Loading...
HomeMy WebLinkAbout061189-A5 - Construction-Related - Contract - CDM Smith Inc.CSC No. 61189-A5 AMENDMENT No . 5 TO CITY SECRETARY CONTRACT No. 61189 WHEREAS, the City of Fort Worth (CITY) and CDM Smith Inc., (ENGINEER) made and entered into City Secretary Contract No. 61189, (the CONTRACT) which was authorized by M&C 24-0172 on the 27th day of February, 2024 in the amount of $ 3,695,990.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $ 0.00 which was administratively authorized on July 16, 2024, Amendment No. 2 in the amount of $11,149,078.00 which was authorized by M&C 24-0729 on August 27, 2024, Amendment No. 3 in the amount of $0.00 administratively authorized on March 5, 2025, and Amendment No. 4 in the amount of $6,249,236.00 authorized by M&C 25-0715 on August 12, 2025; and WHEREAS, the CONTRACT involves engineering services for the following project: Eagle Mountain Water Treatment Plant Expansion, CPN 105176; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $ 80,115. 00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $21,174,419.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas OFFICIAL RECORD r,agle Mountain WTP Tlxp Prof Services Agreement Amendment Template CITY SECRETARY 105176 Revision Date: June 13, 2025 Page 1 of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth i Jesica McEachern Assistant City Manager DATE : O1/22/2026 ATTEST: 4FORT�II a pFoo° �, lLdd d�a �Ap �.//�� pi.8 �a9d C��w ,,��a-k- 4 � PVo o=A ���,v�vnr^R, �J dPa� ooa o0o i�d daQn �EoA564q Jannette Goodall City Secretary APPROVAL RECOM[�NDED: CGr,� ' �Ca,��� Christooher Harder (yan 9. 2026 06:57:54 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER CDMSmith, Inc. '—��i���— Jessica Ueatch, P.E. Associate 01-07-2026 DATE: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. � � � Ja�s McDona�ld, P . E . Senior Capital Project Officer APPROVED AS TO FORM AND LEGALITY: Douglas Black (Jan 9, 2026 10:00:30 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Ylorth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2 M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Gngl� hlount�,in ?dT[ E:«� 145176 CDM Sm�th December 16, 2025 Mr. James McDonald, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Subject: Eagle Mountain Water Treatment Plant and Rolling Hill WTP Pump Station Addition Amendment No. 5 CDM Smith Project No.: 0515-294565 City Secretary No. 61189 - City Project No. 105176 Dear Mr. McDonald: This letter references a contract between Consultant (CDM Smith Inc.) and the City of Fort Worth (the City) dated March 28, 2024 referred to herein as the "Contract." CDM Smith is pleased to submit our Amendment No. 5 for the City's Eagle Mountain Water Treatment Plant Phase IV Expansion — Project No. 105176 to perform design, bid phase and construction phase services to provide electrical drawings and specifications to install the starters and related electrical upgrades to connect new pumps and motors at the high service pump stations at Rolling Hills WTP and Eagle Mountain WTP. The following Task 11.1 Rolling Hills and Eagle Mountain HSP Electrical Support will be added to the contract: 1. Electrical design only for a new high service pump at Rolling Hills and Eagle Mountain that includes one electronic draft submittal for City review and one final submittal for specifications and plans during the Design Phase. It is anticipated that the following information will be supplied: Site Plan, Ductbank Schedule, One-Line Diagram, Pump Station Power Plan, Interface Diagram, Electrical Specifications, and Standard Details. Further one additional site visit to each site is included in the design phase of the project. 2. The City will obtain quotes for completing the electrical work. The scope assumes review of the City provided quotes for review and the Engineer will answer any technical questions that may arise during this process. 3. Construction phase support includes reviewing additional shop drawings, requests for information (RFIs), operation and maintenance manuals, and two additional field visits to witness testing as necessary. Record Drawings will be provided at the end of construction. 4. The scope does not include Record Drawings, construction pay application review, or any permitting activities associated with Construction. The City shall provide relevant CAD backgrounds showing the existing devices and equipment in CAD format. E Cherry Street, Unit 33, Suite 1820, Fort Worth, Texas 76102 CDM Sm�th Mr. McDonald December 16, 2025 Page 2 The following will be required: CDM Smith requests an amendment to our current contract for performing these additional services. This is exclusive of the $250,000 allowance that will remain unused. The attached fee proposal table developed for the additional scope of work. The requested fee for Amendment 5 is $ 80,115.00. Please note that this amendment increases Task 11 from $250,000 to $330,115 leaving the original $250,000 allowance unused. This fee for Amendment 5 is broken down as follows: • CDM Smith, Inc. $13,615 • MWBE Consultants (Gupta & Associates, Inc.) $66,500 • Non MWBE Sub Consultants $0 Table 2 below summarizes our revisions to the total contract: Table 2 — Total Contract: Description Amount Original Contract $3,695,990 Amendment No. 1 $0.00 Amendment No. 2 $11,149,078 Amendment No. 3 $0.00 Amendment No. 4 $6,249,236 Amendment No. 5 $80,115 Modified Contract $21,174,419 This change maintains the overall MWBE percentage above 10% MWBE participation for the full contract. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Sincerely, � Jessica Veach, P.E. Associate / Client Service Leader CDM Smith Inc. 801 Cherry Street, Unit 33, Suite 1820, Fort Worth, Texas 76102 CDM Sm�th Mr. McDonald December 16, 2025 Page 3 Copy to: Sarah Stewart, P.E., CDM Smith, Inc. Tony Sholola, P.E. City of Fort Worth 801 Cherry Street, Unit 33, Suite 1820, Fort Worth, Texas 76102 EXHIBIT B-2 level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Eagle Mountain Phase IV Expansion - Amendment No. 5 City Project No. 105176 Total Hour` 36 7otalLabor $9,290 Total Expens� $70,825 MBE/SBE Subconsullanl $66,500 Non-MBEISBE Subconsultant $� 5% SubMarkup. $3,325 MBE/SBEParticipalion 93.9% Tolal Project Cos� $80,115 ����� Page 1 of 1 F�RT��RTHo City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: CDM Smith, Inc. Subject of the Agreement: Eagle Mountain WaterTreatment Plant Expansion M&C Approved by the Council? * Yes ❑ No ❑✓ If �so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 61189-A5 If �so, provide the original contract number and the amendment number. Is the Contract "PermanenY'? *Yes 0 No ❑ If �unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: N/A Expiration Date: N/A If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No ❑✓ *If �so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 105176 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑✓ No ❑ Contracts need to be routed for CSO processin� in the followin� order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.