Loading...
HomeMy WebLinkAbout056320-A2 - Construction-Related - Contract - Arredondo, Zepeda & Brunz, LLCCSC No. 56320-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 56320 WHEREAS, the City of Fort Worth (CITY) and Arredondo, Zepeda & Brunz., LLC, (ENGINEER) made and entered into City Secretary Contract No. 56320, (the CONTRACT) which was authorized by M&C 21-0538 on the 3rd day of August, 2021 in the amount of $ 302,590.50; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $39,081.85 administratively authorized on May 22nd, 2024; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 118, CPN 102789; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $ 7,847.36. (Water: $941.68 ; Sewer: $6,905.68) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $349,519.71. OFFICIAL RECORD CITY SECRETARY 3 • FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas Sani�a-�y Se��.aer Rehab Ccr�ract 118 Prof Services Agreement Amendment Template 1C2,u9 Revision Date: June 13, 2025 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth ;� Jesica McEachern Assistant City Manager 02/08/2026 DATE: ATTEST: �����A /J .Jo�_��x Jannette Goodall City Secretary �p4�a�nu bb F�RT��� � OF�°° °o �L dd v �� o �O��I�d �o °��o �=o p�p'f °oo �° �`d a�° p a� �'EXA54ba �nnaaoo APPROVAL RECONIl��NDED : Cl��rJto,�G��� �fa��f�� Christopher Hard�r (Feb 2, 2026 1328:15 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Arredondo, Zepeda & Brunz, LLC. � Al onso P. G za, P.E. Managing Principal DATE : 2-2-2OZG By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. a� � 02/02/2026 Parvathi Sreekumaran Unnithan, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: `�P���'IL�� Douglas Black (Feb 3, 2026 17:57:07 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2 M&C No.#: N/A M&C Date: N/A �FFICIAL RECORD CITY SECRETARY FT. WORTH, TX Sanitary Sewer Rehab Contract ll8 1C�789 ����_:,=� .—.�..�■ a� � ARDURRAcomne�y December 16, 2025 Parvathi Sreekumaran-Unnithan, PE City of Fort Worth Water Department 100 Fort Worth Trail Fort Worth, TX 76102 Re: Water and Sanitary Sewer Replacement Contract 118 City Project No. 102789 Amendment No. 2 Ms. Sreekumaran-Unnithan: AZ&B proposes to perform the following additional tasks requested by the City of Fort Worth Water Department that were not originally included in the project scope: • Perform a walkthrough of each water or sanitary sewer replacement segment to identify any major above ground structures or constraints (i.e. Vaults) built after topographic survey was done in Fall 2021— Winter 2022 that could impact the utility alignments. • Any major above ground structures or constraints identified during site walkthroughs will be generally located in the design plans. • Update property owner names on the plans for lots within the replacement project limits that are found to have been sold since initial deed research was done in Fall 2021— Winter 2022. • Compile property owner addresses for public meeting. Ardurra will obtain current property owner names from the Tarrant County Appraisal District GIS map. Generally, research limits will extend one block beyond the beginning and end points of each water or sanitary sewer replacement segment. Approximate limits shall be as indicated by the Water Department on aerial maps provided by email September 17, 2025. Addresses for community facilities near the project limits that may be impacted by street closures, including schools and churches will be included. For apartment complexes or condominiums, only the main office address will be included. Deliverables • Property owner address list using Microsoft Excel file provided by the Water Department. • Changes in property ownership and improvements/changes identified as potentially having an impact on construction during site walkthroughs will be shown on the final review submittal before the project is advertised. Not Included in this Scope and Fee Notification letters to property owners. These will be mailed by the City of Fort Worth. Additional topographic or right-of-way survey. The additional lump sum fee requested for the additional design effort identified above is $7,847.36 as summarized in the table below. I Task Description I Additional Design Effort Compile Property Owner Addresses for Public Meeting I TOTAL AMENDMENT #2 Water Fee $821.30 $120.38 $941.68 Sewer Fee $6022.86 $882.82 $6,905.68 Tota I $6,844.16 $1,003.20 $7,847.36 ����_:,=� .—.�..�■ a� � �RDURRAcomne�y Please refer to the attached Scope of Services and Task/Hour Breakdown for additional details. The adjusted overall contract amount will be as follows � I ORIGINAL CONTRACT I AMENDMENT#1 I AMENDMENT#2 I TOTAL Sincerely, Arredondo, Zepeda & Brunz, LLC � A�t"S° � � /ani v Alf �so P. Garza,'��E, RPLS Water Fee Sewer Fee Total $36,182.21 $266,408.29 $302,590.50 $0 $39,081.85 $39,081.85 $941.68 $6,905.68 $7,847.36 $37,123.89 $312,395.82 $349,519.71 Managing Principal agarza@ardurra.com (214) 908-7493 Task Description Rat� Additional Water and SaniWry Sewer Design Effort Pertorm walkthrough of each replacement segment to idenfiy ma�or above ground structures or constraints (i.e. Vautts) buitt after topographic survey that wuld impact [he utiliry alignments Locate major above ground stmctures or constraints in design plans Update property owner names on the design plans for properties sold after initial deed research Compile Property Owner Addresses for Public Meeting Research Tarran[ Counry Appraisal Distnct GIS Map Compile Properry Owner Address List for Public Meeting Cretlit for Public Meeting Hours Alreatly Billetl Untler 60 % Milestone Ciry of Fort Worth, Texas Attachment B- Level of Effor[ Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet Additional Services TASK/HOUR BREAKDOWN Water Department Design Services for Sanitary Sewer and Water Rehabilitation Contract 118 City Project No. 102789 - Amendment No. 2 �bor(hou s) I Senior Senior P ect Pro'ect Sen Project roj � E�T ior Technician ToWI Labor ,__ ____ Enginee� Manager Enginee� Technician I 8 8 � 3 4 S I � 2 4 1 0 4 18 0 0 1 4 10 e I 1 Subconsultant E�{pense Subconsukant I Total Expense Task Sub ToWI % Complete Remaining Reproduction Cost Budget NBE SBE 0.00 0.00 0.00 0.00 6,844.16 0/ $6,844.16 I 0%� $1,003.20 7,847.36� 0% ect Summary Total Hours Total Labor Total ExpeR �ey@E y �( ( M S&E Su�consuNanf MBE/SBE Partiapa0on Total Project Cost 56 $7,847.36 $0.00 0 $o.00 0.0 % 87,847.36 � FORT ��RTH� City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name Arredondo, Zepeda & Brunz., LLC Subject of the Agreement: Sanitary Sewer Rehabilitation Contract 118, CPN 102789 M&C Approved by the Council? * Yes ❑ No 0 If �so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 56320-A2 If so, provide the original contract number and the amendment number. Is the Contract "PermanenY'? *Yes 0 No ❑ If �unsure, see back page for pernianent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: N/A Expiration Date: N/A If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No 0 *If �so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 102789 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processin� in the followin� order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.