Project Name:1
Sanitary Sewer Replacement Contract 72, Part 1
City Sec No.: 1 40729
Project No.(s):l
P258-709170041183
I DOE No. 1 5333
1 CityProj. No.: 1 00411
Project Descxiptionj
Sanitary Sewer Mains Replacement on Berry Street, Lowden Street and Gordon Avenue. I
Contractor:I
UtiliTex Construction, LLP
Change Order.
2 1 Date: 2/10/2012
City Project Mgr. J
Roberto C. Sauceda
City Inspector:
Mel Duarte
Phone Number
817-392-2387
Phone Number.l
817-223-2266
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Sewer
$1, 052,340.00
$23,100.00
$1,075,440.00 I
$1,075,440.00
$31,570.00
$8,470.00 I
Totals Contract Time
(Calender days)
$1,052,340.00 180
$23,100.00 070
$1,075,440.001 250
070
$1,075,440.0
0
320
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 12.20%
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST +25%) $1,315,425.(
JUSTIFICATION (REASONS) FOR CHANGE ORDEii
The contractor has requested that 70 additional calendar days be provided on the project for the following:
• Delay resulting from having to wait for Paschal High School athletic activities to end for the sanitary
sewer services to be rerouted through tie baseball and football fields.
-der r-
• Delay resulting from having to conduct open cut installation (instead of by other than open cut) due to
previously unknown existing power and gas line that were encountered during sanitary sewer installation
on Berry Street.
Staff concurs with the contloar's requ Iv r
A by: Ou00,
0 o GG
� a~o
��. K� y C� SCtC1�21;8T� ��� oo c
M a 00- 00
It is understood and agreed that the acceptance of thlt4ang
in full (both time and money) for all costs arising out of, old
tractoes
Contractor Name
CUtiliTex Construction, L�LPe Gabriel Carrza es
Inspect A
%�� UA�� R• �Z�Z�f �Z
�S�Ocpr� (1 t l Date s
/ C- s. 7 � z-
1 A me to
na `Actior
M&C Number ` F "
actor constitutes an accord and satisfaction and represents payment
Change Order.
Contractor Signature
M
M&C Date Approved
./ tJ I I L I L Y • Y �.
w�
FO RT WD RT H City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Replacement Contract 72, Part 1 City Sec No.: I 39773
Project No.(s): P258-709170041183 DOE No.1 5333 1 City Proj. No.: 00411
Project Sanitary Sewer Main Replacement on Berry Street, Lowden Street and Gordon Avenue.
Description
Contractor UtiliTex Construction, LLP Change Order: = Date:1 2/10/2012
City Project Mgr. I Roberto C. Sauceda City Inspector I Mel Duarte
ADDITIONS
OW
L tbt#t W1 KM DEPT Qty ink Unk cost I iota
I
I
Sewer
Page 2 of 4 Additions Sub Total
FORT WO RT m City of Fort Worth
''V— Change Order Deletions
Project Name Sanitary Sewer Replacement Contract 72, Part 1 City Sec No.: 39773
Project No.(s): P258-709170041183 I DOE No. 1 5333 City Proj. No.: 00411
Project Description I Sanitary Sewer Main Replacement on Berry Street, Lowden Street and Gordon Avenue. I
Contractor UtiliTex Construction, LLP Change Order: F-2 � Date 2/10/2012
City Project Mgr. Roberto C. Sauceda City Inspector I Adel Duarte
DELETIONS
REM IDEMPTION I DEPT I Oty (Unit (Unit Cost rrotal
Sewer
i
Page 3 of 4 ;Deletions Sub Total
1,TX, ,-j: 1�
CO #
MIWBE Breakdown for this Change Order
I Type of Service I Amount for this CO
Total $0.00 1
Previous Change Orders
DATE I AMOUNT
Total ' $0.00 1
Page 4 of 4
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME: Sanitary Sewer Rehabilitation Contract LXXII (72), Part 1
BuySpeed No: PO-11-00063566
City Project No: 00411 (WP 83)
Contract No: CS40729
D.O.E. No: 5333
C-24385 approved 08-03-10
Attachment to Change Order No: 2
NOTE: Never saw CO#1, just captured the numbers off of #2.
Today's Date: 2/27/12
TOTAL
Sewer
Original Contract Amount:
$
1,052,340.00
$1,052,340.00
Extras to Date:
$
23,100.00
$ 23,100.00
Credits to Date:
$
-
$ -
Contract Amount to Date:
$
1,075,440.00
$1,075,440.00
Amount of Proposed Change Order:
TIME ONLY
$ -
Revised Contract Amount:
$
1,075,440.00
$1,075,440.00
Contingency Funds Avail. for Admin. Change Orders:
$
31,570.00
$ 31,570.00
Remaining Funds Available for Change Orders:
$
8,470.00
$ 8,470.00
Additional Funding (if necessary):
$
-
$ -
Prepared By: Christy Ezernack DOE Construction Services