HomeMy WebLinkAbout060996-CO2 - Construction-Related - Contract - Fort Worth Civil ConstructorsFOR�T WORTH�y City of Fort Worth
��� Change Order Request
CSC No. 60996-0O2
Project Namel Viola Storm Drain I City Sec # I 60996 I
Client Project #(s)I 103264 �
Project Descriptionl This project will involve the installation of a new Storm Drain Line and Outfall in preparation for the South Bypass Channel planned by the United Army Corps I
of Engineers.
Contractorl Fort Worth Civil Constructors � Change Order #I 2 I Date� 12/8/2025 �
City Project Mgr.l Max Aransen, P.E. � City Inspector� James Ruiz I
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
�Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
TPW
$5,996,729.00
$0.00
729.00
Contract Time
Totals (CD)
$5,996,729.00 270
200
$5,996,729.00 470
$627,046.55 0
$6,623,775.55 470
$0.00
Additional Funding (if necessary) $627,046.55 � � � � $627,046.55
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 10.46%
MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST + 25%) $7,495,911.25
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This is Change Order No. 2 for the addition of the unclassified excavation pay item for the sluice gate and headwall. To reduce project costs, the City coordinated with Tarrant
Regional Water District (TRWD) to allow Fort Worth Civil Constructors, LLC (Fort Worth Civil) to haul antl tlispose of the atltlitional material at an
alternative location. This arrangement significantly lowers the trucking and disposal expenses. As a result, Fort Worth Civil has proposed a reduced unit price of $120.00 per
cubic yard for the additional excavation, compared to the originally bid rate of $236.00 per cubic yard. This change order also includes the addition of guardrails around the
headwall requested by TRWD.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature Date
Fort Worth Civil Constructors Bratl Caltlwell n!� '� /�"' �' 12/29/2025
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
„�sF �;��,:, _ O1/05/2026 � �.�,_� -,� �:�T; O1/05/2026
Program Manager Date Se Capi I Project Offcer Date
�"� �""°° O1/05/2026 O1/07/2026
Assistant Director (Dept) Date Dire t, Contr ' g Department (Dept) Date
�� " "�"�`�� � O1/09/2026
Ol/08/2026 �,,,,,., F,�; ,
Assistant City Attorney Date Assistant City Manager Date
.._..
oi/zz/zoz6 �;�,�t,�_ oi/2s/2o2s
Council Action (if required)
99onaq M&C Number � 25-0989 I M&C DateApproved I 10/21/2025I
�
�..SnT�z.4. /� ��^ � ''
Jannette Goodall, City Secretary
p oFFaRr Ba
�°° °� �t a
o'A� �dp
v°F'° �g9.1dd
��o o=d—
PPa*e oo*o°
°ana �ezAsaa
fJFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
12/1/25, 2:31 PM
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 10/21/2025 REFERENCE
NO..
CODE: C TYPE
SUBJECT: (CD 9) Authorize Execution of Change Order No. 2, in the Amount of $627,046.55 to the
Construction Agreement with Fort Worth Civil Constructors, LLC for the Fort Worth Central
City Viola Storm Drain Project, for a Revised ContractAmount of $6,623,775.55
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 2, in the amount of
$627,046.55 to City Secretary Contract No. 60996 a Construction Agreement with Fort Worth Civil
Constructors, LLC for the Fort Worth Central City Viola Storm Drain project (City Project No. 103264)
for a total revised contract amount of $6,623,775.55.
DISCUSSION:
On November 14, 2023 (M&C 23-0982), the City Council authorized a construction contract with Fort
Worth Civil Constructors, LLC, in the amount of $5,996,729.00 for the construction of the Fort Worth
Central City Viola Storm Drain Project (CSC No. 60996). This contract was subsequently revised by
Change Order No. 1, which added 200 days to the contract, administratively authorized on February 14,
2025.
The purpose of this Mayor and Council (M&C) communication is to recommend the execution of
Change Order No. 2 for additional unclassified excavation quantities for the sluice gate and headwall. To
reduce project costs, the City coordinated with Tarrant Regional Water District (TRWD) to allow Fort
Worth Civil Constructors, LLC (Fort Worth Civil) to haul and dispose of the additional material at an
alternative location. This arrangement significantly lowers the trucking and disposal expenses. As a
result, Fort Worth Civil has proposed a reduced unit price of $120.00 per cubic yard for the additional
excavation, compared to the originally bid rate of $236.00 per cubic yard. This change order also
includes the addition of guardrails around the headwall. The total amount of Change Order No. 2 is
$627,046.55.
F�1RT�'�'URTH
-��
**M&C 25- 20SWM FWCC VIOLASTORM
0989 LOG NAME: DRAIN CONSTRUCTION
CHANGE ORDER NO. 2
CONSENT PUBLIC NO
HEARING:
The table below is a breakdown of all previous change orders for this project:
Change Change
Order Order
Number Amount
Date and
Authorization
Type
Purpose of Oriqinal Contract Revised Contract
Chanae Order Amount Amount
$0.00
February 14,
2025
Administratively
Zero-dollar
change order
adding days for
delays caused
by the multiple
revisions of the
USACE
submittal
package
M&C Review
$5,996,729.00 $5,996,729.00
apps.cfw net.org/council_packeUmc_review.asp?ID=33851&councildate=10/21/2025 1/3
12/1/25, 2:31 PM
2
$627,046.55 This M&C
M&C Review
Change order for
additional
unclassified
excavation
quantities for the
sluice gate and
headwall, and
guardrail on the
headwall
The entirety of the $5,996,729.00 original contract, the $60,000.00 material testing fee (to be performed
by a geotechnical testing firm), and the $120,000.00 inspection fee (to be performed by an inspection
firm) are considered Fort Worth Central City related work, which is eligible for funding reimbursement
from Tax Increment Reinvestment Zone No. 9(Trinity River Vision TIF) pursuant to the Trinity River
Vision Authority (TRVA) Project Plan. Having met its $26.6 million commitment to the TRVAProject, the
TRWD will reimburse the City's yearly expenses for this contract at the end of each Fiscal Year, up to
the total amount of $6,176,729.00, in accordance with the provisions of the executed Interlocal
Agreement between the City and the TRWD (City Secretary Contract No. 59910). This is confirmed with
the executed reimbursement letter dated January 10, 2024. Staff will record monthly receivables for
reimbursable expenses, and the FWCC Program Manager in the FWLab Department will collect the full
reimbursement from TRWD at the end of each fiscal year.
Since the City has exhausted the share of the local program budget allocated to Stormwater
infrastructure relocation, the additional $627,046.55 in costs associated with Change Order No. No. 2
will not be included in the annual reimbursement process between the City and the TRWD. Rather, the
cost for this change order will be eligible for reimbursement directly from future Trinity River Vision TIF
revenue after prior commitments of the TIF have been satisfied. Once reimbursement associated with
this project is received, those funds will be used to reimburse the Stormwater Utility. This future
reimbursement of $627,046.55 will be documented in a reimbursement letter between the City and
TRWD upon approval of this M&C.
Funding is budgeted in the Stormwater Capital Projects Fund for the TPW Department for the purpose
of funding the FWCC Viola project, as appropriated.
This project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Stormwater Capital Projects
Fund for the FWCC Viola project to support the above recommendations and execution of this change
order. Prior to any expenditure being incurred, the Transportation and Public Works Department has the
responsibility to validate the availability of funds.
TO
Fund Department
ID
FROM
Account Project
ID
Fund Department Account Project
ID I ID
Submitted for City Manager's Office by;
Originating Department Head:
Additional Information Contact:
Program � Activity
Program Activity
$5,996,729.00 $6,623,775.55
Budget Reference # Amount
Year � (Charifield 2) �
Budget Reference # I Amount
Year (Charifield 2)
Jesica McEachern (5804)
Lauren Prieur (6035)
Thanaa Maksimos (2485)
apps.cfw net.org/council_packeUmc_review.asp?ID=33851 &councildate=10/21/2025 2/3
12/1/25, 2:31 PM
ATTACHMENTS
M&C Review
1295 Fort Worth Civil.pdf (CFW Internal)
20SWM FWCC VIOLA STORM DRAIN CONSTRUCTION CHANGE ORDER NO. 2 fid table.xlsx (CFW Internal)
20SWM FWCC VIOLA STORM DRAIN CONSTRUCTION CHANGE ORDER NO. 2 funds avail.docx (CFW Internal)
Fort worth civil SAM.pna (CFW Internal)
Viola M&C Map.pdf (Public)
apps.cfw net.org/council_packeUmc_review.asp?ID=33851 &councildate=10/21/2025 3/3
Foe� H
Project Name � Viola Storm Drain
ClientProject# � 103264
Contractorl Fort Worth Civil Constructors
I I tM Ut5(:Klf' I I�N
1 Unclassifed excavation (Headwall)
2 TxDOT Handrail
c�ty ot Fort wortn
Change Order Additions
I City Sec # � 60996 �
�
IPMI Max Aransen, P.E. I Inspectorl James Ruiz I
Change Order Submittal # �2 Date � 12/8/2025 I
ADDITIONS
UtPI Clty Umt UmtGost
TPW 5,092.000OOOOU CY $120.00
TPW 83.00000000 LF $192.85
TPW
Change Order Additions Page 2 of 4
Sub Total Additions
lotal �
$611,040.00�
$16,006.55�
�
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$627,046.55�
�
�
�
$627,046.55�
FORT W(�R"1'H
'T�
Project Name � Viola Storm Drain
Client Project # � 103264
Contractorl Fort Worth Civil Constructors
DESCRIPTION
ITEM
City of Fort Worth
Change Order Deletions
� City Sec # � 60996 �
�
PMI MaxAransen,P.E. I Inspectorl JamesRuiz I
Change Order Submittal # �2 Date � 1 21812 0 2 5 �
DELETIONS
DEPT (�ty Unit Unit Cost Total
j TF W
I Sub Total Deletions
Change Order Deletions Page 3 of 4
�
�
�
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$0.00�
�
�
�
$0.00�
MISBE for this Change Order
M/SBE Sub Tvpe of Service Amount for this CO
Total $0.00
Previous Change Orders
Co # DATE AMOUNT
2/14/2024 $0.00
Total I $0.00 �
� ��i� ��
'i, y
•; „� .
7k/ . .n=� �%
�' �C
'�' �F'<;F�^'' �'i
. �
f
,'f ; ` S,.'.,
� ��'S �l' it �J �� t �
7/22/2025
1� ���� �� 4�l t)=f3��.1y�= l C> �l l l . � (_)��J � ia�-� lJ � :�� �:t ���, �.q�1_. c�
To: Mr. Max Aransen, PE
Project Manager
Capital Delivery Division
Transportation / Public Works Department
900 Monroe Street, Suite 200
Fort Worth, TX 76102
Re: Viola Storm Drain
Excavation, Grading, and Haul Off
Mr. Aransen,
Plan sheet 20 shows the grading limits and contours for The Viola Storm Drain project. The volume of dirt shown to be excavated
and graded totals 4,672 cubic yards per the attached. Additionally, the unclassified excavation pay item for the sluice gate and
headwall structures shows a total quantity of 655 cubic yards. There is a total of 1,085 cubic yards of excavation for these structures,
so the quantity is 420 cubic yards short.
The City of Fort Worth has coordinated with TRWD to allow Fort Worth Civil to haul and dispose of this dirt which reduces our
trucking rates and dump fees associated with the unclassified excavation pay item. As a result, Fort Worth Civil is offering a reduced
rate of $120 per cubic yard instead of the$236 per cubic yard for the remaining dirt that needs to be excavated from the project.
Please see below the cost of this additional work.
Unclassified Excavation
5,092 CY $120.00 $E11,040.00
If we were to use the current contract unit price for unclassified excavation the total would have been $1,201,712.00. This reduced
rate ultimately saves The City of Fort Worth $590,672.00
If there are any questions, please feel free to contact me at 817.343.2246 or bradc@f�ucivcor,.com
Respectfully,
- i
1- , - -, _ .
Brad Caldwell
Operations Manager
(0) 817. 562. 2292 �(F) 817. 56L. Z�"i:� � w�/W.r'vVCivC:on.com
Office: 4860 Mark IV Parkway, Fort Worth, TX 76106 I Mail: P.O. Box 164513, Fort Worth, TX 76161
�
�
I
GRADING AREA
/ �A
v" �
�;
/: /
� j'
�
% � / SURV�YOR:
�� FORT WORTH SURVEYING
�'% P.O. BO�C 760
�/ ALVARADO, TX 76009
� Phona (817) 8 ] 9-7391
FIRM REGiSTRATION No. 10194G35
�
0 30
�
NOTE:
ESTIMATED VOLUME BELOW ARE BASED ON
EXISTING AND PROPOSED SURFACE DATA FOUND IN
CAD FILES PROVIDED 8Y SHIELD ENGINEERING AND
THE CITY OF FORT WORTH IN OCTOBER 2023 TO
FORT WORTH CIVIL CONSTRUCTORS.
'RED CONTOURS AND TEXT — PROPOSED ELEVATIONS PER P�AN
3.LFAJ"CCi.! � " :raLi � i —=r i L =_ i.iz1�. . . .._ _.
.�.i�HERS_
IESTIMATED CUT VOLUME (CY) = 4,672
ESTIMATED CUT VOLUME (CF) = 126,144
VOLUME EXHIBIT
VIOLA STORM DRAIN
CITY OF FORT WORTH
DRAWN BV: DLS
TARRANT COUNTY, TEXAS
APPROVED BY: CGH
PREPARED FOR:
DATE: 07-15-2025
FORT WORTH CIVIL CONSTRUCTORS �OB No. 2023054
p�' � dl /l .1 i
,
',. -i
� �C
:-) J
-1
/
f
�> '"'
��dj'S, .f ,i i) c; i `� s
9/10/2025
F 0�37 �►'l 0�37}] Cl�l] L C DyS7�3U CT D�3S, LL C
To: Mr. Max Aransen, PE
Project Manager
Capital Delivery Division
Transportation / Public Works Department
900 Monroe Street, Suite 200
Fort Worth, TX 76102
Re: Viola Storm Drain
Handrail
Mr. Aransen,
Per the e-mail received from Stephen Langley on August 28, 2025, The City of Ft. Worth has requested pricing for Fort Worth Civil
Constructors to install 83 linear feet of TxDOT PRD-13 TY A handrail on the headwall. Below is our proposal for this work.
TxDOT PRD-I3-TY A Handrail
83 LF $ 192.85 $16,006.55
Please note that due to the volatility of the materials and steel markets, the above pricing is firm for acceptance within 30 days. If
acceptance is after 30 days then Fort Worth Civil Constructors reserves the right to adjust our proposal based on the market
conditions.
If there are any questions, please feel free to contact me at 817.343.2246 or bradc@fwcivcon.com
Respectfully,
�j,�,l ���cl
Brad Caldwell
Operations Manager
(0) 817. 562. 2292 �(F) 817. 562. 2293 � www.FWCivCon.com
Office: 4860 Mark IV Parkway, Fort Worth, TX 76106 I Mail: P.O. Box 164513, Fort Worth, TX 76161
F������7
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Viola SD Change Order 2
M&C: 25-0989 CPN: 103264
Date:
To:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Name
Brad Caldwell
BradC@fwcivcon.com
James Ruiz
Max Aransen
Thanaa H. Maksimos
Lissette Acevedo
Patricia Wadsack
Lauren Prieur
Doug Black
Jesica McEachern
Jannette Goodall
Allison Tidwell
Tpw_SW_Contract
TPW Stormwater
12/29/2025
O1/05/2026
O1/05/2026
O1/05/2026
01/07/2026
oi/os/2o26
O1/09/2026
0l/22/2026
O1/28/2026
O1/29/2026
O1/29/2026
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
CSO: 60996 DOC#:
Department Initials Date Out
Contractor �
RC
TPW - Inspector �
TPW - Project Manager �
TPW — Program Manager 7M
TPW — Sr. CPO �
TPW — Assistant Director �7�'w'
TPW - Director xv
Legal - Assistant City Attorney �
CMO — Assistant City Manager �
CSO — City Secretary c�+►
CSO — City Secretary ,%
NEXT DAY: ❑YES �No
1
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contractsna,fortworthtexas.gov Ca11817-229-3283 with questions. Thank you!
Fa��r �o�TH�}
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Fort Worth Civil Constructors, LLC
Subject of the Agreement: Addina Quantities for Excavation and Handrails to the oriainal
contract
M&C Approved by the Council? * Yes ❑X No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes � No ❑
If �so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 0 No ❑
If �unsure, see back page for permanent cont�^act listing.
CSC No. 60996
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 1/23/2024 Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑X No ❑
*If so, please ensu�e it is attached to the approving M&C or attached to the cont�act.
Proj ect Number: If applicable. 103264
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes � No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.