14 3311.0457 12" DIP Water, CLSM Backfill 33 11 10 LS 1 $ 4,991.93 4,991.93$ 15 3312.2003 1" Water Service 33 12 10 EA 8 $ 2,114.00 $ 16,912.00 16 3305.0109 Trench Safety 33 05 10 LF 2,030 $ 1.10 2,233.00$ 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Proposal Description TOTAL UNIT I: WATER IMPROVEMENTS $422,802.14 Bid Quantit Unit Price Bid Value Project Item Information UNIT PRICE BID Bidlist Item No. Bidder's Application Specification Section No. Unit of Measure UNIT I: WATER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 City of Ft. Worth Proposal DAP-Pennington Concrete & Utilities--9.3.25.xlsm 00 42 43 DAP - BID PROPOSAL Page 2 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Proposal Description Bid Quantit Unit Price Bid Value Project Item Information UNIT PRICE BID Bidlist Item No. Bidder's Application Specification Section No. Unit of Measure 1 3331.4115 8" Sewer Pipe 33 11 10, 33 31 12, 33 31 20 LF 597 $ 43.84 26,172.48$ 2 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 6 $ 4,148.37 24,890.22$ 3 3339.0001 Epoxy Manhole Liner 33 39 60 VF 82 $ 415.90 34,103.80$ 4 3331.3302 8" 2-way Cleanout 33 31 50 EA 1 $ 2,278.57 2,278.57$ 5 3305.1004 24" Casing By Open Cut 33 05 23 LF 74 $ 224.86 16,639.64$ 6 3331.4116 8" Sewer Pipe, CSS Backfill 03 34 13 LS 1 $ 2,015.00 2,015.00$ 7 3331.5747 8" Sewer Pipe, CLSM Backfill 33 11 10 LF 80 $ 54.03 4,322.40$ 8 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 5 $ 3,742.18 18,710.90$ 9 3305.0113 Trench Water Stops 33 05 10 EA 2 $1,080.00 $2,160.00 10 3305.0109 Trench Safety 33 05 10 LF 685 $1.10 $753.50 11 3301.0001 Pre-CCTV Inspection 33 01 31 LF 685 $1.10 $753.50 12 3301.0002 Post-CCTV Inspection 33 01 31 LF 685 $1.10 $753.50 13 3301.0003 Final-CCTV Inspection 33 01 31 LF 685 $1.10 $753.50 14 3301.0101 Manhole Vacuum Testing 33 01 30 EA 6 $150.00 $900.00 15 999.0001 Connect To Existing 4"-12" Sewer 00 00 00 EA 5 $4,173.29 $20,866.45 16 17 18 19 20 21 22 23 24 25 26 27 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $156,073.46 UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 City of Ft. Worth Proposal DAP-Pennington Concrete & Utilities--9.3.25.xlsm 00 42 43 DAP - BID PROPOSAL Page 3 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Proposal Description Bid Quantit Unit Price Bid Value Project Item Information UNIT PRICE BID Bidlist Item No. Bidder's Application Specification Section No. Unit of Measure 1 3341.1303 6x4 Box Culvert 33 41 10 LF 760 $ 304.80 231,648.00$ 2 3341.1102 4x3 Box Culvert 33 41 10 LF 195 $ 262.36 51,160.20$ 3 3341.1002 3x3 Box Culvert 33 41 10 LF 242 $ 231.43 56,006.06$ 4 3349.0006 Storm Junction Structure 33 49 10 LS 2 $ 38,347.70 76,695.40$ 5 3349.3215 72" Straight Headwall, 3 pipes 33 49 40 EA 1 $ 31,810.65 31,810.65$ 6 3349.4001 SET, Type I for Box Culverts 33 49 40 CY 10 $ 3,640.33 36,403.30$ 7 3137.0107 Block Riprap, dry 31 37 00 SY 75 $ 167.05 12,528.75$ 8 3301.0011 Pre-CCTV Inspection of Storm Drain 33 01 32 LF 685 $ 1.65 1,130.25$ 9 3301.0012 Post-CCTV Inspection of Storm Drain 33 01 32 LF 685 $ 1.65 1,130.25$ 10 3305.0112 Concrete Collar for Manhole 33 05 17 EA 25 $ 947.44 23,686.00$ 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1 3213.0402 7" Concrete Driveway 32 13 20 SF 1072 $7.00 $7,504.00 2 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 2 $550.00 $1,100.00 3 4 5 6 7 8 9 10 11 UNIT IV: PAVING IMPROVEMENTS TOTAL UNIT IV: PAVING IMPROVEMENTS TOTAL UNIT III: DRAINAGE IMPROVEMENTS $8,604.00 $522,198.86 UNIT III: DRAINAGE IMPROVEMENTS TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 City of Ft. Worth Proposal DAP-Pennington Concrete & Utilities--9.3.25.xlsm 00 42 43 DAP - BID PROPOSAL Page 4 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Proposal Description Bid Quantit Unit Price Bid Value Project Item Information UNIT PRICE BID Bidlist Item No. Bidder's Application Specification Section No. Unit of Measure This Bid is submitted by the entity named below: BIDDER:BY: Pennington Concrete & Utilities 13350 Euless St Euless, TX 76040 TITLE: DATE: 180 END OF SECTION Bid Summary Estimator/Project Manager Contractor agrees to complete WORK for FINAL ACCEPTANCE working days after the date when the CONTRACT commences to run as provided in the General Conditions. 9/3/2025 Daniel Weeden Matthew McCormick $1,109,678.46Total Construction Bid $156,073.46 $522,198.86 $8,604.00 $422,802.14 UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT I: WATER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 City of Ft. Worth Proposal DAP-Pennington Concrete & Utilities--9.3.25.xlsm 00 45 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT – DEVELOPER AWARDED PROJECTS DAP Prequalification Statement.docx Form Version September 1, 2015 SECTION 00 45 12 DAP – PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the “Major Work Type” box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water Distribution, Development, 12-inch Diameter and Smaller Wastewater Mains 12” Diameter and Under Pennington Concrete & Utilities, LLC 4/30/2026 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Pennington Concrete & Utilities, LLC BY: Erick Chavero 13350 Euless St Euless, Tx 76040 _________________________________________ (Signature) TITLE: Project Manager DATE: 10/07/2025 END OF SECTION 00 52 43 - 1 Developer Awarded Project Agreement Page 1 of 6 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised June 16, 2016 SECTION 00 52 43 1 AGREEMENTTHIS AGREEMENT, authorized on ______________is made by and between the 2 Developer, CB-Direct Bonds Ranch, LP), authorized to do business in Texas (“Developer”) , 3 and JCK Commercial_____________________________________________________, authorized 4 to do business in Texas, acting by and through its duly authorized representative, 5 (“Contractor”). 6 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, 7 agree as follows: 8 Article 1. WORK 9 Contractor shall complete all Work as specified or indicated in the Contract Documents for 10 the Project identified herein. 11 Article 2. PROJECT 12 The project for which the Work under the Contract Documents may be the whole or only a 13 part is generally described as follows: 14 CopperRanchInfrastructure_______________________________________________________ 15 106150 16 Article 3. CONTRACT TIME 17 3.1 Time is of the essence. 18 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 19 Documents are of the essence to this Contract. 20 3.2 Final Acceptance. 21 The Work will be complete for Final Acceptance within _____calendar days after the 22 date when the Contract Time commences to run as provided in Paragraph 12.04 of the 23 Standard City Conditions of the Construction Contract for Developer Awarded 24 Projects. 25 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 180 Pennington Concrete & Utilities LLC 10/09/2025 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 6 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised June 16, 2016 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that 27 Developer will suffer financial loss if the Work is not completed within the times 28 specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance 29 with Article 10 of the Standard City Conditions of the Construction Contract for 30 Developer Awarded Projects. The Contractor also recognizes the delays, expense 31 and difficulties involved in proving in a legal proceeding the actual loss suffered by 32 the Developer if the Work is not completed on time. Accordingly, instead of requiring 33 any such proof , Contractor agrees that as liquidated damages for delay (but not as 34 a penalty), Contractor shall pay Developer one million, five hundred and sixty 35 thousand, five hundred and thirty one dollars and seventy cents . Dollars 36 ($1,560,531.70) for each day that expires after the time specified in Paragraph 3.2 37 for Final Acceptance until the City issues the Final Letter of Acceptance. 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the 40 Contract Documents an amount in current funds of 41 __________________________________Dollars ($___________________). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between 45 Developer and Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form (As provided by Developer) 49 1) Proposal Form (DAP Version) 50 2) Prequalification Statement 51 3) State and Federal documents (project specific) 52 b. Insurance ACORD Form(s) 53 c. Payment Bond (DAP Version) 54 d. Performance Bond (DAP Version) 55 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 $500.00 1,109,678.46One million one hundred nine thousand six hundred seventy-eight and forty six cents 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 6 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised June 16, 2016 e. Maintenance Bond (DAP Version) 56 f. Power of Attorney for the Bonds 57 g. Worker’s Compensation Affidavit 58 h. MBE and/or SBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by 63 attachment or, if not attached, as incorporated by reference and described in 64 the Table of Contents of the Project’s Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of the 69 Agreement and, if issued, become an incorporated part of the Contract 70 Documents: 71 a. Notice to Proceed. 72 b. Field Orders. 73 c. Change Orders. 74 d. Letter of Final Acceptance. 75 76 77 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 6 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised June 16, 2016 Article 6. INDEMNIFICATION 78 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its 79 own expense, the city, its officers, servants and employees, from and against any 80 and all claims arising out of, or alleged to arise out of, the work and services to be 81 performed by the contractor, its officers, agents, employees, subcontractors, 82 licenses or invitees under this contract. This indemnification provision is 83 specifically intended to operate and be effective even if it is alleged or proven that 84 all or some of the damages being sought were caused, in whole or in part, by any 85 act, omission or negligence of the city. This indemnity provision is intended to 86 include, without limitation, indemnity for costs, expenses and legal fees incurred 87 by the city in defending against such claims and causes of actions. 88 89 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own 90 expense, the city, its officers, servants and employees, from and against any and 91 all loss, damage or destruction of property of the city, arising out of, or alleged to 92 arise out of, the work and services to be performed by the contractor, its officers, 93 agents, employees, subcontractors, licensees or invitees under this contract. 94 This indemnification provision is specifically intended to operate and be effective 95 even if it is alleged or proven that all or some of the damages being sought were 96 caused, in whole or in part, by any act, omission or negligence of the city. 97 98 Article 7. MISCELLANEOUS 99 7.1 Terms. 100 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions 101 of the Construction Contract for Developer Awarded Projects. 102 7.2 Assignment of Contract. 103 This Agreement, including all of the Contract Documents may not be assigned by the 104 Contractor without the advanced express written consent of the Developer. 105 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 005243-5 Deveioper Awarded Project Agreement Page 5 of 6 106 107 10$ 109 110 111 112 113 114 7.3 Successors and Assigns. Developer and Contractor each binds itselt, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shatt be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 115 7.5 Governing Law and Venue. 116 117 118 119 120 121 122 '123 This Agreement, including all of the Contract Documents is perFormable in the State of Texas. Venue shal! be Tarrant County, Texas, or the United States District Court for the Northern District ot Texas, Fort Worth Division. 7.6 Authorityto Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. 124 IN WITNESS WHEREOF, pevetoper and Contractor have executed this Agreement in 125 muftiple counterparts. 126 127 This Agreement is effective as of the tast date signed by the Parties ("Effective Date"). 128 Contractor: Devetoper: Q�.Vln.t v�� tvr� Co�ncve �f �, �!��;1 �fi'e� C d- D�-''e r� ���ds I� �- vl,, �I� CITY OF FORT WORTH Copper R�nch lnfrastruclure STANDARD CONSTRUCTION SPECiFICATI�N DOCUMENTS— DEVELOPER AWARDED PROIECTS �,�'y ��1fi I�(} Revised June 16, 2076 005243-6 Developer Awarded Project Agreement Page 6 of 6 129 By: �� _ � (Signature) �r�� l, c� 'n�l�� v�.S (Printed Name) Title: � � ompany Name: einln� Vi9� 1 ��^ �Ov,Grc'�- � �i'i"1 i� 1-�cS Address: l�3So �Ic.ss S� By � , (Signaturej �I � ��� r�O✓l� (Printed Name) Title: rvi G�1 �, y� r^ Company name: C�- Q� ^ 4�h �3�"d� f L`"ch � �(' Address: � 2'1.Z1 j�"'1 c,.:�" Ur.! �t,�;1z � L-7.a City/State/Zip: � City/State/Zip: � 4`' y� '�X '75 Z, S� � r�SS rT� �flaoco y � �c� 10�-1 �� )�14/tir Date Data CITY OF FORT WORTH Copper Ranch Inlrasiructure STANDARD CONSTRUCTION SPECIFICATION DOCUMENtS— DEVELOPER AWARDED PROJECTS CPN 106t5U Revised June 16, 2016 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS One million one hundred nine thousand sixhundred seventy-eight and forty six cents 006213-2 PERFORMANCEBOND Page 2 of 4 1 ptans, specifications, and contract documents therein referred to, and as well during any 2 period of extension of the Contract that may be granted on the part of the Developer and/or 3 City, then this obligation shall be and become null and void, otherwise to remain in futl force 4 and effect. 5 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shatl lie in 6 Tarrant County, Texas or the United States District Court for the Northern District of Texas, 7 Fort Worth Division. 8 This bond is made and executed in compliance with the provisions of Chapter 2253 9 of the Texas Government Code, as amended, and all liabilities on this bond shall be 10 determined in accordance with the provisions of said statue. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 IN WITNESS WHEREOF, the Principat and the Surety have SIGNED and SEALED this instrument by duty authorized agents and officers on this the iQ��`day ofOG�{v�e�20�. PRINCIPAL: Pennington Concrete and Utilities, LLC ATfEST: ��1!%'�� `�r��:R� �;�'.' _(Principal) Secretary CITY OF FORT WORTH STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS Revised January 31, 2012 13350 Euless St., Euless, TX 76040 BY: I,�_-----� � ' � � ..,-- Signature 4�►qv tD �c�(��jt n�5 Name and Title Address: Copper Ranch Infrastructure CPN ]06150 006213-3 PERFORMANCEBOND Page 3 of 4 , - J �o� ��s �� 2 Witness as to Principal 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Witness as to Surety Crosby Guercio, Witness CIN OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 SURETY: Frankenmuth Insurance Company . :�, ���� . �. Y';i'l:.�i d,n � . . BY: �' d!/ I << — � . lr.� . . � Signature ;,' �` ..:i - ,.'�" 1� ' ' _ ,24 . .17�. _ Sean McCauley, Jr., Attorney-in-Fact , Name and Title Address: 1 Mutual Avenue, Frankenmuth, MI 48787 Telephone Number: 989-480-4369 Copper Ranch Infrastructure CPN 106150 006213-4 PERFORMANCEBOND Page 4 of 4 1 *Note: If signed by an officer of the Surety Company, there must be on file a 2 certified extract from the by-laws showing that this person has authority to 3 sign such obtigation. If Surety's physical address is different from its 4 mailing address, both must be provided. 5 6 The date of the bond shall not be prior to the date the Contract is awarded. 7 CIT`( OF FORT WORTH Copper Ranch Infrastructure STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS CPN 106150 Revised January 31, 2012 006214-1 PAYMENT BOND Page 1 of 3 1 2 3 4 5 6 THE STATE OFTEXAS COUNTY OF TARRANT § SECTION 00 6214 PAYMENT BOND Bond No. SUR4001227 § KNOW ALL BY THESE PRESENTS: § 7 8 9 10 11 12 13 14 15 16 17 18 That we, Pennington Concrete and Utilities, LLC , known as "Principa�" herein, and Frankenmuth Insurance Company , a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, CB-Direct Bonds Ranch, LP, authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of one miltion, one hundred and nine thousand, six hundred and seventy-eight dotlars and forty-six cents ($1,109,678.46), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum welt and tru(y be made jointly unto the Developer and the City as dual obtigees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointty and severalty, firmly by these presents: 19 WHEREAS, Developer and City have entered into an Agreement for the construction 20 of community facilities in the City of Fort Worth, by and through a Community Facilities 21 Agreement, CFA Number 25-0078; and 22 23 24 25 26 WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the ��� day of �iC��il4J� , 20�, which Contract is hereby referred to and made a part hereof for alt purposes as if fully set forth herein, to furnish alt materials, equipment, labor and other accessories as defined by taw, in the prosecution of the Work as provided for in said Contract and designated as Coppe�Ranch lnfrastructure. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principat 28 shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter CI7Y OF FORT WORTH Copper Ranch lnfrastructure STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROIECTS CPN 106150 Revised lanuary 31, 2012 006214-2 PAYMENTBOND Page 2 of 3 1 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the 2 Contract, then this obtigation shatl be and become null and void; otherwise to remain in futl 3 force and effect. 4 This bond is made and executed in comptiance with the provisions of Chapter 2253 5 of the Texas Government Code, as amended, and atl liabilities on this bond shall be 6 determined in accordance with the provisions of said statute. 7 IN WITNESS WNEREOF, the Principal and Surety have each SIGNED and SEALED � 8 this instrument by duly authorized agents and officers on this the �C} day of 9 �C,-�-'��.i-4� . 20 �5 . iIi] PRINCIPAL: Pennington Concrete and Utilities, LLC ATTEST: BY-�� ..0 � —'' G Signature /-�" __.. ,- �'ts�UC �,'Gi�� ��tvtD �C��� C�o Name and Titte Address: 13350 Euless St., Euless, TX 76040 (Principat) Secretary ��--� �i�� � � 5 Witness as to Principat SURETY: CITY OF FORT WORTH Copper Ranch Infrastructure STANDARDCITYCONDITIONS—DEVELOPERAWARDEDPRO)ECTS CPN 106150 Revised January 31, 2012 006214-3 PAYMENT BOND Page 3 of 3 ATTEST: Crosby Guercio, Witness (Surety)���p� �Nv ` Liam Hackett, Witness Witness as to Surety \,,, � �,�.�i�i�, �--��c-17_•� - BY: � '�� _ ; : , „ , Signature '` - Sean McCauley, Jr., Attorney-ir,-Fact Name and Title Address: 1 Mutual Avenue, Frankenmuth, MI 48787 Telephone Number: 989-480-4369 1 2 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 3 bylaws showing that this person has authority to sign such obligation. If Surety's physical 4 address is different from its mailing address, both must be provided. 5 6 The date of the bond shall not be prior to the date the Contract is awarded. 7 0 END OF SECTION c:' \`. CITY OF FORT WORTH Copper Ranch Infrastructure STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 106150 Revised January 31, 2012 FRANKENMiJTEi IIVSURANCE COMPANY I: ��]`:�.�:.�i] � 1� 1I��,7�i al•1 KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth Insurance Company (the "Company"}, a corporation duly organized and existing under the laws of the State of Michigan, having its principal office at 1 Mutual Avenue, Frankenmuth, Michigan 4$78�, does hereby nominate, constitute aod appoint: Sean McCauley, Jr. Sam Duckett, Bridget Truxillo, Sarah Timmons, Ashlyn Simchik, Jarrod Yost Their true and lawful attorney(s)-in-fact, each in their separate capacity if more than one is named above, to make, execute, seal, acknowledge and deIiver any and all bonds, contracts and undertakings of suretyship, with the exception of Financial Guaranty Insurance, provided, however, that the penal sum of any one such instrument shall not exceed the sum of: Fifty Millioa and 0O110Q Dallars ($SO,OOO,OOQ) This Power of Attamey is granted pursuant to the foltowing Resolution duly adopted at a meeting of ihe Board of Directors of Frankenmuth Insurance Company: "RESOLVED, that the President, Seniar Vice President or Viee President and each of them under their respective designations, hereby is authorized to execute powers of attorney, and such autt�ority can be executed by use of facsimile signature, which may be attested or acknowledged by any officer of the Company, qualifying the attorney(s) named in the given power of attorney, to execute on behalf of, and acknowledge as the act and deed of Frankenmuth lnsurance Company on all bonds, contracts and undertakings of suretyship, and ta affix the corporate seal thereta." IN WITNESS WHEREOF, the Company has caused these presents ta be signed and attested by its appropriate officers and its corporate seal hereµatd'�af���ti.kt�is i� day of _;�l t� v�� .U,r> � p:7.'� • ��4j� t x'�"�ti"••.`"j'_ ; ' �t'��, `�'`�•� : �/�.� �4'K� x �(,��.a f � w. Y` '�*k,'t'`-;� ,��, � `� �.. .' � '�; � j�ry,: � .,�� p STAT�F MICtfti�A�{,�° ) CUUNTI�`Y3F;.Cp�'.ti�}AW ) ss: Frankenmuth I urance Company gY � � '� Andrew H. Knudsen �-- President, Chief Operating Of6cer and Secretary Swom to bcfare me, a Notary Public in the State of Michigan, by Andrew H. Knudsen, to me personally known to be the individuai and officer described in, and who exeeuted the preceding instrument, deposeci and said the Carporate Seal and his signature as Offieer were af'tixed and subscribed to said instrument by the authotity of the Company. 4y .. IN TESTIiNONY WHEREOF, 1 bave set my hand, and affixed my O�cial Seal lhis j�I _ day of ���-�,''�'C����'��r ,��%f.� . lCl.c�c,Q,(.t.'i'� °L (Seal) Grr� ��`� �' � '�'�, Susan L. Fresorger, Notary Pu c �x,r�� �'�:��� ��� �-; � � � Saginaw County, State of Michigan ;o ';� � �� �• �, � . My Commission Expires: April 3, 202$ ��,, c- ����� �. � �� I, the undersigned, Chief Executive Ctfficer of Frankenmuth Insurance Company, do hereby certify that the f0�rc�gping is a trii°Aq�`+orrect and complete copy of the original Power of Attomey; that said Power of Attorney has not been revoked ar rescirided and is in�li force and effect as af this date. � � IN WITNESS WHEREOF, I have set my hand and affixed the Seal oithe Co�y, this _� day of �---�_ �' ; :,�',,�� Frederick r�,: Edmonc�, Jr. � Chief Executive Offieer ' '`- : , � . ��: ���� - ;. ALL CORRESPONDENCE kEL�lTED TO BOND VALIDATlQN AND/t7R .9 CLA/My!SOULD BE C;IREC'TED TQ YP SURETY, 701 U.S. ROUT�' ONE, SUITE 1, YARMOUTH, ME 0409d One million one hundred nine thousand sixhundred seventy-eight and forty six cents i 2 3 4 5 6 7 S 9 ]0 11 12 13 14 15 16 17 18 19 20 21 22 23 006219-2 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Coyper Ranch /nfrastruclure CPN 106150 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the Q� day of ���_-t-oY�e.T 3 . 20 Z� . 4 5 6 7 8 9 10 11 ATTEST: 12 13 14 (Princ' ecretary 15 16 17 18 19 �� 20 Wi � s to Principal 21 22 23 24 25 26 27 z8 29 ATTEST: 30 � 31 32 (S rety} �Ashlyn Simchik, Witness 34 ��' .i' �;'�� ' ,� 35 W'itries`s'as to Surety Crosby Guercio, Witness 36 PRINCIPAL: Pennington Concrete and Utilities, LLC BY: � �' c�. Signature ��/�� �/ I, � ��hG��' ��a.ur'_ L��:r�c-/�i- Name and Title Address: 13350 Euless St. Euless, TX 76040 ,:�.�;;; SURETY: , ' ` - Frankenmuth Insurance CoinFany `:-`�.�`..�-� :; � � . �-- l ���=`���z �r. BY: ' Signatur -_ . Y;� : � ; �� �:� Sean McCauley, Jr., Attcrney-�n-Fact � \' ,��' Name and Title " Address: 1 Mutual Avenue ' ; .,�����`�`� � Frankenmuth, MI 48787 Telephone Number: 989-480-4369 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 41 The date of the bond shall not be prior to the date the Contract is awarded. 42 CITY OF FORT WORTH Cop�e�� Ranch Infi�asmuc[ure STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 106l50 Revised January 31, 2012 FRANKENMUT�I INSUItANCE C�MPANY POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth lnsurance Company (the "Company"'), a corparation duly organized and existin$ under the laws of the State of Michigan, having its principal office at 1 Mutual Avenue, Frankenmuth, Michigan 48�87, does hereby nominate, constitute and appoint: Sean McCauley, Jr. Sam Duckett, Bridget Truxillo, Sarah Timmons, Ashlyn Simchik, Jarrod Yost Their true and lawful attorney(s)-in-fact, each in their separate capacety if more than one is named abave, to make, execute, seal, acknowledge and deliver any and all bonds, contracts and undertakings of suretyship, with the exception of Financial Guaranty Insurance, provided, however, that the penal surn of any one such instrument shall not exceed the sum of: Fifty Million and 00/100 Doltars ($50,000,000) This Power of Attomey is granted pursuant to the foltowing Resolutian duly adopted at a meeting of the Board of Directors of Frankenmuth insurance Company: "RESULVED, that the President, Seniar Vice President or Vice President and each of them under their respective designations, hereby is authori2ed to execute powers of attorney, and such autharity can be executed by use af facsimile signature, which may be attested or acknawledgcd by any o�cer of the Campany, qualifying the attorney(s) named in the given power of attorney, ta execute on behalf of, and acknowledge as the act and deed of Frankenmuth Insurance Company on atl bonds, contracts and undertakings of suretyship, and ta affix the corporate seal thereto." IN WITNESS WHEi2EOF, the Company has caused these presents ta be signed and attes�ed by its appropriate officers and its corporate seal here�tt3'�a'�#'i��t�•tl}is � day of _�! � U r �-, �p;2"�. `;u r r,��, . ft r� C�+,i ` � E;��,.'=��.rF' � �� : �;;'.` , ���,s �,' 1: ` ` +. `w'..� .`"4$,; ;�� '�'� "lr ��Y s� ���� � •. �- p;�� STAT�ifjF MIC1��A''I��� ) C�UNTV`iifi��¢�:[�lAW ) ss: Frankenmuth I urance Company By � � Andrew H. Knudsen ;"""~-- President, Chief (7perating Officer and Secretary Sworn to before me, a Notary Public in the State of M ichigan, by Andrew H. Knudsen, to me personally known to be the individuai and officer described in, and who executed the prcceding instrument, deposeci and said the Corporate 5eal and his signature as Officer were aftixed and subscribed to said instrument by the authoriry of the Company. y q . � . �, IiY TESTIMONY WHEREOF, f have set my hand, and affixed my Official Seal this � 7 _ day of ���-�-f'i�t�,�,�<:V�`��� ,�GJ�,j,, /4��1N'f � __--- j�r'� r �� � `� , (Scal) 'r' .�? ? - a1; r �a Susan L. Fresorger, IVotary Pu c �, '�_. `; :�; � � �;. ; Saginaw County, State of Michigan � ,;, - � ,y ,,,• �-� ; My Commission Expires: Apri13, 2028 tl�' '_`�. ��'_;`���' c�: ,� �. � t��.¢ �: ��� � I, the undersigned, Chief Executive Officer of Frankenmuth insurance Company, do hereby certify that the for�gping is a trii'���c`+orrect and complete copy of the original Power of Atcomey; that said Power of Attomey has not been revoked or resciride�l and is in�`uti force and effect as of this date. ��` IN WITNESS WHEREOF, t have set my hand and affixed the Seal of the Co�y, this _____, day af �� �� ��� Frederick A. Edmond, Jr_ Chief Executive Officer ALL CORRESPQNDENCE fi�L,4TE,a ?'O BOND VALIDATION RNDlQR A CLA/M SHOULD BE AIRECTED TO YP SURETY, 7Dl U.S. ROUTB ONE, SUITE IP YARtd1UUTH, ME 04096 Texas Department of Insurance Amended Certificate of Authority License no. 95333 D�pdr°��r�er�t Certification Licensed since: February 18, 1999 = i � Frankenmuth Insurance Company (foreign stock fire and casualty company) organized under the laws of the state of Michigan This entity has complied with the laws of the state of Texas, as applicable, and is authorized to transact the following lines of insurance: Allied Coverages, Auto Physical Damage, Automobile Liability, Boiler 8� Machinery, Burglary & Theft, Employers' Liability, Fidelity & Surety, Fire, Forgery, Glass, Hail, Inland Marine, Liability Other than Auto, Livestock, Ocean Marine, Rain = This amended certificate of authority is in full force and effect until it is revoked, canceled, or suspended according to law. i i � Given under my hand and official seal of office in the city of Austin, I � April 19, 2023 CASSIE BROWN COMMISSIONER OF INSURANCE BY John Carter, Director Company Ll�;�� �s�� �� and Registration Financial Regulation Division Cu� � �� � �I��ioner's order no. 3632 �.�� o�., ^�'v;�.; :� Y , y. .. L!�:4 �".�. * 85327821 COMMERCIAL GENERAL LIABILITY CG 20 38 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES 4R CONTRACTORS - AUTOMATIC STATUS FOR OTHER PARTIES WHEN REQUIRED IN WRITTEN CONSTRUCTION AGREEMENT This endorsement modifies insurance provided under the following: PREMIUM 400 COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above. Such person(s) or organization{s} is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: a. Your acts or omissions; or b. The acts or omissions of those acting on your behalf; in the pertormance of your ongoing operations for the additional insured described in Paragraph 1. or 2. above. However, the insurance afforded to such additional insured described above: a. Only applies to the extent permitted by law; and b. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. A person's or organization's status as an additional insured under this endorsement ends when your operations for the person or organization described in Paragraph 1. above are completed. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to: 1. "Bodily injury", "property damage" or "personal and advertising injury' arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury' or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. 2. "Bodily injury" or "property damage" occurring after: ' a. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be pertormed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or CG 20 38 12 19 O Insurance Services Office, Inc., 2018 Page 1 of 2 b. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: The most we wifl pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the insurance; whichever is less. This endorsement shall applicable limits of insurance applicable limits of not increase the Page 2 of 2 O Insurance Services Office, Inc., 2018 CG 20 38 12 19 POLICY NUMBER: 8 5 3 2 7 8 21 COMMERCIAL GENERAL LIABILITY CG 20 37 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACT�RS - COMPLETED 4PERATIONS This endorsement modifies insurance provided under the following: pREM I UM 1, 10 0 COMMERCIAL GENERAL UABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Orqanization{sJ Location And Description Of Completed Operations ANY PERSON OR ORGANIZATION TO WHOM LOCATIONS DESIGNATED AND YOU HAVE AGREED TO NAME AS ADDIT- DESCRIBED IN THE ABOVE IONAL INSURED BY WRITTEN CONTRACT MENTIONED WRITTEN CONTRACT OR AGREEMENT IF THE CONTRACT OR OR AGREEMENT AGREEMENT IS EXECUTED PRIOR TO LOS� Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products-completed operations hazard". Howeve r: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. CG 20 37 12 19 O Insurance Services Oifice, Inc., 2018 Page 1 of 1 POLICY NUMBER: 85 3 2 7 8 21 COMMERCIAL GENERAL LIABILITY CG 24 0412 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECQVERY AGAINST OTHERS T4 US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITEQ COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION THAT THE INSURED IS REQUIRED BY A CONTRACT TO PROVIDE A WAIVER OF SUBROGATION. Information re�uired to com�lete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section N — Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 04 12 19 O Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number 85327821 COMMERCIAL GENERAL LIABILITY CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CQNDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the additional insured. This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 O Insurance Services Office, Inc., 2018 Page 1 of 1 85327821 CG 72 80 0717 LIMITED EXTENDED ULTRA LIABILITY PLUS ENDORSEMENT COMMERCIAL GENERAL LIABILITY EXTENSION ENDORSEMENT SUMMARY OF COVERAGES This is a summary of the various additional coverages and coverage modifications provided by this endorsement. No coverage is provided by this summary. * Extended Property Damage " Expanded Fire Legal Liability to include Explosion, Lightning and Sprinkler Leakage * Coverage for non-owned watercraft is extended to 51 feet in length * Property Damage - Borrowed Equipmeni * Property Damage Liability - Elevators * Coverage D- Voluntary Property Damage Coverage $5,000 Occurrence with a $10,OD0 Aggregate "` Coverage E- Care, Custody and Control Property Damage Coverage $25,000 Occurrence with a$1d0,000 Aggregate -$50� Deductible * Coverage F- Electronic Data Liability Coverage -$50,000 PREMIUM 200 * Coverage G- Product Recall Expense $25,000 Each Recall Limit with a$50,000 Aggregate -$1,OOQ Deductible " Coverage H- Water Damage Legal Liability -$25,000 * Coverage I- Designated Operations Covered by a Consolidated (Wrap-Up) Insurance Program - Limited Coverage * Increase in Supplementary Payments: Bail Bonds to $1,000 * Increase in Supplementary Payments: Loss of Earnings to $500 "` For newly formed or acquired organizations - extend the reporting requirement to 180 days * Broadened Named Insured * Automatic Additional Insured - Vendors * Automatic Additional Insured - Lessor of Leased Equipment Automatic Status 1Nhen Required in Lease Agreement With You * Automatic Additional Insured - Managers or Lessor of Premises "Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured * Additional Insured - State or Governmental Agency or Subdivision or Political Subdivision - Permits or Authorizations * Additional Insured - Consolidated Insurance Program (Wrap-Up) Off-Premises Operations Only - Owners, Lessees or Contractors Automatic Status When Required in Construction Agreement With You * Additional Insured - Employee Injury to Another Employee * Automatically included - Aggregate Limits of Insurance (per Iocation) * Automatically included - Aggregate Limits of Insurance (per project) * Knowledge of occurrence - Knowledge of an "occurrence", "claim or suiY' by your agent, servant or employee shall not in itself constitute knowledge of the named insured unless an officer of the named insured has received such notice from the agent, servant or employee * Blanket Waiver of Subrogation * Liberalization Condition * Unintentional failure to disclose all hazards. If you unintentionally fail to disclose any hazards existing at the inception date of your policy, we will not deny coverage under this Coverage Form because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non-renewal. *"Insured Contract" redefined for Limited Railroad Contractual Liability � Mobile equipment to include snow removal, road maintenance and street cleaning equipment less than 1,000 Ibs GVW * Bodily Injury Redefined REFER TO THE ACTUAL ENDORSEMENT FOLLOWING ON PAGES 2 THROUGH 12 FOR CHANGES AFFECTING YDUR INSURANCE PROTECTION CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 12 Policy Number 85327821 CG 72 80 07 17 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. LIMITED EXTENDED ULTRA LIABILITY PLUS ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SECTION I - COVERAGES A. The following changes are made at COVERAGE A- BODILY INJURY AND PROPERTY DAMAGE LIABILITY 1. Extended Property Damage At 2. Exclusions exclusion a. Expected or Intended Injury is replaced with the following: "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. 2. Expanded Fire Legal Liability At 2. Exclusions the last paragraph is deleted and replaced by the following: Exclusions c. through n. do not apply to damage by fire, explosion, lightning, smoke resulting from such fire, explosion, or lightning or sprinkler leakage to premises while rented to you or temporarily occupied by you with permission of this owner. A separate limit of insurance applies to this coverage as described in SECTION III - LIMITS OF INSURANCE. 3. Non-Owned Watercraft At 2. Exclusions exclusion g. Aircraft, Auto Or Watercraft (2)(a) is deleted and replaced by the folfowing: (a) Less than 51 feet long; 4. Property Damage — Borrowed Equipment At 2. Exclusions the following is added to paragraph (4) of exclusion j. Damage To Property: This exclusion does not apply to "property damage" to borrowed equipment while at a jobsite and while not being used to perform operations. The most we will pay for "property damage" to any one piece of borrowed equipment under this coverage is $25,000 per occurrence. The insurance afforded under this provision is excess over any valid and collectible property insurance (including deductible) available to the insured, whether primary, excess, contingent or on any other basis, 5. Property Damage Liability — Elevators At 2. Exclusions the following is added to paragraphs (3), (4) and (6) of exclusion j. Damage To Property: This exclusion does not apply to "property damage" resulting from the use of elevators. However, any insurance provided for such "property damage" is excess over any valid and collectible property insurance (including deductible) available to the insured, whether primary, excess, contingent or on any other basis. B. The following coverages are added: 1. COVERAGE D- VOLUNTARY PROPERTY DAMAGE COVERAGE "Property damage" to property of others caused by the insured: a. While in your possession; or b. Arising out of "your work". Coverage applies at the request of the insured, whether or not the insured is legally obligated to pay. For the purposes of this Voluntary Property Damage Coverage only: Exclusion j. Damage to Property is deleted and replaced by the following: CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 2 of 72 CG 72 80 07 17 j. Damage to Property "Property damage" to: {1) Property held by the insured for servicing, repair, storage or sale at premises you own, rent, lease, operate or use; (2) Property transported by or damage caused by any "automobile", "watercraft" or "aircraft" you own, hire or lease; (3) Property you own, rent, lease, borrow or use. The amount we will pay is limited as described below in SECTION III - LIMITS OF INSURANCE For the purposes of this Voluntary Property Damage Coverage, our right and duty to defend ends when we have paid the Limit of Liability or the Aggregate Limit for each coverage, and we are granted discretion in making payments under this coverage. 2. COVERAGE E- CARE, CUSTODY AND CONTROL PROPERTY DAMAGE COVERAGE For the purpose of this Care, Custody and Control Property Damage Coverage only: a. Item (4) of Exclusion j, does not apply. The amount we will pay is limited as described below in SECTION III - LIMITS OF INSURANCE For the purposes of this Care, Custody and Control Property Damage Coverage, our right and duty to defend ends when we have paid the Limit of Liability or the Aggregate Limit for each coverage, and we are granted discretion in making payments under this coverage. 3. COVERAGE F- ELECTRONIC DATA LIABILITY COVERAGE For the purposes of this Electronic Data Liability Coverage only: a. Exclusion p. of Coverage A— Bodily Injury And Property Damage Liability in Section I— Coverages is replaced by the following: 2. Exclusions This insurance does not apply to: p. Electronic Data Damages arising out of the loss of, loss of use of, damage to, corruption of, inability to access, or inability to manipulate "electronic data" that does not result from physical injury to tangible property. However, this exclusion does not apply to liability for damages because of "bodily injury". b. "Property Damage" means: (1) Physical injury to tangible property, including all resulting loss of use of that property. All such Ioss of use shall be deemed to occur at the time of the physical injury that caused it; or {2) Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the "occurrence" that caused it; or (3) Loss of, loss of use of, damage to, corruption of, inability to access or inability to properly manipulate "electronic data", resulting from physical injury to tangible property. All such loss of "electronic data" shall be deemed to occur at the time of the "occurrence° that caused it. For the purposes of this Electronic Data Liability Coverage, "electronic data" is not tangible property. The amount we will pay is limited as described below in SECTION III - LIMITS OF INSURANCE 4. COVERAGE G- PRODUCT RECALL EXPENSE a. Insuring Agreement (1) We will pay 90% of "product recall expense" you incur as a result of a"product recall" you initiate during the coverage period. (2) We will only pay for "product recall expense" arising out of "your products" which have been physically relinquished to others. The amount we will pay is limited as described below in SECTION III - LIMITS OF INSURANCE CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 3 of 12 CG 72 80 07 17 b. Exclusions This insurance does not apply to "product recall expense" arising out of: (1) Any fact, circumstance or situation which existed at the inception date of the policy and which you were aware of, or could reasonably have foreseen that would have resulted in a"product recall". (2) Deterioration, decomposition or transformation of a chemical nature, except if caused by an error in the manufacture, design, processing, storage, or transportation of "your product". (3) The withdrawal of similar products or batches that are not defective, when a defect in another product or batch has been found. (4) Acts, errors or omissions of any of your employees, done with prior knowledge of any of your officers or directors. (5) Inherent vice, meaning a natural condition of property that causes it to deteriorate or become damaged. (6) "Bodily Injury" or "Property Damage". (7) Failure of "your product" to accomplish its intended purpose, including any breach of warranty of fitness, quality, efficacy or efficiency, whether written or implied. (8) Loss of reputation, customer faith or approval, or any costs incurred to regain customer market, or any other consequential damages. (9) Legal fees or expenses. (10) Damages claimed for any loss, cost or expense incurred by you or others for the loss of use of "your product". (11) "Product recall expense" arising from the "product recall" of any of "your products" for which coverage is excluded by endorsement. (72) Any "product recall" initiated due to the expiration of the designated shelf life of "your producY'. 5. COVERAGE H- WATER DAMAGE LEGAL LIABILITY The Insurance provided under Coverage H(Section I) applies to "property damage" arising out of water damage to premises that are both rented to and occupied by you. The Limit under this coverage shall not be in addition to the Damage To Premises Rented To You Limit. The amount we will pay is limited as described below in SECTION III - LIMITS OF INSURANCE 6. COVERAGE I— DESIGNATED OPERATIONS COVERED BY A CONSOLIDATED (WRAP-UP) INSURANCE PROGRAM The following exclusion is added to Paragraph 2. Exclusions of SECTION I— COVERAGES COVERAGE A— BODILY INJURY AND PROPERTY DAMAGE LIABILITY: r. This insurance does not apply to "bodily injury" or "property damage" arising out of either your ongoing operations or operations included within the "products-completed operations hazard" for any "consolidated (Wrap-up) insurance program" which has been provided by the prime contractar / project manager or owner of the construction project in which you are involved. � This exclusion applies whether or not a consolidated (Wrap-up) insurance program: a. Provides coverage identical to that provided by this Coverage Part; or b. Has limits adequate to cover all claims. This exclusion does not apply if a"consolidated (Wrap-up) insurance program" covering your operations has been cancelled, non-renewed or otherwise no longer applies for reasons other than exhaustion of all available limits, whether such limits are available on a primary, excess or on any other basis. You must advise us of such cancellation, nonrenewal or termination as soon as practicable. For purposes of this exclusion a"consolidated (wrap-up) insurance program" is a program providing insurance coverage to all parties for exposures involved with a particular (typically major) construction project. CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 4 of 12 cc �z so 07 � 7 C. SUPPLEMENTARY PAYMENTS - COVERAGES A AND B is amended: 1. To read SUPPLEMENTARY PAYMENTS 2. Bail Bonds Item 1.b. is amended as follows: b. Up to $1,000 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 3. Loss of Earnings Item 1.d. is amended as follows: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit", including actual loss of earnings up to $500 a day because of time off from work. 4. The following language is added to Item 1. However, we shall have none of the duties set forth above when this insurance applies only for Voluntary Property Damage Coverage andlor Care, Custody or Control Property Damage Coverage and we have paid the Limit of Liability or the Aggregate Limit for these coverages. SECTION II - WHO IS AN INSURED A. The following change is made: Extended Reporting Requirements Item 3.a. is deleted and replaced by the following: a. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier. B. The following provisions are added: 4. BROAD FORM NAMED INSURED Item 1.f. is added as follows: f. Any legally incorporated entity of which you own more than 50 percent of the voting stock during the policy period only if there is no other similar insurance available to that entity. However: (1) Coverage A does not apply to "bodily injury" or "property damage" that occurred before you acquired more than 50 percent of the voting stock; and {2) Coverage B does not apply to "personal and advertising injury" arising out of an offense committed before you acquired more than 50 percent of the voting stock. 5. Additional Insured - Vendors a. Any person(s) or organization{s) (referred to throughout this additional coverage as vendor), but only with respect to "bodily injury" or "property damage", which may be imputed to that person(s) or organization(s) arising out of "your products" shown with the Schedule which are distributed or sold in the regular course of the vendor's business is an insured. However: (1) The insurance afforded to such vendor only applies to the extent permitted by law; and (2) If coverage provided to the vendor is required by a contract or agreement, the insurance afforded to such vendor will not be broader than that which you are required by the contract or agreement to provide for such vendor. b. With respect to the insurance afforded to these vendors, the following additional exclusions apply: (1) This insurance afforded the vendor does not apply to: (a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement; (b) Any express warranty unauthorized by you; CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with iis permission. Page 5 of 12 CG 72 80 07 17 (c) Any physical or chemical change in the product made intentionally by the vendor; (d) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container. (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of products. (f} Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product. (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor. (h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: i. The exceptions contained in Sub-paragraphs d. or f.; or ii. Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. 6. Additional Insured — Lessor of Leased Equipment — Automatic Status When Required in Lease Agreement With You a. Any person(s) or organization(s} from whom you lease equipment when you and such person(s) or organization(s) have agreed in writing in a contract or agreement that such person(s) or organization(s) be added as an additional insured on your policy. Such person(s) or organization(s) is an insured only with respect to your liability for "bodily injury", "property damage" or "personal and advertising injury" directly arising out of the maintenance, operation or use of equipment leased to you, which may be imputed to such person or organization as the lessor of equipment. However, the insurance afforded to such additional insured: (1) Only applies to the extent permitted by law; and (2) Will not be •broader than that which you are required by the contract or agreement to provide for such additional insured. A person's or organization's status as an additional insured under this endorsement ends when their contract or agreement with you for such leased equipment ends. b. With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place afler the equipment lease expires. 7. Additional Insured — Managers or Lessors of Premises a. Any person{s) or organization(s), but only with respect to liability arising out of the ownership, maintenance or use of that part of the premises feased to you and subject to the following additional exclusions: This insurance does not apply to: (1) Any "occurrence" which takes place after you cease to be a tenant in that premises. (2) Structural alterations, new construction or demolition operations performed by or on behalf of the person(s) or organizatiorl(s) shown in the Schedule. However: (1) The insurance afforded to such additional insured only applies to the extent permitted by law; and (2) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded io such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 6 of 12 CG 72 80 07 17 8. Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured a. Any archiiects, engineers or surveyors who are not engaged by you are insureds, but only with respect to liability for "bodily injury" or "property damage" or "personal and advertising injury" which may be imputed to that architect, engineer or surveyor arising out of: (1) Your acts or omissions; or (2) Your acts or omissions of those acting on your behalf; in the performance of your ongoing operations performed by you or on your behalf. But only if such architects, engineers or surveyors, while not engaged by you, are contractually required to be added as an additional insured to your policy. However, the insurance afforded to such additional insured: (1) Only applies to the extent permitted by law; and (2) Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. b. With respect to ihe insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of or failure to render any professional services, including: (1) The preparing, approving, or failing to prepare or approve, maps, drawings, opinions, reports, surveys, change orders, designs or specifications; or (2) Supervisory, inspection or engineering services. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional services. 9. Additional Insured - State or Governmental Agency or Subdivision or Political Subdivision - Permits or Authorizations Any state or governmental agency or subdivision or political subdivision is an insured, subject to the following provisions: a. This insurance applies only with respect to operations performed by you or on your behalf for which the state or governmental agency or subdivision or political subdivision has issued a permit or authorization. However: {1) The insurance afforded to such additional insured only applies to the extent permitted by law; and (2) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. b. This insurance does not apply to: (1) "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or (2} "Bodily injury" or "property damage" included within the "products-completed operations hazard". 10. Additional Insured Consolidated Insurance Program {Wrap-Up) Off-Premises Operations Only - Owners, Lessees or Contractors a. Any persons or organizations for whom you are performing operations, for which you have elecied to seek coverage under a Consolidated Insurance Program, when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy is an insured. Such person or organization is an additional insured only with respect to your liability which may be imputed to that person or organization directly arising out of your ongoing operations performed for that person or organization at a premises other than any project or location that is designated as covered under a Consolidated Insurance Program. A person's or organization's status as an insured under this endorsemeni ends when your operations for that insured are completed. CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 7 of 12 CG 72 80 07 17 b. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies. This insurance does not apply to: "Bodily injury", "property damage", or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and (2) Supervisory, inspection 11. Additional Insured - Employee Injury to Another Employee Wiih respect to your "employees" who occupy positions which are supervisory in nature: Paragraph 2.a.{1) of SECTION II — WHO IS AN INSURED is amended to read: a. "Bodily injury" or "personal and advertising injury" (1) To you, to your partners or members (if you are a partnership or joint venture), or to your members (if you are a limited liability company); (2) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in paragraph (1)(a) above; or (3) Arising out of his or her providing or failing to provide professional healthcare services. Paragraph 3.a. is deleted. For the purpose of this Item 91 only, a position is deemed to be supervisory in nature if that person performs principle work which is substantially different from that of his or her subordinates and has authority to hire, direct, discipline or discharge. SECTION III - LIMITS OF INSURANCE A. The following Items are deleted and replaced by the following: 2. The General Aggregate Limit is the most we will pay for the sum of: a. Medical expenses under Coverage C; b. Damages under Coverage A,, except damages because of "bodily injury" or "property damage" included in the "products-completed operations hazard'; and c. Damages under Coverage B; and d. Damages under Coverage H. 3. The Products-Completed Operations Aggregate Limit is the most we will pay under Coverage A for damages because of "bodily injury" and "property damage" included in the "products-completed operations hazard" and Coverage G. 6. Subject to 5. above, the Damage to Premises Rented to You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, whi�e rented to you, or in the case of damage by fire, explosion, lightning, smoke resulting from such fire, explosion, or lightning or sprinkler leakage while rented to you or temporarily occupied by you with permission of the owner. B. The following are added: 8. Subject to Paragraph 5. of SECTION III — LIMITS OF INSURANCE $25,000 is the most we will pay under Coverage H for Water Damage Legal Liability. 9. Coverage G- Product Recall Expense Aggregate Limit $50,000 Each Product Recall Limit $25,000 a. The Aggregate Limit shown above is the most we will pay for the sum of all "product recall expense" you incur as a result of all "product recalls" you initiate during the endorsement period. CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 8 of 12 CG 72 80 07 17 b. The Each Product Recall Limit shown above is the most we will pay, subject to the Aggregate and $1,000 deductible, for "product recall expense" you incur for any one "product recall" you initiate during the endorsement period. We will only pay for the amount of Product Recall Expenses which are in excess of the deductible amount. The deductible applies separately to each Product Recall. The limits of insurance will not be reduced by the amount of this deductible. We may, or will if required by law, pay all or any part of any deductible amount. Upon notice of our payment of a deductible amount, you shall promptly reimburse us for the part of the deductible amount we paid. 10. Aggregate Limits of Insurance (Per Location) The General Aggregate Limit applies separately to each of your "locations" owned by or rented to you or temporarily occupied by you with the permission of the owner. "Location" means premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad. 11. Aggregate Limits of Insurance (Per Project) The General Aggregate Limit applies separately to each of your projects away from premises owned by or rented to you. 12. With respects to the insurance afforded to additional insureds afforded coverage by items 5 through 11 of SECTION II — WHO IS AN INSURED above, the following is added: The most we will pay on behalf of the additional insured is the amount of insurance: a. Required by the contract or agreement; b. Available under the applicable Limits of Insurance shown in•the Declarations; Whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. 13. Subject to 5. of SECTION III — LIMITS OF INSURANCE, a$5,000 "occurrence" �imit and a$10,000 "aggregate" limit is the most we will pay under Coverage A for damages because of "property damage" covered under Coverage D- Voluntary Property Damage Coverage. For the purposes of this Voluntary Property Damage Coverage, our right and duty to defend ends when we have paid the Limit of Liability or the Aggregate Limit for each coverage, and we are granted discretion in making payments under this coverage. 14. Subject to 5. of SECTION III — LIMITS OF INSURANCE, a$25,000 "occurrence" limit and a$100,000 "aggregate" limit is the most we will pay under Coverage E- Care, Custody and Control Coverage regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". Deductible - Our obligation to pay damages on your behalf applies only to the amount of damages in excess of $500. This deductible applies to all damages because of "property damage" as the result of any one "occurrence" regardless of the number of persons or organizations who sustain damages because of that "occurrence". We may pay any part or all of the deductible amount to effect settlement of any claim or "suiY' and upon notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as has been paid by us. As respects this coverage "Aggregate" is the maximum amount we will pay for all covered "occurrences" during one policy period. CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 9 of 12 CG 72 80 07 17 For the purposes of this Care, Custody and Control Property Damage Coverage, our right and duty to defend ends when we have paid the Limit of Liability or the Aggregate Limit for each coverage, and we are granted discretion in making payments under this coverage. 15. Subject to 5. of SECTION III — LIMITS OF INSURANCE, the most we will pay for "property damage" under Coverage F- Electronic Data Liability Coverage for loss of °electronic data" is $50,000 without regard to the number of "occurrences". SECTION IV - C�MMERCIAL GENEFtAL LIABILITY C�NDlTIDNS A. The following conditions are amended: 1. Knowledge of Occurrence a. Condition 2., Items a. and b. are deleted and replaced by the following: (1) Duties In The Event Of Occurrence, Offense, Claim Or Suit � (a) You must see to it that we are notified as soon as practicable of an "occurrence" or an offense which may result in a claim. Knowledge of an "occurrence" by your agent, servant or employee shall not in itseff constitute knowledge of the named insured unless an officer of the named insured has received such notice from the agent, servant or employee. To the extent possible, notice should include: i. How, when and where the "occurrence" took place; ' ii. The names and addresses of any injured persons and witnesses, and iii. The nature and location of any injury or damage arising out of the "occurrence" or offense. (b) If a claim is made or "suit" is brought against any insured, you must: i. Immediately record the specifics of the claim or "suit" and the date received; and ii. Notify us as soon as practicable. You must see to it that we receive written notice of the claim or "suiY' as soon as practicable. Knowledge of a claim or "suit" by your agent, servant or employee shall not in itself constitute knowledge of the named insured unless an officer of the named insured has received such notice from the agent, servant or employee. 2. Where Broad Form Named Insured is added in SECTION II — WHO IS AN INSURED of this endorsement, Condition 4. Other Insurance b. Excess Insurance (1).(a) is replaced by the following: (a) Any of the other insurance, whether primary, excess, contingent or on any other basis, that is available to an insured solely by reason of ownership by you of more than 50 percent of the voting stock, and not withstanding any other language in any other policy. This provision does not apply to a policy written to apply specifically in excess of this policy. B. The following are added: 10. Condition (5) of 2.c. (5) Upon our request, replace or repair the property covered under Voluntary Property Damage Coverage at your actual cost, excluding profit or overhead. 11. Blanket Waiver Of Subrogation We waive any right of recovery we may have against any person or organization because of payments we make for injury or damage arising out of: premises owned or occupied by or rented or loaned to you, ongoing operations perFormed by you or on your behalf, done under a contract with that person or organization, "your work", or "your products". We waive this right where you have agreed to do so as part of a written contract, executed by you before the "bodily injury" or "property damage" occurs or the "personal and advertising injury" offense is committed. 12. Liberalization If a revision to this Coverage Part, which would provide more coverage with no additional premium becomes effective during the policy period in the state designated for the first Named Insured shown in the Declarations, your policy will automatically provide this additional coverage on the effective date of the revision. CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 10 of 12 CG 72 80 07 17 13. Unintentional Failure to Disclose All Hazards Based on our reliance on your representations as to existing hazards, if you unintentionally should fail to disclose all such hazards at the inception date of your policy, we will not deny coverage under this Coverage Part because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non-renewal. 14. The following conditions are added in regard to Coverage G- Product Recall Expense In event of a"product recall", you must a. See to it that we are notified as soon as practicable of a"product recall". To the e�ent possible, notice should include how, when and where the "product recall" took place and estimated "product recall expense". b. Take all reasonable steps to minimize "product recall expense". This will not increase the limits of insurance. c. If requested, permit us to question you under oath at such times as may be reasonably required about any matter relating to this insurance or your claim, including your books and records. Your answers must be signed. d. Permit us to inspect and obtain other information proving the loss. You must send us a signed, sworn statement of loss containing the information we request to investigate the claim. You must do this within 60 days after our request. e. Cooperate with us in the investigation or settlement of any claim. f. Assist us upon our request, in the enforcement of any rights against any person or organization which may be liable to you because of loss to which this insurance applies. 15. Limited Railroad Contractual Liability The following conditions are applicable only to coverage afforded by reason of the redefining of an "insured contracY' in the DEFINITIONS section of this endorsement: a. Railroad Protective Liability coverage provided by ISO form CG 0035 with minimum limits of $2,000,000 per occurrence and a$6,000,000 general aggregate limit must be in place for the entire duration of any project. b. Any amendment to the Other Insurance condition of form CG 0035 alters the primacy of the coverage or which impairs our right to contribution will rescind any coverage afforded by the redefined "insured contracY' language. c. For the purposes of the Other Insurance condition of form CG 0035 you, the named insured, will be deemed to be the designated contractor. SECTION V - DEFINITIONS A. At item 12. Mobile Equipment the wording at f.(1} is deleted and replaced by the following: f.(1) Equipment designed primarily for: (a) Snow removal; (b) Road maintenance, but not construction or resurfacing; or (c) Street cleaning; except for such vehicles that have a gross vehicle weight less than 1,000 Ibs which are not designed for highway use. B. Item 3. "bodily injury" is deleted and replaced with the following: 3. "bodily injury" means physical injury, sickness or disease sustained by a person. This includes mental anguish, mental injury, shock, fright or death that results from such physical injury, sickness or disease. C. Item 9. "Insured ContracY' c. is deleted and replaced with the following: c. Any easement or license agreement; CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 11 of 12 CG 72 80 07 17 D. Item 9. "Insured Contract" f.(1) is deleted E. The following definitions are added for this endorsement only: 23. "Electronic data" means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software, including systems and applications software, hard or floppy disks, CD-ROMS, tape drives, cells, data processing devices or any other media which are used with electronically controlled equipment. 24. "Product recall" means a withdrawal or removal from the market of "your product" based on the determination by you or any regulatory or governmental agency that: a. The use or consumption of "your producY' has caused or will cause actual or alleged "bodily injury" or "property damage"; and b. Such determination requires you to recover possession or control of "your product" from any distributor, purchaser or user, to repair or repface "your product", but only if "your producY' is unfit for use or consumption, or is hazardous as a result of: (1} An error or omission by an insured in the design, manufacturing, processing, labeling, storage, or transportation of "your product"; or (2) Actual or alleged intentional, malicious or wrongful alteration or contamination of "your producY' by someone other than you. 25. "Product recall expense"means reasonable and necessary expenses for: a. Telephone, radio and television communication and printed advertisements, including stationery, envelopes and postage. b. Transporting recalled products from any purchaser, distributor or user, to locations designated by you. c. Remuneration paid to your employees for overtime, as well as remuneration paid to additional employees or independent contractors you hire. d. Transportation and accommodation expense incurred by your employees. e. Rental expense incurred for temporary locations used to store recalled products. f. Expense incurred to properly dispose of recalled products, including packaging that cannot be reused. g. Transportation expenses incurred to replace recalled products. h. Repairing, redistributing or replacing covered recalled products with like products or substitutes, not to exceed your original cost of manufacturing, processing, acquisition and/or distribution. These expenses must be incurred as a result of a"product recall". CG 72 80 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 12 of 12 COMMERCIAL GENERAL LIABILITY POLICY NUMBER: g5327821 CG 02 05 12 04 THIS ENDORSEMENT CHANGES THE P�LICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION PROVISIONS OR COVERAGE CHANGE This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCT WITHDRAINAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: SCHEDULE I1. Name: PER SCHEDULE ON FILE � Address: CANCELLATION FOR NONPAYMENT OF PREMIUM 10 DAYS i 3. Number of days advance notice: 3 0 Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 02 05 12 04 O ISO Properties, Inc., 2003 Page 1 of 1 Policy Number 85327821 COMMERCIAL AUT� CA 71 09 01 17 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS A�UTO ULTRA ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM COMMON POLICY CONDITIONS COVERAGEINDEX DESCRIPTION � Temporary Substitute Auto Physical Damage � Broad Form Insured Employee as Insureds Additional Insured Status by Contract, Agreement or Permit IBail Bond Coverage Loss of Earnings Coverage Amended Fellow Employee Coverage ITowing and Labor � Physical Damage Additional Transportation Expense Coverage � Extra Expense - Theft Rental Reimbursement and Additional Transportation Expense Personal Effects Coverage � Personal Property of Others ILocksmith Coverage � Vehicle Wrap Coverage Airbag Accidental Discharge � Audio, Visual and Data Electronic Equipment Coverage � Auto Loan/Lease Total Loss Protection � Glass Repair — Deductible Amendment � Amended Duties in the Event of Accident, Claim, Suit or Loss IWaiver of 5ubrogation Required by Contract + Unintentional Failure to Disclose I Hired, Leased, Rented or Borrowed Auto Physical Damage � Mental Anguish _ � Extended Cancellation Condition PAGE 2 2 2 2 3 3 3 3 3 3 4 4 4 4 5 5 5 5 5 6 6 6 6 7 7 1 _� 1 � ..l 1 J --1 I I _l The COVERAGE INDEX set forth above is informational only and grants no coverage. Terms set forth in (Bold /ta/ics) are likewise for information only and by themselves shall be deemed to grant no coverage. CA 71 09 U1 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 7 (Temporary Substitute Auto Physical Damage) A. TEMPORARY SUBSTITUTE AUTO PHYSICAL DAMAGE SECTION I— COVERED AUTOS, paragraph C. Certain Trailers, Mobile Equipment and Temporary Substitute Autos is amended by adding the following at the end of the existing language: If Physical Damage Coverage is provided under this Coverage form for an "auto" you own, the Physical Damage coverages provided for that owned "auto" are extended to any "auto" you do not own while used with the permission of its owner as a temporary substitute for the covered "auto" you own that is out of service because of its breakdown, repair, servicing, "loss", or destruction B. BROADENED LIABILITY COVERAGES SECTION II — LIABILITY COVERAGE in Paragraph A. Coverage at 1. Who Is An Insured is amended to include the following: (Broad Form Insured) d. Any legally incorporated subsidiary in which you own more than 50% of the voting stock on the effective date of the Coverage Form. However, the Named Insured does not include any subsidiary that is an "insured" under any other automobile policy or would be an "insured" under such a policy but for its termination or the exhaustion of its Limit of Insurance. e. Any organization that is acquired or formed by you, during the term of this policy and over which you maintain majority ownership. However, the Named Insured does not include any newly formed or acquired organization: (1) That is a joint venture or partnership, (2) That is an "insured" under any other policy, (3) That has exhausted its Limits of Insurance under any other policy, or (4) 180 days or more after its acquisition or formation by you, unless you have given us notice of the acquisition or formation Coverage does not apply to "bodily injury" or "property damage" that results from an accident that occurred before you formed or acquired the organization. (Employee as Insureds) f. Any employee of yours while acting in the course of your business or your personal affairs while using a covered "auto" you do not own, hire or borrow. (Addifional lnsured Status by Contract, Agreement or Permit) g. Any person or organization whom you are required to add as an additional insured on this policy under a written contract or agreement; but the written contract or agreement must be: (1) Currently in effect or becoming effective during the term of this policy; and (2) Executed prior to the "bodily injury" or "property damage." The additional insured status will apply only with respect to your liability for "bodily injury" or "property damage" which may be imputed to that person(s) or organization(s) directly arising out of the ownership, maintenance or use of the covered "autos" at the location(s) designated, if any. Coverage provided by this endorsement will not exceed the limits of liability required by the written contract or written agreement even if the limits of liability stated in the policy exceed those limits. This endorsement shall not increase the limits stated in Section II. C. Limits of Insurance. For any covered "auto" you own this Coverage Form provides primary coverage. Page 2 of 7 Includes copyrighted material of Insurance Services Office, Inc., with its permission. CA 71 09 01 77 C. BROADENED SUPPLEMENTARY PAYMENTS SECTION II. LIABILITY A. Coverage 2. Coverage Extensions a. Supplementary Payments (2) and (4) are replaced by the following: (Bail Bond Coverage) (2) Up to $5,000 for cost of bail bonds (including bonds for related traffic violations) required because of an "accidenY' we cover. We do not have to furnish these bonds. (Loss of Earnings Coverage) (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earning up to $500 a day because of time off from work. (Amended Fellow Employee Exclusion) D. AMENDED FELLOW EMPLOYEE EXCLUSION Only with respect to your "employees" who occupy positions which are supervisory in nature, SECTION II. LIABILITY B. Exclusion 5. Fellow Employee is replaced by: 5. Fellow Employee "Bodily Injury": a. To you, or your partners or members (if you are a partnership or joint venture), or to your members (if you are a limited liability company); b. To your "executive officers" and directors (if you are an organization other than a partnership, joint venture, or limited liability company) but only with respect to performance of their duties as your officers or directors; c. For which there is an obligation to share damages with or repay someone else who must pay damages because of the injury described in paragraph a and b above; or d. Arising .out of his or her providing or failing to provide professional health care services. For purposes of this endorsement, a position is deemed to be supervisory in nature if that person perForms principle work which is substantially different from that of his or her subordinates and has authority to hire, transfer, direct, discipline or discharge. E. BROADENED PHYSICAL DAMAGE COVERAGES SECTION III — PHYSICAL DAMAGE COVERAGE A. Coverage is amended as follows: (Towing and Labor) 2. Towing is deleted and replaced with the following: 2. Towing and Labor We will pay towing and labor costs incurred, up to the limits shown below, each time a covered "auto" is disabled: a. For private passenger type vehicles we will pay up to $100 per disablement. b. For all other covered "auto's" we will pay up to $500 per disablement However, the labor must be performed at the place of disablement. (Physica! Damage Additional Transportation Expense Coverage) 4. Coverage Extensions a. Transportation Expenses is amended to provide the following limits: We will pay up to $60 per day to a maximum of $1,800. All other terms and provisions of this section remain applicable. The following language is added to 4. Coverage Extensions: (Extra Expense — Theft) c. Theft Recovery Expense If you have purchased Comprehensive Coverage on an "auto" that is stolen, we will pay the expense of returning that stolen auto to you. The limit for this coverage extension is $5,000. CA 71 09 01 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 3 of 7 (Rental Reimbursement and Additional Transportation E�ense) d. Rental Reimbursement We will provide Rental Reimbursement and Additional Expense coverage only for those Physical Damage coverages for which a premium is shown in the Declarations or schedule pages. Coverage applies only to a covered "auto". (1) We will pay for auto rental expense and the expense incurred by you because of "loss" to remove and transfer your materials and equipment from a covered "auto" to a covered "auto." Payment applies in addition to the otherwise applicable coverage you have on a covered "auto." No deductible applies to this coverage. (2) We will pay only for expenses incurred during the policy period and beginning 24 hours after the "loss" and ending, regardless of the policy's expiration, with the lesser of the following number of days: (a) The number of days reasonably required to repair or replace the covered "auto." If "loss" is caused by theft, this number of days is added to the number of days it takes to locate the covered "auto" and return it to you, or (b) 30 days. (3) Our payment is limited to the lesser of the following amounts: (a) Necessary and actual expenses incurred; or (b) $75 per day. (c) This coverage does not apply while there are spare or reserve• "autos" available to you for your operations. (d) If "loss" results from the total theft of a covered "auto" of the private passenger or light truck type, we will pay under this coverage only that amount of your rental reimbursement expense which is not already provided for under the SECTION III — PHYSICAL DAMAGE COVERAGE, A. Coverage, 4. Coverage Extensions, a. Transportation Expenses. (Persona! Effects Coverage) e. Personal Effects If you have purchased Comprehensive Coverage on this policy for an "auto" you own and that "auto" is stolen, we will pay, without application of a deductible, up to $500 for Personal Effects stolen with the "auto". The insurance provided under this provision is excess over any other collectible insurance. For this coverage extension, Personal Effects means tangible property that is worn or carried by an "insured". (Personal Property of Others) f. Personal Property of Others We will pay up to $500 for loss to personal property of others in or on your covered "auto." This coverage applies only in the event of "loss" to your covered "auto" caused by fire, lightning, explosion, theft, mischief or vandalism, the covered "auto's" collision with another object, or the covered "auto's" overturn. No deductibles apply to this coverage. (Locksmith Coverage) g. Locksmith Coverage We will pay up to $250 per occurrence for necessary locksmith services for keys locked inside a covered private passenger "auto". The deductible is waived for these services. Page 4 of 7 Includes copyrighted material of Insurance Services Office, Inc., with its permission. CA 71 09 01 17 (Vehicle Wrap Coverage} h. Vehicle Wrap Coverage If you have Comprehensive or Collision coverage on an "auto" that is a total loss, in addition to the actual cash value of the "auto", we will pay up to $1,000 for vinyl vehicle wraps which are displayed on the covered "auto" at the time of total loss. Regardless of the number of autos deemed a total loss, the most we will pay under this Vehicle Wrap Coverage for any one "loss" is $5,000. For purposes of this coverage provision, signs or other graphics painted or magnetically affixed to the vehicle are not considered vehicle wraps. (Airbag Accidental Discharge) F. SECTION III — PHYSICAL DAMAGE COVERAGE, B. Exclusions is amended at 3. to include the following language: If you have purchased Comprehensive or Collision Coverage under this policy, this exclusion does not apply to mechanical breakdown relating to the accidental discharge of an air bag. This coverage applies only to a covered auto you own and is excess of any other collectible insurance or warranty. No deductible applies to this coverage. G. BROADENED LIMITS OF INSURANCE (Audio, Visual and Data Electronic Equipment Coverage) SECTION III — PHYSICAL DAMAGE COVERAGE — C. Limit of Insurance at 1.b. is amended to provide the following limits: b. Limits of $1,000 per "loss" is increased to $5,000 per "loss". All other terms and provisions of this section remain applicable. (Auto Loan/Lease Total Loss Protection) SECTION III — PHYSICAL DAMAGE COVERAGE — C. Limit of Insurance is amended by adding the following language: 4. In the event of a total "loss" to a covered "auto" shown in the Schedule pages, subject at the time of the "loss" to a loan or lease, we will pay any unpaid amount due including up to a maximum of $500 for early termination fees or penalties on the lease or loan for a covered"auto" less: a. The amount paid under the Physical Damage Coverage Section of the policy; and b. Any (1) �2) (3) (4) (5) Overdue lease / loan payments at the time of the "loss'" Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; Security deposits not returned by the lessor; Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease; and Carry-over balances from previous loans or leases. (Glass Repair— Deductible Amendment) H. GLASS REPAIR — DEDUCTIBLE SECTION 111 — PHYSICAL DAMAGE COVERAGE — D. Deductible is amended by adding the following: Any deductible shown in the Declarations as applicable to the covered "auto" will not apply to glass breakage if the damaged glass is repaired, rather than replaced. CA 71 09 01 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 5 of 7 (Amended Duties in the Event of Accident, Claim, Suif or Loss) I. AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Under SfCTION IV — BUSINESS AUTO CONDITIONS, A. Loss Conditions , the following is added to paragraph 2. Duties In The Event of Accident, Suit or Loss: d. Knowledge of any "accidenY', "claim", "suiY' or "loss" will be deemed knowledge by you when notice of such "accidenY', "claim", "suiY' or "loss" has been received by: (1) You, if you are an individual; (2) Any partner or insurance manager if you are a partnership; (3) An executive officer or insurance manager, if you are a corporation; (4) Your members, managers or insurance manager, if you are a limited liability company; or (5) Your officials, trustees, board members or insurance manager, if you are a not-for-profit organization. (Waiver of Subrogation by Contract) J. WAIVER OF SUBROGATION REQUIRED BY CONTRACT Under SECTION IV, BUSINESS AUTO CONDITIONS, A. Loss Conditions 5. Transfer of Rights of Recovery Against Others to Us the following language is added: However, we waive any rights of recovery we may have against the person or organization with whom you have agreed in writing in a contract, agreement or permit, to provide insurance such as is afforded under the policy to which this endorsement is attached. This provision does not apply unless the written contract or written agreement has been executed, or permit has been issued, prior to the "bodily injury" or "property damage." (Unintentional Failure to Disclose) K. UNINTENTIONAL FAILURE TO DISCLOSE Under SECTION IV — BUSINESS AUTO CONDITIONS, B. General Conditions , the following is added to 2. Concealment, Misrepresentation Or Fraud : Your unintentional error in disclosing, or failing to disclose, any material fact existing at the effective date of this Coverage Form, or during the policy period in connection with any additional hazards, will not prejudice your rights under this Coverage Form. {Hired, Leased, Rented or Borrowed Auto Physical Damage) L. HIRED, LEASED, RENTED OR BORROWED AUTO PHYSICAL DAMAGE Under SECTION IV — BUSINESS AUTO CONDITIONS B. General Conditions 5. Other Insurance Paragraph S.b. is replaced by the following: b. (9) For "Comprehensive" and "Collision" Auto Physical Damage coverage provided by this endorsement, the following are deemed to be covered "autos" you own: (a) Any Covered "auto" you lease, hire, rent or borrow; and (b) Any Covered "auto" hired or rented by your "employee" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto" (2) Limit of Insurance For This Section The most we will pay for any one "loss" is the lesser of the following: (a) $75,000 per accident, or (b) actual cash value at the time of loss, or (c) cost of repair. Page 6 of 7 Includes copyrighted material of Insurance Services Office, Inc., with its permission. CA 79 09 01 17 Minus a$500 deductible. An adjustment for depreciation and physical condition will be made in determining actual cash value in the event of a total loss. No deductible applies to "loss" caused by fire or lightning. (3) This Hired Auto Physical Damage coverage is excess over any other collectible insurance. (4) Definitions For This Section. (a) Comprehensive Coverage: from any cause except the covered "auto's" collision with another object or the covered "auto's" overturn. We will, pay glass breakage, "loss" caused by hitting a bird or animal and, "loss" caused by falling objects or missiles. (b) Collision Coverage: caused by the covered "auto's" collision with another object or by the covered "auto's" overturn. (Mental Anguish) M. MENTAL ANGUISH Under SECTION V— DEFINITIONS, C. is replaced by the following: C. "Bodily injury" means bodily injury, sickness or disease sustained by a person including mental anguish or death resulting from bodily injury, sickness, or disease. (E�ended Cancellation Condition) N. EXTENDED CANCELLATION CONDITION Under CANCELLATION, of the COMMON POLICY CONDITIONS form, item 2.b. is replaced by the following: b. 60 days before the effective date of cancellation if we cancel for any other reason. CA 71 09 01 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 7 of 7 Policy Number 85327821 COMMERCIAL AUTO CA 04 49 11 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONC�NTRIBUTORY - OTHER INSURANCE CONDITIDN This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B. Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision tfl the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance availabfe to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek cflntribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 O Insurance Services Office, Inc., 2016 Page 1 of 1 65327821 POLICY NUMBER: COMMERCIAL AUTO CA71 331210 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CANCELLATION PROVISI4N OR COVERAGE CHANGE ENDQRSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless mod- ified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indi- cated below. Endorsement Effective: Countersigned By: Named Insured: SCHEDULE Number of Days' Notice 30 Name Of Person Or Organization PER SCHEDULE ON FILE Address .CANCELLATION FOR NONPAYMENT OF PREMIUM 10 DAYS [Authorized Representative) If this policy is canceled or materially changed to reduce or restrict coverage, we will mail notice of cancellation or change to the person or organization named in the Schedule. We will give the number of day's notice indi- cated in the Schedule. CA 71 33 12 10 O ISO Properties, Inc., 2003 Page 1 of 1 Includes copyrighted material of tnsurance Services Office, Inc., with its permission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� 3 0 7 7 0 6 COMMERCIAL LIABILITY UMBRELLA CU 02 02 05 03 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION PROVISIONS OR COVERAGE CHANGE This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: SCHEDULE 1. Name: 2. Address: PER SCHEDULE ON FILE CANCELLATION FOR NONPAYMENT 10 DAYS 3. Number Of Days Advance Notice: 3 0 (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) CU 02 02 05 03 O ISO Properties, Inc., 2002 Page 1 of 1 POLICY NUMBER: 2 � 3 0 7 7 0 6 COMMERCIAL LIABILITY UMBRELLA CU 24 03 12 20 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE PART SCHEDULE Name Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION THAT THE INSURED IS REQUIRED BY A CONTRACT TO PROVIDE A WAIVER OF SUBROGATION Information required to complete this Schedule, if not shown above, will be shown in the Delarations. The following is added to Paragraph 9. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recoveryagainst the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CU 24 03 12 20 O Insurance Services Office, Inc.,2020 Page 1 of 1 Page 1 of 1©ISO Properties,Inc.,2002CU02020503 applicable to this endorsement.) asDeclarationstheinnwshobeillwendorsementthiscompletetorequiredinformationabove,appearsentryno(If Number Of Days Advance Notice:3. Address:2. Name:1. SCHEDULE ritten notice of cancellation or material change to:wagreetomailprior ewPart,CoveragethisbyaffordedinsurancetherestrictsorreducesthatchangematerialorcancellationofeventtheIn COMMERCIAL LIABILITY UMBRELLA COVERAGE PART ing:wThisendorsementmodifiesinsuranceprovidedunderthefollo PROVISIONS OR COVERAGE CHANGE TEXAS CHANGES -AMENDMENT OF CANCELLATION .Y.PLEASE READ IT CAREFULLYTHISENDORSEMENTCHANGESTHEPOLIC CU 02 02 05 03 UMBRELLAYCOMMERCIALLIABILITNUMBER:POLICY POLICY NUMBER: COMMERCIA L LIABILITY UMBRELLA CU 24 03 12 20 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGAT ION) This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE PART SCHEDULE Name Of Person(s) Or Organizat ion(s): Information required to complete this Schedule, if not shown above, will be shown in the Delarations . The follow ing is added to Paragraph 9. Transf er Of Rights Of Recovery Against Others To Us of Section IV — Conditions : We waive any right of recovery against the person(s) or organization (s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization (s) prior to loss. This endorsement applies only to the person(s) or organization (s) shown in the Schedule above. CU 24 03 12 20 O Insurance Servic es Offic e, Inc.,2020 Page 1 of 1 IL 71 05 10 14 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. 1�:71��i/_1:�'/_V 1�►[�7►[d�7 ���.:7.1-���� ']..�'Q���:I �:al � 6��1:7_1 �i[� ���7►1 �]� �[�7►1 This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART COMMERCIAL UMBRELLA COVERAGE PART The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; (2) You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured; (3) The additional insured gives us prompt written notice of any "occurrence" which may result in a claim and prompt written notice of "suiY'; (4) The additional insured immediately forwards all legal papers to us, cooperates in the investigation or settlement of the claim or defense against the "suiY', and otherwise complies with policy conditions. (5) The additional insured must tender the defense and indemnity of any claim or "suiY' to any other insurer which also insures against a loss we cover under this policy. This includes, but is not limited to, any insurer which has issued a policy of insurance in which the additional insured qualifies as an insured. For the purpose of this requirement, the term "insures against" refers to any self-insurance and to any insurer which issued a policy of insurance that may provide coverage for the loss, regardless of whether the additional insured has actually requested that the insurer provide the additional insured with a defense and/or indemnity under that policy of insurance. (6) The additional insured agrees to make available any other insurance that the additional insured has for a loss we cover under this policy. IL 71 05 10 14 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 1 MS CPPL 0073 0003 06 24 Page 27 of 27 M. Severability Except with respect to the Limits of Liability and the Retention, and any rights or duties specifically assigned in this Policy to the First Named Insured, this Policy applies as if each Named Insured were the only Named Insured, and separately to each Insured against whom a Claim is made. Any misrepresentation, act, error, or omission that is in violation of a duty, term, or condition under this Policy by one Insured shall not by itself affect Coverage for another Insured under this Policy. However, this exception shall not apply to the Insured who is a parent, subsidiary or affiliate of the Insured which committed the misrepresentation, act, error, or omission referenced above. N. Sole Agent The First Named Insured shall act on behalf of all Insureds, if any, for the payment or return of any premium, payment of any Retention, receipt and acceptance of any Endorsement issued to form a part of this Policy, giving and receiving Notices of Cancellation or Non-Renewal, the exercise of the rights provided in the Extended Reporting Period, and the receipt and acceptance of any payment required to be made by us under the Policy. O. Subrogation If we pay any amount under this policy, we shall be subrogated to all of the Insured’s rights of recovery against any person, firm, or organization. The Insured shall execute and deliver instruments and papers and do whatever is necessary to secure such rights. The Insured shall not waive or prejudice such rights subsequent to when a Claim is first made or when the Insured discovers a Pollution Condition. Any recovery as a result of a subrogation proceeding under this Policy shall accrue first to you to the extent of any payments in excess of the Limits of Liability of this Policy; then to us to the extent of our payment under this Policy, and then to you to the extent of your payment of the Retention. Expenses incurred in such subrogation proceedings shall be apportioned among the interested parties in the recovery in the proportion that each interested party’s share in the recovery bears to the total recovery amount. Notwithstanding the foregoing, we waive our right of recovery against any individual or entity, except for a Professional Subconsultant or Subcontractor, if and to the extent you agreed to waive your right of recovery against such individual or entity in a written agreement signed by the Named Insured prior to the first commencement of a Pollution Condition or prior to a negligent act, error or omission in Professional Services, as applicable to which this insurance applies. 0106 POLICY NUMBER FORMS SUPPLEMENTAL DECLARATIONS 12-14-2024 85327821 The following coverage form(s) govern coverage that is not limited to any specific state even though they are specifically listed in only one state in the declarations. Premium Applicable to the state of Texas *CG2010(12-19) ADDL INSURED-OWNERS LESSEES/CONTRACTORS-SCHEDULED *CG2010*(10-01) ADDL INSD-OWNERS/LESSEES/CONTRACTORS/SCHEDULED *CG2037(12-19) ADDL INSURED-OWNER/LESSEE/CONTRACTOR-COMPLETED OPR *CG2037(12-19) ADDL INSURED-OWNER/LESSEE/CONTRACTOR-COMPLETED OPR *CG2037*(10-01) ADDL INSURED-OWNER/LESSEE/CONTRACTOR-COMPLETED OPR *CG2038(12-19) ADDL INSURED-OWNERS LESSEES/CONTRACTORS-AUTOMATIC *CG2404(12-19) WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST *CG2404(12-19) WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST *CG7280(07-17) LIMITED EXTENDED ULTRA LIAB PLUS END Other Forms Applicable to the state of Texas CG0001(04-13) COMM GENERAL LIAB COVG FORM *CG0069(12-23) EXCL-VIOLATION OF LAW ADDRESSING DATA PRIVACY CG0103 (06-06) TX-CHGS *CG0205(12-04) TX-CHGS AMENDMENT OF CANCEL PROVISIONS/COVG CHG CG2001(12-19) PRIMARY & NONCONTRIBUTORY-OTHER INSURANCE CG2106(05-14) EXCL-ACCESS/DISCLOSURE OF CONFIDENTIAL/PERSONAL CG2132-(05-09) COMMUNICABLE DISEASE EXCL CG2167(12-04) FUNGI/BACTERIA EXCL CG2170(01-15) CAP ON LOSSES FROM CERTIFIED ACTS OF TERRORISM CG2187(01-15) CONDITIONAL EXCL OF TERRORISM CG2196(03-05) SILICA/SILICA-RELATED DUST EXCL CG2234(04-13) EXCL-CONST MANAGEMENT E&0 CG2279(04-13) EXCL-CONTRACTORS-PROFESSIONAL LIAB CG2503(05-09) DESIGNATED CONST PROJECTS GENERAL AGGREGATE LIMIT CG2639(12-07) TX-CHGS EMPLOYMENT RELATED PRACTICES EXCL CG4015(12-20) CANNABIS EXCL WITH HEMP EXCEPTION CG4031(09-22) TX-BROAD ABUSE OR MOLESTATION EXCLUSION *CG7001(03-23) COMMERCIAL GENERAL LIABILITY COVERAGE PART *CG7004(02-05) COMM GENERAL LIABILITY SUPPLEMENTAL DECLARATIONS CG7012(07-10) SPECIAL EVENTS EXCL END CG7086(02-15) ADDL INSURED-DESIGNATED PERSON OR ORGANIZATION CG7115(09-01) EXCL-EXTERIOR INSULATION & FINISH SYSTEMS CG7125(02-12) PROPERTY DAMAGE DEDUCTIBLE LIABILITY INSURANCE *CG7154(01-07) COMM GENERAL LIAB SUPPLEMENTAL DECS-ADDL INSUREDS IL0017(11-98) COMMON POLICY CONDITIONS IL0021(09-08) NUCLEAR ENERGY LIAB EXCL END IL0168(03-12) TX-CHGS DUTIES IL0275(11-13) TX-CHGS-CANCEL & NONRENEW PROVISIONS FOR CASUALTY IL7068(01-10) EXCL-LEAD-HAZARDOUS PROPERTIES IL7069(01-10) EXCL-UNDERGROUND STORAGE TANKS IL7070(09-12) ABSOLUTE ASBESTOS EXCL 100 200 1,100 175 200 400 250 200 UW 70 02 04 96 Other Forms IL7095 (01-20) IL7147 (01-20) IL7177 (08-22) *SPECEND (00-00) *ST-1403 (09-01) *ST1435- (08-04) *ST1436- (08-04) *ST1544 (01-10) *ST1644- (01-12) *ST1681 (06-22) *ST1813 (01-20) *ST1882 (06-16) *ST1947 (11-19) *ST1965 (01-21) *ST2003 (11-21) *ST2182 (12-23) 0106 POLICY NUMBER FORMS SUPPLEMENTAL DECLARATIONS 12-14-2024 85327821 INTERNET SECURITY & PRIVACY INSURANCE END ONLINE BANKING THEFT INSURANCE END ABSOLUTE PFAS EXCLUSION SPECIAL END EXTERIOR INSULATION & FINISH SYSTEMS EXCLUSION TX-NOTICE GL EXCL ASBESTOS TX-NOTICE GL EXCL LEAD TX-EXCL UNDERGROUND STORAGE TANKS POLICY WEBSITE STUFFER TX-NOTICE-RISK CONTROL INFORMATION IMPORTANT NOTICE-INTERNET SECURITY & PRIVACY NOTICE-LOCATION & PREMISES CLARIFICATION TX-NOTICE-HAVE A COMPLAINT OR NEED HELP? NOTICE TO POLICYHOLDERS-COMMUNICABLE DISEASE EXCL NOTICE OF PREM AUDIT NONCOMPLIANCE CHARGE NOTICE-COMM GEN LIAB-EXCL-VIOLATION OF LAW ADDRESS UW 70 02 04 96 IMPORTANT NOTICE TO ALL TEXAS PO�ICYHOLDERS IMPORTANT NOTICE To obtain information or file a claim: You may call Frankenmuth Insurance Company for information or to file a claim at: AVISO IMPORTANTE Para obtener informacion o presentar un reciamo: Usted puede Ilamar a Frankenmuth Insurance Company para obtener informacion o para presentar un reclamo al: 1-989-480-4369 You may also write to Frankenmuth Insurance Company at: Frankenmuth Insurance Company One Mutual Avenue Frankenmuth, MI 48787 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149091 Austin, TX 78714-9091 Fax: (512) 490-1007 Web: http:/Iwww.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the Frankenmuth Insurance Company first. If the dispute is not resoived, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. 1-989-480-4369 Tambien puede escribir a Frankenmuth Insurance Company a la siguiente direccion: Frankenmuth Insurance Company One Mutual Avenue Frankenmuth, Mi 48787 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacibn sobre companias, coberturas, derechos o quejas al: 1-800-252-3439 Tambien puede escribir al Departamento de Seguros de Texas: P.O. Box 149091 Austin, TX 78714-9091 Fax: (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa relacionada con su prima o con un reclamo, debe comunicarse primero con Frankenmuth Insurance Company. Si la disputa no se resuelve, puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE AVISO A SU POLIZA: Este aviso es solo para fines informativos y no forma parte ni condicion dei documento adjunto. 00 ML0042 44 04 16 Page 1 of 1 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 – Definitions and Terminology .......................................................................................................... 1 1.01 Defined Terms ............................................................................................................................... 1 1.02 Terminology .................................................................................................................................. 5 Article 2 – Preliminary Matters ......................................................................................................................... 6 2.01 Before Starting Construction ........................................................................................................ 6 2.02 Preconstruction Conference .......................................................................................................... 6 2.03 Public Meeting .............................................................................................................................. 6 Article 3 – Contract Documents and Amending ............................................................................................... 6 3.01 Reference Standards ..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents .................................................................. 6 Article 4 – Bonds and Insurance ....................................................................................................................... 7 4.01 Licensed Sureties and Insurers ..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7 4.03 Certificates of Insurance ............................................................................................................... 7 4.04 Contractor’s Insurance .................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12 Article 5 – Contractor’s Responsibilities ........................................................................................................ 12 5.01 Supervision and Superintendent ................................................................................................. 12 5.02 Labor; Working Hours ................................................................................................................ 13 5.03 Services, Materials, and Equipment ........................................................................................... 13 5.04 Project Schedule .......................................................................................................................... 14 5.05 Substitutes and “Or-Equals” ....................................................................................................... 14 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16 5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16 5.08 Wage Rates.................................................................................................................................. 18 5.09 Patent Fees and Royalties ........................................................................................................... 19 5.10 Laws and Regulations ................................................................................................................. 19 5.11 Use of Site and Other Areas ....................................................................................................... 19 5.12 Record Documents ...................................................................................................................... 20 5.13 Safety and Protection .................................................................................................................. 21 5.14 Safety Representative ................................................................................................................. 21 5.15 Hazard Communication Programs ............................................................................................. 22 5.16 Submittals .................................................................................................................................... 22 5.17 Contractor’s General Warranty and Guarantee .......................................................................... 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ........................................................................................................................... 24 5.19 Delegation of Professional Design Services .............................................................................. 24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination....................................................................................................................... 25 Article 6 – Other Work at the Site ................................................................................................................... 26 6.01 Related Work at Site ................................................................................................................... 26 Article 7 – City’s Responsibilities................................................................................................................... 26 7.01 Inspections, Tests, and Approvals .............................................................................................. 26 7.02 Limitations on City’s Responsibilities ....................................................................................... 26 7.03 Compliance with Safety Program ............................................................................................... 27 Article 8 – City’s Observation Status During Construction ........................................................................... 27 8.01 City’s Project Representative ..................................................................................................... 27 8.02 Authorized Variations in Work .................................................................................................. 27 8.03 Rejecting Defective Work .......................................................................................................... 27 8.04 Determinations for Work Performed .......................................................................................... 28 Article 9 – Changes in the Work ..................................................................................................................... 28 9.01 Authorized Changes in the Work ............................................................................................... 28 9.02 Notification to Surety .................................................................................................................. 28 Article 10 – Change of Contract Price; Change of Contract Time ................................................................ 28 10.01 Change of Contract Price ............................................................................................................ 28 10.02 Change of Contract Time............................................................................................................ 28 10.03 Delays .......................................................................................................................................... 28 Article 11 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29 11.01 Notice of Defects ........................................................................................................................ 29 11.02 Access to Work ........................................................................................................................... 29 11.03 Tests and Inspections .................................................................................................................. 29 11.04 Uncovering Work ....................................................................................................................... 30 11.05 City May Stop the Work ............................................................................................................. 30 11.06 Correction or Removal of Defective Work ................................................................................ 30 11.07 Correction Period ........................................................................................................................ 30 11.08 City May Correct Defective Work ............................................................................................. 31 Article 12 – Completion .................................................................................................................................. 32 12.01 Contractor’s Warranty of Title ................................................................................................... 32 12.02 Partial Utilization ........................................................................................................................ 32 12.03 Final Inspection ........................................................................................................................... 32 12.04 Final Acceptance ......................................................................................................................... 33 Article 13 – Suspension of Work .................................................................................................................... 33 13.01 City May Suspend Work ............................................................................................................ 33 Article 14 – Miscellaneous .............................................................................................................................. 34 14.01 Giving Notice .............................................................................................................................. 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times ................................................................................................................ 34 14.03 Cumulative Remedies ................................................................................................................. 34 14.04 Survival of Obligations ............................................................................................................... 35 14.05 Headings ...................................................................................................................................... 35 00 73 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 1 – DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw – City’s on-line, electronic document management and collaboration system. 5. Calendar Day – A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) -–A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract—The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents—Those items that make up the contract and which must include the Agreement, and it’s attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non-Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions l. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project’s Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor—The individual or entity with whom Developer has entered into the Agreement. 11. Day or day – A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer – An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance – The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 16. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements—A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non-Participating Change Order—A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order—A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans – See definition of Drawings. 24. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Time. 25. Project—The Work to be performed under the Contract Documents. 26. Project Representative—The authorized representative of the City who will be assigned to the Site. 27. Public Meeting – An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 30. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site—Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions – That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent – The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions—That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 00 73 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 41. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non-Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day – A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City’s written acceptance. C. Furnish, Install, Perform, Provide: 1. The word “Furnish” or the word “Install” or the word “Perform” or the word “Provide” or the word “Supply,” or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 2 – PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non- Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 – CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non-Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 00 73 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. City’s or Engineer’s review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City’s written interpretation or clarification. ARTICLE 4 – BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor’s obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 00 73 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. The certificate of insurance shall document the City, an as “Additional Insured” on all liability policies. 2. The Contractor’s general liability insurance shall include a, “per project” or “per location”, endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers’ compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the “occurrence basis”. If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage’s and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor’s insurance. 4.04 Contractor’s Insurance A. Workers Compensation and Employers’ Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers’ Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers’ Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor’s performance of the Work and Contractor’s other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers’ compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor’s employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment – Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U” coverage’s. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on “any auto”, defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor’s Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor’s construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: ____________________________________________________________ Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a “Right of Entry Agreement” with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor’s use of private and/or construction access roads crossing said railroad company’s properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor’s operations and work cross, occupy, or touch railroad property: a. General Aggregate: _____________________________________ Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence: : _____________________________________ Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- None None None 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company’s right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company’s right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company’s property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor’s beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 – CONTRACTOR’S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor’s representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City’s written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and “Or-Equals” A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or-equal” item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. “Or-Equal” Items: If in City’s sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an “or-equal” item, in which case review and approval of the proposed item may, in City’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City’s sole discretion an item of material or equipment proposed by Contractor does not qualify as an “or-equal” item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor’s achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City’s Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No “or-equal” or substitute will be ordered, installed or utilized until City’s review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an “or-equal.” City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor’s expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City’s Cost Reimbursement: City will record City’s costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute or “or-equal” at Contractor’s expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Required for this Contract. (Check this box if there is any City Participation) Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City’s MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor’s own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract X 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates Required for this Contract. Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City’s determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and X 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor’s compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor’s responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor’s obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City’s safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor’s safety program, if any, with which City’s employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor’s duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor’s designated safety representative at the Site. 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City’s review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City’s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City’s review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2. City’s review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City’s review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor’s General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor’s warranty and guarantee. B. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor’s obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor’s obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor’s responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to City. 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City’s review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City’s review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 6 – OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City’s employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City’s employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor’s Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor’s Work. Contractor’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor’s Work except for latent defects in the work provided by others. ARTICLE 7 – CITY’S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City’s responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City’s Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor’s failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7.03 Compliance with Safety Program While at the Site, City’s employees and representatives shall comply with the specific applicable requirements of Contractor’s safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City’s Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City’s representative during construction are set forth in the Contract Documents. A. City’s Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor’s executed Work. Based on information obtained during such visits and observations, City’s Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City’s Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City’s Project Representative’s efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City’s Project Representative’s visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City’s Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City’s Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City’s Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City’s written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 – CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor’s responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 11 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City’s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory (“Testing Lab”) to perform any inspections or tests (“Testing”) for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a “fail”, “did not pass” or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor’s cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City’s observation and replaced at Contractor’s expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City’s special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor’s use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City’s written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City’s written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor’s obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 stored elsewhere. Contractor shall allow City, City’s representatives, agents, consultants, employees, and City’s other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City’s rights and remedies under this Paragraph 11.09. ARTICLE 12 – COMPLETION 12.01 Contractor’s Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor’s performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City’s satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor’s insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 – SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 – MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. 01 11 00 - 1 DAP SUMMARY OF WORK Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 SECTION 01 11 00 1 SUMMARY OF WORK 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes: 5 1. Summary of Work to be performed in accordance with the Contract Documents 6 B. Deviations from this City of Fort Worth Standard Specification 7 1. None. 8 C. Related Specification Sections include, but are not necessarily limited to: 9 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 10 2. Division 1 - General Requirements 11 1.2 PRICE AND PAYMENT PROCEDURES 12 A. Measurement and Payment 13 1. Work associated with this Item is considered subsidiary to the various items bid. 14 No separate payment will be allowed for this Item. 15 1.3 REFERENCES [NOT USED] 16 1.4 ADMINISTRATIVE REQUIREMENTS 17 A. Work Covered by Contract Documents 18 1. Work is to include furnishing all labor, materials, and equipment, and performing 19 all Work necessary for this construction project as detailed in the Drawings and 20 Specifications. 21 B. Subsidiary Work 22 1. Any and all Work specifically governed by documentary requirements for the 23 project, such as conditions imposed by the Drawings or Contract Documents in 24 which no specific item for bid has been provided for in the Proposal and the item is 25 not a typical unit bid item included on the standard bid item list, then the item shall 26 be considered as a subsidiary item of Work, the cost of which shall be included in 27 the price bid in the Proposal for various bid items. 28 C. Use of Premises 29 1. Coordinate uses of premises under direction of the City. 30 2. Assume full responsibility for protection and safekeeping of materials and 31 equipment stored on the Site. 32 3. Use and occupy only portions of the public streets and alleys, or other public places 33 or other rights-of-way as provided for in the ordinances of the City, as shown in the 34 Contract Documents, or as may be specifically authorized in writing by the City. 35 a. A reasonable amount of tools, materials, and equipment for construction 36 purposes may be stored in such space, but no more than is necessary to avoid 37 delay in the construction operations. 38 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 b. Excavated and waste materials shall be stored in such a way as not to interfere 1 with the use of spaces that may be designated to be left free and unobstructed 2 and so as not to inconvenience occupants of adjacent property. 3 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 4 manner as not to interfere with the operation of the railroad. 5 1) All Work shall be in accordance with railroad requirements set forth in 6 Division 0 as well as the railroad permit. 7 D. Work within Easements 8 1. Do not enter upon private property for any purpose without having previously 9 obtained permission from the owner of such property. 10 2. Do not store equipment or material on private property unless and until the 11 specified approval of the property owner has been secured in writing by the 12 Contractor and a copy furnished to the City. 13 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 14 obstructions which must be removed to make possible proper prosecution of the 15 Work as a part of the project construction operations. 16 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 17 lawns, fences, culverts, curbing, and all other types of structures or improvements, 18 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 19 appurtenances thereof, including the construction of temporary fences and to all 20 other public or private property adjacent to the Work. 21 5. Notify the proper representatives of the owners or occupants of the public or private 22 lands of interest in lands which might be affected by the Work. 23 a. Such notice shall be made at least 48 hours in advance of the beginning of the 24 Work. 25 b. Notices shall be applicable to both public and private utility companies and any 26 corporation, company, individual, or other, either as owners or occupants, 27 whose land or interest in land might be affected by the Work. 28 c. Be responsible for all damage or injury to property of any character resulting 29 from any act, omission, neglect, or misconduct in the manner or method or 30 execution of the Work, or at any time due to defective work, material, or 31 equipment. 32 6. Fence 33 a. Restore all fences encountered and removed during construction of the Project 34 to the original or a better than original condition. 35 b. Erect temporary fencing in place of the fencing removed whenever the Work is 36 not in progress and when the site is vacated overnight, and/or at all times to 37 provide site security. 38 c. The cost for all fence work within easements, including removal, temporary 39 closures and replacement, shall be subsidiary to the various items bid in the 40 project proposal, unless a bid item is specifically provided in the proposal. 41 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 1.5 SUBMITTALS [NOT USED] 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE [NOT USED] 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.11 FIELD [SITE] CONDITIONS [NOT USED] 7 1.12 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION 11 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 25 00 - 1 DAP SUBSTITUTION PROCEDURES Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 25 00 SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or-equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 25 00 - 2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 25 00 - 3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer’s opinion, acceptance will require substantial revision of the original design d. In the City’s or Developer’s opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 25 00 - 4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Not recommended Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 31 19 - 1 DAP PRECONSTRUCTION MEETING Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 31 19 PRECONSTRUCTION MEETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor’s work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material l. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre-Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City’s representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 31 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 31 20 - 1 DAP PROJECT MEETINGS Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 31 20 PROJECT MEETINGS [Specifier: This Specification is intended for use on projects designated as Tier 3 or Tier 4.] PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre-Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of meeting to be determined by the City. 3. Attendees [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 31 20 - 2 DAP PROJECT MEETINGS Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 a. Contractor b. Project Representative c. Other City representatives 4. Meeting Schedule a. In general, the neighborhood meeting will occur within the 2 weeks following the pre-construction conference. b. In no case will construction be allowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an as- needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City’s representatives f. Others, as requested by the Project Representative 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off-site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards l. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents o. Review monthly pay request [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 31 20 - 3 DAP PROJECT MEETINGS Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 32 33 PRECONSTRUCTION VIDEO PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 1 DAP SUBMITTALS Page 1 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 33 00 DAP SUBMITTALS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. General methods and requirements of submissions applicable to the following Work-related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) “By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City’s Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City’s Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 7) Standard wiring diagrams 8) Printed performance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City’s Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non-conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor’s risk if not marked b. Submittals for each item will be reviewed no more than twice at the City’s expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative’s then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City’s discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 33 00 - 8 DAP SUBMITTALS Page 8 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 SECTION 01 35 13 1 SPECIAL PROJECT PROCEDURES 2 [Text in Blue is for information or guidance. Remove all blue text in the final project document.] 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 l. {Coordination with North Central Texas Council of Governments Clean 19 Construction Specification [remove if not required]} 20 B. Deviations from this City of Fort Worth Standard Specification 21 1. None. 22 C. Related Specification Sections include, but are not necessarily limited to: 23 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 24 2. Division 1 – General Requirements 25 3. Section 33 12 25 – Connection to Existing Water Mains 26 27 1.2 REFERENCES 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 33 High Voltage Overhead Lines. 34 3. North Central Texas Council of Governments (NCTCOG) – Clean Construction 35 Specification 36 1.3 ADMINISTRATIVE REQUIREMENTS 37 A. Coordination with the Texas Department of Transportation 38 1. When work in the right-of-way which is under the jurisdiction of the Texas 39 Department of Transportation (TxDOT): 40 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 a. Notify the Texas Department of Transportation prior to commencing any work 1 therein in accordance with the provisions of the permit 2 b. All work performed in the TxDOT right-of-way shall be performed in 3 compliance with and subject to approval from the Texas Department of 4 Transportation 5 B. Work near High Voltage Lines 6 1. Regulatory Requirements 7 a. All Work near High Voltage Lines (more than 600 volts measured between 8 conductors or between a conductor and the ground) shall be in accordance with 9 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 10 2. Warning sign 11 a. Provide sign of sufficient size meeting all OSHA requirements. 12 3. Equipment operating within 10 feet of high voltage lines will require the following 13 safety features 14 a. Insulating cage-type of guard about the boom or arm 15 b. Insulator links on the lift hook connections for back hoes or dippers 16 c. Equipment must meet the safety requirements as set forth by OSHA and the 17 safety requirements of the owner of the high voltage lines 18 4. Work within 6 feet of high voltage electric lines 19 a. Notification shall be given to: 20 1) The power company (example: ONCOR) 21 a) Maintain an accurate log of all such calls to power company and record 22 action taken in each case. 23 b. Coordination with power company 24 1) After notification coordinate with the power company to: 25 a) Erect temporary mechanical barriers, de-energize the lines, or raise or 26 lower the lines 27 c. No personnel may work within 6 feet of a high voltage line before the above 28 requirements have been met. 29 C. Confined Space Entry Program 30 1. Provide and follow approved Confined Space Entry Program in accordance with 31 OSHA requirements. 32 2. Confined Spaces include: 33 a. Manholes 34 b. All other confined spaces in accordance with OSHA’s Permit Required for 35 Confined Spaces 36 D. Use of Explosives, Drop Weight, Etc. 37 1. When Contract Documents permit on the project the following will apply: 38 a. Public Notification 39 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 40 prior to commencing. 41 2) Minimum 24 hour public notification in accordance with Section 01 31 13 42 E. Water Department Coordination 43 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 1. During the construction of this project, it will be necessary to deactivate, for a 1 period of time, existing lines. The Contractor shall be required to coordinate with 2 the Water Department to determine the best times for deactivating and activating 3 those lines. 4 2. Coordinate any event that will require connecting to or the operation of an existing 5 City water line system with the City’s representative. 6 a. Coordination shall be in accordance with Section 33 12 25. 7 b. If needed, obtain a hydrant water meter from the Water Department for use 8 during the life of named project. 9 c. In the event that a water valve on an existing live system be turned off and on 10 to accommodate the construction of the project is required, coordinate this 11 activity through the appropriate City representative. 12 1) Do not operate water line valves of existing water system. 13 a) Failure to comply will render the Contractor in violation of Texas Penal 14 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 15 will be prosecuted to the full extent of the law. 16 b) In addition, the Contractor will assume all liabilities and 17 responsibilities as a result of these actions. 18 F. Public Notification Prior to Beginning Construction 19 1. Prior to beginning construction on any block in the project, on a block by block 20 basis, prepare and deliver a notice or flyer of the pending construction to the front 21 door of each residence or business that will be impacted by construction. The notice 22 shall be prepared as follows: 23 a. Post notice or flyer 7 days prior to beginning any construction activity on each 24 block in the project area. 25 1) Prepare flyer on the Contractor’s letterhead and include the following 26 information: 27 a) Name of Project 28 b) City Project No (CPN) 29 c) Scope of Project (i.e. type of construction activity) 30 d) Actual construction duration within the block 31 e) Name of the contractor’s foreman and phone number 32 f) Name of the City’s inspector and phone number 33 g) City’s after-hours phone number 34 2) A sample of the ‘pre-construction notification’ flyer is attached as Exhibit 35 A. 36 3) Submit schedule showing the construction start and finish time for each 37 block of the project to the inspector. 38 4) Deliver flyer to the City Inspector for review prior to distribution. 39 b. No construction will be allowed to begin on any block until the flyer is 40 delivered to all residents of the block. 41 G. Public Notification of Temporary Water Service Interruption during Construction 42 1. In the event it becomes necessary to temporarily shut down water service to 43 residents or businesses during construction, prepare and deliver a notice or flyer of 44 the pending interruption to the front door of each affected resident. 45 2. Prepared notice as follows: 46 a. The notification or flyer shall be posted 24 hours prior to the temporary 47 interruption. 48 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 b. Prepare flyer on the contractor’s letterhead and include the following 1 information: 2 1) Name of the project 3 2) City Project Number 4 3) Date of the interruption of service 5 4) Period the interruption will take place 6 5) Name of the contractor’s foreman and phone number 7 6) Name of the City’s inspector and phone number 8 c. A sample of the temporary water service interruption notification is attached as 9 Exhibit B. 10 d. Deliver a copy of the temporary interruption notification to the City inspector 11 for review prior to being distributed. 12 e. No interruption of water service can occur until the flyer has been delivered to 13 all affected residents and businesses. 14 f. Electronic versions of the sample flyers can be obtained from the Project 15 Construction Inspector. 16 H. Coordination with United States Army Corps of Engineers (USACE) 17 1. At locations in the Project where construction activities occur in areas where 18 USACE permits are required, meet all requirements set forth in each designated 19 permit. 20 I. Coordination within Railroad Permit Areas 21 1. At locations in the project where construction activities occur in areas where 22 railroad permits are required, meet all requirements set forth in each designated 23 railroad permit. This includes, but is not limited to, provisions for: 24 a. Flagmen 25 b. Inspectors 26 c. Safety training 27 d. Additional insurance 28 e. Insurance certificates 29 f. Other employees required to protect the right-of-way and property of the 30 Railroad Company from damage arising out of and/or from the construction of 31 the project. Proper utility clearance procedures shall be used in accordance 32 with the permit guidelines. 33 2. Obtain any supplemental information needed to comply with the railroad’s 34 requirements. 35 J. Dust Control 36 1. Use acceptable measures to control dust at the Site. 37 a. If water is used to control dust, capture and properly dispose of waste water. 38 b. If wet saw cutting is performed, capture and properly dispose of slurry. 39 K. Employee Parking 40 1. Provide parking for employees at locations approved by the City. 41 L. {Coordination with North Central Texas Council of Governments (NCTCOG) Clean 42 Construction Specification [if required for the project] 43 1. Comply with equipment, operational, reporting and enforcement requirements set 44 forth in NCTCOG’s Clean Construction Specification.} 45 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 1.4 SUBMITTALS [NOT USED] 1 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.6 CLOSEOUT SUBMITTALS [NOT USED] 3 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.8 QUALITY ASSURANCE [NOT USED] 5 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.10 FIELD [SITE] CONDITIONS [NOT USED] 7 1.11 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION 11 12 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.3.B – Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 13 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 EXHIBIT A 1 (To be printed on Contractor’s Letterhead) 2 3 4 5 Date: 6 7 CPN No.: 8 Project Name: 9 Mapsco Location: 10 Limits of Construction: 11 12 13 14 15 16 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 17 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 18 PROPERTY. 19 20 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 21 OF THIS NOTICE. 22 23 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 24 ISSUE, PLEASE CALL: 25 26 27 Mr. <CONTRACTOR’S SUPERINTENDENT> AT <TELEPHONE NO.> 28 29 OR 30 31 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 32 33 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 34 35 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 36 37 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 35 13 - 7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 EXHIBIT B 1 2 3 4 [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 SECTION 01 45 23 TESTING AND INSPECTION SERVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City’s document management system, or another form of distribution approved by the City. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City’s Project Representative 4. Provide City’s Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaña Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City’s document management system. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City’s Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City’s established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on-call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE-INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 34 71 13 – Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 1) Allow a minimum of 5 working days for permit review. 2) Contractor’s responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor’s responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City’s Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 55 26 - 3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 57 13 - 1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 57 13 STORM WATER POLLUTION PREVENTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 31 25 00 – Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 31 25 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP 1. Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 57 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 SECTION 01 60 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City’s website at: https://apps.fortworthtexas.gov/ProjectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City’s Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City’s Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City’s Standard Product List. C. Although a specific product is included on City’s Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer’s standard product. D. See Section 01 33 00 for submittal requirements of Product Data included on City’s Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City’s Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magaña Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City’s website. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer’s recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer’s recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City’s Project Representative. 5. Provide off-site storage and protection when on-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City’s Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers’ unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City’s Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City’s Project Representative. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 66 00 - 3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non-Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor’s operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor’s personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor’s operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor’s personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor’s personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor’s operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor’s operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor’s personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Specified Remobilization” in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 3. Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Work Order Mobilization” in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Work Order Emergency Mobilization” in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Project Name City Project No. xxxxx Revised February 14, 2018 SECTION 01 71 23 1 CONSTRUCTION STAKING AND SURVEY 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes:5 1. Requirements for construction staking and construction survey6 B. Deviations from this City of Fort Worth Standard Specification7 1. See Changes (Highlighted in Yellow).8 C. Related Specification Sections include, but are not necessarily limited to:9 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract10 2. Division 1 – General Requirements11 1.2 PRICE AND PAYMENT PROCEDURES 12 A. Measurement and Payment13 1. Construction Staking14 a. Measurement15 1) This Item is considered subsidiary to the various Items bid.16 b. Payment17 1) The work performed and the materials furnished in accordance with this18 Item are subsidiary to the various Items bid and no other compensation will19 be allowed.20 2. Construction Survey21 a. Measurement22 1) This Item is considered subsidiary to the various Items bid.23 b. Payment24 1) The work performed and the materials furnished in accordance with this25 Item are subsidiary to the various Items bid and no other compensation will be26 allowed.27 3. As-Built Survey28 a. Measurement29 1) This Item is considered subsidiary to the various Items bid.30 b. Payment31 1) The work performed and the materials furnished in accordance with this32 Item are subsidiary to the various Items bid and no other compensation will be33 allowed.34 35 36 37 38 39 40 [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1.3 REFERENCES 1 A. Definitions2 1. Construction Survey - The survey measurements made prior to or while3 construction is in progress to control elevation, horizontal position, dimensions and4 configuration of structures/improvements included in the Project Drawings.5 2. As-built Survey –The measurements made after the construction of the6 improvement features are complete to provide position coordinates for the features7 of a project.8 3. Construction Staking – The placement of stakes and markings to provide offsets9 and elevations to cut and fill in order to locate on the ground the designed10 structures/improvements included in the Project Drawings. Construction staking11 shall include staking easements and/or right of way if indicated on the plans.12 4. Survey “Field Checks” – Measurements made after construction staking is13 completed and before construction work begins to ensure that structures marked on14 the ground are accurately located per Project Drawings.15 B. Technical References16 1. City of Fort Worth – Construction Staking Standards (available on City’s Buzzsaw17 website) – 01 71 23.16.01_ Attachment A_Survey Staking Standards18 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available19 on City’s Buzzsaw website).20 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision21 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land22 Surveying in the State of Texas, Category 523 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. The Contractor’s selection of a surveyor must comply with Texas Government26 Code 2254 (qualifications based selection) for this project.27 1.5 SUBMITTALS 28 A. Submittals, if required, shall be in accordance with Section 01 33 00.29 B. All submittals shall be received and reviewed by the City prior to delivery of work.30 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 31 A. Field Quality Control Submittals32 1. Documentation verifying accuracy of field engineering work, including coordinate33 conversions if plans do not indicate grid or ground coordinates.34 2. Submit “Cut-Sheets” conforming to the standard template provided by the City35 (refer to 01 71 23.16.01 – Attachment A – Survey Staking Standards).36 37 1.7 CLOSEOUT SUBMITTALS 38 B. As-built Redline Drawing Submittal39 Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1. Submit As-Built Survey Redline Drawings documenting the locations/elevations of 1 constructed improvements signed and sealed by Registered Professional Land 2 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 – Attachment A 3 – Survey Staking Standards) .4 2. Contractor shall submit the proposed as-built and completed redline drawing5 submittal one (1) week prior to scheduling the project final inspection for City6 review and comment. Revisions, if necessary, shall be made to the as-built redline7 drawings and resubmitted to the City prior to scheduling the construction final8 inspection.9 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10 1.9 QUALITY ASSURANCE 11 A. Construction Staking12 1. Construction staking will be performed by the Contractor.13 2. Coordination14 a. Contact City and Developer’s Project Representative at least one week in15 advance notifying the City of when Construction Staking is scheduled.16 b. It is the Contractor’s responsibility to coordinate staking such that17 construction activities are not delayed or negatively impacted.18 3. General19 a. Contractor is responsible for preserving and maintaining stakes. If City20 surveyors or Developer’s Project Representative are required to re-stake for21 any reason, the Contractor will be responsible for costs to perform staking. If22 in the opinion of the City, a sufficient number of stakes or markings have been23 lost, destroyed disturbed or omitted that the contracted Work cannot take place24 then the Contractor will be required to stake or re-stake the deficient areas.25 B. Construction Survey26 1. Construction Survey will be performed by the Contractor.27 2. Coordination28 a. Contractor to verify that horizontal and vertical control data established in the29 design survey and required for construction survey is available and in place.30 3. General31 a. Construction survey will be performed in order to construct the work shown32 on the Construction Drawings and specified in the Contract Documents.33 b. For construction methods other than open cut, the Contractor shall perform34 construction survey and verify control data including, but not limited to, the35 following:36 1) Verification that established benchmarks and control are accurate.37 2) Use of Benchmarks to furnish and maintain all reference lines and grades38 for tunneling.39 3) Use of line and grades to establish the location of the pipe.40 4) Submit to the City copies of field notes used to establish all lines and41 grades, if requested, and allow the City to check guidance system setup prior42 to beginning each tunneling drive.43 5) Provide access for the City, if requested, to verify the guidance system and44 the line and grade of the carrier pipe.45 Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 6) The Contractor remains fully responsible for the accuracy of the work and 1 correction of it, as required.2 7) Monitor line and grade continuously during construction.3 8) Record deviation with respect to design line and grade once at each pipe4 joint and submit daily records to the City.5 9) If the installation does not meet the specified tolerances (as outlined in6 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct7 the installation in accordance with the Contract Documents.8 C. As-Built Survey9 1. Required As-Built Survey will be performed by the Contractor.10 2. Coordination11 a. Contractor is to coordinate with City to confirm which features require as-12 built surveying.13 b. It is the Contractor’s responsibility to coordinate the as-built survey and14 required measurements for items that are to be buried such that construction15 activities are not delayed or negatively impacted.16 c. For sewer mains and water mains 12” and under in diameter, it is acceptable17 to physically measure depth and mark the location during the progress of18 construction and take as-built survey after the facility has been buried. The19 Contractor is responsible for the quality control needed to ensure accuracy.20 3. General21 a. The Contractor shall provide as-built survey including the elevation and22 location (and provide written documentation to the City) of construction23 features during the progress of the construction including the following:24 1) Water Lines25 a) Top of pipe elevations and coordinates for waterlines at the following26 locations:27 (1) Minimum every 250 linear feet, including28 (2) Horizontal and vertical points of inflection, curvature,29 etc.30 (3) Fire line tee31 (4) Plugs, stub-outs, dead-end lines32 (5) Casing pipe (each end) and all buried fittings33 2) Sanitary Sewer34 a) Top of pipe elevations and coordinates for force mains and siphon35 sanitary sewer lines (non-gravity facilities) at the following locations:36 (1) Minimum every 250 linear feet and any buried fittings37 (2) Horizontal and vertical points of inflection, curvature,38 etc.39 3) Stormwater – Not Applicable40 b. The Contractor shall provide as-built survey including the elevation and41 location (and provide written documentation to the City) of construction42 features after the construction is completed including the following:43 1) Manholes44 a) Rim and flowline elevations and coordinates for each manhole45 2) Water Lines46 a) Cathodic protection test stations47 b) Sampling stations48 c) Meter boxes/vaults (All sizes)49 Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 d) Fire hydrants1 e) Valves (gate, butterfly, etc.)2 f) Air Release valves (Manhole rim and vent pipe)3 g) Blow off valves (Manhole rim and valve lid)4 h) Pressure plane valves5 i) Underground Vaults6 (1) Rim and flowline elevations and coordinates for each7 Underground Vault.8 3) Sanitary Sewer9 a) Cleanouts10 (1) Rim and flowline elevations and coordinates for each11 b) Manholes and Junction Structures12 (1) Rim and flowline elevations and coordinates for each13 manhole and junction structure.14 4) Stormwater – Not Applicable15 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 16 1.11 FIELD [SITE] CONDITIONS [NOT USED] 17 1.12 WARRANTY 18 PART 2 - PRODUCTS 19 A. A construction survey will produce, but will not be limited to:20 1. Recovery of relevant control points, points of curvature and points of intersection.21 2. Establish temporary horizontal and vertical control elevations (benchmarks)22 sufficiently permanent and located in a manner to be used throughout construction.23 3. The location of planned facilities, easements and improvements.24 a. Establishing final line and grade stakes for piers, floors, grade beams, parking25 areas, utilities, streets, highways, tunnels, and other construction.26 b. A record of revisions or corrections noted in an orderly manner for reference.27 c. A drawing, when required by the client, indicating the horizontal and vertical28 location of facilities, easements and improvements, as built.29 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all30 construction staking projects. These cut sheets shall be on the standard city template31 which can be obtained from the Survey Superintendent (817-392-7925).32 5. Digital survey files in the following formats shall be acceptable:33 a. AutoCAD (.dwg)34 b. ESRI Shapefile (.shp)35 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use36 standard templates, if available)37 6. Survey files shall include vertical and horizontal data tied to original project38 control and benchmarks, and shall include feature descriptions39 PART 3 - EXECUTION 40 3.1 INSTALLERS 41 Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 A. Tolerances:1 1. The staked location of any improvement or facility should be as accurate as2 practical and necessary. The degree of precision required is dependent on many3 factors all of which must remain judgmental. The tolerances listed hereafter are4 based on generalities and, under certain circumstances, shall yield to specific5 requirements. The surveyor shall assess any situation by review of the overall plans6 and through consultation with responsible parties as to the need for specific7 tolerances.8 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical9 tolerance. Horizontal alignment for earthwork and rough cut should not exceed10 1.0 ft. tolerance.11 b. Horizontal alignment on a structure shall be within .0.1ft tolerance.12 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and13 walkways shall be located within the confines of the site boundaries and,14 occasionally, along a boundary or any other restrictive line. Away from any15 restrictive line, these facilities should be staked with an accuracy producing no16 more than 0.05ft. tolerance from their specified locations.17 d. Underground and overhead utilities, such as sewers, gas, water, telephone and18 electric lines, shall be located horizontally within their prescribed areas or19 easements. Within assigned areas, these utilities should be staked with an20 accuracy producing no more than 0.1 ft tolerance from a specified location.21 e. The accuracy required for the vertical location of utilities varies widely. Many22 underground utilities require only a minimum cover and a tolerance of 0.1 ft.23 should be maintained. Underground and overhead utilities on planned profile,24 but not depending on gravity flow for performance, should not exceed 0.1 ft.25 tolerance.26 B. Surveying instruments shall be kept in close adjustment according to manufacturer’s27 specifications or in compliance to standards. The City reserves the right to request a28 calibration report at any time and recommends regular maintenance schedule be29 performed by a certified technician every 6 months.30 1. Field measurements of angles and distances shall be done in such fashion as to31 satisfy the closures and tolerances expressed in Part 3.1.A.32 2. Vertical locations shall be established from a pre-established benchmark and33 checked by closing to a different bench mark on the same datum.34 3. Construction survey field work shall correspond to the client’s plans. Irregularities35 or conflicts found shall be reported promptly to the City.36 4. Revisions, corrections and other pertinent data shall be logged for future reference.37 38 3.2 EXAMINATION [NOT USED] 39 3.3 PREPARATION [NOT USED] 40 3.4 APPLICATION 41 3.5 REPAIR / RESTORATION 42 A. If the Contractor’s work damages or destroys one or more of the control43 monuments/points set by the City or Developer’s Project Representative, the monuments44 shall be adequately referenced for expedient restoration.45 Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1. Notify City or Developer’s Project Representative if any control data needs to be 1 restored or replaced due to damage caused during construction operations. 2 a. Contractor shall perform replacements and/or restorations.3 b. The City or Developer’s Project Representative may require at any time a4 survey “Field Check” of any monument or benchmarks that are set be verified5 by the City surveyors or Developer’s Project Representative before further6 associated work can move forward.7 3.6 RE-INSTALLATION [NOT USED] 8 3.7 FIELD [OR] SITE QUALITY CONTROL 9 A. It is the Contractor’s responsibility to maintain all stakes and control data placed by the10 City or Developer’s Project Representative in accordance with this Specification. This11 includes easements and right of way, if noted on the plans.12 B. Do not change or relocate stakes or control data without approval from the City.13 3.8 SYSTEM STARTUP 14 A. Survey Checks15 1. The City reserves the right to perform a Survey Check at any time deemed16 necessary.17 2. Checks by City personnel or 3 rd party contracted surveyor are not intended to18 relieve the contractor of his/her responsibility for accuracy.19 20 3.9 ADJUSTING [NOT USED] 21 3.10 CLEANING [NOT USED] 22 3.11 CLOSEOUT ACTIVITIES [NOT USED] 23 3.12 PROTECTION [NOT USED] 24 3.13 MAINTENANCE [NOT USED] 25 3.14 ATTACHMENTS [NOT USED] 26 END OF SECTION 27 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 8/31/2017 M. Owen Added instruction and modified measurement & payment under 1.2; added definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 – PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. 2/14/2018 M Owen Removed “blue text”; revised measurement and payment sections for Construction Staking and As-Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 71 23 - 8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS Revised February 14, 2018 measurement criteria; revised list of items requiring as-built survey “during” and “after” construction; and revised acceptable digital survey file format 1 Project Name City Project No. xxxxx [Insert Project Name] [Insert Project Number] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 74 23 - 1 DAP CLEANING Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 74 23 CLEANING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 32 92 13 – Hydro-Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 74 23 - 2 DAP CLEANING Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 74 23 - 3 DAP CLEANING Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on-site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 77 19 - 1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 77 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City’s Project Representative. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 77 19 - 2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 01 78 39 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 77 19 - 3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor’s Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 23 - 1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 ½ inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer’s printed data, or neatly typewritten [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly-leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut-down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 – title of section removed 4/7/2014 M.Domenech Revised for DAP Application [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 78 39 PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City’s Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. [Insert Project Name] Copper Ranch Infrastructure CPN 106150 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application [Insert Project Name] Copper Ranch Infrastructure CPN 106150 CFW Product Name Manufacturer Manufacturer Product Name & Description Makers Sales and Marketing, LLC MRT2470AB‐Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Galvanized Makers Sales and Marketing, LLC MRT2470AB‐Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Black Valmont Industries, Inc DB01373(page 1 of 6)‐Shoe Base Pole Type 11, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 4 of 6)‐Single Arm Type 33B, Galvanized Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P101‐Mvolt‐R2‐3K‐ MP‐NL‐P7‐AO‐RFD325607 Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P101‐Mvolt‐R4‐3K‐ MP‐NL‐P7‐AO‐RFD325606 Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P101‐Mvolt‐R2‐3K‐BK‐ MP‐NL‐P7‐AO‐RFD325609 Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P101‐Mvolt‐R4‐3K‐BK‐ MP‐NL‐P7‐AO‐RFD325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Bayou Forest Products 30‐35’ .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 6 of 6)‐Wood Pole Arm, Galvanized Makers Sales and Marketing, LLC MRT33.585AB‐Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Galvanized Makers Sales and Marketing, LLC MRT33.585AB‐Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Black Valmont Industries, Inc DB01373(page 2 of 6)‐Shoe Base Pole Type 18, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 3 of 6)‐Single Arm Type 33A, Galvanized Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P303‐Mvolt‐R2‐3K‐ MP‐NL‐P7‐AO‐RFD322792 Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P303‐Mvolt‐R4‐3K‐ MP‐NL‐P7‐AO‐RFD322794 Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P303‐Mvolt‐R2‐3K‐BK‐ MP‐NL‐P7‐AO‐RFD322793 Acuity Brands Lighting, Inc.American Electric Lighting, ATB0‐P303‐Mvolt‐R4‐3K‐BK‐ MP‐NL‐P7‐AO‐RFD322795 Wood Pole Arm CFW Lighting Approved Products List Arterial Luminaire Residential Luminaire Residential‐Standard Arterial‐Standard Type 11 Pole Type 33B Arm Timber Pole Type 18 Pole Type 33A Arm McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Bayou Forest Products 30‐35’ .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 5 of 6)‐Wood Pole Arm, Galvanized Washington 10' Pole Acuity Brands Lighting, Inc.Holophane, CLA 10.6(0AL)FT J20P07BK‐MOD, AB‐31‐4 RFD110736 Washington 14' Pole Acuity Brands Lighting, Inc.Holophane, CLA14FT J20DMODC03BK RFD325026, AB‐ 16‐4 SPEC RFD325026 Washington Luminaire Acuity Brands Lighting, Inc.Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 FRGL RFD338699 Washington Globe Luminaire Acuity Brands Lighting, Inc. Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 AO RFD‐315548 Oleander Type A Pole Acuity Brands Lighting, Inc.Holophane, PDA 12S5L20POBBK‐MOD Oleander Type B Pole Acuity Brands Lighting, Inc.Holophane, PDA20S5L20P08BK‐MOD Oleander Type B Arm Acuity Brands Lighting, Inc.Holophane, OHC 15IN 2A TN BK Oleander Luminaire Acuity Brands Lighting, Inc. Holophane, AUCL2 P40 30K AS BK L3 N P7 AO RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc.Holophane, RSA 12 50 G12 SC BK AB‐26‐4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc.Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc.Holophane, VLC 27IN 1A TN QSM BK Berry Luminaire Acuity Brands Lighting, Inc. Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 AO SH Banner Arms Acuity Brands Lighting, Inc.Holophane, BA‐24IN‐2A‐C0‐S4J‐BL‐075P‐BK Cantex Inc. Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10’ Lengths and 20' lengths Heritage Plastics Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC‐2 and NEMA TC‐3, Rated for 90°C Cable, Sunlight & Weather Resistant Atkore‐Heritage Plastics PVC Rigid Schedule 80 Conduit, Conforms to UL 651 and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Prime Conduit, Inc Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Heavy Wall EPC‐80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy‐Splice, ESSLK Series Wood Pole Arm Timber Pole Conduit Decorative‐Pedestrian System Southwire Type XHHW‐2 copper conductor, 600V Encore Wire TYPE XHHW‐2 / RW90, copper conductor, Superslick Elite, 600V/1000V Encore Wire THHN / MTW / THWN‐2 Copper conductor, 600V Service Wire Co Servicepro‐X XHHW‐2, 600/1,000 Volt Copper, CT Rated Advanced Digital Cable Inc XHHW‐2 Low Smoke Halogen Free, Cross‐linked Polyethylene Insulated 14 AWG‐750 MCM, 600 Volts, 90°C Dry and wet Aluminum Wire‐Triplex Priority Wire & Cable, Inc Triplex Overhead Aluminum Conductor Edison General Purpose, Midget Class MEN Fuses, Voltage Rating: MEN ‐ 250 VAC, Ampere Rating: 0.5 ‐ 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Edison Modular Ferrule Fuse Blocks for Midget Class and CC Fuses Cooper In‐line fuse holders for Single‐Pole 13/32" x 1 1/2" Fuses HEB‐AA EATON Bussmann Series, HEB breakaway and non‐breakaway in‐line fuse holders for UL 13/32” x 1‐ 1/2”supplemental fuses EATON Bussmann Series, FNM 13⁄32˝ x 1‐1⁄2˝ 250Vac Ɵme‐ delay supplemental fuses Connector Thomas & Betts Wire Joints for Copper Conductor, Cat No: 54615, 54620, 54625‐TB, 54635, 54640, 54630 Electrol Systems, Inc TY A (120/240) 100(NS)AL(E)PS(U) WE Manufacturing & Controls TY A 120/240 100(NS)AL(E)PS(U) Electrol Systems, Inc TY A (240/480) 100(NS)AL(E)PS(U) WE Manufacturing & Controls TY A 240/480 100(NS)AL(E)PS(U) MacLean Highline Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, 500lbs Oldcastle Polymer Concrete, H‐SERIES UNIT, H1730‐24 TIER‐22 ‐ TXDOT 2x 1/2" CAPTIVE BOLT ‐ 2x BRASS FLOATING NUT Oldcastle Polymer Concrete, H‐SERIES UNIT, H1324‐24 TIER‐15 ‐ TXDOT 2x 1/2" CAPTIVE BOLT ‐ 2x BRASS FLOATING NUT Kearneys NSi Industries, LLC Split Bolt Connectors, Copper Split Bolts 2 Wire, N Series Photocell Acuity Brands Lighting, Inc.Dark To Light, DLL Elite, Electronic Locking, Type Photocontrol, DLL‐127 or DLL‐480 Shorting Caps Acuity Brands Lighting, Inc.Dark To Light, Part # DSHORT SBK U Residential Luminaire TRASTAR INC.DURA‐STR10A‐3K‐120‐3‐GR‐SCL Arterial Luminaire TRASTAR INC.DURA‐STR25‐3K‐120‐3‐GR‐SCL Interim Products Copper Wire/Conductor Metered Pedestal 120‐240V Metered Pedestal 240‐ 480V Ground Box Fuse & Fuse Holder !!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!!!!!!!!! Approval Spec No.Classification Manufacturer Mix ID Mix Description Design Strength @ 28 days Design Rquirements National Spec Concrete Class A (Sidewalk, ADA Ramps, Driveways, Curb/Gutter, Median Pavement) 9/9/2022 32 13 20 Mix Design American Concrete Company 30CAF029 3000 psi 3-5" Slump; 3-6% Air 4/3/2025 32 13 20 Mix Design Big Town Concrete 2211 3000 psi 3-5" Slump; 3-6% Air 7/16/2025 322 13 20 Mix Design Big Town Concrete 22113 With 30% Slag 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Burnco Texas 30U101AG 3000 psi 3-5" Slump; 3-6% Air 4/1/2024 32 13 20 Mix Design Burnco Texas 30U500BG 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Carder Concrete FWCC502001 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Carder Concrete FWCC502021 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Chisholm Trail Redi Mix C13020AE 3000 psi 3-5" Slump; 4.5-7.5% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design City Concrete Company 30HA20II 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Cow Town Redi Mix 253-W 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Cow Town Redi Mix 250 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Cow Town Redi Mix 350 3000 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 20 Mix Design Estrada Ready Mix R3050AEWR 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Holcim - SOR, Inc.1261 3000 psi 3-5" Slump; 3-6% Air 9/23/2024 32 13 20 Mix Design Holcim - SOR, Inc.5177 3000 psi 3-5" Slump; 3-6% Air 5/8/2025 32 13 20 Mix Design Holcim - SOR, Inc.530WA-T1 3000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 20 Mix Design Liquid Stone C301D 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta R2136214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta R2136014 3000 psi 3-5" Slump; 3-6% Air 4/1/2023 32 13 20 Mix Design Martin Marietta R2136N14 3000 psi 3-5" Slump; 3-6% Air 6/1/2023 32 13 20 Mix Design Martin Marietta R2136R20 3000 psi 3-5" Slump; 3-6% Air 6/1/2023 32 13 20 Mix Design Martin Marietta R2136N20 3000 psi 3-5" Slump; 3-6% Air 11/2/2022 32 13 20 Mix Design Martin Marietta R2141K24 4000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 20 Mix Design Martin Marietta R2136K14 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta R2131314 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta R2132214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta D9490SC 3000 psi 3-5" Slump; 4.5-7.5% Air 5/9/2025 32 13 20 Mix Design Martin Marietta R2136R14 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Design NBR Ready Mix CLS A-YY 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Design NBR Ready Mix CLS A-NY 3000 psi 3-5" Slump; 3-6% Air 7/10/2023 32 13 20 Mix Design Osburn 30A50MR 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 20 Mix Design Rapid Redi Mix RRM5020A 3000 psi 3-5" Slump; 3-6% Air 1/24/2023 32 13 20 Mix Design Rapid Redi Mix RRM5525A 3600 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Design SRM Concrete 30850 With 20% Fly Ash 3000 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Design SRM Concrete 30350 3000 psi 3-5" Slump; 3-6% Air 10/18/2024 32 13 20 Mix Design SRM Concrete 30050 With 20% Fly Ash 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Tarrant Concrete FW5025A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Tarrant Concrete CP5020A 3000 psi 3-5" Slump; 3-6% Air 10/10/2022 32 13 20 Mix Design Tarrant Concrete TCFW5020A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Tarrant Concrete FW5525A2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Titan Ready Mix 3020AE 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.230 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.2301 3000 psi 3-5" Slump; 3-6% Air Class CIP (Inlets, Manholes, Junction Boxes, Encasement, Blocking, Collars, (Spread Footing Pedestal Pole Foundations (Reference Detail 34 41 10-D605A) 9/9/2022 32 13 13 Mix Design American Concrete Company 40CNF065 4000 psi 3-5" Slump; 0-3% Air 9/9/2022 32 13 13 Mix Design Burnco Texas 40U500BG 4000 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW5520A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW6020A 4000 psi 3-5" Slump; 3-6% Air 8/4/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW5020A With 20% Fly Ash 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 255-2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 355 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 255 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 270 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 370 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 353 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 257 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 357 3600 psi 3-5" Slump; 3-6% Air 5/7/2025 32 13 13 Mix Design Cow Town Redi Mix 265-42 4200 psi 3-5" Slump; 3-6% Air 2/7/2025 32 13 13 Mix Design Holcim - SOR, Inc.1701 4000 psi 3-5" Slump; 3-6% Air 2/7/2025 32 13 13 Mix Design Holcim - SOR, Inc.1551 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Holcim - SOR, Inc.5409 4000 psi 3-5" Slump; 3-6% Air 8/14/2025 32 13 13 Mix Design Holcim - SOR, Inc.540WA-T1 With 20% Fly Ash and 30% Slag 4000 psi 3-5" Slump; 3-6% Air 4/27/2023 32 13 13 Mix Design Liquid Stone C361DNFA 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2141230 4000 psi 3-5" Slump; 3-6% Air 8/4/2023 32 13 13 Mix Design Martin Marietta R2141R24 4000 psi 3-5" Slump; 3-6% Air 11/20/2023 32 13 13 Mix Design Martin Marietta R2146R33 4000 psi 3-5" Slump; 3-6% Air 11/20/2023 32 13 13 Mix Design Martin Marietta R2146K33 4000 psi 3-5" Slump; 3-6% Air CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 9/30/2025 Page 1 of 6 !!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!!!!!!!!! Approval Spec No.Classification Manufacturer Mix ID Mix Description Design Strength @ 28 days Design Rquirements National Spec CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 9/30/2025 9/9/2022 32 13 13 Mix Design Martin Marietta R2142233 3600 psi 3-5" Slump; 4.5-7.5% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2136224 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2141233 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2146038 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design Martin Marietta R2146K34 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 32 13 13 Mix Design Martin Marietta R2146R35 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 33 13 13 Mix Design Martin Marietta R2146K35 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 33 13 13 Mix Design Martin Marietta R2146N33 4000 psi 3-5" Slump; 3-6% Air 9/12/2023 32 13 13 Mix Design NBR Ready Mix CLS P1-YY 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design NBR Ready Mix TX C-YY 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design NBR Ready Mix TX C-NY 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 13 Mix Design Rapid Redi Mix RRM5320A 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 13 Mix Design Rapid Redi Mix RRM6020ASS 4000 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 40850 4000 psi 3-5" Slump; 3-6% Air 9/16/2024 32 13 13 Mix Design SRM Concrete 35050 3500 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 13 Mix Design SRM Concrete 36850 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW5320A 3000 psi 3-5" Slump; 3-6% Air 10/10/2022 32 13 13 Mix Design Tarrant Concrete TCFW6025A2 4000 psi 3-5" Slump; 3-6% Air Class C (Drilled Shaft for Traffic Signal Pole Foundations Reference Detail 31 41 10-D605) 9/9/2022 32 13 13 Mix Design Burnco Texas 36U500BG 3600 psi 5.5-7.5" Slump; 3-6% Air 6/21/2023 32 13 13 Mix Design Cow Town Redi Mix 360-DS 3600 psi 5.5-7.5" Slump; 3-6% Air 10/30/2024 32 13 13 Mix Design Estrada Ready Mix R36575AEWR 3600 psi 5.5-7.5" Slump; 3-6% Air 9/11/2025 32 13 13 Mix Design Gonzalez Brothers P6020LA 3600 psi 5.5-7.5" Slump; 3-6% Air 12/5/2022 32 13 13 Mix Design Holcim - SOR, Inc.1822 3600 psi 5.5-7.5" Slump; 0-3% Air 9/9/2022 32 13 13 Mix Design Holcim - SOR, Inc.1859 4000 psi 5.5-7.5" Slump; 3-6% Air 4/7/2023 32 13 13 Mix Design Liquid Stone C361DHR 3600 psi 5.5-7.5" Slump; 3-6% Air 6/27/2023 32 13 13 Mix Design Martin Marietta U2146N41 3600 psi 5-7" Slump; 3-6% Air 6/27/2023 32 13 13 Mix Design Martin Marietta U2146K45 3600 psi 5-7" Slump; 3-6% Air 5/9/2025 2 13 13 Mix Design Martin Marietta U2146R41 3600 psi 5-7" Slump; 3-6% Air 8/22/2024 32 13 13 Mix Design NBR Ready Mix 135K2524 3600 psi 5.5" Slump; 3-6% Air 8/22/2024 32 13 13 Mix Design NBR Ready Mix 135K0524 3600 psi 5.5" Slump; 3-6% Air Class C (Headwalls, Wing walls, Culverts) 9/9/2022 32 13 13 Mix Design Carder Concrete FWCC602001 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design City Concrete Company 40LA2011 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 260-2 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 360-1 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 260-1 3600 psi 3-5" Slump; 3-6% Air 8/11/2025 32 13 13 Mix Design Cow Town Redi Mix 275 With 20% Fly Ash 5000 psi 4-6" Slump: 3-6% Air 8/11/2025 32 13 13 Mix Design Cow Town Redi Mix 375 5000 psi 4-6" Slump: 3-6% Air 1/29/2024 32 13 13 Mix Design Estrada Ready Mix R3655AEWR 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design GCH Concrete Services GCH4000 4000 psi 3-5" Slump; 3-6% Air 4/1/2023 32 13 13 Mix Design Martin Marietta 310LBP 3600 psi 3-5" Slump; 4-7% Air 8/30/2023 32 13 13 Mix Design Martin Marietta R2141R30 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2146035 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design SRM Concrete 40050 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design SRM Concrete 35022 With 20% Fly Ash 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW6020A2 4000 psi 3-5" Slump; 3-6% Air Class P (Machine Placed Paving) 4/3/2025 32 13 13 Mix Design Big Town Concrete 4511 3600 psi 1-3" Slump; 3-6% Air 4/3/2025 32 13 13 Mix Design Big Town Concrete 4411 3600 psi 1-3" Slump; 3-6% Air 6/30/2025 32 13 13 Mix Design Big Town Concrete 5211 With 20% Fly Ash 4000 psi 1-3" Slump; 3-6% Air 6/30/2025 30 13 13 Mix Design Big Town Concrete 52113 With 30% Slag 4000 psi 1-3" Slump; 3-6% Air 6/30/2025 30 13 13 Mix Design Big Town Concrete 5311 4000 psi 1-3" Slump; 3-6% Air 9/30/2025 30 13 13 Mix Design Burnco Texas 40U553BG With 20% Fly Ash 4000 psi 1-3" Slump; 3-6% Air 31 13 13 Mix Design Burnco Texas 40U553BG 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Carder Concrete FWCC552091 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Carder Concrete FWCC602091 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design City Concrete Company 36LA2011 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 33 13 13 Mix Design Cow Town Redi Mix 257-M 3600 psi 1-3" Slump; 3-6% Air 11/14/2022 32 13 13 Mix Design Cow Town Redi Mix 357-M 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 260-M 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 360-M 4000 psi 1-3" Slump; 3-6% Air 2/6/2024 32 13 13 Mix Design Estrada Ready Mix TD3655AEWR 3600 psi 1-3" Slump; 3-6% Air 5/20/2025 32 13 13 Mix Design Gilco Contracting Inc 36MP1643 3600 psi 1-3" Slump; 3-6% Air 6/20/2025 32 13 13 Mix Design Gilco Contracting Inc 36MP1629 3600 psi 1-3" Slump; 3-6% Air 7/29/2025 32 13 13 Mix Design Gilco Contracting Inc 36MP1655 With 20% Fly Ash 3600 psi 1-3" Slump; 3-6% Air 7/29/2025 32 13 13 Mix Design Gilco Contracting Inc 36MP1670 3600 psi 1-3" Slump; 3-6% Air 5/12/2025 32 13 13 Mix Design Holcim - SOR, Inc.1703 4000 psi 1-3" Slump; 3-6% Air 8/4/2023 32 13 13 Mix Design Martin Marietta Q2141R27 4000 psi 1-3" Slump; 3-6% Air 11/2/2022 32 13 13 Mix Design Martin Marietta Q2141K30 4000 psi 1-3" Slump; 3-6% Air ...Concrete (Continues) Page 2 of 6 !!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!!!!!!!!! Approval Spec No.Classification Manufacturer Mix ID Mix Description Design Strength @ 28 days Design Rquirements National Spec CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 9/30/2025 5/5/2025 32 13 13 Mix Design Martin Marietta Q2141N27 4000 psi 1-3" Slump; 3-6% Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix TX C SF-YY 3600 psi 1-3" Slump; 3-6% Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix TX C SF-NY 3600 psi 1-3" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 40068 4000 psi 1-3" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 40825 4000 psi 1-3" Slump; 3-6% Air 9/16/2024 32 13 13 Mix Design SRM Concrete 40025 With 20% Fly Ash 4000 psi 1-3" Slump; 3-6% Air 10/18/2024 32 13 13 Mix Design SRM Concrete 35023 3600 psi 1-3" Slump; 3-6% Air 6/5/2025 32 13 13 Mix Design SRM Concrete 40324 4000 psi 1-3" Slump; 3-6% Air 7/21/2025 32 13 13 Mix Design SINACOLA 24011-4000MP 20%With 20% Fly Ash 4000 psi 1-3" Slump; 3-6% Air 7/21/2025 32 13 13 Mix Design SINACOLA 24011-4000MP Straight Cement 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW5520AMP 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design True Grit Redi Mix 0255.2301 3600 psi 1-3" Slump; 3.5-6.5% Air 9/9/2022 32 13 13 Mix Design True Grit Redi Mix 0260.2302 4000 psi 1-3" Slump; 3.5-6.5% Air 6/17/2025 32 13 13 Mix Design True Grit Redi Mix 460.230M 4000 psi 1-3" Slump; 3-6% Air 6/23/2025 32 13 13 Mix Design True Grit Redi Mix 360.230M 4000 psi 1-3" Slump; 3-6% Air Class H (Hand Placed Paving, Valley Gutter) 9/9/2022 32 13 13 Mix Design American Concrete Company 45CAF076 4500 psi 3-5" Slump; 3-6% Air 5/2/2023 32 13 13 Mix Design Big D Concrete CM14520AE 4500 psi 3-5" Slump; 3-6% Air 4/3/2025 32 13 13 Mix Design Big Town Concrete 6211 4500 psi 3-5" Slump; 3-6% Air 4/3/2025 32 13 13 Mix Design Big Town Concrete 6311 4500 psi 3-5" Slump; 3-6% Air 4/5/2025 32 13 13 Mix Design Big Town Concrete 6017 4500 psi 3-5" Slump; 3-6% Air 7/16/2025 32 13 13 Mix Design Big Town Concrete 62113 With 30% Slag 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Burnco Texas 45U500BG 4500 psi 3-5" Slump; 3-6% Air 33 13 13 Mix Design Burnco Texas 45U100AG 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Carder Concrete FWCC602021 4500 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 13 Mix Design Chisholm Trail Redi Mix CTFW6520A 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design City Concrete Company 45NA20II 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 265 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 365 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 13 Mix Design Estrada Ready Mix R4560AEWR/4500 psi 3-5" Slump; 4-6% Air 9/9/2022 32 13 13 Mix Design GCH Concrete Services GCH4500 4500 psi 3-5" Slump; 3-6% Air 5/20/2025 32 13 13 Mix Design Gilco Contracting Inc 45HP1643 4500 psi 3-5" Slump; 3-6% Air 6/20/2025 32 13 13 Mix Design Gilco Contracting Inc 45HP1629 4500 psi 3-5" Slump; 3-6% Air 7/29/2025 32 13 13 Mix Design Gilco Contracting Inc 45HP1670 4500 psi 3-5" Slump; 3-6% Air 10/4/2024 32 13 13 Mix Design Holcim - SOR, Inc.5507 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Holcim - SOR, Inc.1851 4500 psi 3-5" Slump; 3-6% Air 5/8/2025 32 13 13 Mix Design Holcim - SOR, Inc.545WA-T1 4500 psi 3-5" Slump; 3-6% Air 4/5/2025 32 13 13 Mix Design Liquid Stone C451D 4500 psi 3-5" Slump; 3-6% Air 11/2/2022 32 13 13 Mix Design Martin Marietta R2146N35 4500 psi 3-5" Slump; 3-6% Air 8/4/2023 32 13 13 Mix Design Martin Marietta R2146R36 4500 psi 3-5" Slump; 3-6% Air 11/2/2022 32 13 13 Mix Design Martin Marietta R2146N36 4500 psi 3-5" Slump; 3-6% Air 5/22/2023 32 13 13 Mix Design Martin Marietta R2146K37 4500 psi 3-5" Slump; 3-6% Air 12/22/2023 32 13 13 Mix Design Martin Marietta R2146R44 4500 psi 3-5" Slump; 3-6% Air 12/22/2023 32 13 13 Mix Design Martin Marietta R2146K44 4500 psi 3-5" Slump; 3-6% Air 11/15/2022 32 13 13 Mix Design Martin Marietta R2146P36 4500 psi 3-5" Slump; 3-6% Air 11/15/2022 32 13 13 Mix Design Martin Marietta R2146K36 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2147241 4500 psi 3-5" Slump; 4.5-7.5% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2146236 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2146036 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2146242 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2146042 4500 psi 3-5" Slump; 3-6% Air 6/3/2025 32 13 13 Mix Design Martin Marietta R2146K43 4500 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix CLS P2-YY 4500 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix CLS P2-NY 4500 psi 3-5" Slump; 3-6% Air 7/10/2023 32 13 13 Mix Design Osburn 45A60MR 4500 psi 3-5" Slump; 3-6% Air 1/24/2023 32 13 13 Mix Design Rapid Redi Mix RRM6320AHP 4500 psi 3-5" Slump; 3-6% Air 2/7/2025 32 13 13 Mix Design SRM Concrete 45023 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design SRM Concrete 45000 4500 psi 3-5" Slump; 3-6% Air 5/23/2025 32 13 13 Mix Design SRM Concrete 45300 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 45350 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 45850 With 20% Fly Ash 4500 psi 3-5" Slump; 3-6% Air 10/18/2024 32 13 13 Mix Design SRM Concrete 45050 4500 psi 3-5" Slump; 3-6% Air 7/21/2025 32 13 13 Mix Design SINACOLA 24011-4500HP 20%With 20% Fly Ash 4500 psi 3-5" Slump; 3-6% Air 7/21/2025 32 13 13 Mix Design SINACOLA 24011-4500HP Straight Cement 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW6020AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW60AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete TCFW6020AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Titan Ready Mix TRC4520 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design True Grit Redi Mix 0260.2301 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design True Grit Redi Mix 0265.2301 4500 psi 3-5" Slump; 3.5-6.5% Air 9/9/2022 32 13 13 Mix Design True Grit Redi Mix 270.230 4500 psi 3-5" Slump; 3-6% Air 6/12/2025 32 13 13 Mix Design True Grit Redi Mix 465.230H With 30% Slag 4500 psi 3-5" Slump: 3-6% Air 6/23/2025 32 13 13 Mix Design True Grit Redi Mix 365.230H 4500 psi 3-5" Slump: 3-6% Air 10/9/2024 32 13 13 Mix Design Wildcatter 4520AI 4500 psi 3-5" Slump; 3-6% Air ...Concrete (Continues) Page 3 of 6 !!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!!!!!!!!! Approval Spec No.Classification Manufacturer Mix ID Mix Description Design Strength @ 28 days Design Rquirements National Spec CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 9/30/2025 Class HES (High Early Strength Paving) 9/9/2022 32 13 13 Mix Design Big D Concrete 14500AE 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 370-1NC 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 375-NC 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 370-NC 4500 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 13 Mix Design Cow Town Redi Mix 380-NC 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 13 Mix Design Estrada Ready Mix 4575AESC 4500 psi / 3000 psi @ 3 days 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Holcim - SOR, Inc.2125 5000 psi 3-5" Slump; 3-6% Air 1/24/2023 32 13 13 Mix Design Liquid Stone C451DHR-A 4500 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 13 Mix Design Martin Marietta R2161K70 6000 psi / 3000 psi @ 24hr.3-5" Slump; 3-6% Air 2/10/2023 32 13 13 Mix Design SRM Concrete 50310 5000 psi 3-5" Slump; 3-6% Air 2/7/2025 32 13 13 Mix Design SRM Concrete 40326 4500 psi / 3000 psi @ 3 days 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW6520AMR 4500 psi / 3000 psi @ 3 days 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW7520AMR 4500 psi / 3000 psi @ 3 days 3-5" Slump; 3-6% Air Class S (Bridge Slabs, Top Slabs of Direct Traffic Culverts, Approach Slabs) 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 260 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 360 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 365-STX 4000 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 13 Mix Design Estrada Ready Mix R4060AEWR 4000 psi 4-6" Slump; 3-6% Air 5/3/2023 32 13 13 Mix Design Martin Marietta M7842344 4000 psi 3-5" Slump; 4.5-7.5% Air 4/1/2023 32 13 13 Mix Design Martin Marietta R2146P33 4000 psi 3-5" Slump; 3-6% Air 8/18/2025 32 13 13 Mix Design Martin Marietta 610LBT 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 32 13 13 Mix Design NBR Ready Mix TX S-NY 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 32 13 13 Mix Design NBR Ready Mix TX S-YY 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 32 13 13 Mix Design SRM Concrete 40850 With 20% Fly Ash 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 32 13 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 5/5/2023 32 13 13 Mix Design SRM Concrete D100008553CB 4000 psi 3-5" Slump; 3-6% Air Concrete Base Trench Repair 4/1/2023 03 34 16 Mix Design Burnco Texas 10YH50BF 1000 psi Flowable; 8.5-11.5% Air 9/9/2022 03 34 16 Mix Design Burnco Texas 08Y450BA 800 psi 5-7" Slump; 3-6% Air 03 314 16 Mix Design Martin Marietta YN81O001 750 psi 8-12" Slump; 5-10% Air Controlled Low Strength Material (Flowable Fill) 2/7/2025 03 34 13 Mix Design Burnco Texas 01Y690BF 100 psi Flowable; 9.5-11.5% Air 5/19/2025 03 34 13 Mix Design Burnco Texas 01Z180AF 100 psi Flowable; 9.5-11.5% Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWCC359101 50-150 psi 3-5" Slump; 8-12% Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWFF237501 50-150 psi Flowable; 8.5-11.5% Air 8/4/2025 03 34 13 Mix Design Chisholm Trail Redi Mix CT150FF 50-150 psi Flowable; 7-9.0% Air 9/9/2022 03 34 13 Mix Design City Concrete Company 11-350-FF 50-150 psi Flowable; 8-12% Air 9/9/2022 03 34 13 Mix Design Cow Town Redi Mix 9 70 psi 7-9" Slump; 8-11% Air 9/9/2025 03 34 13 Mix Design Cow Town Redi Mix 10 Min 50 psi Min 9" Slump; 10-20% Air 5/12/2025 03 34 13 Mix Design Holcim - SOR, Inc.3741 100 psi Flowable; 12.0-24.0% Air 8/4/2025 03 34 13 Mix Design Holcim - SOR, Inc.901 100 psi 9-11" Slump; 10-30% Air 8/14/2025 03 34 13 Mix Design Holcim - SOR, Inc.904 150 psi 9-11" Slump; 10-30% Air 9/11/2025 03 34 13 Mix Design Martin Marietta FLOW25A 150 psi 8"-12" Slump; 10% Air 10/4/2023 03 34 13 Mix Design NBR Ready Mix FTW FLOW FILL 150 psi 7-10" Slump; 8-12% Air 2/7/2025 03 34 13 Mix Design SRM Concrete 910 150 psi Flowable; 8-12% Air 9/9/2022 03 34 13 Mix Design Tarrant Concrete FWFF150CLSM 50-150 psi Flowable; 8-12% Air Concrete Rip Rap 4/1/2023 31 37 00 Mix Design Martin Marietta R2141030 4000 psi 3-5" Slump; 3-6% Air 4/1/2023 31 37 00 Mix Design Martin Marietta R2146033 4000 psi 3-5" Slump; 3-6% Air Asphalt Paving 9/9/2022 32 12 16 Mix Design Austin Asphalt FT5B117965 FT5B117965 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Austin Asphalt FT1B139965 FT1B139965 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Austin Asphalt FT1B117.2 FT1B117.2 PG64-22 Type B Fine Base 5/1/2024 32 12 16 Mix Design Reynolds Asphalt 340-DG-B P 340-DG-B PG64-22 Type B Base Course 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1112B 1112B PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1612B 1612B PG64-22 Type B Fine Base 4/4/2025 32 12 16 Mix Design Reynolds Asphalt 2315B 2315B PG64-22 Type B Fine Base 12/5/2022 33 12 16 Mix Design Sunmount Paving 3076BV6422 3076BV6422 PG62-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Sunmount Paving 341-BRAP6422ERG 341-BRAP6422ERG PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 37-211305-20 37-211305-20 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 44-211305-17 44-211305-17 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 211305 (1757)211305 (1757) PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 64-224125-18 PG 64-224125-18 PG70-22 Type D Fine Surface 4/1/2024 32 12 16 Mix Design TXBIT 344 MAC-SP-D 70-22XR 344 MAC-SP-D 70-22XR SAC A-R Type D Fine Surface Detectable Warning Surface 9/9/2022 32 13 20 DWS - Pavers Pine Hall Brick (Winston Salem, NC)Tactile Pavers 9/9/2022 32 13 20 DWS - Pavers Western Brick Co. (Houston, TX)Detectable Warning Pavers 9/9/2022 32 13 20 DWS - Composite Armor Tile 9/9/2022 32 13 20 DWS - Composite ADA Solutions (Wilmington, MA)Heritage Brick CIP Composite Paver 4/7/2023 32 13 20 DWS - Pavers ADA Solutions (Wilmington, MA)Detectable Warning Pavers Page 4 of 6 !!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!!!!!!!!! Approval Spec No.Classification Manufacturer Mix ID Mix Description Design Strength @ 28 days Design Rquirements National Spec CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 9/30/2025 Silicone Joint Sealant 9/9/2022 32 13 73 Joint Sealant Dow 890SL 890SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Tremco 900SL 900SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Pecora 300SL 300SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Crafco RoadSaver Silicone RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 9/9/2022 33 05 10 Embedment Sand Silver Creek Materials Utility Embedment Sand ASTM C33 9/9/2022 33 05 10 Embedment Sand Crouch Materials Utility Embedment Sand ASTM C33 9/9/2022 33 05 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 33 05 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 33 05 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 9/28/2018 33 05 13 Manhole Frames and Covers AccuCast (Govind Steel Company, LTD)MHRC #220605 MHRC #220605 (Size - **24" Dia.)ASTM A48 AASHTO M306 9/28/2018 33 05 13 Manhole Cover Neenah Foundry NF-1274-T91 NF-1274-T91 (Size - 32" Dia.)ASTM A48 AASHTO M306 9/28/2018 33 05 13 Manhole Frames and CoversNeenah Foundry NF-1743-LM (Hinged)NF-1743-LM (Hinged) (Size - 32" Dia.)ASTM A48 AASHTO M306 9/28/2018 33 05 13 Manhole Frame Neenah Foundry NF-1930-30 NF-1930-30 (Size - 32.25" Dia.)ASTM A48 AASHTO M306 9/28/2018 33 05 13 Manhole Frames and CoversNeenah Foundry R-1743-HV R-1743-HV (Size - 32" Dia.)ASTM A48 AASHTO M306 4/3/2019 33 05 13 Manhole Frames and CoversSIP Industries ++2279ST 2279ST (Size - 24" Dia.)ASTM A48 AASHTO M306 4/3/2019 33 05 13 Manhole Frames and CoversSIP Industries ++2280ST 2280ST (Size - 32" Dia.)ASTM A48 AASHTO M306 10/8/2020 33 05 13 Manhole Frames and CoversEJ ( Formally East Jordan Iron Works)EJ1033 Z2/A EJ1033 Z2/A (Size - 32.25" Dia.)ASTM A536 AASHTO M306 3/8/2024 33 05 13 Curb Inlet Covers SIP Industries ++2296T 2296T (Size - ***24" Dia.)ASTM A48 AASHTO M306 6/18/2024 33 05 13 Curb Inlet Covers SIP Industries ++2279STN 2279STN (Size - 24" Dia.)ASTM A48 AASHTO M306 Storm Sewer - Inlet & Structures 33-05-13 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-10x3-405-PRECAST** (Size - 10' X 3')ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-10x3-406-PRECAST** (Size - 10' X 3')ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-10x4.5-407-PRECAST** (Size - 10' X 4.5')ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-10x4.5-420-PRECAST** (Size - 10' X 4.5')ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-TOP (Size - 4' X 4')ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-BASE (Size - 4' X 4')ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-TOP (Size - 5' X 5')ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-BASE (Size - 5' X 5')ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-TOP (Size - 6' X 6')ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-BASE (Size - 6' X 6')ASTM C913 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-10X3-405-PRECAST INLET** (Size - 10' X 3')ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-15X3-405-PRECAST INLET** (Size - 15' X 3')ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-20X3-405-PRECAST INLET** (Size - 20' X 7')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-4X4-409-PRECAST TOP (Size - 4' X 4')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-4X4-409-PRECAST BASE (Size - 4' X 4')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-4X4-412-PRECAST 4-FT RISER (Size - 4' X 4')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-410-PRECAST TOP (Size - 5' X 5')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-410-PRECAST BASE (Size - 5' X 5')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-412-PRECAST 5-FT RISER (Size - 5' X 5')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-411-PRECAST TOP (Size - 6' X 6')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-411-PRECAST BASE (Size - 6' X 6')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-412-PRECAST 6-FT RISER (Size - 6' X 6')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-7X7-411-PRECAST TOP (Size - 7' X 7')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-7X7-411-PRECAST BASE (Size - 7' X 7')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-7X7-412-PRECAST 4-FT RISER (Size - 7' X 7')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-411-PRECAST TOP (Size - 8' X 8')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-411-PRECAST BASE (Size - 8' X 8')ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-412-PRECAST 5-FT RISER (Size - 8' X 8')ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-4X4-408-PRECAST INLET (Size - 4' X 4')ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-5X5-408-PRECAST INLET (Size - 5' X 5')ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-6X6-408-PRECAST INLET (Size - 6' X 6')ASTM 615 8/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Stacked Manhole (Size - 4' X 4')ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box (Size - 5' X 8')ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Storm Junction Box (Size - 4' X 4')ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 5' Storm Junction Box (Size - 5' X 5')ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 6' x 6' Storm Junction Box (Size - 6' X 6')ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 8' x 8' Storm Junction Box Base (Size - 8' X 8')ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box Base (Size - 5' X 8')ASTM C478 8/28/2023 33 49 10 Manhole Rinker Materials Reinforced 48" Diameter Spread Footing Manhole (Size - 4' X 4')ASTM C433 **Note: All new development and new installation manhole lids shall meet the minimum 30-inch opening requirement as specified in City Specification 33 05 13. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and covers. Page 5 of 6 !!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!!!!!!!!! Approval Spec No.Classification Manufacturer Mix ID Mix Description Design Strength @ 28 days Design Rquirements National Spec CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 9/30/2025 8/28/2023 33 39 20 Curb Inlet 10 'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT)ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 15 'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT)ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 20' x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT)ASTM C913-16 1/12/2024 33 49 20 Drop Inlet AmeriTex Pipe &Products Drop Inlet (4' X 4')ASTM C913 1/12/2024 33 49 20 Drop Inlet AmeriTex Pipe &Products Drop Inlet (5' X 5')ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 4'x4' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 5'x5' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 5' Precast Transition MH (4' MH on the top of 5' JB)ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 6'x6' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 6' Precast Transition MH (4' MH on the top of 6' JB)ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 8'x8' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 8' Precast Transition MH (4' MH on the top of 8' JB)ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Type C Storm Drain Manhole on Box (4' MH on the top of RCB)ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products 10x3 Precast** (Size 10' x 3')ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products 15x3 Precast** (Size 15' x 3')ASTM C913 Storm Sewer - Pipes & Boxes 33-05-13 4/9/2021 33 41 13 Storm Drain Pipes Advanced Drainage Systems, Inc. (ADS)ADS HP Storm Polypropylene (PP) Pipe (Size - 12" - 60")ASTM F2881 & AASHTO M330 8/28/2023 33 41 10 Storm Drain Pipes Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe (Size - 21" or larger)ASTM C76, C655 8/28/2023 33 41 10 Culvert Box Rinker Materials Reinforced Concrete Box Culvert (Sze - Various)ASTM C789, C850 10/12/2023 33 41 10 Storm Drain Pipes AmeriTex Pipe &Products Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger)ASTM C76, C506 10/12/2023 34 41 10 Culvert Box AmeriTex Pipe &Products Reinforced Concrete Box Culvert (size - Various))ASTM C1433,C1577 10/18/2023 35 41 10 Storm Drain Pipes The Turner Co.Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger)ASTM C76, C506 10/18/2023 33 41 10 Culvert Box The Turner Co.Reinforced Concrete Box Culvert (size - Various)ASTM C1433,C1577 4/12/2024 33 41 10 Storm Drain Pipes Thompson Pipe Group Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various)ASTM C76, C506 6/25/2024 33 41 10 Culvert Box Oldcastle Reinforced Concrete Box Culvert ASTM C1433,C1577 6/25/2024 33 41 10 Storm Drain Pipes Oldcastle Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various)ASTM C76, C506 (4-5-2025) 03 34 13 CLSM specification ….Storm Sewer - Inlet & Structures Continues (1-29-2025) Removed Argos, Ingram, Redi-Mix, Charley's (4-3-2025) Bigtown Concrete updated Mix ID's **Note: Pre-cast inlets are approved for the stage I portion of the structure (basin) only. Stage II portion of the structure are required to be cast in-place. No exceptions to this requirement shall be allowed. Revision Comments Page 6 of 6 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra-Seal P-201 ASTM D2240/D412/D792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press-Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1/26/99 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non-traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowtite ASTM 3753 Non-traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non-traffic area Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. 01/31/06 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASHTO M306-04 30" Dia. 11/02/10 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/11 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products MH32FTWSS-DC 30" Dia 08/10/11 33 05 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 10/14/13 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works 30" ERGO XL Assembly with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536 30" Dia 06/01/17 34 05 13 30" Dia. MH Ring and Cover (Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. 12/05/23 34 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 4267WT - Hinged (32") ASTM A 48 30" Dia. 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. CAP-ONE-30-FTW, Composite, w/ Lock w/o Hing 30" Dia. 10/07/21 34 05 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 33 05 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 33 05 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) * 33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item #49 ASTM C 478 48" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 12/05/23 33 39 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 09/03/24 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. Manhole, 32" Opening and Flat top, (No Transition Cones) ASTM C 478 48" to 84" I.D. 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC Geneva Pipe and Precast (Predl Systems) 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas 03/07/23 33 39 20 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-478; ASTM C-923; ASTM C-443 03/07/23 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardscp 48" & 60" I.D. Manhole w/32" Cone 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amitech USA Meyer Polycrete Pipe Sewer -(WAC) Wastewater Access Chamber 33 39 40 12/29/23 33 39 20 Wastewater Access Chamber Quickstream Solutions, Inc. Type 8 Maintenace Shaft (Poopit) For use when Std. MH cannot be installed due to depth Water & Sewer - Manholes & Bases/Rehab Systems/Cementitious * E1-14 Manhole Rehab Systems Quadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP E1-14 Manhole Rehab Systems AP/M Permaform 4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 E1-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Misc. Use CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 * From Original Standard Products List 1 Approval Spec No. Classsification Manufacturer Model No. National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Water & Sewer - Manholes & Bases/Rehab Systems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Sprayroq, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) For Exterior Coating of Concrete Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 03/19/18 33 05 16, 33 39 10, 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams RR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion) For Exterior Coating of Concrete Structures Only Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16) * 33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. * 33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. LifeSaver - Stainless Steel For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non_pressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 09/03/24 33 05 13 Casing Spacers Raci (Completely HDPE) Per Manufacturers Requirements (Sewer Applications Only)8" - 12" (Sewer Only) Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13) * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AWWA C150, C151 3" thru 24" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AWWA C150, C151 4" thru 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AWWA C150, C151 4" thru 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AWWA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AWWA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatings/Epoxy 33-39-60 (01/08/13) 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 210RS LA County #210-1.33 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications Sewer - Coatings/Polyurethane Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2" Sewer - Pipes/Concrete * E1-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL Item #95-Manhole, #98- Pipe ASTM C 76 * E1-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pipe Enlargment System (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously Sewer - Pipe/Fiberglass Reinforced/ 33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Hobas Pipe (Non-Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 33 31 13 Glass-Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 03/07/23 33 31 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AWWA M45 09/03/24 33 31 13 Fiberglass Pipe (FRP) Superlit Boru Sanayi A.S. Superlit FRP ASTM D3262, ASTM D3517, ASTM 3754, AWWA C950 * From Original Standard Products List 2 Approval Spec No. Classsification Manufacturer Model No. National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Sewer - Pipe/Polymer Pipe 4/14/05 Polymer Modified Concrete Pipe Amitech USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to 102", Class V 06/09/10 E1-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - Pipes/HDPE 33-31-23(1/8/13) * High-density polyethylene pipe Phillips Driscopipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8" * High-density polyethylene pipe Plexco Inc. ASTM D 1248 8" * High-density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" High-density polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-12 DR-14 PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AWWA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AWWA C900 4" thru 12" Sewer - Pipes/PVC* 33-31-20 (7/1/13) * 33-31-20 PVC Sewer Pipe J-M Manufacturing Co., Inc. (JM Eagle) SDR-26 (PS115) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PS115) ASTM D 3034 4" thru 15" * 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26 (PS115) ASTM D 3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe SDR-26 (PS115) ASTM D3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer Pipe J-M Manufacturing Co, Inc. (JM Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" *33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlake)Gasketed PVC Sewer Main Fittings ASTM D 3034 3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034 4"- 15" 3/29/2019 33 31 20 Gasketed Fittings (PVC)GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Westlake) SDR 26 ASTM D3034 4" - 15" 10/22/2020 33 31 20 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Westlake) SDR 26 PS 115 ASTM F-679 18"- 36" * From Original Standard Products List 3 Approval Spec No. Classsification Manufacturer Model No. National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Water - Appurtenances 33-12-10 (07/01/13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co., Inc. 202B 1"-2" SVC, up to 16" Pipe 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops-Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1" 10/27/87 Curb Stops-Ball Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6101M 1½" and 2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc. FB600-7NL, FB1600-7-NL, FV23-777-W-NL, L22-77NL AWWA C800 2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc. FB600-6-NL, FB1600-6-NL, FV23-666-W- NL, L22-66NL AWWA C800 1-1/2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc. FB600-4-NL, FB1600-4-NL, B11-444-WR- NL, B22444-WR-NL, L28-44NL AWWA C800 1" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd. B-25000N, B-24277N-3, B-20200N-3, H- 15000N, , H-1552N, H142276N AWWA C800, ANSF 61, ANSI/NSF 372 2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd. B-25000N, B-20200N-3, B-24277N-3,H- 15000N, H-14276N, H-15525N AWWA C800, ANSF 61, ANSI/NSF 372 1-1/2" 5/25/2018 33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd. B-25000N, B-20200N-3,H-15000N, H- 15530N AWWA C800, ANSF 61, ANSI/NSF 372 1" 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) JCM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-1EPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-1EPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13) None Water - Combination Air Release 33-31-70 (01/08/13) * E1-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" * E1-11 Combination Air Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" * E1-11 Combination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2" & 3" Water - Dry Barrel Fire Hydrants 33-12-40 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American-Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 09/24/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 10/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company Shop Drawings No. 6461 A-423 Centurion AWWA C-502 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company Shop Drawing FH-12 A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 Approval Spec No. Classsification Manufacturer Model No. National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13) 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 AWWA C900, AWWA C605, ASTM D1784 4"-16" 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 AWWA C900, AWWA C605, ASTM D1784 16"-18" 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR14 AWWA C900, AWWA C605, ASTM D1784 4"-16" 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR18 AWWA C900, AWWA C605, ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 4"-28" 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16" - 24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"- 12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" Water - Pipes/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 E1-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AWWA C153 & C110 * E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittings AWWA C 110 * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB Class 350 AWWA C 153, C 110, C 111 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AWWA C153 4"-12" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AWWA C111/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle-Lock AWWA C111/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe)AWWA C111/C116/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe)AWWA C111/C116/C153 4" to 24" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AWWA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AWWA C111/C153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AWWA C111/C153 12" to 24" 08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 04/07/69 Interior Restrained Joint System Hultec Hydrogrip-R ASTM D395, D412, D471, D573, D883, D1149, D1229, D1349, D1414, D1415, D1566, F913 4'-12" 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AWWA C111 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AWWA C111 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) EZ Grip Joint Restraint (EZD) Black For DIP ASTM A536 AWWA C111 3"-48" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) EZ Grip Joint Restraint (EZD) Red for C900 DR14 PVC Pipe ASTM A536 AWWA C111 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) EZ Grip Joint Restraint (EZD) Red for C900 DR18 PVC Pipe ASTM A536 AWWA C111 16"-24" * From Original Standard Products List 5 Approval Spec No. Classsification Manufacturer Model No. National Spec Size CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Water - Pipes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" * E1-26 Resilient Seated Gate Valve M&H 4" - 12" * E1-26 Resilient Seated Gate Valve Mueller Co.4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16" 11/08/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" (Note 3) 05/08/91 E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co.Metroseal 250, requirements SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works)EJ FlowMaster Gate Valve & Boxes 08/24/18 Matco Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" Water - Pipes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14) * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AWWA C-504 24" * E1-30 Rubber Seated Butterfly Valve Mueller Co. AWWA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AWWA C-504 24" and larger 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp. Valmatic American Butterfly Valve. AWWA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AWWA C504 Butterfly Valve AWWA C-504 30"-54" 09/03/24 33 12 21 Rubber Seated Butterfly Valve American AVK Company AWWA C504 Butterfly Valve Class 250B AWWA C-504 24" - 48" Water - Polyethylene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polyethylene Encasment Flexsol Packaging Fulton Enterprises AWWA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AWWA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AWWA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AWWA C105 8 mil LLD Water - Sampling Station 03/07/23 33 12 50 Water Sampling Station Kupferle Foundry Company Eclipse, Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50 09/02/24 33 12 50 Water Sampling Station Mueller Water Products, Inc.Model BSS01-36-MUDG2-CSD-NL, Freeze Proof, Hasp for Locking Access Hatch This product removed Water - Automatic Flusher 10/21/20 Automated Flushing System Mueller Hydroguard HG6-A-IN-2-BRN-LPRR(Portable) HG2-A-IN--2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) Yellow Highlight indicates recent changes The Fort Worth Water Department’s Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department’s Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department’s Standard Specifications and the Fort Worth Water Department’s Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department’s Standard Specifications or is on the Fort Worth Water * From Original Standard Products List 6