Loading...
HomeMy WebLinkAbout061644-FP2 - Construction-Related - Contract - A'Lure General Contractors, LLC-FP2 City Secretary Contract No. 61644 FORT WORTH. Date Received 12/17/2025 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Babers Manors Multifamily City Project No.: 105482 Improvement Type(s): Water ❑x Sewer ❑x Original Contract Price: $44,087.03 Amount of Approved Change Order(s): $5,204.20 Revised Contract Amount: $49,291.23 Total Cost of Work Complete: $49,291.23 ��tieg�'v�il�/R..�. 12/09/2025 arturodelahova (Dec 15. 202514:41.51 CST. Contractor Date Project Manager Title A' Lure General Contractors, LLC Company Name Aea 12/15/2025 Project Inspector Date RAM, T" rr Ram Mari (Dec 15.202516-05.33 CST) 12/15/2025 Project Manager Date 12/17/2025 CFA Manager Date /e.Z 12/17/2025 Lauren Prieur (Dec 17, 202514:32:05 CST) TPW Director Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Project Name: Babers Manors Multifamily City Project No.: 105482 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety 0 Statement of Contract Time Contract Time: 60 WD Days Charged: 180 WD Work Start Date: 1/20/2025 Work Complete Date: 11/13/2025 Completed number of Soil Lab Test: 10 Completed number of Water Test: 6 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BABERS MANOR PROPOSED LOT 1, BLOCK 33 EASTWOOD ADDITION. Contract Limits Project Type WATER & SEWER City Project Numbers 105482 DOE Number 5482 Estimate Number 1 Payment Number 1 For Period Ending 11/13/2025 WD City Secretary Contract Number Contract Time 6WD Contract Date Days Charged to Date 180 Project Manager NA Contract is 100.00 Complete Contractor GMA CONSTRUCTION GROUOP 3520 S MORGAN STREET CHICAGO , IL 60609 Inspectors T. GARDNER / E. TINNER Friday, December 5, 2025 Page 1 of 4 City Project Numbers 105482 DOE Number 5482 Contract Name BABERS MANOR PROPOSED LOT 1, BLOCK 33 EASTWOOD ADDTIT Estimate Number I Contract Limits Payment Number I Project Type WATER & SEWER For Period Ending 11/13/2025 Project Funding UNIT L• WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 MOBILIZATION 1 LS $16,902.00 $16,902.00 1 $16,902.00 2 6" WATER PIPE 59 LF $85.66 $5,053.94 59 $5,053.94 3 6" CUT -IN GATE VALVE (CO#1) 3 EA $2,000.00 $6,000.00 3 $6,000.00 4 1" PRIVATE WATER SERVICE 43 LF $22.00 $946.00 43 $946.00 5 2" PRIVATE WATER SERVICE 63 LF $40.00 $2,520.00 63 $2,520.00 6 1" WATER METER BOX (CO#1) 1 EA $115.62 $115.62 1 $115.62 7 -------------------------------------- 2" WATER METER BOX (CO#1) 2 EA $419.29 $838.58 2 $838.58 Sub-Total of Previous Unit $32,376.14 $32,376.14 UNIT Ik SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 4' DROP MANHOLE 1 EA $7,617.90 $7,617.90 1 $7,617.90 2 4' MANHOLE 1 EA $5,144.77 $5,144.77 1 $5,144.77 3 8" PVC SEWER PIPE 26 LF $73.17 $1,902.42 26 $1,902.42 4 -------------------------------------- EPDXY MANHOLE LINER (CO#1) 9 VF $250.00 $2,250.00 9 $2,250.00 Sub-Total of Previous Unit $16,915.09 $16,915.09 Friday, December 5, 2025 Page 2 of 4 City Project Numbers 105482 DOE Number 5482 Contract Name BABERS MANOR PROPOSED LOT 1, BLOCK 33 EASTWOOD ADDTIT Estimate Number I Contract Limits Payment Number I Project Type WATER & SEWER For Period Ending 11/13/2025 Project Funding Contract Information Summary Original Contract Amount $44,087.03 Change Orders Change Order Number 1 $2,250.00 Change Order Number 1 $2,954.20 Total Contract Price $49,291.23 Total Cost of Work Completed $49,291.23 Less % Retained $0.00 Net Earned $49,291.23 Earned This Period $49,291.23 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $49,291.23 Friday, December 5, 2025 Page 3 of 4 City Project Numbers 105482 DOE Number 5482 Contract Name BABERS MANOR PROPOSED LOT 1, BLOCK 33 EASTWOOD ADDTIT Estimate Number I Contract Limits Payment Number I Project Type WATER & SEWER For Period Ending 11/13/2025 Project Funding Project Manager NA Inspectors T. GARDNER / E. TINNER Contractor GMA CONSTRUCTION GROUOP 3520 S MORGAN STREET CHICAGO , IL 60609 City Secretary Contract Number Contract Date Contract Time 60 WD Days Charged to Date 180 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $49,291.23 Less % Retained $0.00 Net Earned $49,291.23 Earned This Period $49,291.23 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $49,291.23 Friday, December 5, 2025 Page 4 of 4 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Babers Manor Mufti -Family CHANGE CONTRACT: Water, Sanitary Sewer, Drainage, Paving, and Street Lighting ORDER No: CFA # 24-0076 CITY PARTICIPATION: NO CITY PROJECT # 105482 IPRC 24-0053 CITY SECRETARY CONTRACT # 61644 FID # 30114-0200431-10548-EO7685 X # X-28113 FILE # W-3042 INSPECTOR: Troy Gardner Phone No: (682) 215-8720 PROJECT MANAGER: RAM Tiwari Phone No: 817.392.2237 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS WORKING Developer Developer Developer Developer DAYS Cost City Cost Developer Cost City Cost Cost City Cost Cost CityCost Cost City Cost ORIGINAL CONTRACT $29,421.94 S0.00 $14,665.09 $0.00 $6,951.34 $0.00 $51,327.40 $0.00 $101,439.00 S0.00 60 EXTRAS TO DATE $0.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 S0.00 S0.00 CREDITS TO DATE $0.00 $0.00 $0.00 S0.00 $0.00 S0.00 $0.00 $0.00 $0.00 S9.00 CONTRACT TO DATE $29,421.94 $0.00 $14,665.09 $0.00 $6,951.34 S0.00 $51,327.40 $0.00 S101.439.00 $0.00 60 AMOUNT OF PROP. CHANGE ORDER $2,954.20 $0.00 $2,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28,170.00 S0.00 0 REVISED CONTRACT AMOUNT $32,376.14 $0.00 $16,915.09 $0.00 $6,951.34 $0.00 $51,327,40 $0.00 $1291609.00 S0.00 60 TOTAL REVISED CONTRACT AMOUNT PER UNIT $32,376.14 $16,915.09 $6,951.34 S51,327.40 $129.609.00 REVISED COST SHARE Dev. Cost: $237,178.97 Cost: $0.00 TOTAL REVISED CONTRACT $237,178.97 REVIEWED By Ram Tiwari at 2:05 pm, Nov 24, 2025 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost City Cost TOTAL 3 1.00 EACH 6" Cutdn Gate Valve $2000.00 $2.000.00 $2,000.00 6' i.00 EACH 1"Water Meter Box I $115.62 $115.62 $115.62 7' 2.00 EACH 2" Water Meter Box $419.29 $838.58 $838.58 TOTAL UNIT I: WATER IMPROVEMENTS $2,954.20 $0.00 $2,954.20 UNIT II: SANITARY SEWER IMPROVEMENTS CITY B4 ITEM Developer PAY ITEM # I I QUANTITY I UNIT I ITEMyOM.SJRI N I UNIT PRICE I I CRY Cost I TOTAL , VF JI $2,250.00 $2,250.00 TOTAL UNIT I: WATER IMPROVEMENTS $2,250.00 0 00 $2,250.00 UNIT III: STREET LIGHTING IMPROVEMENTS CITY BID ITEM Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRk(PTION UNIT PRICE Cost City Cost TOTAL 7' 2 EACH ground Box Type B $2625.00 $5,250.00 $5,250.00 8' 3408 LF #6 Copper Cable Stranded $3.75 $12,780.00 $12.780.00 9' 1 EACH Service Meter 120240V $10140.00 $10,140.00 $10,140.00 TOTAL UNIT III: STREET LIGHTING IMPROVEMENTS $28.170.00 $0.00 I $28,170.00 � Asterisk (*) indicates New Pay Item � REVIEWED By Ram Uwari at 2:05 pm, Nov 24, 2025 Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER Proposed Sidewalk and existing sidewalk be ins needed more demolition of the existing sidewalk pavement for the grades to work RECOMMENDED: APPROVED: APPROVED: FW Babers Me—, LP, a Texas Limited Partnership (Consulting Engineer) (Developer) BY: FW Babers Manor GP, LLC (Contractor) Its: General Partner SoleMemlberHordability;1— Its: �.L... fio y ILIUM By: CarrilloEngineerinq By:'X1...._.m___._._,By, Mary -Margaret Lemons By. KN/ �^. Its: Secre[aryjirea-urer Name: Anna Carrillo Name: Mary-Marqaret Lemons Name: Arturo De La Hoya Title: Civil Engineer Title: SecretarvTreasurerofthe Sole Member Titlp Project Manager By: Name: Title: By: Name: Title: M&C Number: M&C Date Approved: APPROVAL RECOMMENDED CFW - Water Department NIA RECOMMENDED: CFW- *Contract Compliance Manager APPROVED: CFW - Assistant City Manager By: N/A Name: Title: APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: NIA Name: Title: ATTEST * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible NIA for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract ElThere are City Funds associated with this Contract REVIEWED By Ram Tiwari at 2:05 pm, Nov 24, 2025 Revised: 12-17-2018 Page 3 FORT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Babers Manor Proposed Lot 1, Block 33 Eastwood Addition CITY PROJECT NUMBER: 105482 1 WATER PIPE LAID SIZE TYPE OF PIPE 6" SDR 26 FIRE HYDRANTS: N/A PIPE ABANDONED DENSITIES: NEW SERVICES: I PIPE LAID N/A PIPE ABANDONED DENSITIES: NEW SERVICES: VALVES (16" OR LARGER) SIZE TYPE OF PIPE Yes 1" (1) Copper 2" (2) Copper SEWER SIZE TYPE OF PIPE 8" SDR 26 PVC SIZE N/A TYPE OF PIPE Yes TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 LF 59 N/A LF LF 26 LF FORTWORTH. TRANSPORTATION AND PUBLIC WORKS November 21, 2025 GMC Construction Group of Texas 13355 Noel Rd, Ste 1134 Dallas TX 75240 RE: Acceptance Letter Project Name: Babers Manor proposed Lot 1 block 33 Eastwood Addition Project Type: Water, Sanitary Sewer, Paving , and Lighting Improvements City Project No.: 105482 To Whom It May Concern: On November 21, 2025 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on December 4, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 4, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2025. Sincerely, R"Pt, 7" � Ram Ti i!Dec 15. 202, 1(, 0533 CST Ram Tiwari, Project Manager Cc: Eric Tinner, Inspector Troy Gardner, Inspection Supervisor Ariel Duarte, Senior Inspector Andrew Goodman, Program Manager Carrillo Engineering, Consultant GMC Construction Group, Contractor Babers Manor GC JV, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Matt Walter, Controller Of GMA Construction Group, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; CFA for Water, Storm Water, Sanitary Sewer Utilities and Paving at Babers Manor Multifamily CPN-105482 BY Matt Walter - Controller Subscribed and sworn before me on this date 15 of Decembe, 2025. Notar�Pubrc Cook County, Illinois Official Seal 0AISY I RIVERA Notary Public, State of Illinois Commission No. 668542 My commission Expires November 25, 2028 3 ._,•,."•K�.,,sy....�,...,,,.'cam,-.,t,...�,.;.�y,. y CONSENT OF SURETY TO FINAL PAYMENT ALA Document G707 (instructions on reverse side) TO OWNER: (Name and addrms) City of Fort Worth 100 Fort Worth Trail Fort Worth, TX 76102 PROJECT: (Name and aelditx) OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ Bond # US3003266 OTHER O ARCHITECT'S PROJECT NO.: CONTRACT FOR: CONTRACT DATED: 08/09/2024 Babers Manor proposed Lot 1, Block 33, Eastwood Addition, Water, Sanitary Sewer, Paving and Lighting Improvements In accordance with the provisions of the Contract between the Owner and the Conti -actor as indicated above, the (lrtwrt name and addm-,� ojSuretr) Euler Hermes North America Insurance Company 100 International Dr., 22nd Floor Baltimore, MD 21202 , SURETY, on bond of On.witna»teandaddrmcgfeontractor) Babers Manor GC JV , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (bturtnanteand addrescofOtrner) City of Fort Worth 100 Fort Worth Trail Fort Worth, TX 76102 , OWNF,R, as set forth in said Surety's bond. IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: December 10, 2025 (Insol in writh»; the ntonthfollou•ed ht• the numeric date and gear) �l�al4 a;i-„q Euler Hermes North America Insurance Company BRANDIE CATLII`i NOTARY PUBLIC, STATE OF ILLINOIS My Commission Expires 3131/26 -. (ti{qnt t eofcrruix�rizedrrpnscntruireJ Attest: (Seal): ` t David Kotula, Attorney -in -fact (Printer/moue and title) AM LITION: You should sign an original AIA document that has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced, See Instruction Sheet for Limited License for Reproduction of this document. AIA DOCUMENT G707 • CONSFNT OF SURFIN TO FINAL. PAYMENT' • 1994 EDITION • `AIA 01994 • THE AMERICAN INS7111)TF OF ARCI-ir ECTS, 1735 NEW YORK AVFNI;L•, NW, WXSH- INGTON, D.C. 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copy. right laws and will subject the violator to legal prosecution. G707--1994 Allianz @ EULER HERMES NORTH AMERICA INSURANCE COMPANY 800 Red Brook Boulevard * Owings Mills, Maryland 21117 The number of persons authorized by this Power of Attorney is not more than: POWER OF ATTORNEY Allianz Trade KNOW ALL MEN BY THESE PRESENTS: That EULER HERMES NORTH AMERICA INSURANCE COMPANY (EULER HERMES), a corporation organized and existing under the laws of the state of Maryland, does hereby nominate, constitute, and appoint the person or persons named below, each individually if more than one is named, its true and lawful attorney -in -fact, for and in its name, place, and stead to execute on behalf of EULER HERMES, as surety, any and all bonds, undertakings, and contracts of suretyship, or other written obligations in the nature thereof, provided that the liability of EULER HERMES on any such bond, undertaking, or contract of suretyship executed under this authority shall not exceed the limit stated below. NAME ADDRESS LIMIT OF POWER Brian DiPaola David Kotula 220 N. Green Street Chicago, IL 60607 This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above. �2o.GQk{PO��P mom" c " SEAL : g _ = 2003 ice; ax Unlimited IN WITNESS WHEREOF, EULER HERMES has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunder affixed this._ lsi _ day of November 20 22 James Daly, President and CEO The Americas State of Maryland, County of Baltimore " � g� ��//,,/".I - Nicholas P. Verna II, Senior Vice President and Regional Head of Surety and Guarantee, Americas On this 1st _day of _November , 20 22 before me personally appeared Nicholas P. Verna II, to me known, being duly sworn, deposes and says that he resides in Southeastern, PA; that he is Senior Vice President and Regional Head of Surety and Guarantee, Americas of Euler Hermes North America Insurance Company, the Company described herein and which executed the above instrument; that he know the seal of EULER HERMES; that the seal affixed to said instrument is such corporate seal; that it was so affixed by authority of the Board of Directors of EULER HERMES; and;that hd signed his name thereto by like authority. •' ?a Q T .k. ,I Notary Publi, Notanal Seat r49 'z This Commission Expires February 2, 2026 This Poorer; tAttosriAe�7s gra'rited by authority of the following resolutions adopted by the Board of Directors of EULER HERMES C NORTH AMERICA t h1 StJkANCE COMPANY (Company) by unanimous consent on October 1, 2015. RESOLVED: That the President, Executive Vice President, Senior Vice President, Vice President, Secretary, and Assistant Vice Secretary, be and hereby are authorized from time to time to appoint one or more Attorneys -in -Fact to execute on behalf of the company, as surety, and any and all bonds, undertakings and contracts of suretyship, or other written obligation in the nature thereof,to proscribe their respective dutiesand all respective limits of their authority; and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and signature of the aforesaid officers and may be affixed by facsimile to any Power of Attorney given for the execution of any bond, undertaking, contract of suretyship, or other written obligations in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as thought manually affixed. CERTIFICATION I, Nicholas P. Verna II, Senior Vice President and Regional Head of Surety & Guarantee, Americas of EULER HERMES NORTH AMERICA INSURANCE COMPANY, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of October 1, 2015, have not been revoked and are now in full force and effect. Signed and sealed this 1 Oth day of December 12025 SEAL •� . p., 20U3Q •n_ tia���... Nicholas P. Verna I1, Senior Vice President and Regional Head of Surety and Guarantee, Americas Euler Hermes Noah America Insurance Company and its affiliated debt collection company are part of the Allianz group and market their products and services using the'AilianzTrade trademark.