HomeMy WebLinkAbout056415-A5 - Construction-Related - Contract - Shield Engineering Group, PLLCCSC No. 56416-A5
AMENDMENT No . 5
TO CITY SECRETARY CONTRACT No. 56416
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Groin
PLLC., (ENGINEER) made and entered into City Secretary Contract No. 56416,
(the CONTRACT) which was authorized by M&C 21-0508 on the 22nd day of June,
2021 in the amount of $ 456,150.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $94,690.00 which was administratively authorized on
June 27th, 2022; Amendment Number 2 in the amount of $644,000.00
which was authorized by M&C 24-0245 on March 26th, 2024; Amendment
Number 3 in the amount of $0.00 which was administratively authorized
on June 4th, 2025; Amendment Number 4 in the amount of $99,050.00 which
was administratively authorized on October lst, 2025; and
WHEREAS, the CONTRACT involves engineering services for the following
proj ect :
Trinity River Vision- Central City Flood Control Drainage Projects,
CPN (103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666,
103667); and
WHEREAS, it has become necessary to execute Amendment No. 5 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in the proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $500,000.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Revision Date: June 13, 2025
Page 1 of 4
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,793,890.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth CONSULTANT
Shield Engineering Group, PLLC
4--'4-
Jean-Marie Alexander (Dec 18, 2025 13:03:36 AST)
Jesica McEachern Jean Marie Alexander
Assistant City Manager COO
DATE:
01/13/2026 DATE: 12/18/2025
ATTEST:
aoF FORr°�i °a
ya'�8 G9pd
Cl �U o� *=A
C� t Ann
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
Lauren Prieur (Dec 29, 2025 09:54:45 CST)
Lauren Prieur
Director, TPW Department
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103663, 103666, 103667
Revision Date: June 13, 2025
Page 2 of 4
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Thanaa Maksimos
Program Manager
APPROVED AS TO FORM AND LEGALITY:
. W64-V
Douglas Black (Jan 8, 202612:36:38 CST)
Douglas W. Black
Sr. Assistant City Attorney
M&C No.#:
M&C Date:
25-1153
12/09/2025
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Revision Date: June 13, 2025
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 56416
Amendment No. 5
Fund Dept ID Account Project
ID
52002 0200431 5330500 103664
52002 0200431 5330500 103666
52002 0200431 5330500 103264
Total:
CF2 -
CF1-
Bond
Activity
Reference
002880
9999
002880
9999
002880
9999
Amount
$251,750.00
$131,248.00
$117,002.00
$500,000.00
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Revision Date: June 13, 2025
Page 4 of 4
ATTACHMENT B
COMPENSATION
Design Services for
Trinity River Vision -Central City Flood Control Drainage Projects
City Project No. 103260.103261.103262,103263,103264,103664.103665.103667
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2025 Rate
2026 Rate
($/hour)
($/hour)
Principal/Director
305
305
Program Manager
285
285
Project Manager
255
260
Senior Professional Engineer
235
245
Professional Engineer
215
220
EIT II
170
175
EIT 1
150
155
Designer
160
165
CAD Drafter
135
140
Support/ Admin
100
105
Senior RPLS
255
265
RPLS
220
230
GIS Analyst
155
160
Survey Technician
120
125
Party Chief
120
125
Survey Crew Member
80
85
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 1 of 4
B-1
ATTACHMENT B
COMPENSATION
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department, Capital Delivery Division, monthly
progress reports and schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Shield Engineering Project Manager
Group, PLLC
Proposed Sub -Consultants
Project Number & Name
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 3 of 4
TOTAL
Total Fee
$:500,000.00_
Fee Amount %
$500,000.00 100
$ 100%
Sub Fee
$ J
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 4 of 4
B-4
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
City of Fort Worth Capital Delivery Capital Project Management
City Secretary No.
Total Labor I
Expense
Task No.
Task Description
Project Professional
Principal
EIT II EITI
SBE- Subconsultantl
SBE-Subconsukant2
Manam(�@ Enaineer
Rate
$305 $255 $215
$170 $150
$170 Total
$170 Total
I1.0
1.1
TRVA Proeect ManaVement Assistance
Mam Street Outfall & 8th St ((103262 1103666)
0 451 0
116
687 1788.03 $500/ 000
181 472.69 $131,248
0 $`�
0 $0
$0
1.2
5th St/Greenleaf Sump (1032to)
$0
$0
1.3
Viola (103264)
106
164 413.99 $117,002
$0
1.4
Bazaar Outfall (103261)
$0
$0
1.5
University (1032b3)
$0
$0
1.6
Cemetery (1036671
$0
$0
1.7
Grand Avenue Ph 2 Pt 2 (103664)
229
342 901.43 $251,750
$0
1 1.8
Grand Avenue Ph 2 Pt 3 1103665)
$0
$0
Totals
d 451 6
687 1788.0 $500,000.00
(j $d
d $U
I
Project Summary
Total Hours
Total Labor
Total Expense
456150 I
SBE Subconsultan J
94690 I
Non-SBE Subconsultan(
644000 I
10% Sub Markup
$99,050.00 I
MWBE Participation
350000 1
Total Prolecf CosI
1643890
*Projected effort for Design Only
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FWWTR Official Release Date 5.15.2012
Travel Reproduction
$0 $0
sd
2,926
$500,000
$0
$0
$0
$0
0%
$500,000.00
so
Total Task Sub
$0 $500//000
$0 $131,248
$0 $0
$0 $117,002
$0 $0
$0 $0
$0 $0
$0 $251,750
$0 $0
so $500,000
103260, 103261, 103262, 103263, 103264
Trinity River Vision -Central City Flood Control Drainage Projects
Professional Services Invoice Project Manager: IThanaa Maksimos Summary
Project: ITRV-Central City Flood Control Drainage Projects
City Project #: f 103260 - 103264; 103G64-103667
City Sec Number: i i
Supplier Instructions:
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
Company Name: (shield Engineering Group, PLLC
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Supplier's PM: Jean-Marie Alexander
email: Jeanmarie.alexander@shield-engin,
Supplier Invoice M
Office Address 1600 W 7th Street, Suite 400,Fort Worth, TX 76102
Payment Request M
Telephone: 817.810.0696
Service Date:From
Fax:
Service Date:To
Invoice Date:
Remit Address: P. 0. Box 470636, Fort Worth, Tx 76147
Sheet FID and Work Type Description
Work Type 1
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Totals This Invoice
Agreement LTD
Agreement Amendment Amount to Completed Percent ($) Invoiced Current
Amount Amount Date Amount Spent Previously Invoice
$500,000.00 $500,000.00
$500,000.00 $500,000.00
Overall Percentage Spent:
Remaining
Balance
$500,000.0
$500,000.00
103260,103261,103262,103263,103264
Trinity River Vision -Central City Flood Control Drainage Projects
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/09/25 M&C FILE NUMBER: M&C 25-1153
LOG NAME: 20SWM FWCC PROJECT MANAGEMENT CONSTRUCTION AM 5
SUBJECT
(CD 2 and CD 9) Authorize Execution of Amendment No. 5 in the Amount of $500,000.00 to a Professional Services Agreement with Shield
Engineering Group, PLLC, for a Revised Contract Amount of $1,793,890.00 for Stormwater Capital Project Management Services, for the Fort
Worth Central City Flood Control Drainage Projects
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 5 in the amount of $500,000.00 to a professional services
agreement with Shield Engineering Group, PLLC (City Secretary Contract No. 56416), for a revised contract amount of $1,793,890.00 for
stormwater capital project management services for the Fort Worth Central City Flood Control Drainage projects (City Project Nos. 103666,
103264, and 103664).
DISCUSSION:
On June 22, 2021, Mayor and Council Communication (M&C) 21-0508, a professional services agreement with Shield Engineering Group, PLLC,
was authorized to provide capital project management services for the Fort Worth Central City (FWCC) Flood Control Drainage projects. The
construction of the north and south bypass channels by the Corps of Engineers (Corps) for the FWCC Flood Control Project will displace existing
City drainage infrastructure and require its relocation. The relocation projects are in various phases.
This M&C is to authorize execution of Amendment No. 5 in the amount of $500,000.00 to a professional services agreement with Shield
Engineering Group, PLLC (City Secretary Contract (CSC) No. 56416), for a revised contract amount of $1,793,890.00 for stormwater capital
project management services for the following Fort Worth Central City Flood Control Drainage projects:
New Main Street Outfall and 8th Street (City Project No. 103262/103666) — construction
Viola Outfall (City Project No. 103264) — construction
Grand Ave Ph 2 Pt 2 (City Project No. 103664) - construction
The following table summarizes contract action and amendments:
Contract Date Amount
CSC 56416 June 22, 2021 $456,150.00
Amendment 1 June 27, 2022 $94,690.00
Amendment 2 March 26, 2024 $644,000.00
Amendment 3 June 4, 2025 $0.00
Amendment 4 October 6, 2025 $99,050.00
Amendment 5 This M&C $500,000.00
Revised Amount $1,793,890.00
Project Name Original Amendment Amendment Amendment Amendment Amendment Revised
Contract 1 2 3 4 5 Amount
i
103666 New Main Street Outfall and 8th Street $0.00 $0.00 $138,500.00 $0.00 $28,027.50 $131,248.00 $375,428.00
103264 FWCC Viola Outfall
$97,800.00
$0.00 $138,500.00
$0.00
$0.00 $117,002.00 $353,302.00
103664 FWCC Grand Ave Ph 2 Pt 2
$0.00
$33,830.00 $69,250.00
$35,000.00
$71,022.50 $251,750.00 $429,940.00
Funding for this contract is available in the Stormwater Capital Projects Fund for TPW Department for the purpose of funding various Fort Worth
Central City projects, as appropriated.
Having exhausted the share of the local program budget allocated to Stormwater infrastructure relocation, costs for this contract will not be
included in the annual reimbursement process between the City and the Tarrant Regional Water District (TRWD). Rather, costs for this contract will
be eligible for reimbursement directly from future Trinity River Vision Tax Increment Financing (TIF) revenue after prior commitments of the TIF have
been satisfied. Once reimbursement associated with this project is received, those funds will be used to reimburse the Stormwater utility.
The projects are located in COUNCIL DISTRICTS 2 and 9.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital
Projects Fund for the FWCC New Main St Outfall & 8, FWCC Viola, and FWCC Grand Ave Ph2 Pt2 projects to support the above
recommendation and execution of this amendment. Prior to an expenditure being incurred, the Transportation & Public Works Department has the
responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Thanaa Maksimos 2485
Docusign Envelope ID: BD955F4F-6E57-4EA5-ACD5-CF1 BF3879DE8
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of.1
Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number:
of business. 2025-1372284
Shield Engineering Group, PLLC
Fort Worth, TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 10/03/2025
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
56416
Trinity River Vision - Central City Flood Control Drainage Project Management
Nature of interest
4
Name of Interested Party City, State, Country (place of business) (check applicable)
Controlling Intermediary
Alexander, Jean Marie Fort Worth, TX United States X
Barnes, Craig Fort Worth, TX United States X
Hill , Ryan Fort Worth, TX United States X
5 Check only if there is NO Interested Parry. ❑
6 UNSWORN DECLARATION
My name is Jean-Marie Alexander and my date of birth is
My address is 8103 Shelton Drive Fort Worth TX 76120 USA
(city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Tarrant County, State of Texas on the 3rd day of October 2025
(month) (year)
Signed by:
�� h -
'S*i2Rh?F TF96ffiorized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V4.1.0.f10d0fd8
FORT WORTH -
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Shield Contract Amendment No.5
M&C: 25- CPN: 103260,103261,103262, CSO: 56416
1153 103263,103264,103664,
103665,103666,103667
Date:
To:
1
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Name
Jean-Marie Alexander
j eanmarie. alexandergshield-engineering. com
Thanaa H. Maksimos
Lissette Acevedo
Patricia Wadsack
Lauren Prieur
Doug Black
Jesica McEachem
Jannette Goodall
Allison Tidwell
Katherine Cenicola
Tpw—SW—Contract
DOC#:
Department
Initials
Date Out
Consultant
A
12/18/25
JMA
TPW — Program Manager
_ZW
12/15/25
TPW — Sr. CPO
�,<V
12/23/25
TPW — Assistant Director
PLW
12/26/25
TPW - Director
dea"Lur
12/29/25
Legal - Assistant City Attorney -
01/08/26
CMO — Assistant City Manager
01/13/26
CSO —City SecretaryjjA
01/13/26
CSO — City Secretary
.%_
01/13/26
CSO — City Secretary
cc
cc
01/13/2026
TPW Stormwater
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: []YES ®No
ROUTING TO CSO: ®YES ❑No
Action Reauired:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tnw sw contractsna,fortworthtexas. 2vv Call 817-229-3283 with questions. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Shield Engineering Group PLLC.
Subject of the Agreement: Amendment No. 5 to CSC No. 56416, an Engineering Agreement for the
Trinity River Vision - Central City Flood Control Drainage Projects
M&C Approved by the Council? * Yes 8 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 56416-A5
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
1295 Form (page 18) attached per comment below
Effective Date: Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes 8 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. Various
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the followin4 order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.
Docusign Envelope ID: 218B6EO7-D916-473A-BF55-C0057C877347
SHIELD
ENGINEERING
December 11, 2025
Thanaa Maksimos, PE, CFM
Engineering Manager, TPW Capital Delivery
City of Fort Worth
100 Fort Worth Trail
Fort Worth, TX 76102
RE: Trinity River Vision -Central City Flood Control Drainage Projects — Amendment 5
CSN 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Dear Mrs. Maksimos,
Shield Engineering Group, PLLC, is pleased to submit Amendment No. 5 to the FWCC Program
contract. The amendment increases the contract amount by $500,000.00 for a revised total
contract value of $1,793,890.00.
The budget modifications are necessary due to construction delays caused by unforeseen
material delays and extended construction durations across several FWCC projects. This
amendment will allow our project management services to continue uninterrupted till the end of
the project.
Amendment 5 with the total amount of $500,000.00 is required to cover remaining project
management expenses assuming all FWCC construction completion of early Spring 2026.
We appreciate your review and consideration of this request. Please feel free to contact me with
any questions or comments.
Sincerely,
G�Signed by:
/ `lqc—
F292A21D37F04C0...
Jean-Marie Alexander, P.E.
COO
Shield Engineering Group, PLLC
Shield Engineering Group, PLLC
1600 West 7th Street, Suite 400, Fort Worth, TX 76102 / 817.810.0696
into@sh►eld-engineer►ng.com / www.sh►eld-engineer►ng.com
TBPELS / Engineering #F-11039 / Surveying #10193890
SHIELD
ENGINEERING
December 11, 2025
Thanaa Maksimos, PE, CFM
Engineering Manager, TPW Capital Delivery
City of Fort Worth
100 Fort Worth Trail
Fort Worth, TX 76102
RE: Trinity River Vision -Central City Flood Control Drainage Projects — Amendment 5
CSN 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Dear Mrs. Maksimos,
Shield Engineering Group, PLLC is pleased to submit the following services to amend the
contract shown. The new contract will be amended in the amount of $500,000.00 for a revised
contract amount of $1,793,890.00. Shield plans to provide a Project Manager, P.E., and EIT
services.
Original contract
$456,150
Amendment 1
$94,690
Amendment 2
$644,000
Amendment 3
$0
Amendment 4
$99,050
Amendment 5
$500.000
Revised contract
$1,793,890
Below is a breakdown of the expected monthly hours for the FWCC program. These are
projected hours and are subject to fluctuation dependent on the workload and needs of the
FWCC program.
Project Manager Hours: 40
P.E./ E.I.T. hours: 220
Total Hours: 260
Below is a breakdown of the individual projects and budgets modifications necessary due to the
change in scheduling and effort needed for specific projects. There are no specific scope
changes or additions to this contract. Attachment A, as amended with Amendment 5, will not be
revised with this amendment.
Shield Engineering Group, PLLC
1600 West 7th Street, Suite 400, Fort Worth, TX 76102 / 817.810.0696
into@sh►eld-engineer►ng.com / www.sh►eld-engineer►ng.com
TBPELS / Engineering #F-11039 / Surveying #10193890
Docusign Envelope ID: 218B6EO7-D916-473A-BF55-C0057C877347
SHIELD
ENGINEERING
Original
Amendment 1 Amendment 2 Amendment 3 Amendment 4 Amendment 5
Revised
Contract
Contract
103260 Greenleaf Sump
$
97,800
$
$
138,500
$ (10,000) $
- $
$
226,300
103261 Bazaar Outfall
$
86,850
$
$
30,000
$ (22,000) $
- $
$
94,850
103262 Main Street Outfall
$
86,850
$
$
138,500
$ - $
28,028 $
131,248
$
384,626
103263 University Drive
$
86,850
$
$
30,000
$ (24,000) $
- $
-
$
92,850
103264 Viola Outfall
$
97,800
$
$
138,500
$ - $
- $
117,002
$
353,302
103664 Grand Ave Pt 2
$
-
$
33,830 $
69,250
$ 35,000 $
71,023 $
251,750
$
460,853
103665 Grand Ave Pt 3
$
$
33,830 $
69,250
$ 44,000
$
-
$
147,080
103667 Cemetery Outfall
$
$
27,030 $
30,000
$ (23,000) $
- $
-
$
34,030
Total
$
456,150
$
94,690 $
644,000
$ - $
99,050 $
500,000
$
1,793,890
Please feel free to contact
me with
any questions or comments.
Sincerely,
Signed by: �
F292A21 D37F04C0...
Jean-Marie Alexander, P.E.
COO
Shield Engineering Group, PLLC
Shield Engineering Group, PLLC
1600 West 7th Street, Suite 400, Fort Worth, TX 76102 / 817.810.0696
into@sh►eld-engineer►ng.com / www.sh►eld-engineer►ng.com
TBPELS / Engineering #F-11039 / Surveying #10193890