Loading...
HomeMy WebLinkAbout055399-A7 - Construction-Related - Contract - Freese and Nichols, Inc.ANIENDMENT No . 7 TO CITY SECRETARY CONTRACT No. 55399 CSC No. 55399-A7 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc., (ENGINEER) made and entered into City Secretary Contract No. 55399, (the CONTRACT) which was authorized by M&C 21-0128 on the I6't'' day of February, 2021 in the amount of $ 1,001,447.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $ 94,871.00 which was administratively authorized on October 8, 2021, and Amendment No. 2 in the amount of $169,005.00 which was authorized by M&C 22- 0590 on August 9, 2022; Amendment No. 3 in the amount of $35,396.00 administratively authorized on October 6, 2022, Amendment No. 4 in the amount of $64,597.00 administratively authorized on August 23, 2023, Amendment No.5 in the amount of $796,720.00 authorized by M&C 24-1126 on December 10, 2024; and Amendment No. 6 in the amount of $381,300.00 authorized by M&C 25-0073 on January 28, 2025 and WHEREAS, the CONTRACT involves engineering services for the following project: 3r°' Barrel Parallel Sanitary Sewer to VCWTP, CPN 103128; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $357, 780. 00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $2,901,116.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. �FFICIAL RECORD City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 1 of 2 CITY SECRETARY 3rtl i�arrel Parallel SS for VCWTP FT. WORTH, TX , 0318 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth � Jesica McEachern Assistant City Manager 02/08/2026 DATE: ATTEST: /� � � ��`�'l�A.. I 1 Jannette Goodall City Secretary po� Fooa nr°�°a P �O O':�A( ho OVe oo2p PPa*000 000*� daan nE4ps6qq APPROVAL RECOD�NDED: �� /1 i .0�1 l'� .OA l.nristopherHarder(Fe ,20261331:30 ST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Freese and Nichols, Inc. � ,�z�M}'�rJ ci�9 �-- N1Ch013S �.+c� �.ci � �. L''. Vice President DATE : 01 /30/2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. a� � 02/02/2026 Parvathi Sreekumaran Unnithan, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: �� Douglas Black (Feb 3, 2026 17:51:52 CST) Douglas W. Black Sr. Assistant City Attorney M&C No.#: 26-0082 M&C Date: January 27th, 2026 4FFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas 3rtl i3arrel Paralle� SS for VCWTP Prof Services Agreement Amendment Template 1C�128 Revision Date: June 13, 2025 Page 2 of 2 www.freese.com January 8, 2026 Mr. Tony Sholola, P.E. Assistant Water Director, Capital Project Delivery City of Fort Worth Water Department 100 Fort Worth Trail Fort Worth, TX 76102 Re: Amendment No.7 for 78" Trinity Replacement (City Project No. 103128) Dear Mr. Sholola: Freese and Nichols, Inc. (FNI) is pleased to provide this amendment for the Engineering Design Services for the 3rd Barrel / Village Creek Bank Stabilization / 5 Sites project (City Project Number 103128). This amendment includes: 1. The fee includes design management and project coordination, design services for the sewer lines and bank stabilization at WF-9, environmental and geotechnical investigations, bid phase and construction support, and design survey. This also includes design efforts for the M-244B emergency breaks. FNI records show that this proposal would serve as Contract Amendment No. 7. A summary of the additional costs is shown below: Villa�e Creek Bank Stabilization General Rep Services: Item 78-Inch Emergency Stabilization Design M-244B Emergency, Site 1 M-244B Emergency, Site 2 78-Inch Replacement Total Amendment No.7 L:\Client\OLCR\F\Fort Worth\FTW21267\Amd #7 Fee $ 31,729 $ 13,026 $ 13,738 $ 299,287 $ 357,780 801 Cherry Street, Suite 2800 + Fort Worth, Texas 76102 + 817-735-7300 + FAX 817-735-7491 �.- 1 1 . '�. __' ___� � CPN 103128 Amendment No.7 Page2of2 Original Contract Amount Amendment No.1 Amendment No.2 Amendment No.3 Amendment No.4 Amendment No.S Amendment No.6 Amendment No.7 Contract Amount to Date $ $ $ $ $ $ $ $ $ 1,001,447 94,871 169,005 35,396 64,597 796,720 381,300 357,780 2,901,116 Freese and Nichols, Inc. appreciate this opportunity, and we would like to meet with you to discuss these additional services at your convenience. Sincerely, �� � Amanda Johnson, P.E. Associate � Project Manager L:\Client\OLCR\F\Fort Worth\FTW21267\Amd #7 � Level of Effort Spreadsheet TASFVHOURBREAKDOWN �esign Services for 3rd Barrel Parall¢I Sanitary Sewer tor Village Creek Wa[er Treatment Plan[ City Project No. 103128 iaskx TashDescnptian vro�ec arolec ministran uc[ura e Enai Scie Scie �e Enoi �e enai Geoloist ISAnas ITo�og� Subconsu�an�en�FR Cast Tatal nmaunt omplet revio In�oice Butlee� n.,el ` a�aol M �a„�,I E,;aal `„°=I �' a,sal s' ,�J 5zs=I ` m�=sz�.� °° „=al a,�.l „5,1 G,�ssl G ee�s;�.l ,zoal 5„s, Ma,.�o � Fee„Pe,m,n�� ����,eam ao ao ao °o;d�aa�e�,e4 a a a a asa$o $o ssaso go .o� o..s ,s, z° ���r�������9 3 s 3 so s� �� Bo = s s�a;� ��„ s�sa so a36a so o:� a ,a,�e P°.�ao�,n:MaE,seERaPa;s�,n =< za =, �,zsaa sa a,z�a �o o_s M saa,s �, saa,s �o °�_ s ,9z, I°o�'�,ti°�o�'a�e�,aAas�s,e'��=a�a � sl ,ol I 3al I �,I 3,I ,I I I I I I I I�3„zsl I I I so� �3„=sll �ol o•,ols i5�t So 50 5o So xorvlo. IB awingsentl 100 16 60 12 110 $65�22 80 $65.312 $0 ° S a 81.510 SO 51.510 $0 S Cc�JJpc�ubAi�eaf?auoncnecklisl � a a $SI68 Sa $S 6B So 5 ��oolRvUf�aa�r 2 � bo so 5eax 50 5ea2 8o v B J� tl'�'a $2�5]0 $o $2�5]0 $o Geom p�ai A6 98 34 4B e $30096 513,189 $1,31] $13.169 $<3.B65 $0 S 516.188 SO 816108 SO �S ieas veo�ern�ireisar�� ia s �s s�sis se2oo serzo noo saeoa sis so tl. e .eu(eo°io)ao�sr�o�o�Pie�sa�a rf4G'%raaeoiscoorai�auo�cneaes $s�zio so $s�rzio so F ���tgn,°�)�)g��y�95� y�') � s�s�ai ao a�s.eai� � 50 i5aa %CA'SAiICRCrfE�R£(C�5'G�ilAd�QUJ�'ial a+sio sa Stsial I So I i����DSwm s�oeBuiltler $0 �� I 5a�a 5o Saia l So .. sue dtlentleen At_]66 SO 53.]58 I b0 .. anma�ae�asa� ae�mme� wa,a sszsz so sssszl I so ,s=, =�e�o � oa��me�h s=oao a=sa, a=sa, a,ssoi i Bo ���j� 'ti ,, ,96z a�� r� � f� �o�.ew��e aa,a ao ��a{ � Ho �sass ao ssass � �o ,s„ � o,ao��l�`,�a �.oea sa ssasa � so ,sa, �ne��s��� �z�6a �,boo �,so s,soo saa6a � �o 1991a r�I�t2 84296 84v0 8450 84]a� I SO � '��v�,��,a�,�o�„a�,o,�oo,d�a,o� Bo �e�° sazss s so a48as1 i Ho ,9,o,b o�a���,�o�vauo,�oo,d�a,o� s,saa so s,�,e�� so 19101 o I S� �a4 Sa S] 3aal I So 2 t2 20 �o,a�, s, ,aa ,os �,e 5�� ,<� ,35� o,� sn� ,�,� 39s� ,o� � s,l b��o.3z. f a b a. ai � bo � ,o,a�=:� �a�,,,ao, o,o� osi saxa.ezal asa.assl Pn�q�'cia szeessl *e�ai re o�� san.�eal �ols �S S 0°/�8 °:,s �8 o%IB oiols o��% o'/el g fa a �sa,= ��� 36aoo ��� 'aa,aoo I,� „�,�ool 8 b $ Z'$03,865 �S 16a1600 rg i 51�ioo� f� 000l I ' } ool /�F 001 �R '9Ps00� � oo� � s�zoo� 59,aie1 F �3soo1 �p ool � 553soo; � ,�aoo� s F ool dl SaSi,ieol City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, January 27, 2026 REFERENCE NO.: **M&C 26-0082 LOG NAME: 603RDB901NTVCBPEAPA7-FNI SUBJECT: (CD 5) Authorize Execution of Amendment No. 7 in the Amount of $357,780.00 to an Engineering Agreement with Freese and Nichols, Inc. for the 3rd Main to West Fork Trunk Mains (Village Creek Water Reclamation Facility Biosolids Facility Bank Stabilization) Project, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2026-2030 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 7 to City Secretary Contract No. 55399, an Engineering Agreement with Freese and Nichols, Inc., in the amount of $357,780.00, for construction support services for the 3rd Main to West Fork Trunk Mains (Village Creek Water Reclamation Facility Biosolids Facility Bank Stabilization) project for a revised contract amount of $2,901,116.00; and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Revenue Bonds Series 2025 Fund by increasing estimated receipts and appropriations in the 3rd Main to West Fork Trunk Mains project (3rd Barrel Parallel Sanitary Sewer to the Twin 90-inch Sewers Serving the Village Creek Wastewater Treatment Plant, Bank Protection at the Village Creek Wastewater Treatment Plant and Pipeline Erosion Analysis at Five Low Water Crossings)(City Project No. 103128) in the amount of $417,780.00 and decreasing estimated receipts and appropriations in the Commercial Paper project (City Project No. UCMLPR) by the same amount, to effect a portion of Water's contribution to the Fiscal Years 2026-2030 Capital Improvement Program. DISCUSSION: On February 16, 2021, Mayor and Council Communication (M&C) 21-0128 authorized an engineering agreement with Freese and Nichols, Inc., (City Secretary Contract No. 55399) in the amount of $1,001,447.00 for the preparation of plans and specifications for the design of the 3rd Barrel Parallel Sanitary Sewer to the Twin 90-inch Sewers Serving the Village Creek Wastewater Treatment Plant, Bank Protection at the Village Creek Wastewater Treatment Plant and Pipeline Erosion Analysis at Five Low Water Crossings project. The agreement was subsequently revised by the following amendments: Amendment No. 1, in the amount of $94,871.00, administratively authorized October 8, 2021, that provided for additional design efforts for the preparation of a necessary individual permit from the United States Army Corps of Engineers, additional tree and topographic survey and additional archaeological survey. Amendment No. 2, in the amount of $169,005.00, authorized August 9, 2022 (M&C 22-0590), that provided for design and survey services for a soil-supporting concrete encasement for the portion of the project sewer main that is adjacent to an existing pond, additional geotechnical investigation, additional archeological survey and design for the replacement of an existing conflicting 10-inch sanitary sewer main. Amendment No. 3, in the amount of $35,396.00, administratively authorized October 6, 2022, that provided for design and environmental services for an additional 1,300 feet of sewer main in the Mary's Creek Basin. Amendment No. 4, in the amount of $64,597.00, administratively authorized August 23, 2023, that provided for additional coordination with the Texas Historical Society, additional topographical/ archaeological investigation and alignment modification. Amendment No. 5, in the amount of $796,720.00, authorized December 10, 2024 (M&C 24-1126) that provided for the preparation of plans and specifications for the replacement of the existing deteriorated 60 and 70-inch raw water mains, which cross the West Fork Trinity River at the Fort Worth/River Oaks City boundaries, which is the one of the low water crossings for which erosion analysis was conducted in the original agreement. Amendment No. 6, in the amount of $381,300.00, authorized January 28, 2025 (M&C 25-0073) that provided for construction management and resident project representative during construction of the Village Creek Water Reclamation Facility Biosolids Facility Bank Stabilization project, which is one of the five low water crossings for which erosion analysis was conducted in the original agreement. Amendment No. 7 will provide for design bank stabilization and aerial crossing replacements for Sewer Mains M-33BA (78-inch diameter) and M-280A (96-inch diameter) which both cross a tributary of the West Fork Trinity River. The proposed improvements must be conducted in order to prevent collapse of the crossings and both locations are part of the low water crossings for which erosion analysis was conducted in the original agreement. The amendment will also provide compensation for design efforts for emergency design at two break locations on M-244. In addition to the contract cost, $60,000.00 is required for additional project management. It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. Funding is budgeted in the Commercial Paper project within the W&S Rev Bonds Series 2025 Fund for the Water Department for the purpose of funding the 3rd Main to West Trunk Mains project. Funding for the 3rd Main to West Fork Trunk Mains are depicted below: Fund 56019 — W&S Rev Bonds Series 2021 56022 — W&S Rev Bonds Series 2024 56023 — W&S Rev Bonds Series 2025 Project Total I Existing � Appropriations $1,616,032.00 $961,720.00 $10,575,812.00 �� $13,153,564.00�� $0.00 $1,616,032.00 $0.00 $961,720.00 $417,780.00 $10,993,592.00 $417,780.00��$13,571,344.00� *Numbers rounded for presentation purposes. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Commercial Paper project within the W&S Rev Bonds Series 2025 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Rev Bonds Series 2025 Fund for the 3rd Main to W Trunk Mains project to support the execution of the amendment. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Additional � project Total* Appropriations FUND IDENTIFIERS (FIDs),: TO Fund Department Accoun Project ProgramActivity Budget Reference # �4mount ID � ID , Year � (Chartfield 2) FROM Fund Department'Accoun Project Program ctivity Budget ' Reference # mount ID � ID Year , (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manaqer's Office by_ Originating Department Head: Additional Information Contact: Jesica McEachern (5804) Chris Harder (5020) Parvathi S (7803) ATTACHMENTS 1. 603RDB901NTVCBPEAPA7-FNI FID Table (1.05.25 AC).xlsx (CFW Internal) 2.603RDB901NTVCBPEAPA7-FNl.pdf (Public) 3. 603RDB901NTVCBPEAPA7-FNI FundsAvail.docx (CFW Internal) 4. Form 1295 Certificate 101473828-CPN103128-FTW 3rd Barrell Amend7.pdf (CFw Internal) 5.ORD.APP 603RDB901NTVCBPEAPA7-FNI 56023 A026(R2).docx (Public) 6. PBS CPN 103128.pdf (CFW Internal) 603RDB90INTVCBPEAPA7-FNI FID Table 1&2) 56023 0600430 4905163 UCMLPR 2026 ($417,780.00) 1&2) 56023 0700430 4905163 103128 2026 $417,780.00 1&2) 56023 0600430 UCMLPR 2026 ($417,780.00) 1&2) 56023 0700430 103128 2026 $417,780.00 3 56023 0700430 5110101 103128 001780 9999 $60,000.00 Water Staff Costs 1 56023 0700430 5330500 103128 001730 9999 $357,780.00 Pay to Engineering Company CERTIFICATE OF INTERESTED PARTIES Complete Nos. 1- 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. Freese and Nichols, Inc Fort Worth, Texas 76102, TX United States 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Fort Worth Water Department FORM 1295 1 of 1 OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2026-1404255 Date Filed: 01/02/2026 Date Acknowledged: g Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. CPN 103128 3rd Barrel Parallel Sanitary Sewer to the VCWTP Project, CPN 103128 - Amendment Number 7 4 Pence, Bob Coltharp, Brian Payne,Jeff Brown, Jessica Hatley, Tricia Chambers, Robert Stull, Cory Bennett, David Reedy, Michael Name of Interested Party 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name �s Paula Durant My address is $01 Cherry Street, Suite 2800 City, State, Country (place of business) Fort Worth, TX United States Fort Worth, TX United States Fort Worth, TX United States Fort Worth, TX United States Oklahoma City, OK United States Fort Worth, TX United States Houston, TX United States Denver, CO United States Houston, TX United States Nature ofinterest (check applicable) Controlling Intermediary X X X X X X X X X , and my date of birth is Fort Worth TX 76102 USA (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in TarCant County, State of TeXaS , on the 2nd aay of January 20 26 (month) (year) �"GZ� �L�%!.�.[-l7.C. Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V4.1.0.22701b2a F�RT��RTHo City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Freese and Nichols, Inc. Subject of the Agreement: 3rd Barrel Parallel Sanitary Sewer to VCWTP M&C Approved by the Council? * Yes ❑✓ No ❑ If �so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 55399-A7 If �so, provide the original contract number and the amendment number. Is the Contract "PermanenY'? *Yes 0 No ❑ If �unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 1/27/2026 Expiration Date: N/A If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑✓ No ❑ *If �so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 103128 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑✓ No ❑ Contracts need to be routed for CSO processin� in the followin� order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.