Loading...
HomeMy WebLinkAbout062598-R1 - Construction-Related - Contract - Conatser Construction, TxFORTWORTH� -FP1 City Secretary Contract No. 62598 Date Received 1/23/2026 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Westport 24 Detention Pond City Project No.: 105634 Improvement Type(s): ❑ Paving 0 Drainage 0 Street Lights ❑ Turn Lane Original Contract Price: $3,209,806.50 Amount of Approved Change Order(s): $0.00 Revised Contract Amount: $0.00 Total Cost of Work Complete: $3,209,806.50 � Arturo Sancen Uan 222026 09:1030 CS71 Contractor Superintendent Title Conatser Construction, Tx Company Name fd�I.Jan 77, 7076 09:38:56 CST) Project Inspector a��.�� ,�� Project Manager e�� CFA Manager ��..�.�,.:.� �a�r�� i�r ��r uao ze, zozh ue:sz:on cs-; TPW Director O1/22/2026 Date O1/22/2026 Date O1/22/2026 Date O1/23/2026 Date O1/26/2026 Date �FFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Westport 24 Detention Pond City Project No.: 105634 City's Attachments Final Pay Estimate � Change Order(s): ❑ Yes 0 N/A Contractor's Attachments Affidavit of Bills Paid � Consent of Surety � Statement of Contract Time Contract Time: 120 WD Days Charged: 138 WD Work Start Date: 3/24/2025 Work Complete Date: 12/19/2025 Completed number of Soil Lab Test:104 Completed number of Water Test:O Page 2 of 2 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WESTPORT 24 DETENTION POND Contract Limits Project Type DRAINAGE City Project Numbers 105634 DOE Number 5634 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 WD City Secretary Contract Number Contract Date Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH � TX 76119 Inspectors D. WATSON / S. JOHNSON ContractTime 1�� Days Charged to Date 138 Contract is 100.00 Complete Sunday, December 28, 2025 Page 1 of 4 City Project Numbers 105634 Contract Name WESTPORT 24 DETENTiON POND Contract Limits Project Type DRAINAGE Project Funding UNIT ID: DRAINAGE IMPROVEMENTS Item Description of Items No. 1 SITE CLEARING 2 BORROW BY PLAN (fill per plan 3 UNCLASSIFIED EXCAVATION BY PLAN (CUT PER PLAN) 4 SEEDING, HYDROMULCH 10310 $2.00 $20,620.00 5 SWPPP>1 ACRE 1 $5,500.00 $5,500.00 6 TRENCH SAFETY 5512 $4.00 $22,048.00 7 COMPACT SUBGRADE 218 $6.00 $1,308.00 8 4' MANHOLE RISER 16 $7,500.00 �120,000.00 9 LARGE STONE RIPRAP, DRY 44 $155.00 $6,820.00 10 24" RCP, CLASS lll 1368 $105.00 �143,640.00 11 CUSTOM REMOVE HEADWALLTYPE INSTALL 1 $24,500.00 $24,500.00 12 TXDOT 24" 4:1 HEADWALL TYPE INSTALL 2 $6,500.00 $13,000.00 13 41' X 9' CUSTOM JUNCTION BOX 1 $115,000.00 � 115,000.00 14 47' X 3 RCB 4144 $570.00 '.,362,080.00 I S 7'X 3 X 90' BEND INSTALL 4 $2,500.00 $10,000.00 16 TXDOT SW-0 HEADWALL I $34,500.00 $34,500.00 17 7' X 3 X 45 BEND INSTALL 4 $2,500.00 $10,000.00 18 7' X 3 X 22.5 BEND INSTALL 8 $2,500.00 $20,000.00 19 7' X 3' X VERTICAL BEND INSTALL 4 $3,500.00 $14,000.00 20 24" X 45 BEND INSTALL I $2,500.00 $2,500.00 21 STD. 4' DIA STMH INSTALL 3 $6,500.00 $19,500.00 22 6" CONCRETEFLUME 218 $82.00 $17,876.00 23 FLEXAMAT 627 $165.00 �103,455.00 Sub-Total of Previous Unit �3,2o9,so6.so DOE Number 5634 Estimate Number � Payment Number 1 For Period Ending 12/19/2025 Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 1 LS $7,500.00 $7,500.00 1 $7,500.00 6557 CY $6.50 $42,620.50 6557 $42,620.50 20742 $4.50 $93,339.00 20742 $93,339.00 10310 $20,620.00 1 $5,500.00 5512 $22,048.00 218 $1,308.00 16 $120,000.00 44 $6,820.00 1368 $143,640.00 1 $24,500.00 2 $13,000.00 1 $115,000.00 4144 2,362,080.00 4 $10,000.00 1 $34,500.00 4 $10,000.00 8 $20,000.00 4 $14,000.00 1 $2,500.00 3 $19,500.00 218 $17,876.00 627 $103,455.00 $3,209,806.50 Sunday, December 28, 2025 Page 2 of 4 City Project Numbers 105634 Contract Name WESTPORT 24 DETENTiON POND Contract Limits Project Type DRAINAGE Project Funding Contract Information Summary Original Contract Amount Chan�e Orders DOE Number 5634 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 $3,209,806.50 Total Contract Price $3,209,806.50 Total Cost of Work Completed $3,209,806.50 Less % Retained $0.00 Net Earned $3,209,806.50 Earned This Period $3,209,806.50 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement De�ciency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $3,209,806.50 Sunday, December 28, 2025 Page 3 of 4 City Project Numbers 105634 Contract Name WESTPORT 24 DETENTiON POND Contract Limits Project Type DRAINAGE DOE Number 5634 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 Project Funding Project Manager NA Inspectors D. WATSON / S. JOHNSON Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 City Secretary Contract Number Contract Date Contract Time 120 WD Days Charged to Date 138 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $3,209,806.50 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement De�ciency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $3,209,806.50 $0.00 $3,209,806.50 $0.00 $0.00 $0.00 $0.00 $0.00 $3,209,806.50 Sunday, December 28, 2025 Page 4 of 4 FoRTWoRTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Westport Detention Pond CITY PROJECT NUMBER: 105634 � WATER PIPE LAID SIZE TYPE OF PIPE N/A N/A N/A FIRE HYDRANTS: N/A PIPE ABANDONED N/A SIZE N/A VALVES (16" OR LARGER) TYPE OF PIPE N/A DENSITIES: NEW SERVICES: � PIPE LAID pre cast RCP RCB box culvert pre cast RCB box culvert pre cast RCB box culvert pre cast RCB box culvert pre cast RCB box culvert pre cast Pre cast RCP PIPE ABANDONED N/A DENSITIES: NEW SERVICES: SIZE 24" 7'x3' 7'x3, 7'x3, 7'x3, 7'x3' 24" SIZE N/A N/A SEWER TYPE OF PIPE RCP Class 3 RCB Pre cast 90 degree bend Pre cast 45 degree bend Pre cast 22.5 degree bend Pre cast vertical bend Pre cast 24"x45 degree bend TYPE OF PIPE N/A LF N/A N/A LF N/A LF LF 1368 4,144 4 EA 4 EA 8 EA 4 EA 1 EA N/A TRANSPORTATION AND PL'BLIC WORKS The Ciry of Fort W'orth • 1000 Throckmorton Street • Fort �X'orth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 ���������� TRANSPORTATION AND PUBLIC WORKS December 23, 2025 Conatser Construction TX, L.P 5327 Wichita St Fort Worth, TX 76119 RE: Acceptance Letter Project Name: Westport 24 Dention Pond Project Type: Developer City Project No.: 105634 To Whom It May Concern: On December 23, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 23, 2025, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7830. Sincerely, a��.�� P� Izeldeen, Ahmed, P.E , Project Manager Cc: Edgar Estrada, Inspector Don Watson , Inspection Supervisor Aaron Ybarra , Senior Inspector Andrew Goodman , Program Manager Raul M. Zavala, Consultant Conatser Construcion, Contractor HILLWOOD ALLIANCE SERVICES,IIc, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 ���c��nvr�� �rr��r�: o� r�:x�s �c��Jt��r�r or T�.�r��n��� Befar� me, thc unci�rst�n�d a�tk�ority, a�v�ary F'�hiic in the sta�� and c�unty� �fv�s�id, on this d�y p�rs€3nally a}�p��r�d Brock Hug�ins, P�esidef3l o� C:arl�[�r iV�ana��rtl�rit Circ��l�, Inc., ,�et�era] ��rtner of Cc�nat�cr ['nnstructin� TX. l..F. l�iawn to me t� be ��redibke pe�rs�on, v�ho lxing by m� c�uly sworn, upv� hi� oa�h deposed an�J said; Tl��c �!Z persc�ns, firms, �acia[ioris, corp�ar��ior�� �nr other or�ari�xstions furnishi�g t�6c�r artc�lor mat�:rial� have b��� p�id in full; Tha�l the wa�� scal� �st�b�ishe� �y t�e City C�ttncii in tl�e Cit�+ of Nnrt 1?�arth, tbas be��t pai�# in f'u12; ancl 'I`hat ther� arc� no clairn� �nding f�r �ersonal inje�ry �d1or proper#y damage�; [)n C:t�n�3�ct d�SCribed a5: ViVES'�PQRT 24 D�'I'F�I`T'I�N POhID GRAD��iG 8r. i}RAIIVAGE IMPRDVEMENI S IP�C PR] � 2�-4136 C3"C'Y PR[3jECT # 105�fi3� CCTY �F FORT Vi��it�'N STA'1'� �F TE�GA5 C�NA'I`5E� �D�ISTR�1��'�QN TK, I�� , Broc�; 1 iu����iY� Subsc.�ihed a�ici �wr}rn tn bcfor� mc this 7�' �ay �f �ovembcr. 2�12�. �� �� �_� �_'.�..� t}-�__ KATi If; F21NF: F?(J5� -- N47�NYv��LN,. ���41f.d ItRA6 IV�t3i� PUt7IiC 1!3 �ATTi�1� �OLI[l�, TC?L�S . Y �� y 33d�7$sa � ' �:o� exN , �-;,u-�n�a �ONS�NT OF ��JRETY COMP��VY T� FINA� PAYMENT con�orm. ,�da th. M+.�icam �natitute o� ArdrFt�cn, A!A Dac�t a3�7 PR�.JECT: �neme, addfeasl�� �a �ar� Fort wortn tx T� ;Dwrwer} Bor�d N4 ��1� Giiy Project k4�TY �F FOR7 WDRT#i AM� HILLVV0047 ALL;nr�cE� ARCHIT��T' � PF�OJ��T N�: �n. v�.�+ s��tv�C�s. uC C�NTRA�Z F�R: � H�h1+00tl P�ri�w$y. $�Ne �(1 Car�dirg Bf�A Df8tf19�� ImpfbflBRlYf1Si = VYfi��6f1 24 PQ►Id �atwa+:n Tx r�trr � Cbf�i�'RA�T �ATE: GDNTRAC��F{: COfVA7��R t`AHSTRkJCTIOI+F Tk. L P 1� accordae�cc witi� tha pr�visiot�s nf s#� Cantract bctr�rern tixe 4wner and thc Cantra�ctar as indicatcd above, tire o+.+« rw.t M+rw..�e .de�... ee s�r.,y con�.�,�� B�RKL�Y iT3SURAIJ�E CQkdPANY 475 $t�arnbq�pl Ra�d GFeen+,�c+� CT OB83� . Sl1RE1'Y CONIPIIl�IY an bond af in�n �«+ n�r�+f �+d .d�.� a�.�o�o CONATSER CONSTRUCTIQN TJ{, L P. F�ort�W�or�h� � T]( 76��9�6�35 � Cflf1�TRACT�R, hereby a�rowea of tha finul payment ta the Caatnc#a:, urd egrrxa �hat �"i�ai p�y�neret �o tltia Co�ctor ahn�] not rc�i�vc the 5e�raety Canps�y af any of its ob�� gstivns to �• ++�•.n +�•�,r•.�+a •�,•• �� a,.�,«R CfiY Qf FQR� WQRTH AFi� H4LLIIVOOb IILLlAHCE SERViCES, LLG 99���Iw�ad Pansway. Suite 3t7Q �x 7$17T �s �et forti� in the swid �urety Camppsny"s bend. IN WIiT�E�S, WHERE�F, the Sure#y Campsny has l�ereun#a sc# its hsr� tfinis A#tcs#: {seaE�: ,�#;,�,.Mv�� �� awrvE� � ��c����cfi C) cor����acTaa C7 ��aErr C� OTH EFk etn day o� 1�vemoer. 2025 BEftK�.Ev rNSURANG� CDM�AhiY Surety C�mp�nY �.�a,�, . . � 7.r7 �,�,,� Signatu�r�a o� Authoriacd R��rescnt�ti�rc Ro�bE M�rales Title . �Wf�F.�i, Atl4mCY-lri�F�Ct r,or�: �+r, +o.+r+ a t� a. ,�.a «. ooma.�a+s a�� �.aw occu�+�T o�oa, car�rh*cto+�'8 ►�FlGAVff �f PAY�11R1'VT Q'f �T8 AN� CLAM�L'd, a� �� ON� PAt#E