Loading...
HomeMy WebLinkAbout060501-A1 - Construction-Related - Contract - James DeOtte Engineering, Inc.CSC No. 60501-A1 AN�NDMENT No .1 TO CITY SECRETARY CONTRACT No. 60501 WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc. (ENGINEER) made and entered into City Secretary Contract No. 60501, (the CONTRACT) which was authorized by M&C 23-0978 on the 14tn day of November, 2023 in the amount of $ 622,350.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 121, CPN 104973; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated he�li�.cost to City for the additional design services to be performed by Engineer totals $83,375.00. (Water: $30,785.00; Sewer: $52,590.00) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 705,725.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. flFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Sanitary sewe� Rehab Co__tract 121 Prof Services Agreement Amendment Template 10�9?3 Revision Date: June 13, 2025 Page 1 of 2 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth , Jesica McEachern Assistant City Manager O1/24/2026 DATE: ATTEST: � � � Jannette Goodall City Secretary anq p� F pORt�9ad Od p�`g ,-i0 OVo o=d �°o*°�e o'*d d°na nezA5a4 APPROVAL RECONIl��NDED : ( �JJiI ���0�/DA. OY/'i/1 ,O�l. CinstopherHarder(J� 13,2026�T) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER James DeOtte En ineering, Inc. w Brian Dar y, P.E. Vice-President DATE: 12/18/25 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. T��Z�L `'.�K�dd�L Dena Johnson, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: . ������ Douglas Black (Jan 13, 2026 12:3527 CST) Douglas W. Black Sr. Assistant City Attorney M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Sanitary sewe� Rehab Contract 121 Prof Services Agreement Amendment Template 1C4973 Revision Date: June 13, 2025 Page 2 of 2 •:. �� ��::.,James ..................... •:. :•. � �;..:De.,.......e ................... �`�;.:.En�i neeri ng,. ENGINEERING �`' II'1C. November 24, 2025 Dena Johnson, P.E. Project Manager City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 Ref: Amendment # 1 Contract 121 City Project No. 104973 Ms. Johnson, This amendment came about due to: Civil Enginee�ing ..................... Land Surveying . ................. Constr�clion Management Hydroloc�ic and Hydiau�ic Modelinc� The City's adjacent project to relocate a portion of M-191 into South Hughes Avenue and needing more depth at the connection at Avenue J. To provide for this, our replacement design of L-3308 needed to be lowered and also extended further south to include the replacement design of L-3817 to gain the needed lower elevation along with upsizing the existing 6" sewer line to an 8" sewer line. This south sewer extension will also extend our water line replacement design limits as it will be disturbed where the sewer line will bend and cross water line. 2. The City's TPW TxDOT Oakland Miller Safe Streets project that will be placed along the same segment of Miller where our proposed water and sewer replacement design will be constructed. Per the City's wishes, at the time of construction for our project, the TPW installed pavement markings and bike lane curbs will be replaced. Due to the additional services that are outside the scope of the existing contracted agreements that have been requested by the City to be performed as part of the referenced project, JDEI will perform the work outlined in the following: Additional services shall include: 1. Additional time on the agreement that extends the number of months by 15 months. 2. Additional survey and design of 205 LF of L-3817 sewer line. 3. Additional design of 120 LF of water line. 4. Additional 3 easements for L-3817. 5. Additional pavement marking sheets. fox 817.930.0445 2201 DoVPio Lynn ParKway Sle. 119 • Forl Walh iX, 76120 phone 817.446.6877 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TBPLS firm Reg. �lo. 1010�440 �� iDPE Firm Reg. No. 6917 vwir.runHc Amendment # 1 Contract 121 November 24, 2025 Page 2 The specific tasks to be accomplished with this Amendment are outlined within the attached Level of Effort spreadsheet. JDEI anticipates the fees listed above for the various elements of the project to be a not to exceed amount of $83,375.00. All costs, associated with the identified scope of work, will be lump sum for the scope provided and will be billed as a percentage of completed work as determined by JDEI. This scope of work assumes any services not specifically listed as part of this contract will be treated as an additional service. The owner will be notified before any additional services are performed. Summary of previous contract amendments: Original Contract Amendment # 1 $ 622,350.00 $ 83,375.00 Total Revised Contract $ 705,725.00 Sincerely, A Brian Darby, P.E. Vice-President fox 817.930.OA45 2201 Doliie Lynn Parkway Ste. I 19 • Fort Walh TX, 76120 phone 817.446.6877 ............................................................................................................................................................. � ............................... iBPL5 Firm Reg. No. I0101 A00 �� 70PE Firm Reg. No. 8917 e-Hair.ri,nwa Tast No. Task Descflptlon 7.0 Pro�eet Ma S� en[ 1.1 Manaq��y Nelamm 1.1.� OA/f7G i.z 5p�^ �wlPq e�+o aq�aro�a tzi Nro-u a�a�+ ygt a-bnryjase��p pm(asumesameetirqJ,�J� i.zz DesfanSu6�lf6 eviwA��erTslaseumes�monfhs�� 1�.4 � ProO��e Mon� Prp/]fe 126 I Prooare MonNl.�( ME4FJS�� R�r9c (atcumas 0 monNa) tz7-e � coom�nanonw,M�ONor p s 1:?.10 � MonU+h ConauMant Coordihjtion Meetinps (assumes 15 meeEngsl 2A 'ConctyNal0eslj1n ]0-PercentI 21 Dah CoOectlon (t20 LF Wamr.1Q5 LF Sewer = 325 LF Tot I) 2.4 Conce�Nal DasiP� P��kape (assumes 325 LF toQl) 25 Esemale J,0 Prellmina Deslqn/ 60 Pereent) 3.1 I rel�mina/�� sion �nvnnas J.z Iconso-uc66iotrReviewfno2wrtormbw�rctl 3.3 IPublic MeaLnp 3.4 IUbli Cloa�ance 3.6 IE�ate 4.0 �,F�lnal Des�yJ� 4.2 IF'mnl DmK(90%) ConstrucUon Phrts unE SpecifiwLom 4.3 Firol(t00%)P � d$�py fi pp a.4 IConswceon Es �males 19Q%an�d 1��.61 a.5 �Pavement Markinp Sheeb (TxDOT Sab Streat rapbcement) S,0 s.i 5.1.1 5.1.2 5.1.3 s.i a s.�s S.t.6 6.0 6.7 6.1.1 6.1.2 6.1.3 6.1.5 6.2 7.0 7.t 7.2 73 B.0 B.t Cily of Fort Worth, Texaa Athchment B- Level of Ettort Suppbment PMO Official Raleuse Dam:8.09.2012 �BIO �hasoc � �a�asuop ^ I IUA load E Sell�o ntract ppq�mants antl Mainhin Pbn Holtlen lirt � lss�e nme�a� (osaumo:Lf 1 Attentl Pro-Eid Conlerence (v�irtual) � ARend Bid Openiqy (not part of thic contract) � r�b�mt. e�a: o�CftemmmenE AwarG � � Issue Conlartned Contrae[ Document � Constructlon Phase Servltes � Construrnon Su��prt � Atlend Promn3NuNon Conlerence Attend Pub6c Meeo^p � Project Sib Visib (akumes 0 visi6l � Request lor Inlormacon Review (assumes 01 � Ramrtl Drawinps (no mybrs Drovided) � 11ahlo�f Woy Kesevrch c 1 Rip�tbl-Way/Easemen[ ProparoGon antl SuCmittal (assumes 3 QR 52.500 eac�l � Tem00rory �ipht o/ Entry SJbmiRal (assumas o�! seo eacn) � survc�y 1 UeaQll Survey � Totals� Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Design Services for Sanitary Sewer Rehabilitation Contract'12� City Project No. 104973 Amendment#� LaEor ( mlor1 Survcy Project Prof[c[ S P�Inelpal MnnaqerJ Enqlneer EIT J Oeslans�� RP SZ3 Tech I 5230 5210 St45 5735 ) S1]Di 8 ]� ]BI 0 34 0� S� I el i � i I ' I �' I � � � 1 � ; 3Di I 30�1 � bl ,25I 251 �I s1� A � , e� ,� � ,z� � � 4j � I 16� � O.Si 1'� I 2� 1 01 �6.51 35J 0� SOI � OI i6i 37 I 4B 1. I i I / 2 � � O.S 1 I Z J D 11� 36J o� 60I � 0� � � � ,� I � � � � � 1 32� 6+ 0 0 6 0� 0� - _ � -_ _ -_ I -! i � I I I I I � i I I � � I 1 - -I i oI z s� ol ixl o� o I I I ; I 1 I I ; I � I 1 6; j ,z; ! o � o� � s� of I I I I -I L I _- I _ �i � d� : I I I I �� 1� 1�� �I 1 2 'I ,� f z p� Bal 1111 0� t9�� I 1; Survcy Atl; Inlstr�Tobl c«w uvc 5270 5901 0 '� L i I < � 15 � 4.5 a o.s � 2.5 I I I Z �� 0.5 OJ 5 1 i�4 OI 0) i � 1 __ I 1 I i 1 0� 1 1 I I 1 I I I I D� 0� 1 1 . 2 t� _� z, w� � SubeonsulCn[Et e ic � I Total Expmsc Remalnlnp Subeonsultant TaskSUETotal Y.Comple4 ecP�oa��ao� eose euaQee MWBE Non-MWBE s - i so sd sx�,sco f S 640� no� 51.100� 50.00 5 so 50 So sa sa so� 52.LSO.D9 j Sa �g, sz.��� 51.060.00�j 50� si a�l s_ 52,I90.00� 5 E2290� 5 sse,xm� s so s� sao so so I E � SO I I ;p so i i fo eo � � 50 53 ]20 I I EO 515 900 - I SD� 510 S10 S'Q.SfiS I I - $r 35.920 sio s50 54.130 � SOI 5555 I - I f0 St0 StO� StS.Y/5 I 510 510� 5!4,250� I I � i� so� Soi I I I so sa�c7 I I 50 5555� SO 520J 51 51G }9� I I 510� bitl Sa��yO� � 510� 52 050� i i i ��o s,.iioi � � SD 5�.100� - S0� S0� SO S0� I 1 I I I I Sol Soi I 1 5� Soi I 1 So 501 I I 5.. so1 � � sol so1 � 50J 50� , I :o� soj sx.eso� SD� 50 ; so� I I 1 �sol I I I Eol � � � 52.850� T.S00.00 � S01 S0� Sf.50o 38.960� I I bo So� 7.500.00 � 57 500 58.960� � C S01 s�tso.00 d I soj ss.zso� se.s�o� 6.250.00 + 56,?50 58,510 �s,vso � sa s4aJ s+a.�so sex.000 I I I I I I DN.� S� Wator and Sev.er Oeslpn BreakEovm Pro�eet Summary IFootape % Footae Desqn Fea I I Water Svnidry Sewer ToCI Cost I%ComDbte Remoinlnc BUEpq Tohl Houn I 459 Waterl 120.0 37 I S 30.7951 I Foo�J %� 3 LF� %� 5 TotlLabor I 569,q10 Sev.erl 205.00I 639�1 5 52.590 I � Contract 12 I 121�OUI 37%J 5 30,�85 205Affl 63%J S 52.SB0 S 83.375 I 0 J 5 83.375 ToOI EYoense � 513.790 Totall 325.001 100�1 5 83.375 � I TOTAL 120A� 379(I 5 30.785 205.00 63961 5 52,590 S 83,375 � 0961 s es.s�s MWBE Submnsulbnfl 513750 Non-MWBE Subconsupant 50 I 10% Sub Markuo 51.375.00 � MWBE PorCcipotion 16.5% I TOLti Pro�ttt Coz I SB7,J75 i6L F�RT` ��RTH� City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name James DeOtte Engineering, Inc. Subject of the Agreement: Sanitary Sewer Rehabilitation Contract 121 M&C Approved by the Council? * Yes ❑ No 0 If so, the M&C must be attached to the cont�act. Is this an Amendment to an Existing contract? Yes � No ❑ 60501-A1 If so, provide the original contract nurnbeY and the amendinent number. Is the Contract "Permanent"? *Yes � No ❑ If unsuNe, see back page foN permanent cont�^act listing. Is this entire contract Confidentiial? *Yes ❑ No 0 Ifonly specific info�mation is Confidential, please list what information is Confidential and the page it is located. Effective Date: 12/18/2025 Expiration Date: N/A If �different from the approval date. If �applicable. Is a 1295 Form required? * Yes ❑ No 0 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: Ifapplicable. 104973 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑ No ❑ Contracts need to be routed for CSO nrocessin� in the followin� order: L Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. A1lison Tidwell (Form Fi11er) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.