HomeMy WebLinkAbout061420-AR2 - Construction-Related - Contract - Jackson Construction, Ltd.CSC No. 61420-AR2
FORT WORTH . City of Fort Worth
��''�� Construction Allowance Request
Project Name� Trinity Boulevard Phase 2- Salado Trail to Thames Trail
ClientProject#(s)� 103280
Project Trinity Boulevard Phase 2 Salado Trail to Thames Trail - Roadway, Drainage, Waterline, Landscape and Illumination Improvements
Description
ContractorlJackson Construction, Ltd. I CA#I 2 I Datel 1/22/202E
City Project Mgr.l Mitch Aiton I City Inspectorl Mark Kitts
UNIT or DEPT Unit I, III 8 IV Unit II
OriginalContractAmount $7,117,637.00 $4,981,705.00 $12,099,342.00
Extras to Date $37,870.79 $37,870.79
Credits to Date
Current Contract Amount $7117 637.00 $5 019 575.79 $12137 212.79
�Amount of Proposed Allocation $6 308.47 $0.00 $0.00 $0.00 $6 308.47
Original Allowance Available to Allocation $350,000.00 $150,000.00 $500,000.00
Allowance Funds Previously Allocated $6,140.00 $6,140.00
Revisetl Allowance Balance $337,551.53 $150,000.00 $0.00 $0.00 $487 551.53
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL:
This Construction Allowance Request is to add bid item Manhole Adjustment, Major, to adjust the top of an existing sewer manhole to grade on
Seguin Trail, a street connecting to Trinity Boulevard. The work was called out as a minor atljustment in the plans, however, there is an existing
brick structure in the manhole that must be removed and reconstructed to our current standards to adjust the grade. A minor manhole adjustment
bitl item was not inclutletl in the contract, so a quantity tletluction is not necessary. Bitls were recently received for the Avontlale Haslet project
(CPN 101014) with cost for the same scope of work being $9,870IEA. Staff deems the proposed price of $6,308.47IEA reasonable.
� City Sec # � 61420
ITotals
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
Jackson Construction, Ltd.
;,�,�
�s,,,. ,cs���
���, r�nP.� � o2i� 2i2o2s
ii�I�Of1eS �I�.� ,r�cn'z�ii�hv�.is:�ic�i�,
Date Project and Contract Comp
02/10/2026 ,��u� �F � , ., �:_,T.
Date
02/10/2026
Assistant Director (Dept)
�mua_� wart �k
r - F.h�� ,-n�sn��r
Assistant City Attorney
�
ATTEST: �FOq;np
. , . � a`oao,,,o00004°a
_�.�w .. w�. . �� o 000�oo
o °o
Jannette Goodall, City Secret ry '0p;'�oo °<
'd°a aa' oaado
02/16/2026
Date
02/19/2026
Date
02/23/2026
�..r7,.�.
02/18/2026
Date
02/19/2026
Date
03/01 /2026
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 4
FORT WORTH. City of Fort Worth
��—" Construction Allowance Additions
i
Project Name � Trinitv Boulevard Phase 2- Salado Trail to Thames Trail �ity Sec # � 61410 �
Client Project # I 103280 I
Contractor�Jackson Construction, Ltd. � PM� Mitch Aiton � Inspector� Mark Kitts �
Construction Allowance Submittal # 0 ate � 1/"L'1l'1U'L(i �
ITEM DESCRIPTION
I-62 3305.0106 Manhole Adjustment, Major
ADDITIONS
DEPT
Unit I. III & IV
Qty Unit Unit Cost
1.0000 EA $6,308.47
Total �
$6,308.47�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
$6,308.47I
$O.00I
$O.00I
$O.00I
$6,308.47I
I Unit I, III & IV
I Unit II
I Total Additions
Construction Allowance Additions
Page 2 of 4
FORT WORTH., City of Fort Worth
����� Construction Allowance Value
Project Name � Trinitv Boulevard Phase 2- Salado Trail to Thames Trail � City Sec # � ti142U �
Client Project # I 103280 I
Contractor� Jackson Construction, Lttl. � PM� Mitch Aiton I Inspector� Mark Kitts �
Construction Allowance Submittal # � Date � 11"111'1U"L6 �
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 59 9999.0007 Construction Allowance 0.018024 LS $350,000.00 $6,308.47
Construction Allowance Value
3of4
MISBE for this Construction Allowance Request
M/SBE Sub Type of Service Amount for this CAR
Total I $0.00 �
Previous Construction Allowance Requests
CAR # DATE AMOUNT
1 1 /28/2025 $6,140.00
Total I $6,140.00 �
Construction Allowance MSBE Data
Page 4 of 4
vE
o+oo
PROP 9" ASPHALi
TRANSITION
(SlIB51DIARY TO
*THE CONTRACTOR SHALL �OORDINATE �
WITH PROPERTV OWNERS 7 DAVS o��
PRIOR TO GONST�CTION +
PROP� CUFB FAMP
10 T ODFED�
coNNecr ro ex
DRIVEWAY E% BRICK WqLL k
MONUMENT TO REMAN�
E% DRIVEWAY PROP 5' SiDEWALK
— E% ROW� TO REMAIN�
—� I lOC
1 � _
FATCDEPiH� SAWCUi
H EX AVEMENT� _ _�
\ \ 3
�` � ^ 02
�
��, SEGUIN TRAIL
E% WATER LINE �MINOR MANHOLE
�TO REMAIN� qDJUSiMENT 1+00
+
F�UiL DEPTH SAWWT 08
M CH E% PAVEMENT
PROP CURB � �
RAMP TY R-1
RE SHEEi C4.08 _
� --' _ —
L Z(iC —
06 � �
�EX iREE TO
CONNECT'0 I REMAIN (iM)
EX SIDEWAL�C�\
ml I
�
` � 1
�\ o � II
Z lo
Ji� <
\Ci PFOP FA QJ
OF CURBCE r
� O +�
�, \. PROP 36"
iER wE
�I �
ZIC . TY �lLVD C/L I
��EX GAS uNE
PROP a"
WATER LINE
I �+00
PRov SEGuiN � �
- �TRAiL C/ �
S�
�—�w�� I
—� G - Cn/L STA I I
CL SENII . C/_ Si _I-89.46
I
j PROP FACE 1
� OF WRB }
TX COMM LINE I
�t � q% E�GE O 0 REMAIN
� � SPHALT F 1
�JRB R 1F /I I
o_ F eo '
� Ex.�NJI — 105 10
� �I 1
\\ �I �.:::. I
" 'vc Q l P P
PROP 4 SDEWALKJ / L 0 i
E%IJGHi POLE i0 REMANJ �
E% FETAINING WA�LL TO E% BF TK WALL &
BE PFOTECiED IN LACE �,ONUMENT 0 EMAI�'
ISCALE = 10' HORiZONTALI
= 2' VERTICAL
516
512
508
504
S�� �-�
0+00
Major Manhole
Adjustment _
\
: � �y'
. �'.ss','?,�¢t.�
. ` . ,:l�dA��+i'1� i f � . 1 '� i . . � �. '..
_ . ; •i '�
_ t�f�• ,• , �•-.
�,, ,
_ '. ._. _ . :.,,.:• . _
i+oa
REVISIONS
P k.@ R 1 D p 1 1
(PARD)N 1 P� � ull �ork o. QQ oEscxP*oN onrE
� d I- r,hC yp� kl� d I�nd
� �� d � Jb�P4RD � 0
�iclidingnyh�-ot-�vny, medians, 3 0
�� �,aanomF, «m�� �m.�, �a�:�veys ^ �
- �a �„ay ���m�� m �"o�k aa�e����m
Ciry��erklend GRnPHiC SGn�E in FEET
Ciy Parks(ConmctPerk Plenncr � 5 io 2
R I'1-39L5'/64)_ p �
I.AII dutilit IF PLAN SHEET i5 11xi�,
P�aFlas� y SCALE IS 1'=20'
improvcmcnbontsidcofarccordal LEGEN�
�� �� cnt[s� and locetcd in and/or
rhrough e park shall req�ire parkland
' ' -' � "co[da�tceloS�a�eof CONCRETE PAVEMENT �
TexevlPerksandWildlifeCoAe wiTHiNTEGRtLLCURB
Chnpler26 covcREtE irtni� O
2.Const�uclion cquipmcnl IVTEG��L COLORED AND
and/or s�aging,malcrialssloraF�+ TExTu2Eo CONCRETE �
and ma�erials [es[inq ma}' nof
prinn fity parkland nifhnut
r written nppra�-nl from C¢. Q�
PARD. —
3. Priurlo bebinning r�urk on No. C/L STA OFFSET DESC T/C ELEV
parklan�, con�acl PAI2U af p� 1+42.}� 5SU}' Li PC 513.1)
817f392-5761, ro echedule an
n- ite meefing t� Incate PARD 02 1+12.)4 18.00' LT PT 512.62
ulilitie�, tree prntectinn, and 03 0+92.48 18.00' LT PI/IAATCH E% 511.813
parklnud fcncing. Pruvide
]2 h 1 04 0+92.48 18.50' LT PI/MATCH E% 510.69t�
4 �' �� � � k� � h} 05 0+15.43 16.50' LT MATCH E% 50].B4t�
i �� i-�r a�-
�� - F - b - �ntil O6 0+15.5� 3].02' RT PC/MATCH E% 50).2pt�
�� �- Ol 0+1).0� 33.02' RT PC/MATCH E% SO1.59
Alld�� b � t g..il'
� y � I � I � p n OB 0+32.00 18.00' RT PT 508.62
�b P � P� J 09 1+3].O8 18.00'RT PC 512.]t
' �rPne � i cu�d tions
- b : � JJ � I i�u�l i� 10 1+SS Bl 35.09' RT PT 512.5]
1'ARD. � ELEVAnONS SHOWN AT TOP OF PAVEMENT
f_S lfo b' ktll.h IlAcfmcof NOtEE%SiNG FFGATON SYSTEMS LE ALONG THE PFOJECi LIMITS
�an dcl�n.sand rocks ¢rcetcr � CONiFACiOR SHALL SURVEv CONIFACTOft SHALL SUftVEY, TEST.
tl�vn,lu�in,ch_I3vekfillwi�helcensail AN� DOCUMENT WORKING ORDER OF E%ISTiNG IRRIGATION SYSTEM
���iortasccdingoc.�odd�ing_(Rcfccro GRIOR i0 CONSTRUCTION
3�9119,329? 13and329214) �� LDJIlSilAENiS NEEDED i0 E%ISTING IRRIGAiION SYSTEM AND
FEStORE� t0 EpUAL OF BEttEF
"1 TurC�nslallnlioi�mi�elcomNly CONDSTIONNPAYMENT I�NGLUDE� WITH LANDSCAPE IRRIGATION
' hCFWS I� IC - RESTOFATON ALLOWnNCE TEM
3 ALL DMENSONS ARE TO FqCE OF CURB UNLE55 OTHERWISE NOTED
Sp ' f't�o D' �3292�n q REFER TO E%STNG uTLiv nvOLi SHEEiS AND uTluTv
13-5 dd ny d� 32 92 ADJuSiMENi SHEEiS FOR AI]Il ICNAL NFORMAiON
I3 \ N�tire Seedi�e. ���11,
R. Up rcqiicst �hc contrac�or �„'� ''� a/ o/zoza
n u p d��o Pnuo,�oo� or r:��'� ����4
rt ao�osonsod,sod s�a�ng. $t:` ..............::r.G,
�nA hydromulchmg pnor lo � ^
insiellel�on;nlong wnhihe delivery % �
�icke� (Referlu 32 9? 13:in� 32 42 f ��
iai ..a�.�'.�..o�
9_AllcroFion control mv[ccivlc and � L �
.. �wu..' ✓ �GW¢3�'
fcn �o bci oval,incliiding silt � �
fcncc anAtrcc pro�cc[ion,at ■
�im°�°°°°°�°���° Kimley>>>Horn
o ro�ex�sn�5o�iy�ve�io�eme�o,
«n� �o pa�e i a��d is.
ii_ro�m��„m��ro�a�m�i,2r�� ano�e��ei7�%3s-`e5�;"rox�e;i7'3is `so ow°;evc o��o� No r-sze
o pa�c 152 9
CItY PRO✓ECt�Q103280 MAPSCO N0. 0660 & O6)A
CITY OF FORT WURTH, TEXAS
TRANSPORTATION AND PUBLiC WORKS
CAPITAL DELIVERY DNiSION
TRINITY BOULEVARD ROADWAY
IMPROVEMENTS -PHASE2
SALADO TRAIL TO THAMES TRAIL
SiDE STREET PROFILES
SHGUIN TRAIL
oEsicnEo� 1or scA�E�. onrE sHEEr 22
cHccKEo. o�s ���� %�pri12024 C¢,p]
�'`� Jackson Construction, Ltd.
Change Order Request
Item Description
NEW CHANGE SCOPE OF WORK
Sewer Manhole Adjustment ( Major) remove existing
brick riser, convert 24" concrete cone opening to 30"
cone opening, adjust to grade, install 30" ring & cover
See Attached Breakdown
i Additional Days Requested: 1 Calendar Day
Total
Project: Trinity Blvd. Phase 2
Project #: CPN -103280
City: Fort Worth
Date: 15-Jan-26
Quantity UM Bid Price
$
$
$
1.000 EA $ 6,308.47 $
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Amount
6,308.47
6,308.47
Page 1 of 1 1115/2026 4:16 PM
JACKSON CONSTRUCTION LTD.
Force Account Daily Time and Material
County Tarrant Project Trinity Boulevard Phase 2 City Fortr Worth CPN 103280
Description of Work: � Sewer Manhole Adjustment ( Major) remove existing brick riser, convert 24" concrete cone opening to 30" opening, adjust to grade and install
Date: 15-Jan-26 ;�0.' rmq...�..cover .. ............ ............ �... .. ..._.... ___..........�
�,. ,.,,, ... ..
y,���
EQUIPMENT � Labor �
,
..u.�,,� � ... , �
Description Hrs Rate Amount � ,,, Hours Rate Amount �
�,�,,�. ���.�m�... ( Reg �T,.�OT � Re� 0T "
.� me� �... .. ...� _ . . _.. .. -� �m»�.., ti,.-, ,�„ , . � .
i
, , �,�.
Caterpillar 326 Trackhoe $ 110.46 $ Utility Foreman ' 10 00� $ 50 00 :$ �$� 500.00 ;
;Caterpillar 320 Trackhoe 8 00 $ 100.25 $ 802 00 rUti� Crew ; 10 00� �$ 146 00 �$ �$ 1,460.00
. .. ._
��.
Caterpillar 938 Loader 8 00', $ 88.34 $ 706J2 � ; ; $ � $ _
. _ .. ............
'Pickup 1-Ton 10 00'' $ 22.52 $ 225.20 �
� ; $ �
� _ __ _
___
� $
� 3 r
P,.......,..... � ...,..._ ..................._. 3 � ,,....,. ,....,...... __. _.......
� I 3 � �
r. ......... .._....... . ...............i .......,,, ,,,,,,,,
�y 3 $ �. —..
E..y..._.. . ......,,,
_., . ._. _ ,_
,
� I �
; fI .. _ .._._._...., � � --""-""`— _ If �,......,....v.._�_____.
`, `I ,,.,,.,....
€ . ............ ......4.......,_. .,,....._. ,� ...,
� � � { _
y � m � __.�
�
y. _. .. $ _ .._ �
�
�. . ,._�,�� ��., .�, � � ,� �, � ,.� �,� x� � .� a..� _ _.. $ , _ _ _
E Sub-Total9 1,733 92 �� �
15% $ 260 09 �
� TotalEqwpment:� $ 1,99401 �'
M,�, �„ . � � -.� ,. , _ a��� „ .:.µ�,,, ..,�
_..... �
� __ __
... _ . ..... _ .....
._
_. _..
. _..
. . . $ [ $. -
�.__._ � $ _�_$_ �.. ... �_.. m
... ,,,,,,, ; ....,, . , ,,,, .,�, mm. , ,.
, ,. � „ „ � .... ......... ......... �
..........
! ; � $ ; . _ $ .. ,�:__,.
� � �,
._ .,,...,_..�.._ .......... ... � _ ,,., . ..�..�,�, 3 Q .... _._�..�.. ,,,,.... .... ...._.w.....
� •V �D '
Q.. .. . ... ...........Q _
,..... . S ... .,_......._._..__I _�QD ! J�
....„ I � � � �
w�
{ � $.__ __
r���� �!.�„ �__,�.x$�M,_...�,�_.�m�,�$ -......
Sub-Total $ 1,960.00
55% $ 1,078.00
15% $ 294.00
Total Labor: $ 3,332.00
_. ................... .
Description
Ring�&�Cover �
Quantity; UOM { Rate � Amount
,, � _, ��-.�,a� ' � ,��� . ��. .,.,.,. ,,,,
1 00 j EA �$ 800 00 ,$ 800.(
i......._ ..._ ; � � .,.._ ............ ..
_
iI....................... ' ...�Q......___...._...............
!j � W '
I � .
,... ....., ...__........
i......._. ....,.o .,,,, .. ......, � .............__,.
Sub-Total, $ 800.00
15%; $ 120.00
Total Material:� $ 920.00
Approved: Steve Haberstroh
JACKSON CONSTRUCTION LTD.
Date 01115/26
Date
JACKSON CONSTRUCTION JOB � 3376
, m..:.,,, ,,,,,,,�„
ontract ������"
Quantity; UOM �4 Rate � Amount
;�� �,�
�. w ,,j � =w ��, . . .,,�,,, , ,
...� � ` $
: ( � $ ....__........-
....... . ...... ..._.. _ . � .
„e,._ _.__..........., `' Q
....................................... � . _. ___._. _ _ `(. ��.....
...Q , ........................,,....._
€ W '
.. .___ � __. fi Q '
J�
�.... .... _,. _...... _. _..
_
........£, .,, _,. .......,.€@ Q
.......... ... ......... . ..... @ W
i '
_ ,
,:: .�,��.�.,......, n,,,,m.. .,,...� ,...�,�,,,u, 0 1 $,,,�. .m.�..�_�
Sub-Total �
i$ _ ,r;
Total Subcontract € $ �
-- .,�� �,:,., � .,._..�,: .� �.,,,..�,,,�;
.,, w �, ..,.,:. ,,,
� Summary �' �
� ��,.. a...�, , _ _ ��,,�.�.. b ,,. z
,Labor ! $ 3 332 00
..................__.... �._,,.�
�Equipment 3 $ ����� 1,994.01 �
�Material � $ 920.00;
_ _ .........._..___. , ,
Subcontract i $ ;
� ..... . ........ .... . . . ,.... . _
�Bo�d 1% $ 62 46 g
�. , -
�TotalThis Sheet , $ 6 308 47 �
�ti� .ra.,� �.�,,.� �.,,. m�.,�.z.�.,,A..�.,,u t ,�„A.� „�..a�� w ��
1115/2026 4:16 PM
F�RT �aRTH�
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Trinity Blvd Ph 2 CA #2
M&C: N/A CPN: 103280
Date: 2/9/2026
To:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
11
12
Name
Crystal Greene
Mitch Aiton
Ali Jones
Mark Kitts (Inspector)
Raul Lopez
Lissette Acevedo
Patricia Wadsack
Lauren Prieur
Doug Black
Jesica McEachern
Jannette Goodall
TPW Contracts
CSO: 61420
Department Initials
TPW - Review �
TPW - Signature M"�
Jackson - Signature A T`T
TPW — Signature M�
TPW - Signature ��-
TPW — Signature �
TPW - Signature PL'VV'
TPW — Signature �a'��P,;eu�
Legal — Signature o��g�sBlack
CMO — Signature �
CSO - Signature �
DOC#: N/A
Date Out
02/11/26
02/10/26
02/12/26
02/10/26
02/16/26
02/18/26
02/19/26
02/19/26
02/23/26
03/O1/26
03/02/2026
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CiTY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
NEXT DAY: ❑YES �No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
� For Your Information
� Signature/Routing and or Recording
� Comment
❑ File
Return To: Please notify TPWContractsnu,fortworthtexas.�ov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!
F�RT�OI�TH��
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Jackson Construction, Ltd.
Subject of the Agreement: Construction Allowance 2 to add Manhole Adjustment, Major pay item.
M&C Approved by the Council? * Yes ❑ No ❑�
If so, the M&C must be attached to the cont�act.
Is this an Amendment to an Existing contract? Yes ❑ No 0
If so, provide the o�iginal contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsu�e, see back page foN permanent cont�^act listing.
Is this entire contract Confidentiial? *Yes ❑ No � Ifonly specific information is
Confidential, please list what info�mation is Confidential and the page it is located.
Effective Date: Expiration Date:
If �different, fi�oin the approval date. If �applicable.
Is a 1295 Form required? * Yes ❑ No �
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: Ifapplicable. 103280
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes � No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the infor�nation is not provided, the contract will be