HomeMy WebLinkAbout061866-CO3 - Construction-Related - Contract - McClendon Construction Company, Inc.CSC No. 61866-0O3
Fox__ T�W�o� M
Project Name� 2022 Bond Year 2 Contract 8
Client Project #(s)� 104183
Project Description�
Contractor� McClendon Construction Company, Inc
City Project Mgc� Christian Cardona
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
�Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
City of Fort Worth
Change Order Request
I City Sec # I 61866
Water, sewer and pavement improvements on various streets
� Change0rder#I 3 � Datel 11/24/2025
ICity Inspectorl William Fauver
Unit 1: Water Unit 2: Sewer Unit 3: TPW
$2,867,200.00 $1,459,830.00 $2,955,024.00
$6,684.00 $101,305.00
$2,867,200.00 $1,466,514.00 $3,056,329.00
$0.00 $0.00 $0.00
$2,867,200.00 $1,466,514.00 $3,056,329.00
$143,360.00 $72,992.00 $147,751.00
Unit 4: Storm Water
$0.00
$13,132.00
13.132.00
Contract Time
Totals (CD�
$7,282,054.00 00
$121,121.00 77
$7,403,175.00 477
14
$7,403,175.00 491
$364,103.00 �
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.66°/a
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $9,102,567.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and materials as specified in Change Order #3. This change order adds new
bid items to reconstruct the intersection of 5th Street and Flint Street and repair an existing storm drain pipe. During installation of the new water line on 5th Street, it was
discovered that the existing connection point at the intersection was a cast-iron pipe rather than the PVC pipe shown in the record drawings. In addition, the existing cast-iron
pipe was found to have penetrated an existing storm drain pipe. To resolve these conflicts, the new water line needs to be installed at a deeper elevation beneath the storm
drain, and the damaged storm drain pipe needs to be repaired. This work requires the removal of the cast-iron pipe, the installation of a new water line, storm drain repairs,
and the full reconstruction of the intersection paving.
Time: Staff support the contractor's request for 14 calendar days to complete the additional work. This includes:
•2 days (August 5-6, 2025) for site investigation and price negotiations
2 days (August 11-12, 2025) for lowering the water line and repairing the storm drain pipe
•10 days (October 13-22, 2025) for pavement removal and full reconstruction of the intersection
The additional time is necessary and reasonable, given the scope of the unforeseen utility conflict and the required reconstruction.
Cost: The contractor will honor the existing unit pricing for all current bid items. Staff have reviewed the pricing for the newly added bid items and confirmed
that the proposed costs are fair reasonable and consistent with recent comparable projects
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Com an Name Contractor Name Contract Si nature Date
McClendon Construction Company, Inc. Justin Blair �o �� r��� :�r� 12/09/2025
.u�- � Iz/1�/zozs Ou�G�- . 12/1�/2025
'ro ram Mana er Date Senior Ca ital Pro'ect Officer Date
, ._ iz/i7/zozs �""'> i2/i�/Zo2s
— `'"°°`� iz/z6/zozs �e�.�..�^�,. . iz/z9/zozs
Assistant Cit Attorne Date Assistant Cit Mana er Date
� O1/08/2026 O1/14/2026
Council Action (if required)
M&C Number I N/A � M&C Date Approved I N/A I
ATTEST:
.. .... ,_; .. ..
�FFICIAL RECORD
Jannette Goodall, City Secretary q4foRTn�A
poF�� �t a
a�`° O9.Id0
A��� � d
Pd�nn➢E6p564
CITY SECRETARY
FT. WORTH, TX
Forzr WoarH City of Fort Worth
'T"' Change Order Additions
Project Name � 2022 Bond Year 2 Contract 8
ClientProject# � 104183
Contractorl McClendon Constmction Company, Inc �
I I tM UtS(;KIY I IUN
5"L 0241.1100 Kemove Asphalt f'vmt
53 3211.0400 8" Lime Treatment
54 3211.0502 Hydrated Lime (401b/SY)
55 3213.0101 6" Conc Pvmt
56 3301.0012 Post -CCTV Inspection of Storm Drain
57 9999.0026 Repair existing storm drain pipe
� City Sec # � 61866 �
�
PMI Christian Cardona � Inspectorl William Fauver I
Change Order Submittal # �3 Date � 11/24/2025 �
ADDITIONS
UtYI
Unit 1: Water
Umt 1: Water
Unit 1: Water
Umt 1: Water
Unit 1: Water
Umt 1: Water
Uty Umt
"L"L0.00000000 SY
220.000OOOOU SY
4.50000000 TN
220.000OOOOU SY
342.000OOOOQ LF
1.00000000 LS
Umt c;ost �
$16.0
$7.0 '
$360.OU
$80.00
$3.5U
$5,930AU
I otal �
$3,520.00�
$1,540.00�
$�,szo.00�
$17,600.00�
$1,197.00�
$5,930.00�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
�
1
I
$31,407.00�
$0.00 �
$0.00 �
$0.00 �
$31,407.00�
Unit 1:�Nater
Unit 2: Sewer
Unit 3: TPW
Unit 4: Storm Water
Sub Total Additions
Change Order Additions Page 2 of 3
F�>R� H c�ty of Fort wortn
Change Order Deletions
Project Name � 2022 Bond Year 2 Contract 8
Client Project # � 104183
Contractorl McClendon Construction Company, Inc �
I I tM UtJI;KIF' I IUN
bi ssyy.uuuz Gonstruction Huowance
� City Sec # � 61866 �
�
PMI Christian Cardona I Inspectorl William Fauver I
Change Order Submittal # O3 Date � 11/24/2025 �
DELETIONS
utri Uty Unit Unit�ost
Unrt �: vvater u.'s�4urouu �a y�uu,uuu.uu
Unit 1:tiVater
Unit 2: Sewer
Unit 3: TPW
Unit 4: Storm Water
Sub Total DeletionS
Change Order Deletions Page 3 of 3
iotai �
yst,aui.uu�
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
$31,407.00 �
$0.00�
$0.00�
$0.00�
$31,407.00�
F�R'��ORTH�
Routing and Transmittal Slip
Transportation & Public Works Department
D�Cj7MENT TITLE: Change Order #3 — 2022 Bond Year 2 Contract 8
M&C:
IDate:
ITo: Name
I 1. Wendi Hedlund
2. Justin Blair
CPN: 104183 CSO: 61866
Department Initials
TPW - initials ��'
McClendon Construction �'�
Co. - si�nature �B
DOC#:
Date Out
12/09/25
12/09/25
3. William Fauver TPW - si�nature ,� E 12/17/25
4. Don Watson TPW - signature �.� 12/17/25
oo�aidm�acso�
5. Christian Cardona TPW - signature � 12/17/25
�n,�s��.,��a����,�
6. Gregory Robbins TPW - signature LG� 12/17/25
7. Mary Hanna TPW - signature ��' 12/17/25
8. Patricia Wadsack TPW - signature p(�� 12/26/25
9. Lauren Prieur TPW - signature „x� 12/29/25
10. Doug Black Legal - signature � O1/08/26
f.ou4a5 filzck
11. Jesica McEachern CMO - signature � O1/14/26
12. Jannette Goodall CSO - signature � O1/14/26
13. TPW Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE
ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the
routing slip, Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: �YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Reauired:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a�FortWorthTexas.�ov at ext. 7233 for pick up when completed.
Thank you!
FORT ��RTH�
City Secretary's Office
Contract Routing & Transmittal Slip
C011tI'aCtOr�S NaT11e: McClendon Construction Company, Inc.
SUb� eCt Of tlle 1�gT'eeTllerit: Change Order #3 to 2022 Bond Year 2- Contract 8(CPN 104183).
M&C Approved by the Council? * Yes ❑ No 8
If �so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 6� 866-Co3
If so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 8 No ❑
If �unsure, see back page for pernianent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date: NiA
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If �so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. � 04� s3
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be