HomeMy WebLinkAbout061514-FP2 - Construction-Related - Contract - Wright Construction Company, Inc.-FP2
FORTWURTH�
City Secretary
Contract No. 61514
Date Received 1/15/2026
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Lone Star at Liberty Trails Phase 1 B
City Project No.: 105130
Improvement Type(s): Water � Sewer 0
Original Contract Price:
Amount of Approved Change Order(s)
Revised Contract Amount:
Total Cost of Work Complete:
E�ic J�a�
Eri� DaV (Jan 1�.202�13'.06'.1� CST'�
Contractor
Vice President
Title
WRIGHT CONSTRUCTION COMPANY, INC.
Company Name
�� uJ�.
Project Inspector
�%'� �"��
Project Manager
���
CFA Manager
��-��
Lauren Prieur(Jan 16, 202612:1838 CST)
TPW Director
O1/14/2026
Date
O1/14/2026
Date
O1/15/2026
Date
O1/15/2026
Date
O1/16/2026
Date
$2,438, 555.00
$11, 241. 40
$ 2, 449, 796. 40
$ 2, 449, 796. 40
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Lone Star at Liberty Trails Phase 1 B
City Project No.: 105130
City's Attachments
Final Pay Estimate x❑
Change Order(s): 0 Yes ❑ N/A
Pipe Report: � Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid �."�
Consent of Surety �
Statement of Contract Time
Contract Time: 55 WD
Work Start Date: 8/6/2024
Completed number of Soil Lab Test: 1092
Completed number of Water Test: 22
Days Charged: 278 WD
Work Complete Date: 12/2/2025
Page 2 of 2
F���r ���Tx
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LONE STAR AT LIBERTY TRAILS PHASE 1B
Contract Limits
Project Type WATER & SEWER
City Project Numbers 105130
DOE Number 5130
Estimate Number 1 Payment Number 1 For Period Ending 12/2/2025
WD
City Secretary Contract Number
Contract Date
Project Manager NA
Contractar WRIGHT CONSTRUCTION COMPANY, INC.
601 W. WALL ST.
GRAPEVINE� TX 76051-
Inspectors M.GLOVER / E.WALKER
Contract Time ��
Days Charged to Date 278
Contract is 100.00 Complete
Wednesday, December 3, 2025 Page 1 of 5
City Project Numbers 105130
Contract Name LONE STAR AT LIBERTY TRAILS PHASE 1B
Contract Limits
Project Type WATER & SEWER
Project Funding
UN1T I: WATER IMPROVEMENTS
DOE Number 5130
Estimate Number 1
Payment Number 1
For Period Ending 12/2/2025
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
1 TRENCH SAFETY 9493 LF $1.00 $9,493.00 9493 $9,493.00
2 DUCTILE IRON WATER FITTINGS 13.4 TN $7,985.00 $106,999.00 13.4 $106,999.00
W/RESTRAINT
3 8" WATERPIPE 8569 LF $53.00 $454,157.00 8569 $454,157.00
4 12" WATERPIPE 155 LF $150.00 $23,250.00 155 $23,250.00
5 16" WATER PIPE 112 LF $211.00 $23,632.00 112 $23,632.00
6 24" WATERPIPE 657 LF $194.00 $127,458.00 657 $127,458.00
7 FIRE HYDRANT 11 EA $7,661.00 $84,271.00 11 $84,271.00
8 2" COMBINATION AIR VALVE ASSEMBLY FOR 1 EA $8,944.00 $8,944.00 1 $8,944.00
WATER
9 1" WATER SERVICE 241 EA $1,543.00 $371,863.00 241 $371,863.00
10 1" WATER SERVICE (IRRIGATIOI� (CO#1) 0 EA $1,751.00 $0.00 0 $0.00
11 8" GATE VALVE 25 EA $2,796.00 $69,900.00 25 $69,900.00
12 12" GATE VALVE 1 EA $4,782.00 $4,782.00 1 $4,782.00
13 16" GATE VALVE W/ VAULT 2 EA $21,961.00 $43,922.00 2 $43,922.00
14 24" GATE VALVE & VAULT 1 EA $47,276.00 $47,276.00 1 $47,276.00
15 2" WATER SERVICE (IRRIGATION) (CO#1) 2 EA $2,927.00 $5,854.00 2 $5,854.00
16 6" PVC SCHEDULE 40 CONDUIT SLEEVES 100 LF $28.00 $2,800.00 100 $2,800.00
(CO#1)
17 6" PVC SCHEDULE 40 CONDUTT SLEEVES 180 LF $33.83 $6,089.40 180 $6,089.40
(CO#1)
Sub-Total of Previous Unit $1,390,690.40 $1,390,690.40
UNIT II: SEWER IMPROVEMENTS
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
1 POST-CCTV INSPECTION 7824 LF $2.00 $15,648.00 7824 $15,648.00
2 MANHOLE VACUUM TESTING 28 EA $165.00 $4,620.00 28 $4,620.00
3 TRENCH SAFETY 7824 LF $1.00 $7,824.00 7824 $7,824.00
4 4" SEWER SERVICE 241 EA $1,484.00 $357,644.00 241 $357,644.00
5 8" SEWER PIPE 7464 LF $60.00 $447,840.00 7464 $447,840.00
6 8" SEWER PIPE, CSS BACKFILL 360 LF $161.00 $57,960.00 360 $57,960.00
7 4' MANHOLE 28 EA $4,324.00 $121,072.00 28 $121,072.00
Wednesday, December 3, 2025 Page 2 of 5
City Project Numbers 105130 DOE Number 5130
Contract Name LONE STAR AT LIBERTY TRAILS PHASE 1B Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 12/2/2025
Project Funding
8 EXTRA DEPTH MANHOLE 134 VF $347.00 $46,498.00 134 $46,498.00
Sub-Total of Previous Unit �1,059,106.00 �1,059,106.00
Wednesday, December 3, 2025 Page 3 of 5
City Project Numbers 105130
Contract Name LONE STAR AT LIBERTY TRAILS PHASE 1B
Contract Limits
Project Type WATER & SEWER
Project Funding
Contract Information Summary
Original Contract Amount
Chan�e Orders
Change Order Number 1
DOE Number 5130
Estimate Number 1
Payment Number 1
For Period Ending 12/2/2025
$2,438,555.00
$11,241.40
Total Contract Price $2,449,796.40
Total Cost of Work Completed g2,449,796.40
Less % Retained $0.00
Net Earned $2,449,796.40
Earned This Period �2,449,796.40
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$2,449,796.40
Wednesday, December 3, 2025 Page 4 of 5
City Project Numbers 105130
Contract Name LONE STAR AT LIBERTY TRAILS PHASE 1B
Contract Limits
Project Type WATER & SEWER
DOE Number 5130
Estimate Number 1
Payment Number 1
For Period Ending 12/2/2025
Project Funding
Project Manager NA
Inspectors M.GLOVER / E.WALKER
Contractor WRIGHT CONSTRUCTION COMPANY, INC.
601 W. WALL ST.
GRAPEVINE� TX 76051-
City Secretary Contract Number
Contract Date
Contract Time 55 WD
Days Charged to Date �78 W�
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $2,449,796.40
Retainage This Period $0.00
Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$2,449,796.40
$0.00
$2,449,796.40
$0.00
$0.00
$0.00
$0.00
$0.00
$2,449,796.40
Wednesday, December 3, 2025 Page 5 of 5
REVIEWED
By George Marqeuez, P.E. at 12:10 pm, Dec 03, 2024
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
I PROJECT NAME:
I CONTRACT:
ICFA#
ICITY PROJECT�
I CITY SECRETARY CONTRACT �
IFID #
ISEWER PROJECT#
I FILE #
INSPECTOR:
PROJECT MANAGER:
Lone Star at Libertv Trails Phase 1 B
Water. Sewer, 8 Drainaqe Improvements
CFA-240008 I
105130
IPRC23-0131
301140200431-105130-E07685
X-27961
� W-2933
Sri Peddibhotla
George Marquez
CITY PARTICIPATION:I NO
Phone No: 682-718-6979
Phone No: 817-392-6826
CHANGE
ORDER No:
1
CONTRACT UNIT
WATER SEWER DR.4INAGE PAVING STREET LIGHTS
Developer Developer Developer
Cost City Cost Developer Cost Ciry Cost Developer Cost City Cost Cost City Cost Cost City Cost
IORIGINAL CONTRACT $�,379,449.00 51,059,106.00 $'1,264,113.00
IXTRAS TO DATE $1'1,241.40 50.00 50.00
CREDITS TO DATE
ICONTRACTTO DATE 51,379,449.00 $0.00 51,059,106.00 $1,264,'113.00
IAMOUNT OF PROP. CHANGE ORDER 51 t�1A0 $0.00 50.00 .
IREVISEDCONTRACTAMOUNT 51,390,690.40 51„059,1D6.00 $1.264,'113.00 ��
I TOTAL REVISED CONTRACT AMOUNT PER
{ UNIT $1,390,690.40 $1,059,106.00 $'1,264,'113.00 50.00 $0.00
� REVISED COSTSHARE Dev. Cost: $3,713,909.40 City COSt: 50.00
fTOTAL REVISED CONTRACT $3,713,909.40
CONTRACT
DAYS
55
55
0
55
Revised: 12-17-2018 Page 1
You are directed to make the followin9 cha iges in the con ract documents
CITY BID ITEM
PAY ITEM � � QUANTITY UNIT ITEM DESCRIPTION
'10 3312.2103 -2 EA �" Water Service (Irrigafion)
10' 3312.2103 2 EA 2" Water Service (Irriqation)
15' 9999.0002 100 LF 4" PVC Scheduie 40 Conduit Sleeves
16' 9999.0003 180 LF 6" PVC Schedule 40 Conduit Sleeves
Tolal
Asterisk (•) indicates New Pay Item
REASONS FOR CHANGE ORDER
Addition of irrigation Sleeves for Landscaping and updated irrigation meter sizes
UNIT PRICE TOTAL
5 1,751.00 S (3,502.D0)�
3 2,927.00 3 5,854.00 �
5 26.00 S 2,800.00 �
$ 33.83 S 6.089.40 �
511,241.40 J
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100°/ OF THE CHANGE ORDER COST AND NO REIMBURSEMENT
FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER
Revised: 12-17-2018 Page 2
RECOMMENDED:
By: Paoe Dawson Enoineers. LLC
Name: KEV� RPHY
✓
Ti�e: �
APPROVAL RECOMMENDED:
By:
Name:
Title:
N /A
RECOMMENDED:
By. �Q,$?� i����Gl,GV
v
Name: Geor�e Marquez
rtie: CFW Project Manager
M&C Number. N/A
M�C Date Approved: %i �Q
APPROVED:
(Developer)
By: Forestar fUSAI Real Estate Grouo inc.
Name: C/" t -�f�'"i
Titfe: ��U&SY/hGN\ /V�n)A G� iZ.
APPROVED:
By:
Name:
Title:
N/A
APPROVED:
(Contractor)
By: Wriqht Construction Co.. inc.
Name: EriC Day= a,ro=^~-
VP of Project Management
Title:
APPROVED AS TO FORM AND LEGALITY:
By:
Name:
Title:
N/A
ATTEST " Contract Compliance Manager {Project Manager):
By signing i acknowledge that I am the person responsible
N/A Por the monitoring and administration of this contract, include
ensuring ali performance and reporting requirements.
Jannette S. Goodail
City Secretary OThere are NO City Funds associated with this Contract
❑There are City Funds associated with this Contract
Revised: 12-17-2018 Page 3
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Lone Star at Liberty Trails Phase 1 B
CITY PROJ�CT NUMB�R: 105130
� WATER
PIP� LAID SIZE TYPE OF PIPE
PVC 8" PVC
PVC 12" PVC
PVC 16" PVC
PVC 24" PVC
FIRE HYDRANTS: 11
PIPE ABANDONED
SIZE
VALV�S (16" OR LARGER)
TYPE OF PIPE
DENSITIES:
NEW S�RVICES:
�
PIPE LAID
PVC
PIPE ABANDON�D
D�NSITIES:
NEW SERVICES:
�
SIZE
8��
SIZ�
4"
YES
COPPER
COPPER
SEWER
TYPE OF PIPE
PVC
TYPE OF PIPE
YES
PVC
LF
8569 LF
155 LF
]12LF
657 LF
LF
241 EA
2 EA
LF
7464
LF
241
TRr1NSPORTATION AND PUBLIC ���ORKS
The Cit�� of Fort \�/orth • 1000 Throckmorton St�eet • Fort Wordi, T�i 76012-6311
(817) 392 - 7941 • Fat: (817) 392 - 7845
�ORTWORTH��
TRANSPORTATION AND PUBLIC WORKS
December 2, 2025
WRIGHT CONSTRUCTION CO, INC.
600 W. WALL ST.
GRAPEVINE,TEXAS 76051
RE: Acceptance Letter
Project Name: Lone Star at Liberty Trails Phase 1B
ProjectType: WATER, SEWER, AND DRAINAGE
City Project No.: 105130
To Whom It May Concern:
On December 2, 2025 a final inspection was made on the subject project. There were no punch list
items identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on December 2,
2025, which is the date of the final inspection and will extend of two (2) years in accordance with the
Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6826.
Sincerely,
�� ���
George Marquez, P.E., Project Manager
Cc: Eddie Walker, Inspector
Mike Glover, Inspection Supervisor
Cristobal Fuentes, Senior Inspector
Andrew Goodman, P.E., Program Manager
PAPE-DAWSON ENGINEERS, Consultant
WRIGHT CONSTRUCTION CO, INC., Contractor
D.R. HORTON , Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY �F TARRt�NT
Before me, the undersigz�ed authority, a notary public in the state
and county aforesaid, on this day personally appeared Kevin Littlefield,
Controller Of Wright Construction Co, Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
orgariizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Gity Project # 105130, Lone Star at Liberty Trails Phase l B, at or near
Hwy 11� & Pembine Lane, Justin,
:�
TX 7 247 /
� 7� ��
Kevin Littlg�f`ield !
Subscribed and sworn before me on this date 14th of January,�2026.
1 / �,��"�1
i
,/�otary Public
Tarrant, TX
� ��j �--
/
11er
1+"� P�� DORlS L ELtAS MEND�ZA
�Noiary !0 # 133483149
�� My Commission Expires
'rFOF�+ �tiosraozs
� � �, � � , . _
�
�
M E RC HAN T�
60ND[NG COMPANY:.�.
M��cii�N�rs l3oN�iNc CoMi�nNv (Mu�ruA�.> P.O. Box 14498, Dr,s MoiNr.s, I�w� 50306-3498
f�iioNr: (800> 678-8171 Fnx: (515) 2�3-3854
CONSENT OF SURETY
TO FINAL PAYMENT
OWNER
ARCHITECT
CONTRACTOR
SURETY
OTHER
Bond No. 100340729
TO OWNER:
City of Fort Worth
100 Fort Worth Trail
Fort Worth, TX 76102
PROJECT:
Lone Star at Liberty Trails Phase 1 B
City Project No. 105130
ARCHITECT'S PROJECT NO.:
CONTRACT FOR: Public Sitc Utilities
CONTRACT DATED:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert name and address of Surety)
Merchants Bonding Company (Mutual)
P.O. Box 14498
Des Moines, lowa 50306-3498
on bond of
(Insert name and address of Contractor)
Wright Construction Co., Inc.
600 W. Wall Street
Grapevine, TX 76051
, SURETY,
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety of any of its obligations to
(Insert name and address of Owner)
City of Fort Worth
100 Fort Worth Trail
Fort Worth, TX 76102
as set forth in said Surety's bond.
, OWNER,
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: January 14, 2026
(Insert in writing the inonth followed by the numeric date and year.)
Merchants Bonding Company (Mutual)
(Surety/��
Attest: A-r /�'[�'�.��?ti(J�L
(Seal): Adam Syswerda, Witness " �
CON 0405 (4/15)
Kim Bracamonte Attornev-In-Fact
" � - (Printed name and title)
Printed in cooperation with American Institute of Architects (AIA). The
language in this document conforms exactly to the language used in
AIA Document G707-1994 Consent Of Surety to Final Payment.
�ERC�[ANTS
BONDING COMPANYT�
POWER OF ATTORNEY
KnowAll Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of lowa, and MERCHANTS NATIONAL INDEMNITY COMPANY , an assumed name of Merchants
National Bonding, Inc., (herein collectively called the "Companies") do her�by make, constitute and appoint, individually,
Adam Syswerda; Charlie Fletcher; Elise White; Jennifer R Garcia; Kim Bracamonte; Laura Ibarra
their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons,
guaranteeing the peiformance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or
proceedings allowed by law.
This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the By-Laws adopted by the Board of Directors of
the Companies.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority
to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other writings obliyatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship o obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the
Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts
required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Departrnent of
Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its
obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 12th day of November , 2025
MERCHANTS BONDING COMPANY (MUTUAL)
Np�NG Cp,y�•, •PS��NA�'•• •�pNA��NpF. MERCHANTS NATIONAL BONDING, INC.
'��'�RP�R ��'A'�'• °'�•'�RP�R �' eo'; � Q'�'��FOR;t;•.'yy' MERCHANTS NATIONAL INDEMNITY COMPANY
;�y.:ro q�.�.2� � :h�i:`p qj:•, 2 • : y ;.cp iv;,�'� �
:a:_ -o 0':3':Q:2 _o o.p::=; � ,<,
: �� t933 .���: ;�`•.. 2003 ::,c�; ',��; !3� L7��
. . •d . .. `• •d• •I a• / ��
'•�y�'..•. •''�^,• •..� ' e�,: . ��;••._ � *? . B
..�. •.�....,�...:�' 4� Y
STATE OF IOWA
COUNTY OF DALLAS ss.
On this 12th day of November 2025 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL), MERCHANTS NATIONAL BONDING, INC., and MERCHANTS
NATIONAL INDEMNITY COMPANY; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the
said instrument was signed and sealed in behalf of the Companies by auttiority of their respective Boards of Directors.
tiP��A�S� Penni Miller
� � � Commission Number 787952
• • My Commission Expires
iarvp. lanuary 20, 2027
(Expiration of notary's commission
does not invalidate this instrument)
�
Notary Public
I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL), MERCHANTS NATIONAL BONDING, INC., and
MERCHANTS NATIONAL INDEMNITY COMPANY do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-
ATTORNEY executed by said Companies,which is still in full force and effect and has not been amended or revoked.
In Witness Whereof, t have hereunto set my hand and a�xed the seal of the Companies on this 14th day of January , 2026
.•���� � � Mq�' �,,�PS`P,OA` e•; � P�`oNFOROF�• �I/
• 0.� PO ' •
�g :2O ��t^'�•� '•tir�.�G�tt R,q�� ?' " "� � VP� �Y�9 y<'
.a: "° O•' :2;2 O. .�t �
�3.'� o o� � ' �n• Secretar
: v'•. 1933 :' � : :2. :. 2003 ;�, : s'�, �3 � Y
'.d,;• �ac,: :� .: :�'• a.
. �v'. `,�.. ��' • ��,:' . a�;�, ..*�a .
•t:• ��' .;t..��� d..
POA 0018 (5/25)