HomeMy WebLinkAbout062683-FP3 - Construction-Related - Contract - Wright Construction, Co. Inc.FORTWURTH�
NOTICE OF PROJECT COMPLETION
(Developer Projects)
AT
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Beltmill Phase 6
City Project No.: 105361
Improvement Type(s): ❑ Paving 0 Drainage ❑ Street Lights ❑ Turn Lane
Original Contract Price: $382,024.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
Kvle M��sh
Contractor
President
Title
Wright Construction, Co. Inc.
Company Name
�.1.4o�t/'�,�����_
� .,�,-� �,:,,:,�;,��<;:5
Project Inspector
R�t,vt�t� Tl,t�r�,��
Project Manager
e���
CFA Manager
����
�,�,ro�, Pr�o�r �Fon z, zaze n�s3_s� csT)
TPW Director
oi/2s/2o26
Date
O1/28/2026
Date
O1/29/2026
Date
02/02/2026
Date
02/02/2026
Date
-FP3
City Secretary
Contract No. 62683
Date Received 2�2�2026
$382,024.00
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Beltmill Phase 6
City Project No.: 105361
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑ Yes 0 N/A
Contractor's Attachments
Affidavit of Bills Paid ,
�'
Consent of Surety ��
Statement of Contract Time
Contract Time: 102 WD Days Charged: 184 WD Work
Work Start Date: 2/12/2025 Complete Date: 12/8/2025
Completed number of Soil Lab Test: 206
Completed number of Water Test: 8
Page 2 of 2
F���r ���Tx
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name BELTMILL PHASE 6
Contract Limits
Project Type DRAINAGE
City Project Numbers 105361
DOE Number 5361
Estimate Number 1 Payment Number 1 For Period Ending 12/8/2025
WD
City Secretary Contract Number
Contract Date
Project Manager NA
Contractar WRIGHT CONSTRUCTION COMPANY, INC.
601 W. WALL ST.
GRAPEVINE� TX 76051-
Inspectors G. DEYON / G. YBARRA
Contract Time 10�D
Days Charged to Date 184
Contract is 100.00 Complete
Monday, December 22, 2025 Page 1 of 4
City Project Numbers 105361
Contract Name BELTMILL PHASE 6
Contract Limits
Project Type DRAINAGE
Project Funding
UN1T ID: DRAINAGE IMPROVEMENTS
DOE Number 5361
Estimate Number 1
Payment Number 1
For Period Ending 12/8/2025
Item Estimated Estimated
Description of Items Unit Unit Cost
No. Quanity Total
1 21" RCP, CLASS III 486 LF $88.00 $42,768.00
2 24" RCP, CLASS III 680 LF $97.00 $65,960.00
3 30" RCP, CLASS III 271 LF $115.00 $31,165.00
4 36" RCP, CLASS III 235 LF $149.00 $35,015.00
5 48" RCP, CLASS III 271 LF $241.00 $65,311.00
6 4' STORM JiJNCTION BOX 2 EA $9,442.00 $18,884.00
7 5' STORM JLTNCTION BOX 2 EA $10,542.00 $21,084.00
8 4' DROP INLET 1 EA $7,617.00 $7,617.00
9 10' CURB INLET 12 EA $7,122.00 $85,464.00
10 REMOVE HEADWALL. SET 1 EA $3,330.00 $3,330.00
11 CONNFACT TO EXISTING 48" RCP I EA $3,483.00 $3,483.00
12 TRENCH SAFETY 1943 LF $1.00 $1,943.00
Sub-Total of Previous Unit
Completed Completed
Quanity Total
486 $42,768.00
680 $65,960.00
271 $31,165.00
235 $35,015.00
271 $65,311.00
2 $18,884.00
2 $21,084.00
1 $7,617.00
12 $85,464.00
1 $3,330.00
1 $3,483.00
1943 $1,943.00
$382,024.00 $382,024.00
Monday, December 22, 2025 Page 2 of 4
City Project Numbers 105361
Contract Name BELTMILL PHASE 6
Contract Limits
Project Type DRAINAGE
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Total Cost of Work Completed $382,024.00
Less % Retained $0.00
Net Earned $382,024.00
Earned This Period $382,024.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
Total Contract Price
DOE Number 5361
Estimate Number 1
Payment Number 1
For Period Ending 12/8/2025
$382,024.00
$382,024.00
$0.00
$0.00
$0.00
$0.00
$0.00
$382,024.00
Monday, December 22, 2025 Page 3 of 4
City Project Numbers 105361
Contract Name BELTMILL PHASE 6
Contract Limits
Project Type DRAINAGE
DOE Number 5361
Estimate Number 1
Payment Number 1
For Period Ending 12/8/2025
Project Funding
Project Manager NA
Inspectors G. DEYON / G. YBARRA
Contractor WRIGHT CONSTRUCTION COMPANY, INC.
601 W. WALL ST.
GRAPEVINE� TX 76051-
City Secretary Contract Number
Contract Date
Contract Time 102 WD
Days Charged to Date 184 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $382,024.00
Retainage This Period $0.00
Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$382,024.00
$0.00
$382,024.00
$0.00
$0.00
$0.00
$0.00
$0.00
$382,024.00
Monday, December 22, 2025 Page 4 of 4
F��� ����r��
TRANSPORTATION AND PUBLIC WORKS
December 18, 2025
Wright Construction Co., Inc.
600 W Wall St, Grapevine, TX 76051
Grapevine, TX 76051
RE: Acceptance Letter
Project Name: Beltmill Phase 6
Project Type: Water, Sewer, Storm Drain
City Project No.: 105361
To Whom It May Concern:
On December 12, 2025 a final inspection was made on the subject project. There were no punch list
items identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on December 12,
2025, which is the date of the final inspection and will extend of two (2) years in accordance with the
Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 682-
201-6278.
Sincerely,
�ww T'u�r�r�
Ram Tiwari P.E., Project Manager
Cc: Gilbert Ybarra, Inspector
Gary Deyon, Inspection Supervisor
Edward Davila, Senior Inspector
Andrew Goodman, Program Manager
Westwood Professional Services., Consultant
Wright Construction Co. Inc., Contractor
D.R. Horton-Texas, LTD, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
A}�FIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this da}• personally appeared Kevin Littlefield,
Controller Of Wright Constructi�n Co, Inc., known to me to be a credible
person, who being by me duly s��vorn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materiais have been paid in full;
That the wage scale est<<blished by the City Council in the City of
Fort Worth has been paid in fuU;
That there are no claim;� pending for personal injury and/or
property damages;
On Contract described .3s;
CPN; ] 05361 - Drainage Impravements {$382,024.00) for Rosewood (a�J
Beltmill Phase 6 at or near Ma�;nolia Blossom Trail & Prairie Clover
Trail, Fort Worth, TX 76247
BY �" '
1
/%
�
�.
�• �-�
tlef /�Controller
Subscribed and sworn before me on this date 12th of J
, ,
�� ����,-�
Notary Public �
Tarrant, TX
��
{�YPVq�, LeeAnn Lindsey -
ro�Notary Ip # 12Q.59318
+r My Cornmission l�xpires
'F�F`� 0$/07l2028 -
' illi�nl i�� ih�'� y,�, i��n��w�,.i��i..�� Ilr^�i r i
d..�y�r niod � �. �•
, 2026.
MERCHANT•S�
BONDING COMPANY,�,
MFRCHANTS I�ONDING COMI'ANY (MUTUAL) f.C�. IiOX 14498, DFS MOINES, IOWn 50306-3498
l�HONr: (S00) 678-8171 FnX: (515) 243-3�54
CONSENT OF SURETY
TO FINAL PAYMENT
OWNER _
ARCHITECT _
CONTRACTOR _
SURETY _
OTHER —
:��� •
TO OWNER:
City of Fort Worth
100 Fort Worth Trail
Fort Worth, TX 76102
PROJECT:
Beltmill Phase C / CPN #105361
100340752
ARCHITECT'S PROJECT NO.:
CONTRACT FOR:
Drainage
CONTRACT DATED:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert naine and address of Surety)
Merchants Bonding Company (Mutual)
P.O. Box 14498
Des Moines, lowa 50306-3498
on bond of
(Insert name and address of Contractor)
Wright Construction Co., Inc.
600 W. Wall Strcct
Grapevine, TX 76051
, SURETY,
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety of any of its obligations to
(Insert name and address of Owner)
Ciry of Foi•t Wortll
100 Fort Worth Trail
Fort Worth, TX 76102
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: Deccn,bcr 10, 2025
(Insert in writing the month followed by the numeric date and year.)
Merchants Bonding Company (Mutual)
---- (Sw�ety
Attest: ---�9�� x' ��1�'iirN�
(Seal): Adam Syswerda, Witness ..�;._. ` (Signature of authorized representative)
CON 0405 (4/15)
, OWNER,
�y Kim Rracamontc Attornev-In-Fact
� - (Printed name and title)
-- �rinted in cooperation with American Institute of Architects (AIA). The
language in this document conforms exactly to the language used in
AIA Document G707-1994 Consent Of Surety to Final Payment.
MERc �Ts
BONDING COMPANYT��
POWER OF ATTORNEY
KnowAll Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of lowa, and MERCHANTS NATIONAL. INUEMNITY COMPANY , an assumed name of Merchants
National Bonding, Inc., (herein collectively called the "Companies") do hereby rnake, constitute and appoint, individually,
Adam Syswerda; Charlie Fletcher; Elise White; Jennifer R Garcia; Kim Bracamonte; Laura Ibarra
their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in ihe nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons,
guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or
proceedings allowed by law.
This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the By-Laws adopted by the Board of Directors of
the Companies.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority
to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other writings obligatory in the naturethereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship o obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the
Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts
required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of
Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its
obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 12th day of November � 2025
MERCHANTS BONDING COMPANY (MUTUAL)
,O�p\NGCp,�A.• •PS�O,Nq�••. .`oNAL1lypF.�. MERCHANTS NATIONAL BONDING, INC.
�y ;:�RPOqqTqy,. .;y�:��pOq9.eo:: ��p�,P�,�FOR;y��y�. MERCHANTS NATIONAL INDEMNITY COMPANY
:�.r �„'.'`' ''` �c, �'F:y: .„, � v �,,��:
:_: 'o �'3•:Q:.2 -o �;2:�=, � �n�
�vd: 1933 �CS; ;�'•.. 2003 ::c�; ;�i�; �3� � �
• �''•. . . : d'• . . • � : . d " • 'aa. ` % �
'•`�' ��. :.��....�...:��,. .��;,•-._4.=*a. BY 9`
...�.. ... . �
STATE OF IOWA
COUNTY OF DALLAS ss.
On this 12th day of November 2025 , before me appeared Larry Taylor, to me personally known, who being by rne duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL), MERCHANTS NATIONAL BONDING, INC., and MERCHANTS
NATIONAL INDEMNITY COMPANY; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the
said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors.
,�P��pA�S� Penni Miller
� ,(� y Commission Number 787952
• � • My Commission Expires
1pwP January20,2027
(Expiration of notary's commission
does not invalidate this instrument)
Notary Public
I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL), MERCHANTS NATIONAL BONDING, INC., and
MERCHANTS NATIONAL INDEMNITY COMPANY do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-
ATTORNEY executed by said Companies,which is still in full force and effect antl has not been amended orrevoked.
In Witness Whereof, I have hereunto set my hand and a�xed the seal of the Companies on this 10th day of December , 2025
. 0o�p�NG�Cp�N e ' •PZ\ON,q� •• .•oNALINaF
RP 17' 4 ``� PO ��,. •�� Fo �•,.
'p DEt Rq •• O ,� P �,� R�y�', y
:ti� G �'�'.,�:%�• 'hy:'V ��'•.2; ,y�'C�P 9•'��
,a;�2 _o_ o;�: ;Q:2 _o- o:a: :Zt �tt�i:
:va i933 :�:,: 'z' 2003 :;cz: • 2', � � o •
• 'J
� ' °d
. :'� , � :�y .aD;
•• �' :
•:�h-'��•......•�'��a� •..�L�"1�..�a�� ����, .4., ra:
� ... .
�
Secretary
POA 0018 (5/25)