HomeMy WebLinkAbout062390-FP2 - Construction-Related - Contract - Conatser Construction-FP2 FORTWURTH� City Secretary Contract No. 62390 Date Received 1/23/2026 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Madero Phase 11 City Project No.: 105404 Improvement Type(s): � Paving 0 Drainage � Street Lights ❑ Turn Lane Original Contract Price: $3,699,453.75 Amount of Approved Change Order(s) Revised Contract Amount: Total Cost of Work Complete: Ar[uro5anceYt Jan22.202610:23'.04C51) Contractor Superintendent Title Conaster Construction Company Name Hussei�l�an zz zoze io:na:ss cs i) Project Inspector � Project Manager e��� CFA Manager �a.,a.�.�r,:..,,. �,�,ro�, Pr�o�r ��ao ze, zoze aa�so_zo csrj TPW Director O1/22/2026 Date O1/22/2026 Date O1/23/2026 Date O1/23/2026 Date O1/26/2026 Date $27,224.00 $3,726,677.75 $3,726,677.75 QFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Madero Phase 11 City Project No.: 105404 City's Attachments Final Pay Estimate x❑ Change Order(s): 0 Yes ❑ N/A Contractor's Attachments � Affidavit of Bills Paid � Consent of Surety �:� Statement of Contract Time Contract Time: 210 WD Days Charged: 182 WD Work Start Date: 3/3/2025 Work Complete Date: 12/9/2025 Completed number of Soil Lab Test: 1264 Completed number of Water Test: 35 Page 2 of 2 F���r ���Tx CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS City Project Numbers 105404 DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 WD City Secretary Contract Number Contract Date Project Manager NA Contractar CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH� TX 76119 Inspectors G.DEYON / R.ROGERS Contract Time 21�JD Days Charged to Date i8� Contract is 100.00 Complete Friday, December 19, 2025 Page 1 of 7 City Project Numbers 105404 Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS Project Funding UN1T III: DRAINAGE IMPROVEMENTS DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 Item Estimated Estimated Description of Items Unit Unit Cost No. Quanity Total 1 TRENCH SAFETY (CO#1) 4024 LF $2.00 $8,048.00 2 CONCRETE COLLAR (CO#1) 10 EA $1,000.00 $10,000.00 3 21" RCP, CLASS III (CO#1) 838 LF $75.00 $62,850.00 4 24" RCP, CLASS III 1834 LF $85.00 $155,890.00 5 27" RCP, CLASS III (CO#1) 378 LF $105.00 $39,690.00 6 30" RCP, CLASS III 149 LF $ll5.00 $17,135.00 7 36" RCP, CLASS III 114 LF $130.00 $14,820.00 8 4X3 BOX CULVERT 532 LF $305.00 $162,260.00 9 10' CURB INLET 28 EA $4,000.00 $112,000.00 10 15' CURB INLET ll EA $5,000.00 $55,000.00 11 REMOVE 5' DROP INLET 2 EA $1,000.00 $2,000.00 12 CONVERT 4'X4' WYE INLET INTO A 4' STORM 2 EA $3,500.00 $7,000.00 JUNCTION BOX MANHOLE 13 CONVERT SXS' WYE INLET INTO A 5' STORM 1 EA $4,500.00 $4,500.00 JUNCTION BOX MANHOLE 14 CONVERT 6'X6' WYE INLET INTO A 6' STORM 1 EA $5,500.00 $5,500.00 JUNCTION BOX MANHOLE 15 4' STORM JLTNCTION BOX 12 EA $5,500.00 $66,000.00 16 5' STORM JUNCTION BOX 2 EA $6,500.00 $13,000.00 17 CONNECT TO EXISTING 21" RCP 2 EA $1,500.00 $3,000.00 18 CONNECT TO EXISTING 24" RCP 2 EA $1,500.00 $3,000.00 19 CONNECT TO EXTSTING 27" RCP 1 EA $2,000.00 $2,000.00 20 CONNECT TO EXISTING 30" RCP 1 EA $2,000.00 $2,000.00 21 CONNECT TO EXTSTING 36" RCP 1 EA $3,000.00 $3,000.00 22 18° LARGE STONE TYPE "A" DRY RIP RAP 11 SY $145.00 $1,595.00 23 24" SLOPED END HEADWALL 1 EA $3,500.00 $3,500.00 24 INLET PROTECTION 39 EA $200.00 $7,800.00 25 33" RCP, CLASS III (CO#1) 179 LF $125.00 $22,375.00 Sub-Total of Previous Unit Completed Completed Quanity Total 4024 $8,048.00 10 $10,000.00 838 $62,850.00 1834 $155,890.00 378 $39,690.00 149 $17,135.00 114 $14,820.00 532 $162,260.00 28 $112,000.00 ll $55,000.00 2 $2,000.00 2 $7,000.00 12 2 2 2 1 1 1 11 1 39 179 1 $4,500.00 1 $5,500.00 $66,000.00 $13,000.00 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $3,000.00 $1,595.00 $3,500.00 $7,800.00 $22,375.00 $783,963.00 $783,963.00 Friday, December 19, 2025 Page 2 of 7 City Project Numbers 105404 Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS Project Funding UN1T IV: PAVING IMPROVEMENTS DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 HYDRATED LIME (32 LBS/SY) 558.12 TN $275.00 $153,483.00 55812 $153,483.00 2 6" LIME TREATMENT 34883 SY $4.00 $139,532.00 34883 $139,532.00 3 6" CONC PVMT 32712 SY $52.00 �,701,024.00 32712 �1,701,024.00 4 4" CONC SIDEWALK 12095 SF $4.25 $51,403.75 12095 $51,403.75 5 BARRIER FREE RAMP, TYPE R-1 12 EA $2,400.00 $28,800.00 12 $28,800.00 6 BARRIER FREE RAMP, TYPE P-1 20 EA $2,200.00 $44,000.00 20 $44,000.00 7 TOPSOIL 251 CY $28.00 $7,028.00 251 $7,028.00 8 BLOCK SOD PLACEMENT 1504 SY $8.00 $12,032.00 1504 $12,032.00 9 REMOVE BARRICADE & CONNECT TO 2 EA $1,000.00 $2,000.00 2 $2,000.00 EXISTING PAVEMENT HEADER 10 REMOVE & RELOCATE BARRICADE & 3 EA $1,200.00 $3,600.00 3 $3,600.00 CONNECT TO EXISTING PAVEMENT HEADER 11 CONSTRCT STD. PAVEMENT HEADER 87 LF $25.00 $2,175.00 87 $2,175.00 12 STOP S1GNS 20 EA $850.00 $17,000.00 20 $17,000.00 13 FURNISH/INSTALL ALUM SIGN GROLTND 22 EA $550.00 $12,100.00 22 $12,100.00 MOUNT CITY STD. 14 FURNISH/INSTALL ALUM SIGN EX. POLE 1 EA $250.00 $250.00 1 $250.00 MOUNT SUb-TOial OiPYCVIOUS Urili $2,174,427.75 $2,174,427.75 UN1T III: DRAINAGE IMPROVEMENTS(WAGON 'I'RAIN Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 TRENCH SAFETY 29 LF $2.00 $58.00 29 $58.00 2 21" RCP, CLASS III 29 LF $75.00 $2,175.00 29 $2,175.00 3 10' CURB INLET 4 EA $4,000.00 $16,000.00 4 $16,000.00 4 CONVERT 4'X4' WYE INLET INTO A 4' STORM 1 EA $3,500.00 $3,500.00 1 $3,500.00 JUNCTION BOX MANHOLE 5 INLET PROTECTION A $200.00 $800.00 4 $800.00 Sub-Total of Previous Unit �22,533.00 $22,533.00 Friday, December 19, 2025 Page 3 of 7 City Project Numbers 105404 Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS Project Funding DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 UN1T IV: PAVING IMPROVEMENTS (WAGON TRAIN T Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 HYDRATED LIME (42 LBS/SY) 88 TN $275.00 $24,200.00 88 $24,200.00 2 8" LIME TREATMENT 4189 SY $5.00 $20,945.00 4189 $20,945.00 3 7.5" CONC PVMT 3972 SY $68.00 $270,096.00 3972 $270,096.00 4 4" CONC SIDEWALK 10352 SF $4.25 $43,996.00 10352 $43,996.00 5 BARRIER FREE RAMP, TYPE P-1 4 EA $2,200.00 $8,800.00 4 $8,800.00 6 TOPSOIL 178 CY $28.00 $4,984.00 178 $4,984.00 7 BLOCK SOD PLACEMENT 1066 SY $8.00 $8,528.00 L066 $8,528.00 8 CONSTRCT STD. PAVEMENT HEADER 37 LF $25.00 $925.00 37 $925.00 9 REMOVE & REPLACE BARRICADE & 1 EA $1,200.00 $1,200.00 1 $1,200.00 CONNECT TO EXISTING PAVEMENT HEADER Sub-Total of Previous Unit �383,674.00 $383,674.00 UN1T V: STREET LIGHTING IMPROVEMENTS Item No. 1 2 3 4 5 6 7 Description of Items 2" CONDT PVC SCH 80 (T) RDWY ILLUM ASSEMBLY TY 8, 1 l, D-25, AND D-30 LED LIGHTING FIXTURE (SOW-R2) LED LIGHTING FIXTURE (SOW-R4) INSTALL TYPE 33B ARM RDWY ILLUM FOUNDATION TY 1,2, AND 4 NO l 0 INSULATED ELEC CONDR Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 2821 LF $15.00 $42,315.00 2821 $42,315.00 51 EA $2,500.00 $127,500.00 51 $127,500.00 48 EA $750.00 $36,000.00 3 EA $950.00 $2,850.00 51 EA $600.00 $30,600.00 51 EA $1,200.00 $61,200.00 2821 LF $5.00 $14,105.00 48 $36,000.00 3 $2,850.00 51 $30,600.00 51 $61,200.00 2821 $14,105.00 Sub-Total of Previous Unit �314,s�o.00 UNTI' V: STREET LIGIi'I'ING IMPROVEMENTS(WAGON Item Description of Items No. i z�� corr�T rvc scx so �-r� 2 RDWY ILLUM ASSEMBLY TY 8,11 D-25, and D- 30 3 LED LIGHTTNG FIXTURE (SOW-R2) $314,570.00 Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 1113 LF $15.00 $16,695.00 1113 $16,695.00 5 EA $2,500.00 $12,500.00 5 $12,500.00 5 EA $750.00 $3,750.00 5 $3,750.00 Friday, December 19, 2025 Page 4 of 7 City Project Numbers 105404 Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS Project Funding DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 4 INSTALL TYPE 33B ARM 5 EA $600.00 $3,000.00 5 $3,000.00 5 RDWY iLLUM FOLTNDATION TY 1,2, AND 4 5 EA $1,200.00 $6,000.00 5 $6,000.00 6 NO 10 INSULATED ELEC CONDR 1113 LF $5.00 $5,565.00 1113 $5,565.00 Sub-Total of Previous Unit �47,s�o.00 $47,s�o.00 Friday, December 19, 2025 Page 5 of 7 City Project Numbers 105404 Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 $3,699,453.75 $27,224.00 Total Contract Price $3,726,677.75 Total Cost of Work Completed $3,726,677.75 Less % Retained $0.00 Net Earned $3,726,677.75 Earned This Period $3,726,677.75 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $3,726,677.75 Friday, December 19, 2025 Page 6 of 7 City Project Numbers 105404 Contract Name MADERO, PHASE 11 Contract Limits Project Type DRAINAGE, PAVING & STREETLIGHTS DOE Number 5404 Estimate Number 1 Payment Number 1 For Period Ending 12/19/2025 Project Funding Project Manager NA Inspectors G.DEYON / R.ROGERS Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH� TX 76119 City Secretary Contract Number Contract Date Contract Time 210 WD Days Charged to Date 18� W� Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period �3,726,677.75 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $3,726,677.75 $0.00 $3,726,677.75 $0.00 $0.00 $0.00 $0.00 $0.00 $3,726,677.75 Friday, December 19, 2025 Page 7 of 7 Docusign Envelope ID: C3058AB0-D67C-4AC1-8BD9-15324E33A6A3 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: MADERO PHASE 11 (UNIT 1) WATER, (UNIT II) SEWER, (UNIT III) STORMWATER, (UNIT I� PAVEMENT, &(UNIT CHANGE CONTRACT: V) STREET LIGHTS ORDER No: CFA # 24-0095 I CITY PARTICIPATION:I NO CITY PROJECT # 105404 FID # FID # 30114-0200431-105404-E07685 � X-Number X-28153 FILE # :NV-3052 INSPECTOR: PR�JECT MANAGER: Russell Rogers Sandip Adhikari Phone No: 214-980-2068 Phone No: 817-392-8424 ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACTTO DATE AMDUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNR REVISED COST SHARE TOTAL REVISED CONTRACT WATER SEWER Developer Cost City Cost Devetoper Cost � S7.164,146.00 30.0o 51,029,417.60 f0.00 Sa.Oo s0.00 50.00 30.00 SO,DO 51,154,146.00 SO.t10 S'1029,417.50 50.00 SQ.Otl �116.e'....�, ..:��+ 57,164,746.00 SO.Ao =1,070,448.4b ly Coq f0.00 30_uo 50�00 ;O�Otl sa.ao 51,154,146.00 51,070,449.45 Dev. Cost: 55,891,275.20 CaNTRACT UNIT PAVING I �RAINAGE STREET IJGHT3 DevHoper levetoper Cost Clty Ceat peveloDer Cost C1t Cast Cast Cky f ;2,658,707.76 30.Q0 5779.27200 fQ.60 5362,080.00 f0.i 50.00 fO.OQ s0.00 t0.1}4 f0.00 50.� 50.00 f0.00 50.00 iB.Pi! 50.00 SO.i j2,658,101.7b yU.00 5779,27200 f0.40 � SS62.080.00 fG.� 54.UCN f0.00 $ 27,22�9.'.': fO.DU 20.00 f0.� a 5�,558,1D1.7b f8.00 58�,496.OD fa.00 5362,080.00 f0.� S2,Sb6,tOt.76 5806,486.00 5382,Q80.00 Clty Cosx i0.04 55,891,273.20 CONTRACT DAYS Z�o 0 0 z�o 0 2to REVI EWED By Sandip Adhikari at 11:39 am, Apr 17, 2025 Docusign Envelope ID: C3058AB0-D67C-4AC1-86D9-15324E33A6A3 You are directed to make the following changes in the contract documents: UNIT II: SANITARY SEWER IMPROVEMENTS {Resldentlal} CITY BID ITEM PAY ITEM # # QUANTITY 1 3301.0002 (63) 2 3305.0109 (63) 3 33D1.0101 (1) 4 3305.D113 (2) 6 3331.4115 (41) 7 3331.41t6 (22) 14 3339.0001 (9.18) 16 9999.0005 11 17 3339.1003 ( .03) 20 9999.0006 (1) 24 3305.0112 (1) UNIT LF LF EA EA LF LF � EA � EA EA TOTAL SANITARY SEWER ITEM DESCRIPTION Posl-0CN Inspection Trench Safety Manhde Vacuum Testing Trench Water Stops 8" Sewer Pipe - SDR 26 8" Sewer Pipe, CSS Backfill Evnxy Manhole Liner 4' Manhole W/ Hydraulic Slitle 4' Extra Depth Manhole End and Plug 9" PVC Conaete Collar for Manhole UNIT PRICE $ 4.00 $ $ 2.00 $ $ 200.00 $ $ 350.00 $ $ 72.00 $ $ 82.00 $ $ 485.00 $ $ 5,800.00 $ 5 225.00 $ $ 1.000.00 $ a ,,000.00 s � TOTAL �252.00) 126.00} {20D,OOJ (700.001 {2,952.00� {1,804.00 f 4.452.30 {5,800.00 f681.751 { 1,000.00} (1,000.00� [19,968.05� You are directed to make the following changes in the contract documents: UNIT III: DRAINAGE IMPROVEMENTS IResidenUal! CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 1 3305.0109 222 LF Trench Safety 3 2.00 S 444•0� 2 3305.0112 1 EA ConcreteCollar S 1,000.00 S 1,000.00 3 3341.0201 37 LF 21" RCP, Class III $ 75.00 8 2,775.00 5 3341.0206 6 LF 27" RCP, Class III $ 705.00 $ 63D.00 '25 334�.0305 179 LF 33" RCP, Class III $ 125.00 S 22,375.00 TOTAL DRAINAGE S 27,224.00 Asterisk (') indicates new Pay kem REASONS FOR CHANGE ORDER This change order includes the remo�al of Sewer Line K and its associated manhole. Addillonally, the 4' diameter manhole with hydraulie slide and corrosion protection on Line G is replaced with a standard 4' diameter manhole due to the removal of Line K. This change order also covers the addition of stortn pipe beneath the Madero Phase 11 pavement to accommodate flows from Madero Phase 13. NO CITY FUNDS INVOLVED IN THIS CONTRAGT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WtLL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: LJA Engineering, Inc By: �Q ��S Name: DANIEL BETTEN, P.E. Tdle: PROJECT MANAGER APPROVED: Signed by: GBTM nd��� �C � U/ 1� QAAq� By: � �... Name: BOBBY SAMUEL Title: DIREC�6RflFtAidD-DE►/EL-CiPMEPdf ,4uthorized Signer APPROVED: Conatser Constru . ( By: Name: t�+�j Title: ''`��►4�.� . REVIEWED By Sandip Adhikari at 11:39 am, Apr 17, 2025 F�RT�ORTH� `--� TRANSPORTATION AND PUBLIC WORKS December 19, 2025 Conatser Construction 5327 Wichita ST Fort Worth TX 76119 RE: Acceptance Letter Project Name: Madero 11 Project Type: Water,Sewer,Paving,Storm Drain,Street lighting City Project No.: 105404 To Whom It May Concern: On December 19, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 19, 2025, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-8424. Sincerely, � Sandip Adhikari, Project Manager Cc: Russell Rogers, Inspector Gary Deyon, Inspection Supervisor Lorrie Pitts, Senior Inspector Andrew Goodman, Program Manager LJA Engeering, Consultant Conatser Construction, Contractor CBTM Sendera LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFE�EDAV�'[' STAT�: i�F �'��AS C�UNTY C}F '��t1�ANT Bcfat`c me, th� undersi�r�e� auth�riiy, a i�Ia�ary Pt�blic in �he state �nd county a.for�said, 4n this c�ay personally' �ppeared Brock Huggins, �resident v�C�ix:s�ser ��anag�rnenx Cfroup, lr��., general partner of Con�ts�r Constn:ction �')C. [.P, kut�vm to rrte io 6t a cngdi��e persan, w�v being by me duly swc�rn, upo�1 his aat� de}x�sed and said: Th�t all Qersons, firtns. �s�aciatior�,s, cnrpvr��uns ar ather ��gani�ativr� !'e�mishir�� lakror �cUor materials have 6c�;�n p;�id in f'ull; Tha� lhc wage �cate cs��blishcd hy the City Cauncil in thc �it� of F�rt Waet�. �t�s laecr� paid it� fu11; az�d Th�t there arc nc� c�a�m� pcnding for persc�xr�l injury andlvr prup�.rly dat�ges; ()n C'ontr�ct des�:ril�ed ay: h+tADER� PH. tl iVAT�I�, SAn1ITARY SE�ER, Di�AIT�AGE, �A�'ING & STRE�,T LF�HT I[1+IPROY�!►�EN"I'S �FA PR] # 24-0095 CZ'�'Y PE�UJEC7' ## 1�5444 CiTY �1� HOl�T V�UORTH �TATE �F TE7�AS G[}IVA'[�5�:� CO�ST�i[1CTiQAI 'I'�C,1�P . E3rr�ck Hug i s Subscnbe� and swom to befvre me tl�is 7�' day af �l�vemt�er, 2�25. ������ ���-� �., KATN�RI�l� fl�SE _"°►'"••�""�°FT°'�* Notary Pu61ic i� �`arrant CaunE�, 7'exas . �� � aase��aa �:owre��. i�_sa•�ass C�NS�NT [�� SUAETY CO�V[PAN1� TO F1NAL PAYIIAENT ca�far� whi� el+� Am�4c�e, #r�axitut. o! Ae�hftr�r. +atA poo�t i�7�7 PRQJ�CT: tr�a�'r�, d�d��s�}�adero. Phas+b ii Fort WOrih. T7( Ta �vwnerl IGB�'1N SENpERA LLC A�iD TliE ��7Y DF FOf2T ��� 5�03 Har4quarSera Ur . Siile 3R4W ��[w i% 750�; sor�a �o oz���7a � ARCHIT�CT'S PROJECT NQ: cF�a2��v95 C�NTRA�� FdR: Ulil�t�e� 8 Pdv+ng icr Marlero, Pha� i i � con�����r �►aT�: �ONTl�►C"�OR: C01+WTS��t C�ISTR�CTi�hl T7[. L� jn accard.ance wi#h the provisioa�s af the Contract betweer t�e Owecr attd !he Contr�a�tar �a istdicated above, ihe o,rra ir+wrt �r�n..na .ddr.w aR s.r.rr cort+ou+�s BF�1{LEY JNSkJRiWC.� COA�tPANY 475 St�arstbo8# R�d GreenwAct� �T �0683� . SCFRETY C�MPAI�lY oa bond af a+r+. �..r �.+�. a+d.d�... a+ c«n..e�r COh#AtS�J� CONSTRUC�I�Iw! T7(. L.P 5�2T Wa�J��#a 5# �«twantr Tx 7�9y9-6o35 , GONTRACT4R, t�t�by ap�r�+�s of tte� Fnsl paymts►t to �he C�ntra�ctar, �d e�rees t�at �inal paym�nt to the Contrac�or �lfi n�t ral"s�ro thc 5ur+cty Campany af ar�y �f i�s �kig�ti�n.x #o �+n. m..rx �.m. n,d.e�... o� ow,�.r+ G�TM SEf�DERA LLC AN� TwE C�TY Of FORT WO�tT� 5501 HdedqUar�brs D1.. SldtE 3001N P�ana Tx 750�� , OI�IF�F.Ft� �s mel forth i� t�e �aid Sur�ty Computy's bond. IN VI�TN�SS, W}�RE�F, the �urety Comp�►ny � hcrcuato set its h� thia {$P��): �,��t-t�� 6th day of Novemher, 2025 BERKL�Y IN3t1RA1'�E �QMPANY 5�rcry ComP�Y ��,.i . 1 _ ', �-,J,Y�.� $1�1�tL�tE O� ApR�10�127E� �p[�E9E11ldtlYE **��• " F Atkamev-�n-Fac� fV�TE; 7'hir l,prm a ta h� vew i# • m+ryv�++ eec�an�nr �a h1A OC�U1AtNT G7pp. CWa'fMGTDR'8 AFfIP�YIT UF PAYMEhYT Of G$BfS IINp CLAIMS, CurrKrt Edtlon ow��� � ��c��fi�cr Q COf�TRACTDR � Sl�Rf �Y ❑ OTNER 01�� �A43E