HomeMy WebLinkAbout060065-A3 - Construction-Related - Contract - Texas Department of Transportation (TxDOT)Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
� i7 �Z�� �1
CCSJ # 0902-90-229 I AFA ID I Z00004032
AFA CSJs 0902-90-229
Federal Highway Administration:
CFDA No.
CFDA Title
20.205
Highway Planning and Construction
District # 02 Code Chart 64# I 15000 I I
Project Name Butler Housing Project I I AFA Not Used For Research & Development
THE STATE OF TEXAS §
CSC No. 60065-A3
THE COUNTY OF TRAVIS §
ADVANCE FUNDING AGREEMENT
For A
Surface Transportation Block Grant Program
Off-System
AMENDMENT #3
THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of
Transportation, called the "State", and the City of Fort Worth, acting by and through its duly authorized
officials, called the "Local Government". The State and Local Government shall be collectively referred to
as "the parties" hereinafter.
WITNESSETH
WHEREAS, the parties executed a contract on August 24, 2023 to effectuate their agreement to conduct
a study for the project recommendations regarding the Butler Housing areas; and,
WHEREAS, the parties executed Amendment #1 to the contract on August 2, 2024 to extend the
termination date due to discovery of the regional impacts of the project; and,
WHEREAS, the parties executed Amendment #2 to the contract on August 26, 2025 to extend the
termination date due to additional transportation alternatives analysis request; and,
WHEREAS, it has become necessary to amend that contract in order to extend the termination date due to
additional time to incorporate the stakeholders' and public review comments into the plan so it can be
adopted by the City Council;
NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the
parties, the parties do agree as follows:
AGREEMENT
1. The parties agree that the Agreement is amended as follows:
Article 1, Period of the Agreement, is amended to extend the termination date from December
31, 2025 to April 30, 2026 due to additional time to incorporate the stakeholders' and public
review comments into the plan so it can be adopted by the City Council.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
AFA Amend Page 1 of 2 Rev. 10/03/2024
Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
TxDOT:
CCSJ #
AFA CSJs
District #
Project Name
0902-90-229 I AFA ID I Z00004032
0902-90-229
02 Code Chart 64# I 15000
Butler Housing Project
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
2. Attachment A-2, Scope of Work, is deleted in its entirety and replaced with Attachment A-3,
Scope of Work, which is attached to and made part of this Amendment. The Task Duration
timelines have been changed due to the additional time needed to incorporate the
stakeholders' and public review comments into the plan so it can be adopted by the City
Council.
All other provisions of the original contract are unchanged and remain in full force and effect.
Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of
the entity represented.
Each party is signing this Agreement on the date stated under that party's signature.
THE STATE OF TEXAS
CDocuSigned by:
�� 5�,�-
FiCOA80FDB8C4B6...
Kenneth Stewart
Signature
Typed or Printed Name
Director, Contract Services
Typed or Printed Title
12/30/2025
Date
THE LOCAL GOVERNMENT
���' � :�.
Signature
Jesica McEachern
Typed or Printed Name
Assistant City Manager
Typed or Printed Title
12/30/2025
Date
AFA Amend Page 2 of 2 Rev. 10/03/2024
Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
TxDOT:
CCSJ #
AFA CSJs
District #
Project Name
0902-90-229 I AFA ID I
0902-90-229
02 Code Chart 64# I 15000
Butler Housing Project
�
Federal Highway Administration:
Z00004032 CFDA No. 20.205
I I CFDA Title Highway Planning and Construction I
I
IAFA Not Used For Research & Development
ATTACHMENT A-3
SCOPE OF WORK
Contractor-Related Entity shall perform its work in accordance with Attachment D, Information
Resources and Security Requirements. A Contractor-Related Entity might create, access,
transmit, store, or use Sensitive TxDOT data in a Contractor-Related Entity Environment.
Contractor shall ensure that Contractor-Related Entity Environments comply with the TxDOT
Low Security Baseline with the Sensitive Overlay.
The local government shall conduct a study of the area bound by Commerce Street on the west,
Belknap Street on the north, Sylvania Avenue/Riverside Drive on the east, and Lancaster
Avenue on the south. However, the core study area for project recommendations is the area
including and connecting to the former Butler Housing area bound by I-30, I-35W and US 287.
This project will focus on public engagement, needs assessment, concept plan analysis, and a
final report.
;�
\ �
• �a O
•� O
,+ �
� � a
�,;r,�.� .,�
r:u� �,,+
,�
�`
���M504
�s � �(Y
M� � � b
111I1M t
P 1 �'
44� ; #i� 9 +y� y
�
� ���� ,
� i �.
� ���
� � � }3
� `s
� i i Greer,e.,y ,.
e
� � R Park N'Q.
tpP ` y �1
a �fO�V=.
r ��'"r ,
b�'�2 �
� y
J� �f`
/� �. ii
a
i� �
.5� ' .�
e �..� .
t � � _� z Butler Place
a _ -
�..L R.�.� ^��° `�U rban Vil la�
,.�a � "��'•-----�- -
�s'�'� -
tYt _ re: �
'�y�c� .�°"' _, � L R i
� �«u� � + � y g � � .o<.«�, Y
� � n� � F . � . ,�
1 ` e.t.u�., � o
1 ^� � � �
....� �.i. ,+�vn
� i.ew�wo.>o ; 4 ..w.w
»o
t>��� � _ ._� � �
� � = �0.
„� �..� a.u1,
� _� -
� o F�� '
uau�e
� � „ wron � ..,. o�
arsor w�..�.,
�n r.�.
� �
�
�
'"' Sycama� �'oo�
� — = -
--�", «V,° .- -,.
ry Mr,M � �
. aL.Yc���i� `
ASTER- — -
i
Picture 1: The core study area (yellow) and peripheral study area (white).
Page 1 of 5
AFA NonConstruction Attachment A-3
rM�F.w •�� ♦ � �` �. � ��A, g sW.. _ �i �
Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
TxDOT:
CCSJ # 0902-90-229 AFA ID Z00004032
AFA CSJs 0902-90-229
District # 02 I Code Chart 64# I 15000
Federal Highway Administration:
CFDA No.
CFDA Title
20.205
Highway Planning and Construction
Project Name I Butler Housing Project I I AFA Not Used For Research & Development
This study is the first phase of work as part of a greater implementation project. This phase
includes transportation/land use analysis and engineering. The land use concept will help the
City and partners better understand what suite of transportation improvements are appropriate
and to understand the highest and best land uses in order to maximize taxable value while also
supporting equitable opportunities in housing and economic development.
PROJECT DURATION
This project is expected take 24 months, but the contract duration will be for 32 months.
Task 0 - Proiect Manaaement
The CONSULTANT (team) will manage the work outlined in this scope to ensure efficient and
effective use of the team and City's time and resources. The CONSULTANT will communicate
effectively, coordinate internally and externally as needed, and proactively address issues with
the City's project manager and others as necessary to make progress on the work.
1. Managing the Team
2. Communications and Reporting
3. Schedule
4. Progress Reports and Invoices
5. Sub-Consultant Monitoring and Management
Task 0 — DELIVERABLES:
1. Detailed schedule indicating compliance with the 24-month completion timeframe and all
required items within Tasks 0-5.
2. Monthly invoices and detailed narrative progress reports in accordance with City
requirements.
3. Copies of sub-consultant contracts.
Task 0 — DURATION:
1. 24-month duration
2. Anticipated completion: April 2026
Task 1 - Public/Stakeholder Enaaaement
The CONSULTANT will work with the City an inclusive approach to public and stakeholder
involvement. All outreaches should be coordinated with the TPW Outreach Coordinator and the
City of Fort Worth's Communications and Public Engagement Department. The public and
stakeholder participation plan shall include but is not limited to the following:
1. Stakeholder Advisory Committee (SAC) Meetings (Minimum of Six)
2. Public Open Houses (Minimum of Four)
3. Targeted Outreach
Page 2 of 5
AFA NonConstruction Attachment A-3
Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
TxDOT:
CCSJ # 0902-90-229 AFA ID Z00004032
AFA CSJs 0902-90-229
District # 02 Code Chart 64# I 15000
Project Name Butler Housing Project
Federal Highway Administration:
CFDA No.
CFDA Title
20.205
Highway Planning and Construction
AFA Not Used For Research & Development
4. Project Web Site and Other Methods
Task 1 — DELIVERABLES:
1. Public Participation Plan, including a proposed public meeting schedule.
2. Any survey, questionnaires, comment cards, letters, and any other materials with
associated feedback/results provided to the City.
3. Study vision, goals, and objectives.
4. Meeting materials including marketing materials, sign-in sheets, exhibits, etc.
5. Meeting summaries of each meeting in Microsoft Word format within five (5) business
days of the meeting date.
6. Content for posting on the project website/page.
Task 1 — DURATION:
1. 30-month duration
2. Anticipated completion: February 2026
Task 2- Discoverv. Existina/Baseline Conditions. and Needs Assessment
The CONSULTANT (team) will collect any data necessary to evaluate existing transportation,
land use, market, and environmental (natural, built, human) conditions within the project study
area. The data collection will pay particular attention to the use of various multimodal
transportation related items such as pedestrian, transit and bicycle facilities, streetscapes and
street sections, and traffic operations, parking, safety, land use market trends, existing built
form/building types, housing, infill development, adaptive reuse/historic preservation, public
spaces and opportunities for economic development.
Task 2 — DELIVERABLES:
1. Existing/Baseline Conditions and Needs Assessment Report
2. Future Volume Diagrams (as appendices to the report)
3. ArcGIS Urban Model
Task 2 — DURATION:
1. 9-month duration
2. Anticipated completion: May 2025
Task 3- Conceat Plan and Transaortation Alternative Analvsis
The CONSULTANT shall prepare draft conceptual plans and alternatives based on the existing
conditions and needs assessment. This concept plan shall identify relevant projects and policies
to improve the transportation network, and supportive land uses. When implemented, the
concept plan should enhance mobility, connectivity, safety, and various multimodal travel
options. It should also support economic development in the area, enhance environmental
Page 3 of 5
AFA NonConstruction Attachment A-3
Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
TxDOT:
CCSJ # 0902-90-229 AFA ID Z00004032
AFA CSJs 0902-90-229
District # 02 Code Chart 64# I 15000
Project Name Butler Housing Project
Federal Highway Administration:
CFDA No.
CFDA Title
20.205
Highway Planning and Construction
AFA Not Used For Research & Development
quality, create a sense of place, and provide for a housing mix that meets the needs and goals
of the community. It is important the land use element be based on the susceptibility to change
analysis and market data completed in Task 2. The land use concept will be the basis for
potential zoning implications for the area, transportation improvements, and potential fiscal
impact to the City. Specific concept elements and supporting analysis should include but not
limited to:
1. Circulation and Connectivity
2. Land Use
3. Housing and Economic Development
4. Environment and Place
Task 3 - DELIVERABLES:
1. Completed concept plan report narrative with graphics and methodology.
2. Visualizations for alternatives.
3. Street grid and access altematives with a preferred approach, inclusive of ped/bike and
transit.
4. Proposed roadway cross-sections.
5. Catalytic project case study with visuals.
6. Land use plan with draft form code.
7. Fiscal impact analysis, and figures for services, jobs and housing creation.
8. Risk analysis for preferred transportation concept (e.g. utilities, topography, etc.).
9. Any raw traffic data should be included in the appendix.
Task 3 — DURATION:
1. 18-month duration
2. Anticipated completion: December 2025
Task 4- Enaineerina. Proiect Prioritization, Final Report
The CONSULTANT shall create near, short, medium, and long-term projects, and policy
recommendations that are tailored to the needs of the City, partners, and other stakeholders.
Timeframes for the recommendations and implementation strategies are defined as:
1. Project Selection
2. Engineering Schematic Design
3. Final Report, Project List, and Recommendations
Task 4 — DELIVERABLES:
1. Base maps showing the location, layout, and typical sections for each concept
considered (one high resolution, reproducible digital copy).
2. Schematic layouts for roadway and other relevant concepts.
Page 4 of 5
AFA NonConstruction Attachment A-3
Docusign Envelope ID: FAF859C8-6ACB-447C-A1 D8-1 B6E0B3AB994
� i7 �Z�� �1
CCSJ # 0902-90-229 AFA ID Z00004032
AFA CSJs 0902-90-229
District # 02 Code Chart 64# I 15000
Project Name Butler Housing Project
Federal Highway Administration:
CFDA No. 20.205
CFDA Title Highway Planning and Construction
AFA Not Used For Research & Development
3. Executive Summary of the study report with its high resolution, reproducible digital copy,
not to exceed five pages. (Word and PDF format) and a one-page front and back project
brief for elected officials and board members.
4. Form-Based Code text and graphics ready for adoption.
5. Catalytic project implementation marketing brief.
6. Twenty-five (25) Hard Copies in Color of the Final Report, Fifty (50) Hard Copies in
Color of the Executive Summary, and Ten (10) Hard Copies in Color of the Appendices.
Final Report should be in 8.5' X 11' format, perfect binding.
7. All data, graphic, photo, model, and other associated native files. GIS data should be
ESRI compatible and include associated metadata. Preference is a file geodatabase
with any defined domains as well as deliver of process to maintain data.
8. Any additional content deemed necessary by the City.
Task 4 — DURATION:
1. 8-month duration
2. Anticipated completion: March 2026
Page 5 of 5
AFA NonConstruction Attachment A-3
ADVANCE FUNDING AGREEMENT
CSJ: 0902-90-229
PROJECT NAME: Butler Housinp Proiect
ADDITIONAL ROUTING SIGNATURES
CITY OF FORT WORTH
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Armond Brvant /��� a� Name of Employee/Signature
Title: Transnortation Mana�er
Email: armond.bryant@fortworthtexas.gov
APPROVAL RECOMMENDED:
�Q,�.�..�.. /'��;...,t.
gY; LaurenPrieur(Jan6,202609:4422CST)
Lauren Prieur, Director
Transportation and Public Works Department
Email: lauren.prieur@fortworthtexas.gov
CONTRACT AUTHORIZATION
M&C: N/A
Date Approved: N/A
Form 1295: N/A
APPROVED AS TO FORM AND LEGALITY:
��
BY; Douglas Black (Jan 8, 2026 17:47:12 CST)
Douglas W. Black
Senior Assistant City Attorney
Email: douglas.black@fortworthtexas.gov
ATTEST AS TO CITY MANAGER SIGNATURE:
�, 1J �-� pFFOqT�Yad
� oi`a �9.1P0
g�i: ,, o,�e =°o
°a*°°�o a �xo —
Jannette S. Goodall °QannEaaa��
City Secretary QFFICIAL RECORD
Email: Jannette.Goodall@fortworthtexas.gov
CITY SECRETARY
FT. WORTH, TX
FORT ��RTH�
City Secretary's Office
Contract Routing & Transmittal Slip
COnti'aCtOr'S Name: Texas Department of Transportation
SUU� eCt Of t�le AgT'eeTllellt: Amendment No. 3 to CSC No. 60065, an Advance Funding Agreement for the Butler Housing Project
M&C Approved by the Council? * Yes ❑ No 8
If �so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 60065-A3
If so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 8 No ❑
If �unsure, see back page for pernianent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If �so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. 103807
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.