HomeMy WebLinkAbout056396-R3 - Construction-Related - Contract - Shield Engineering Group, PLLCCSC No. 56396-R3
CITY OF FORT WORTH
THIRD RENEWAL OF AGREEMENT
WHEREAS, the City of Fort Worth, ("City"), and Shic:ld En�ineea�iil� Grouu. PI.I,C.,
("Contractor"), entered into that certain ORIGINAL AGREEMENT (City Secretaty #56396,
M&C 21-0380) for the PROJECT genei•ally described as: W�.tei� and Sanitary Scw�:�• Desi�n
Sei•vices Cont��act 2020; and
WHEREAS, the ORIGINAL AGREEMENT may be renewed up to 3 times as provided
by M&C 21-0380; and
WHEREAS, the City of Fort Worth, ("City"), and Shield Engineering Group, PLLC
("Contractor"), entered into that certain FIRST RENEWAL (City Secretary # 56396-R1, M&C 22-
0413);
WHEREAS, the City of Fort Woi�th, ("City"), and Shield Engineering Group, PLLC
("Contractor"), entered into that certain SECOND RENEWAL (City Secretary # 56396-R2, M&C
23-0826);
WHEREAS, The City and Contractor desii•e to renew the ORIGINAL AGREEMENT
for an additional term at the same price and funding for said THIRD RENEWAL is available in
the budget of the Water and Sewer Capital Projects Fund, as appropriated in Oi•dinance # 25773-
09-2022.
NOW, THEREFORE, it is agreed by the City and Contractor as follows:
Article I
The Scope of Services as set forth in the ORIGINAL AGREEMENT has not changed.
Article II
The Contractor's compensation shall be in the amount up to $270,000.00. The Term of
this renewal agreement shall be effective as of the effective date and shall remain active until the
funds are expended or programmed.
Article III
There are no other changes to any other terms or conditions of the ORIGINAL
AGREEMENT.
Third Renewal of Agreement Water & Sanitary Sewer Design Services Contract 2020
Shield Engineering Group, PLLC City Secretary No. 56396
City Project No. 10332�4 Page 1 of 2
EXECUTED by each party's duly authorized representative and EFFECTIVE as of the
date subscribed by the City's designated City Manager.
City of Fort Worth
���
Jesica L. McEachern
Assistant City Manager
O1/30/2026
DATE:
APPROVAL RECOMMENDED:
c,Gr,�' •��;�G� �-c���
ch��stopher HardEr ��k� zs, zoze iza�:sa csr�
Clu•is Harder, P.E.
Director, Water Department
Shield Engineering Group, PLLC
��' ;�� ; ����
Je�an — Mai•ie Alexarzdc�•, P. E.
Chief Operating Officer
DATE: / /Z /�Z �o
APPROVED AS TO FORM AND LEGALITY:
/�� �
Douglas Black (Jan 26, 2026 17:50:10 CST)
Douglas W. Black
Sr. Assistant City Attorney
Contrac� Comnliance Mana�er
M&C: {Auth. M&C� 21-038D;
(Fund. M&C) 25-1051
Date: 06/08/2021
Form 1295 No.: 2021-736283
By signing I acknowledge that I am the person responsible for the monitoring and administration
of this contract, including ensuring all perfoimance and reporting requirements.
Tony Sholola
Tony Sholola, P.E.
Assistant Director
ATTEST:
C�,�:�. I� „�
J
Jannette S. Goodall
City Secretaiy
anIl�
v°�O� F�RT�o9-i0
Fo
OV8 o=d
°°o*°�a o°*'
daab nEXP?44p�
��1��L�►,��:TX�%7:7�7
C«] � i'�'i Xy:7� ��I:�`I
FT. WORTH, TX
Third Rene�val of Agreement Water & Sanitary Sewer Design Services Contract 2020
Shield Engineering Group, PLLC City Secretary No. 56396
City Project No. 103324 Page 2 of 2
�ii`� o� Fo�� t/VortB�, Texas
�fayoa� and ����c�� ���mu�fl��tQon
DATE: Tuesday, June 8, 2021
LOG NAME; 60DESIGNCON2021-SHIELD
REFERENC� NO.: *�M&C 21-0360
SUBJEC7:
(ALLj Authorize Execution of an Engineeric�g Agreement in the Amount of $270,fl4Q.00 wlth Shleld
Engineering Group, PLLC, for Water and 5anitary Sewer Design Secvices Contract 2020 and Adopt
Altached Appropriation Ordinance
RECOMME�fDATi�N:
It is recommended tl�at the Ciiy Council:
1. Authorize lhe execution of an engineering agreement in the amount of $270,000.00 with
Shield Engineering Grou�, pLLC, for the Water and Sanitary Sewer Design Services Corrtract
2020 proJect, wlth up to ihreE renewais. (City Projeci No. 1D3324); and
2. Adopt the attached approprialian ordinance by-increasing estimateci receipts and appropriations in
lhe Water anct Sewer Capifal Projects Fund for ihe amaunf af �300,q00.00 transferred fram
available funds within the Water and Sewer Fund far the Water and Sanitary Sewer Design Services
Contract 2020 project.
DISCUSSION:
The Water Department has a need for general engineering design assisting with in-house design projects
such as water and/or sanitary sewer maln replacement, relocations, repairs and anatysis. The Engineer
may also pro�+ide dssign for emergency situations inctuding traffic control, erosior� ct�ntrol, slape
skabilization and olhEr prafessional engineering or c�nstruction servlces. As engineering worlc is
warranted, lhe Cily wiil isstFe individual work orders to the Engineer for which a cost determinafion will be
prepared and appro�ed before work begfns, The Cily reserves the option to renew (subject to appopriated
fund�ng) this areement three kimes under the same terms and conditions.
In addition to the contract cost, $30,000 (Water: $15,000,00; Sewer: $15,000,00) is required for project
management and material testing.
This project will have no impact on the Water DepartmenPs operating budget when completed.
Appropriations for the Water and Sanitary Sewer Design Services Contract 2021 is as depicied below;
Fund
W&S Capital �
Projects - Fund
�6002
�xisting Additional Project
�Appropriations Appropriations Tofal*
$0.00
Project Total $0.00
'`Numbers rounded for presentation purposes.
$300,000.00 �300,000.00
$300,000.00 $30fl,�0a_00
Business Equity - Shield Engineering Group, PLLC is in compllance with the Cify's Business Equity
Ordinance by committing to 10 percent Business Equity participation on this praject. The City's Business
Equity goal on this project is 10 percent.
The project is located in ALL COUNCIL DISTRICTS.
FISCAL INF4RMATl0t3 f CERTlFICATION:
The Director of Finance certifies that funds are available in the current operating budget in the Water &
5ewer Funcf, and upon approval of ihe above recammendations and adoptian of the attached
appropriation ordinance, FuRds will be available in the W&S Capital Projects F�md for the Design Services
G�nSract 202D project to support the approval of the above recommendatlons and execution of the
engineering agreement. Prior to any expenditure being incurred, the Water Department is responsible to
validate the availabiliiy of Funds.
FUND IDENTIFIERS IFIDs):
TO
Fund Department Account Pro�ect Program cii�iiy Budget �� Reference # �mount'
ID ID Year Chartfield 2_r ____ I
-
- - - I - - -. - - - - � ..__._-i-- -- - . -- - �.- _.--. -.---�-. {-- - �
FROM
Fund Departmen�Accounf Project Program ctivity Budget Reference #t M mount
ID ID I Year Chartfield 2
i I ---- _t____�_-_-_.�-_.._. . ____i___� ___._}___� __. ___
CERTIFICATIONS:
Submitted for Citv Manaaer's Office bv: Dana Burghdoff (8018)
Oriqinatinq Denar#ment Head: Chris Harder (5020)
Adciitionat Information Contact: Lawrence Hamilton (2626)
ATTACHMENTS
1. 1p3324 Comnliance Memo-Water and Saniien� Sewer DesiQn Services Conlraci 20?_i UPDATE.pdf
(CFW Inlernal)
2. 103324 Comn(iance Memo-Waler and Sanitary Sewer Desiqn Ser�i�es Cantract 2021.�df (cFW
Internal)
3. 2021 W& SS Desian Services - Form 1295,pdf (cFW Intemal)
4, 60DESIGNCON2021-SHIELD F1D Table {WCF 04,14.21).xlsx (CFW Internal)
5. GOD�SIGNCON2021-SHIELD funds a�ail.cincx (CFW Inlernal)
6. 60QESIGNCON2021-SNIELD SAM.pdf (CFW Internal)
7.60DESIGNCOIV2Q21-SHIEL� 56002r.docx (Public)
60DESIGNCOV2021-SHIELD FID Table
'� • �,.; ��!Cll�l
2 56001
2 56002
2 56001
2 56002
:;,-�= ::� '+�'�or�.) �-
a
I I��
2 56002
2 56002
1 5600Z
2 56002
2 56002
2 56002
2 56002
1 56002
2 56002
2 56002
0600430 4956001 103324
0600430 5110101 103324
0600430 5330500 103324
0600430 5330500 103324
0600430 5310350 103324
0700430 I 4956001 103324
0700430 5110101 1033Z4
0700430 5330500 103324
0700430 5330500 103324
0700430 5310350 103324
001730
001730
001730
001784
001784
001730
001730
001730
001784
001784
9999
9999
9999
9999
9999
9999
9999
9999
9999
9999
$150,000.00
$12,000.00
$135,000.00
$1,500.00
$1,500.00
$150,000.00
$12,000.00
$135,000.00
$1,500.00
$1,500.00
2 56002 0700430 4956001 103324 zuti ����,���.u�
2 56002 0700430 103324 2021 $150,000.00
2 56002 0600430 4956001 103324 2021 $150,000.00 .
2 56002 0600430 103324 2021 $Z5D,004.00 .
�����.
0709020 5956001 150,000_00 .
0700430 4956001 103324 OD1730 9999 (5150,000.00;
0609020 5956001 $150,000_00
0600430 4956001 103324 001730 9999 i5150,000.00
F�RT��RTHo
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name
Shield Engineering Group, PLLC
Subject of the Agreement: Water & Sanitary Sewer Design Services Contract 2020
M&C Approved by the Council? * Yes ❑✓ No ❑
If �so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 56396-R3
If �so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 0 No ❑
If �unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 11/11/2025 Expiration Date: N/A
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑✓ No ❑✓
*If �so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. 103324
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ❑✓ No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.