Loading...
HomeMy WebLinkAbout059361-A2 - Construction-Related - Contract - Kimley-Horn and Associates, Inc.CSC No. 59361-A2 AN�NDMENT No . 2 TO CITY SECRETARY CONTRACT No. 59361 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 59361, (the CONTRACT) which was administratively authorized on the 9t�' day of May, 2023 in the amount of $ 97,594.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $716, 095. 00 which was authorized by M&C 23-0638 on August Sth, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Long Avenue Pedestrian Safety Improvements Project CPN 104299; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $49,955.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an ar�ount of $863, 644. 00. OFFICIALRECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Long Avenue Pedestrian Safety Improvements Prof Services Agreement Amendment Template CPN 104299 Revision Date: June 13, 2025 Page 1 of 4 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth ��,��^.�v Jesica McEachern Assistant City Manager Kimley-Horn and Associates, Inc. ,�� �� Scott R. Arnol d, P.E. Vice President DATE : O1/13/2026 �n� �pORT nQd ATTEST : p��� �d p'�'° �9dd G�o �o-7C 1 pVo 0=0 ����� /J � ��P� ��o 00o i�� Qdda nE�As6p,d Jannette Goodall City Secretary DATE : 12/19/2025 APPROVAL RECOMMENDED: Ola.�vw+.� / i-e�..wL Lauren Pricur (Dec 29, 2025 09SS51 CST) Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. �� Seth Cooksey, P.E. Professional Engineer OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Long Avenue Pedestrian Safety Improvements Prof Services Agreeme�t Amendment Template CPN 104299 Revision Date: June 13, 2025 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: . �i4.tlo�- Douglas Black (Jan S, 202612:38:29 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 3 of 4 M&C No . # : N/A M&C Date : N/A Long Avenue Pedestrian Safety Improvements CPN 104299 FUNDING BREAKDOWN SHEET Department TPW City Secretary No. 59361 Amendment No. 2 Fund-Account-Center K�III�QIZ►.ZIII��QL��i1�1I1��1�i►.�'�'IIIII��'��I Amount $49,955.00 Total: $49,955.00 City of Fort Worth, Texas Long Avenue Pedestrian Safety Improvements Prof Services Agreement Amendment Template CPN 104299 Revision Date: June 13, 2025 Page 4 of 4 FORT WORTHo ATTACHMENT "A" Scope for Enqineerinq Desian Related Services for Lonq Avenue Pedestrian Safetv Improvements Proiect The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective for this Amendment is to prepare landscape and irrigation construction plans for the updated median areas along Long Avenue per the landscape exhibit submitted to the CITY on June 2025. The Long Avenue conceptual landscape exhibit from this report is attached for reference. • Install landscape per plans along the medians from Azle Avenue to 35t" Street. • Install Irrigation per plans along the medians from Azle Avenue to 35th Street. WORK TO BE PERFORMED Task 12. City of Fort Worth, Texas Attachment A Release Date: 07.22.2021 Page 1 of 4 Landscape and Irrigation Construction Documents Long Avenue Pedestrian Safety Improvements Project CPN 104299 FORT WORTHo TASK 12. LANDSCAPE AND IRRIGATION CONSTRUCTION DUMNETS. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 12.1 Design Management: • Lead, manage and direct design team activities. • Ensure Quality Control / Quality Assurance (QC/QA) is practiced in performance of the work. Refer to Tasks 12.4 and 12.5 for further details. • Communicate internally among team members. • Task and allocate team resources. 12.2 Landscape and Irrigation Design (90%) ENGINEER will develop the preliminary design of the infrastructure as follows. 12.2.1 Landscape Plans and Details Develop Landscape Plans and Details for the medians showings new plant material locations as they relate to the medians. • Develop planting schedule specifying recommended plant species and details illustrating recommended installation methods and requirements. 12.2.2 Irrigation Plans and Details • Develop Irrigation Plans and Details forthe proposed landscape improvements showing head layout, pipe sizing and controller/valve locations and standard details. • Plans will show sufficient detail for construction and will be prepared to conform to published City requirements. 12.2.3 Standards • Compile applicable City standard details necessary for design; City standard details may be modified as needed. 12.2.4 OPCC • Develop opinion of probable construction costs (OPCC). This estimate shall be standard CITY of TxDOT bid items, as applicable. • The ENGINEER has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. City of Fort Worth, Texas Page 2 of 4 Attachment A Release Date: 07.22.2021 Page 2 of 4 FORT WORTH�� Opinions of probable construction costs provided herein are based on the information known to ENGINEER at this time and represent only the ENGINEER's judgment as a design professional familiar with the construction industry. • The ENGINEER cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. 12.3 Final Design (100%) ENGINEER will develop final design of infrastructure as follows: • Following 90% comment review meeting with CITY, the ENGINEER shall submit Final Design Plans (100%) to the CITY. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit an opinion of probable construction cost with both the 90°/o and 100% design packages. 12.4 QA/QC and Review (90%) • ENGINEER shall perform Quality Assurance / Quality Control (QA/QC) review of all documents being submitted for review for the 90% design review submittal. QA should be performed by an individual within the firm who is not on the design team. 12.5 QA/QC and Review (100%) • ENGINEER shall perform Quality Assurance / Quality Control (QA/QC) review of all documents being submitted for review for the 100% Final Document design review submittal. QA should be performed by an individual within the firm who is not on the design team. 12.6 CCA Support for Landscape and Irrigation ENGINEER will support the construction phase of the project as follows: • The ENGINEER shall attend two additional construction progress meetings during the duration of construction. The ENGINEER will prepare of collaborate with the CITY PM on a Construction Progress Report using the CITY's standard format and upload to eBuilder. The ENGINEER shall review two additional shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies, or omissions. The ENGINEER shall log and track all shop drawings, samples, and other submittals to eBuilder. ASSUMPTIONS • One (1) digital 11" x 17" PDF to be submitted to the CITY for comment review. • Address one (1) round of 90% CITY comments. City of Fort Worth, Texas Page 3 of 4 Attachment A Release Date: 07.22.2021 Page 3 of 4 FORT WORTHo • Re-submit one (1) digital 11" x 17" PDF to the CITY. • Three (3) plan review meetings. • Conduct 90% comment review meeting with CITY staff. DELIVERABLES A. (90%) - Landscape and Irrigation Design Plans, Details, and Specifications B. Final (100%) — Landscape and Irrigation Design Plans, Details and Specifications C. (90%) — OPCC D. Final (100%) — OPCC ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existinq Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Additional bid phases and bid packages. • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake, or other acts of God. • Services related to warranty claims, enforcement, and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • PerFormance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Page 4 of 4 Attachment A Release Date: 07.22.2021 Page 4 of 4 ATTACHMENT B COMPENSATION Design Services for Long Avenue Pedestrian Safety Improvements Project City Project No. 104299 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $49,955.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 08/18/2025 Page 1 of 3 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Kimley-Horn and Engineering Services Associates, Inc. Proposed Sub-Consultants TOTAL � Project Number & Name CPN 104299 Long Avenue Pedestrian Safety Improvements Projects City of Fort Worth, Texas Attachment B Revised Date: 08/18/2025 Page 2 of 3 Total Fee $49,955.00 Fee Amount $49,955.00 % 100°/a $49,955.00 100% Sub Fee i.v� EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 08/18/2025 Page 3 of 3 B-3 Le�rel a� Cffort SpreF,ds�aet TASPGHGilR BRFA4(DOYYlf ��esig�� Servi�as f€�r Lono Av�ix�e �edes#ran Sa1e�l kr��rover��r�ts �rc�lect - A�r�e���er�s 2 Cily I*ropecS No. 1{�429� Li�or qoera7 ' Craan» €. n� �. 6e�laiPraQeeF 3erla�Rr�Fasel�ne�f �icfeea�co�r Taak 71a�r.rl711nn Rmjml Liq7yaf IT � Il�nha#RJ dnalfnLl Y Tr.rnlf a7nr SUMam�dtM I 9E1[ H0. AQ9d1AQ4� 1 3611[UI l74f 9C[ F74f 9Gt AAIIHI � 1A&na4�f EFi III E!f � E i 1 CuaC FaUJaclULacl�n La5lriaei [ii�riari �,q�ys= h'�hlWBE 3�ale $9�G i�p #7A $295 31i�S� $+&S $iS4. �1f0� Af'i�= #•ul►iA5Y8= !!,l EifIC9�3pE8�OJ71Bfl4h5111:0119lYCiVQFULCl7111911[8 a Si � P 13Af� lv � U� ��`3S5C _f�G[" S@ rr.� �=eien �nana�r�=�: I � ai �i.sz�� � a '22 �r��p-a��l IMgal�']teo5rsf'-d'�} ' , /[ I I is.�.� �� triS--Pc��r.canyQMak� 16 1 #Q �],� 15rJ � 11 �} =���.aSnr. R�nF arn f1NaCc , , � 1 � I � �d�i7?i _ 71.2.y, Sar.iarFs. , � 2' S � 72...z OP,.� � S� � 3Z,� —� °2: Fra>dss�71•�]O�i�� iS � 46' 30 � S1E�,15* —. i 2.7 G41�C aisc �evl��r 30�} � t 4` - �'2'3� - �1.= SJi+il{;dP.CF{�41E�{'rl�iF�;1L•SA' t ] Z��#'24 :2.�i C.".h 3J]6G� iJr L�]f�8:3G! 3hS I'1„7511v 1 �a 1 G 1 C }-0.1'u{ - -- -- -- - - -- Tahala [! S7 0 U 11A� T3 O U� SdS.�Sv #GI SG� TiB461 1S3JF@DIICL417' 7rtlnlCt� nsa i9Elf XII� I RBI P:lisllu� i�UG � i°Q�# #1 #3fl0 $#3.95E !m ia:rm � fi��.� 3 �7 52�c y� i2�42C' � 518,1?C 62��2F _ _ 761 }�,#1L .`�iil7 14.G.'i{ S] #ifl0 ##g.95: Pf6f �G? SFJiYlldiy 'oS�ll-a•�ic °5: rnrH;ar.er g{c�� Tobl E%p�ziae � �S I�C . k32�'?3f 3uPx'�s!_I�yi _ . _ri 4cn-0��E�33= 3�E[�'latl�Fi iU IOK :u�Martip �u r,v��es= yan�pa�.�j L'L.^., 7'uln: P�ulucl �wi ss7,oaa � � ��r�' 1 or��r�o�s CIF� U: �rtYraV,Ttwe A7lachr.i�n? 3 -_cra�oiflYol Sv^FpicrarL PY.�CS :iT.'I:I.l'. RT�P;.SP II,�P' �.^.V'}n'.'} I{llfJ Ava�1 P 7Pflpf..'�.lf C.liPh' IRQICEJPiIFI!S �?N ifu9239 id� 104299-EPAM-ARPA Long Ave Pedestrian Improvements Project Final Audit Report 2026-01-14 Created: 2025-12-19 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAnYaNvTVR2X54SzdrFlVjzglq60MLrsRE "104299-EPAM-ARPA Long Ave Pedestrian Improvements Proj ect" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-12-19 - 2:02:33 AM GMT- IP address: 204.10.90.100 Document emailed to LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) for filling 2025-12-19 - 1:48:29 PM GMT Document emailed to Seth Cooksey (seth.cooksey@fortworthtexas.gov) for signature 2025-12-19 - 1:48:29 PM GMT Document emailed to Scott Arnold (scott.arnold@kimley-horn.com) for signature 2025-12-19 - 1:48:30 PM GMT �� Email viewed by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) 2025-12-19 - 1:50:29 PM GMT- IP address: 104.47.64.254 �-� Email viewed by Scott Arnold (scott.arnold@kimley-horn.com) 2025-12-19 - 2:39:16 PM GMT- IP address: 47.185.64.52 : Document e-signed by Scott Arnold (scott.arnold@kimley-horn.com) Signature Date: 2025-12-19 - 2:40:04 PM GMT - Time Source: server- IP address: 47.185.64.52 — Email viewed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) 2025-12-19 - 3:24:26 PM GMT- IP address: 104.28.97.20 ���=,� Form filled by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) Form filling Date: 2025-12-19 - 6:37:28 PM GMT - Time Source: server- IP address: 204.10.90.100 �,� Document e-signed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) Signature Date: 2025-12-19 - 9:03:16 PM GMT - Time Source: server- IP address: 68.64.252.104 F�RTWaRTHg P°"'�"�bv � Ado6e AcrobatSign Document emailed to Chad Allen (Chad.Allen@fortworthtexas.gov) for filling 2025-12-19 - 9:03:18 PM GMT =� Form filled by Chad Allen (Chad.Allen@fortworthtexas.gov) Form filling Date: 2025-12-23 - 5:03:06 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for filling 2025-12-23 - 5:03:09 PM GMT Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2025-12-23 - 7:43:50 PM GMT- IP address: 104.47.65.254 �%� Form filled by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Form filling Date: 2025-12-23 - 7:46:37 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for filling 2025-12-23 - 7:46:39 PM GMT °�, Form filled by Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) Form filling Date: 2025-12-26 - 7:31:50 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2025-12-26 - 7:31:53 PM GMT '; Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2025-12-29 - 3:55:51 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) for approval 2025-12-29 - 3:55:53 PM GMT Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2025-12-29 - 4:49:40 PM GMT- IP address: 104.47.64.254 ��� ,� Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2025-12-29 - 4:55:04 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2025-12-29 - 4:55:07 PM GMT �%±:, Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov) Signature Date: 2026-01-08 - 6:38:29 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Jesica McEachern (jesica.mceachern@fortworthtexas.gov) for signature 2026-01-08 - 6:38:31 PM GMT -:� Document e-signed by Jesica McEachern Qesica.mceachern@fortworthtexas.gov) Signature Date: 2026-01-13 - 9:50:37 PM GMT - Time Source: server- IP address: 204.10.90.100 F�RTWaRTHg P°"'�"�bv � Ado6e AcrobatSign Document approval automatically delegated to Cristian Chavez (cristian.chavez@fortworthtexas.gov) by Katherine Cenicola (katherine.cenicola@fortworthtexas.gov) 2026-01-13 - 9:50:40 PM GMT Document emailed to Cristian Chavez (cristian.chavez@fortworthtexas.gov) for approval 2026-01-13 - 9:50:40 PM GMT Document emailed to Katherine Cenicola (katherine.cenicola@fortworthtexas.gov) for approval 2026-01-13 - 9:50:41 PM GMT �;_:_ Document dedined by Cristian Chavez (cristian.chavez@fortworthtexas.gov) Decline reason: Please attach the appropriate M&C 2026-01-14 - 3:42:34 PM GMT- IP address: 208.184.124.181 F�RTWaRTHg P°"'�"�bv � Ado6e AcrobatSign FORTWORTH Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: ARPA Long Ave Pedestrian Improvements Project M&C DATE: 12-09-2025 TO: �. Lakeshia Lynch 2. Chad Allen 3. Seth Cooksey 4. Lissette Acevedo 4. Patricia Wadsack 5. Lauren Prieur 6. Doug Black 7. Jesica McEachern 8. Jannette Goodall g. Scott Arnold INITIALS - review � _ review S� <A - review ��r Seth Couksey - review � - review p(��/1/' _ review x�• �a�,e�P,e�, - signature oo�g�1asBlack - signature � - signature � - signature S� 59361 DOC# 1 DATE OUT 12/19/25 12/23/25 12/19/25 12/23/25 12/26/25 12/29/25 O1/08/26 O1/13/26 O1/14/2026 12/19/25 DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑ Yes � No RUSH: ❑ Yes � No SAME DAY: ❑ Yes � No ROUTING TO CSO: � Yes ❑ No Action Repuired: ❑ As Requested ❑ For Your Information � Signature/Routing and or Recording ❑ Comment ❑ File PN_104299 CSO # NEXT DAY: ❑ Yes � No ❑ Attach Signature, Initial and Notary Tabs Return To: Please caIITPW Contracts at ext. 7233 for pick up when completed. Thank you. F�RT` ��RTH� City Secretary's Office Contract Routing & Transmittal Slip COntraCtOr'S Name: Kimley-Horn and Associates, Inc. Subject of the Agreement: Amendment No. 2 to CSC No. 59361, an Engineering Agreement for the Long Avenue Pedestrian Safety Improvements Project M&C Approved by the Council? * Yes ❑ No 0 If so, the M&C must be attached to the cont�act. Is this an Amendment to an Existing contract? Yes 0 No ❑ 59361-A2 If so, provide the o�iginal contract nuinber and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page fo� permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If �different, fi�o�n the approval date. If �applicable. Is a 1295 Form required? * Yes ❑ No 0 �`If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: Ifapplicable. 104299 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processin� in the followin� order: L Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the infor�nation is not provided, the contract will be returned to the departn�ent. Amendment Purpose Statement: The purpose of this engineering amendment is to provide additional design services to account for landscape and irrigation plan development which has been incorporated into the project at the request of the City after the final plans are approved. This effort includes designing the tree planting plan for the medians along Long Ave within the project limits. The amendment also includes designing irrigation systems for these medians. The effort also includes resources to provide additional coordination with City departments and construction phase services to coordinate with the City and contractor for this landscape and irrigation component of this project. The detailed scope and level of effort is attached with this amendment. The scope and level of effort have been reviewed and agreed upon by the City staff prior to submittal of this amendment. Long Ave Pedestrian Safety Improvements Project CPN 104299