NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Madero Phase 7
City Project No.: 104925
Improvement Type(s): 0 Paving 0 Drainage 0 Street Lights
IOriginal Contract Price: $746,950.20
IAmount of Approved Change Order(s): $35,268.80
IRevised ContractAmount: $782,219.00
ITotal Cost of Work Complete: $782,219.00
�
Arturo Sancen (Feb � 6. 2026 1 � 22 01 CST)
Contractor
Superintendent
02/16/2026
Date
Title
Conatser Construction Tx, L.P
Company Name
��` ��
Project Inspector
�
Project Manager
����
CFA Manager
����
i a���Pn c��P��� rFPn �a �,s�F iR����nn r.sri
TPW Director
❑ Turn Lane
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
02/16/2026
Date
02/19/2026
Date
02/19/2026
Date
02/19/2026
Date
Page 1 of 2
Notice of Project Completion
Project Name: Madero Phase 7
City Project No.: 104925
City's Attachments
Final Pay Estimate 0
Change Order(s): 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid �
Consent of Surety �
Statement of Contract Time
Contract Time: 135 WD Days Charged: 187 WD
Work Start Date: 4/21/2025 Work Complete Date: 1/30/2026
Completed number of Soil Lab Test: 367
Completed number of Water Test: 4
Comment: Greensheet package cover sheet has been updated with the revised contract time.
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
F1NAL PAYMENT REQUEST
Contract Name MADERO, PHASE 7
Contract Limits
Project Type DRAINAGE
City Project Numbers 104925
DOE Number 4925
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
For Period Ending 1/30/2026
WD
Project Manager NA
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH � TX 76119
Inspectors T. GARDNER / J. ROGERS
Contract Time 135 WD
Days Charged to Date i8'1
Contract is 100.00 Complete
Friday, February 13, 2026 Page 1 of 5
City Project Numbers 104925
Contract Name MADERO, PHASE 7
Contract Limits
Project Type DRAINAGE
Project Funding
UNIT III: DRAINAGE IMPROVEMENTS
Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
Description of Items Estimated Unit
Quanity
TRENCH SAFETY 602 LF
21" RCP, CLASS III 30 LF
24" RCP, CLASS III 331 LF
4"X3' BOX CULVERT 154 LF
4' STORM JUNCTION BOX 1 EA
5' STORM JUNCTION BOX 1 EA
10' CURB INLET 2 EA
15' CURB INLET 2 EA
4X2 BOX CULVERT 87 LF
12" LARGE STONE TYPE "A" DRY RIP RAP 46 SY
36 SLOPER END HEADWALL 1 EA
4"X3' SLOPED END HEADWALL 1 EA
INLET PROTECTION 4 EA
Sub-Total of Previous Unit
UNTT IV: PAVING IMPROVEMENTS
Item Description of Items
No.
1 HYDRATED LIME (32LBS./SY)
2 HYDRATED LIME (42LBS./SY)
3 6" LIME TREATMENT
4 8" LIME TREATMENT
5 6" CONC PVMT
6 6" CONC SIDEWALK
7 BARRIER FREE RAMP, TYPE P-1
8 TOP SOIL
9 BLOCK SOD PLACEMENT
10 FURNISH/INSTALL ALUM SIGN GROUND
MOUNT CITY STD.
11 7.5 CONC PVMT
12 6" WEATHER ACCESS ROAD
DOE Number 4925
Estimate Number 1
Payment Number 1
For Period Ending 1/30/2026
Unit Cost �stimated Completed Completed
Total Quanity Total
$2.00 $1,204.00 602 $1,204.00
$75.00 $2,250.00 30 $2,250.00
$85.00 $28,135.00 331 $28,135.00
$305.00 $46,970.00 154 $46,970.00
$6,000.00 $6,000.00 1 $6,000.00
$7>000.00 $7,000.00 1 $7,000.00
$3,800.00 $7,600.00 2 $7,600.00
$4,800.00 $9,600.00 2 $9,600.00
$285.00 $24,795.00 87 $24,795.00
$145.00 $6,670.00 46 $6,670.00
$4,500.00 $4,500.00 1 $4,500.00
$5,500.00 $5,500.00 1 $5,500.00
$150.00 $600.00 4 $600.00
$150,824.00 $150,824.00
Estimated Unit Unit Cost �stimated Completed Completed
Quanity Total Quanity Total
106 TN $275.00 $29,150.00 106 $29,150.00
13 TN $275.00 $3,575.00 13 $3,575.00
6619 SY $4.00 $26,476.00 6619 $26,476.00
602 SY $4.50 $2,709.00 602 $2,709.00
6193 SY $62.00 �383,966.00 6193 $383,966.00
399 SF $4.80 $1,915.20 399 $1,915.20
4 EA $2,200.00 $8,800.00 4 $8,800.00
18 CY $28.00 $504.00 18 $504.00
107 SY $8.00 $856.00 107 $856.00
3 EA $650.00 $1,950.00 3 $1,950.00
599 SY $74.00 $44,326.00 599 $44,326.00
430 SY $30.00 $12,900.00 430 $12,900.00
Friday, February 13, 2026 Page 2 of 5
City Project Numbers 104925
Contract Name MADERO, PHASE 7
Contract Limits
Project Type PAVING
Project Funding
13 COMPACTED FILL 472 SY
14 REMOVE Bt1RRICADE & CONNECT TO 3 EA
EISTING PAVEMENT
15 CONSTRUCT TYPE III BARRICADE 1 EA
16 CONSTRUCT STD. PVMT HEADER 29 LF
17 STOP SIGNS (Rl-1) 2 EA
18 6" CONC PVMT FOR 6' FLUME (CO#1) 658 LF
Sub-Total of Previous Unit
UNTT V: STREET LIGHTING IMPROVEMENTS
DOE Number 4925
Estimate Number 1
Payment Number 1
For Period Ending 1/30/2026
$4.00 $1,888.00 472 $1,888.00
$500.00 $1,500.00 3 $1,500.00
$800.00 $800.00 1 $800.00
$30.00 $870.00 29 $870.00
$450.00 $900.00 2 $900.00
$53.60 $35,268.80 658 $35,268.80
$558,354.00 $558,354.00
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 2" CONDT PVC SCH 80 ('1� 571 LF $15.00 $8,565.00 571 $8,565.00
2 RDWY IIlUM ASSEMBLY TY 8,11, D-25, AND D- ll EA $3,000.00 $33,000.00 ll $33,000.00
30
3 LED LIGHTING FIXTURE (SOVI� ll EA $850.00 $9,350.00 ll $9,350.00
4 INSTALL TYPE 33B ARM 11 EA $500.00 $5,500.00 11 $5,500.00
5 RDWY IIIUM FOLTNDATION TY 1, 2 AND 4 ll EA $1,200.00 $13,200.00 ll $13,200.00
6 #10 COOPER WIRE 571 LF $6.00 $3,426.00 571 $3,426.00
Sub-Total of Previous Unit �73,041.00 $73,041.00
Friday, February 13, 2026 Page 3 of 5
City Project Numbers 104925
Contract Name MADERO, PHASE 7
Contract Limits
Project Type STREET LIGHTING
Project Funding
Contract Information Summary
Original Contract Amount
ChangC OY(leYS
Change Order Number 1
Total Contract Price
DOE Number 4925
Estimate Number 1
Payment Number 1
For Period Ending 1/30/2026
$746,950.20
$35,268.80
$782,219.00
Total Cost of Work Completed ��g2,219.00
Less % Retained $0.00
Net Earned $782,219.00
Earned This Period $782,219.00
Retainage This Period �0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$782,219.00
Friday, February 13, 2026 Page 4 of 5
City Project Numbers 104925
Contract Name MADERO, PHASE 7
Contract Limits
Project Type STREET LIGHTING
Project Funding
Project Manager NA
Inspectors T. GARDNER / J. ROGERS
ContraCtor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH � TX 76119
DOE Number 4925
Estimate Number 1
Payment Number 1
For Period Ending 1/30/2026
City Secretary Contract Number
Contract Date
ContraCt Time 135 WD
Days Charged to Date 187 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center
Amount Gross Retainage Net
Funded
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $782,219.00
Retainage This Period $0.00
Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$782,219.00
$0.00
$782,219.00
$0.00
$0.00
$0.00
$0.00
$0.00
$782,219.00
Friday, February 13, 2026 Page 5 of 5
D�LOPER-AWARQED-PRDJEGT CHANGE OF2DER
PROJECT NAME:
GONTF2AC7:
CFA #
CP#Y PROJECT #
CITY S�CREfARY GON7RACT #
F1D #
x�
FiLE #
INSPECTOR:
PROJEGT MAiJAGER:
MADERO PNA5E T
(tlNiT I) iRtRTER, {EINI'P tf} SEiM1IER, (UNEIT III} DRAINAGE, (UNlT 11n PAVEMENFT, (UNIT Vj
STREEiLEGliTS
2k-D436 � CI7Y PRf2i4CiPA710N:I NO
1Q4925
�2847
F! � # 3f1'f 14-0ZEf043t-404925-E07685
X-28015
W�3Q13
Jahn Rodgers
Sandip Adhikari
WAIER
Cost ��i
QRIGINAL CRNFRAC'F t2�2,65Q.o6 f406
EXTRAS T� DATE SP.DQ !i PO
CREdITS TO �AfiE S�,DO 'W +�
car�rr�cT ro onT� sz�z,856.00 �
AMDUM OF PRpP, CHANGE ORDER S11,SQ0.04 I Sp 0p
��n � coNrwRcr n�ouwr sxa�,�sa.ao sa rc
T0�1��EVlSED COMTTiACT AMOl1PfT PER
UNtT 1284,158.00
FCE�ASk'fl COSr SHaR� Dev. Cost
TbTAL RENIS�A GOkSIL�GT
Phone �lo:
Phone No:
SEINER
Oevelaprr
Cost �i Gns�
S3bG�8�8.0a f� OQ
iA.40 !o dR
3o.oa _so ov
j366,689.40 {G 6S`
xa.ao ss oe
�fi6,649_00 � '_K`.00�
5386,6Q9.08
�i,432,888.46
682-21Q-8044
817-392-8424
CONTi2ACT UNIT
[1RAlNAGE
Developer
Coat _ �'.�y Cu
�i64,Qi4.8D ib.00
�0.0+14� fA OC+
Sa.00 tt� oc
=150.,824.04 i0 00
id1.4f1 i�Q 00
stsv.aza.00 so �o
�15@,824,Ofl
c'ity Gc+il
S1,432,386.80
CHANGE
QRDER P[o:
1
PAVING
17eveloper
Gaat C��i..�
552S,OE520 iQ 40
�0.00 i� QO
SO.uD Ij !a o0
3523,OE5.20 I ;4 DO
335,2fi8.8D t{! QO
�sss,�s� e:o s� o0
.0
S7�i tiGHi'S
L�ava�oper
Cost C Go
ST9,o41A0 ti@4
Sti.AS1 f{ oc
5�.00 fa �00
ira,o��.ao io ao
jB.flO �C e7C
S�.oa�.oa sa o0
TO 00
REVIEWED
By Sandip Adhikari at 3:54 pm, Sep 18, 2025
,
WORK�IG
DAYS
120
0
0
'f 2Q
1S
135
Ctevised: 12-17-ZOiB Page 1
You are directed to rnake the [aRawing changes in the cantract dacumer�:
fResidentiaf lnfrashvttu 1
CfFY BID fTE1�1
� PAYfBT.EiJI� I 988B.00i4 I��.��ODm I EP. 1SERR�GAT1flN5`fRV1G�E�BaRE ��50.46 �I �i .5AD.E10 ��i11,�.00 � 3D.0€I � S 1o5fl0.00 �
TOiAL11NIT 1: WATER IMPROVEMENT$ S'i9�D
Asterlsk (`j indlcates New Pay Item
��ie=i�ertral lnirasfru�ti�r:�
IPAY78TEM� 1C199BB.0075�� �fiU58�.00TM UF� 6°CO�C��FOI 6�OFLIiME �CF411�MdtOPricel UI+41T 553.60I�5:�5,2fie.8�`I CSr1.4[} I 535, 68.80 �
� f
3r '6a.aiF
Astsrlsk (') Indfcates New Pay Rsm
. .
REVIEWED
By Sandip Adhikari at 3:54 pm, Sep 18, 2025
Revised: 'l2-17-2018 Page 2
RF.A.40NS F4R CF#�WGE OR�ER
RECf)MNIENCC3ED:
LJA Enginccring, Inc.
Bv: ��'`� �
Atame: Qarde! Bet�en. P.�.
Title: Proleci Manaper
APPROVAi. liECONI[MENDE�:
r�1t' - Wat�r DePertmen�
Br. Not Applioahle
Name: Not Applicable
Tii�e: Nat Applicabte
�iECqIMN1ENDED:
CFW- "Contracl Campliance lkanager
By:
Name:
T'�fe:
NlBC FEumber.
Nk&C bate Approved:
Change order rcquired far the addition af angaGoe service forlarrdseaping, as shown fn Revis%rt Na. 3 nn Sheets 2, & and 12. This chaege order also inchrdas the
add,tiort of � c�. ,�r�fe Hum�, svh�la was �+miKed hom fhe oripirta! hid prnposal. No plan nsvis�ns are requir�i �'or this item.
APPROVED; APPRQVED:
' e �r �o ;P^ irt rs�.�� and CpnStrvetion, LiC. truefion TX. LP.
date: 09V9912D25 BY ��ate: "[I�t �7_S BY ��a"t"�Yii�
�pa � . � , Name: Adam ms
Titl�!: �� � Title: �Nana9er
.J
APPROVED:
(;FW - As9i5lant Gr�y Manager
f]ate: BY= ?da# AP�icab�e
Hame: f�atApplicahie
TiBe: NotApplicabEe
ATTE5T
Daie:
MIA
N/A
Date: 8-11-25
a�to►rEa as s�o r-c� anm � r.�6, �,r;
GFW „4sssistanf Ci1y Aftom�y
�ate: BY. Not Aop6c2t�le dabe:
Name Not AD�icable
Trtle: Nol Apdicahle
By Not Appliea6le �ate:
Name: Jannette S. Goad�ll
Tt�e: Cityr Secretary
.
• CoRtrBGt Compllanee Manager;Project Manager}:
By signing I adviowled�e tha# 1 am the person respons�le
for Ne monitoring a�►d adminishation af this oontrad,
and ensuArg a� perforrnance and reporting require�nents.
0 There are NO C9i� �unds assoc[ated withh this Contract
❑ There are City Funds assoc�ated wiih this Contract
REVIEWED
By Sandip Adhikari at 3:54 pm, Sep 18, 2025
,
R�vised_ 12 97-20'18 Page 3
�`o�� ����rx�
TRANSPORTATION AND PUBLIC WORKS
February 11, 2026
Conaster Construction TX,L.P
5327 Wichita Street
Fort Worth,TX 76119
RE: Acceptance Letter
Project Name: Madero Phase 7
Project Type: Drainage,Paving and Streetlights
City Project No.: 104925
To Whom It May Concern:
On February 11, 2026 a final inspection was made on the subject project. There were no punch list
items identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on February 11,
2026, which is the date of the final inspection and will extend of two (2) years in accordance with the
Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-8424.
Sincerely,
�
Sandip Adhikari, Project Manager
Cc: John Rogers, Inspector
Troy Gardner, Inspection Supervisor
Charles Hayes, Senior Inspector
Andrew Goodman, Program Manager
UA Engineering,lnc , Consultant
Conaster Construction TX, L.P, Contractor
Lennar Homes of Texas Land and Construction, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
AFI� i i7A V I'I'
sr��r� or TLxns
ca��tv'r� o� �r�n��AN�r
�3cfnre rr�e, the euiders'sgncd authority, a No�suy Puhlic in thr s�te and caunty afnresF►id,
on this d:�y persvnaliy gppenred Brock Fiuggir�s, Prc�ident af Conatser Managemrnt Graup, Inc.,
gencral partner cyF "nnst�er Cnnstructinn TX. I.�, knnwn tu me �r� be a crcdib3c persan, who
being hy me duly swom, upc�n his aath deposed and said:
That A11 porsr�r�s, firms, �ssoriatians, wrporetioris ar athcr argani�ntians furnishing
l�hor andlor materials ha�e ht;e� paid in fiill;
'l'hat �he wage scale estublishad by thc City Cauncil in the City af fiart Wnrth, Etas
tacen paid iri full; rand
That lhore �re no cIaims pcnding t'ar personal snjury sndlvr praperiy deumagts;
�n Cantra�t described a5:
M,hI3ERU FH. 7
WATE�t, SANITARY SEWER, ORAIIVAGE,
PAYING & 5TR£ET L1GHT iMPRQVEMENTS
CFA Pit] # 24•OL36
CITY PR[3jBCT # 11U4925
CITY dF FORT WdRTI-[
STATE aF TEJCAS
CONA�ER CONSTRUCTIDN T]{, l.P
,
i3rvck Huggins
Subx:ribed and swnrn io hefare rrie �i3is 3Uu' day of ]amessy, 2D2fi.
K,aTHERINE ROSE
MQ7�Mf ��iC. �TA�F � �17A�
o� Ya��iiisa
corr cv. r, •�e�e2.
}•;,� �_ � , • .• � _ � �'t:. �.� �
Natary Public in'Tc►rrant Counry, Texas
C�NSENT C]�
su�ErY cvnnFan�►r
TD FI1►lAL PAYIUIENT
cw,romn wit1, tl,. am.,icea, �iur+ddm ot
A.u,ksr�,. nww vocun�u,i a�o7
PROJEC'F�
Iname. addreasl��o s>t+sse 7
Fcrt Wort�.Tx
ra caw�M
ow�ER ❑
ARCHITECT CI
CONTRAE�QR ❑
SURETY ❑
pTFlER
i CITY OF FORT YyDRTH p� CE WYAR HOAAES nF �
�x�s uwowao causrr�uc��an, �r�.
1231 i3�a�ay Q�',. SuNE b04
� I7l 75D3B
�p1+ITRAGT�Fi: GOi�1�4TSER G4RSTRlJC710N TX. L P
J
Bartd hEa 026�0?9
ARCHI7EGT'S PA�,i€CT Na: �FA�.zs.n��
con�r�acr Foa:
YVate*, Sa�:lary Sewer. pr��ndge. Asving �, Slr�! ligh! ImprpvpmarXa
!a MaOc�a Phase 7
Gfl1�iT�1ACT DATE:
[n .. _..1'��... with the provisiom. of the ContraCt beiwax� the flwner and the Cantrector as indicsted n6o�e, ths
n�. �..n �w+�..�e .aa�■.. � s�w.�,� cw„wn�l
BERKi.EY 1hiSUFiA7�rCE COAdPAHY
475 5�earn�v2t Roari
Greenw+ca, Cr UB&3o , SURETY CaM�A1�kY
on bond of uw. Mrre �n.++a wa... a cv�+a.���
CtlNAiSER CONST�iLfCT�ON TX L P
5327 V1�chila St
Fnrt Wonti TYt 787 t�-fi435
. CONTRACTaR,
hcrcby approves of the final payroerti W tha Cvntractor, and agrees Ehat firsal payment tu the Con�actor shaii not ra14e►�e
the S urety Com pany of any of its nhf igstiasu lo m«. � n+�++. r�a .am�.� or �,Mr�i
C17Y a� FO�t7 YVDRTH AN4 LEiikAR 1-Ip1�A�5 QF T�1(AS LAkO ANO CONSTRUCTION 1.TD
1237 Geenway �r, Su�ee 80a
�r,nr,g rx �so3a , vwNF.R,
as set fo�th in the seid Sutat]r Corttp�ny': bo�d,
ItJ WI7'N6.S5, WHEitED�'.
�he 5 urety Carnp�y has hereuiata set its hand Ihis
anass:
{Sea[J� .�n�-''�` ` �--rr�
29�n day af .lanusry. 2aZs
eERlCLEY IHSURANCE CQMPANY
Surety Compeny
�o�i t� 'J%s-'!,?-t�/.��
5i�atu�e of Anthorizcd R�rraentaiiva
��}�, A[mmevrrnFaci
7'ide
HOTE: T�f rom� n m W rrM r� oampr�4fn tlecwnw+t m AL4 DOGUMENY D7C6, d0/JTMCTOl1'S �Fi1DAViT OF MYM�IT DF G�TS µP C1.14l419.
Curnnt b�flpn
ONE PA4f