HomeMy WebLinkAbout063082-CO3 - Construction-Related - Contract - Thalle Construction Company, Inc.CSC No. 63082-0O3
Fc� R1' Wc7 RT H City of Fort Worth
Change Order Request
, I rvonnsiae ui - rnase u- 54-incn water i ransmission nnam � Ciry Sec No.: I 63082 �
Pro ect Name: and Chaoel Hill West - Phases i and II
ProJect No.(s);I 5602610600430/001480 I DOE No. I N/A I City Proj. No.: I toasao•z
� !
Project Description:l Installation of a 54" water transmission main. Project also inciudes paving, drainage, and slreet lighting improvements for (
� Fleming Ranch Road.
Conlractor.� Thalle Construction Company, Inc. � Change Order # � 3 � Date: � 12I3012025 �
City Project Mgr. � Preeti KC � Cily Inspeclor. � Carmen Drake �
Phone Number:� 817-392-5467 � Phone Number:� 682-432-5486 �
Dept. Fieming Ranch Road Improv.
Water - Part I
Part II Part III
Original Contract Amounl $28,687,630.44 $2,099,427.30 �u1,529,223.00
Extras to Date $313,365.00
Credils to Date
Pending Change Orders (in M8C Process)
Conlract Cost to Date $29,000,995.44 $3,62F ,650.30
�Amount of Proposed Change Order $0.00 a0.00
Revised Contract Amount $29,000,995.44 $3,628,650.30
Original Funds Available (or Change Orders $573,753.00 $0.00
Remaining Funds Available for lhis CO $260,388.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CON7RA CT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
� JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 3 provides for ihe (ollowing:
Totals Contract Time
(Calender days)
$32,316,280.74 450
$313,365.00
$32,629,645.74 450
ao.00
$32,629,645.74 450
$573,753.00
$260,388.00
1.09%
$40,395,350.93
� Backfilling the face of an existing retaining wall with native soll to acl as a buffer that was previousiy installed by a developer fn order to
preveni damage during (nstailalion of the project 54-inch water main. The wall was installed afler receipt of bids on ihe project. The native
material will be removed after Ihe waler main is installed.
• The change order also provides for an additional reinforcement for the elght butterfly va►ve vaults on the project to protect against potential
additional shear forces lhat may be encountered subsequent to construction of the project. The steel reinforcement will increase irom #6 bar
@ 12" OC to #6 bar @ 6" OC and #6 bar @ S" OC respeclively tor three and five of lhe vaults,
ootl�[WaqJua Ewu
wi.aus.
E.;.•.�»,ow�vn
Jason Esparza g;;- �o � y�,
�'.�:,
It is understood and agreed that the acceplance o( this Change Order by lhe contractor constitutes an a�cord an�satisfaction and represents payment
in (u�l (both �Ime and money) for all costs arising out of, or Incidental to, lhe above Change Order. �
� I _ �� Nar�@ Cdnlractor Si,qnature bale ,
� Thalle Cons rucCon ompanm Inc. CC asetoa' r .
� y, ndall I i� i
Ins ector
�i� %�2�i�.�
Qireatar (Water Dept)
r�kr-�r.nGrz,- rc�-ae�
Se lor ssistant City Attorney
� ,, ,
M&C Number
Date Pto ect Mana er
2/23/2026 aaa,t'�G
_ _ Date __ _ Cbnsintc n supe�jsor�,lNater D�pk)
_'� ', � , 02/24/2026 ' ' ,i ' � � ,' .' //.!/
Date Asslstant Clty Manager _
02/25/2026 �\�� r,��.
Council Action (I( Requfred)
NIA � M&C Date Approved �
NIA
Date
2/11/2026
Date
����� �
Dete
03/04/2026
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FQ R T�'�O 1�T H City of Fort Worth
�= Change Order Additions
Project Name � Northside III - Phase II - 54-Inch Water Transmission Main � City Sec No.: � 63082 �
Project No.(s): � 104940-2 � DOE No.� N/A � City Proj. No.: � 104940-2 �
Project � Installation of a 54" water transmission main. Project also includes paving, drainage, and street lighting improvements for �
Description Fleming Ranch Road.
Contractor � Thalle Construction Company, Inc. � Change Order: �3 Date: � 12I30I2025 �
City Project Mgr. � Preeti KC � City Inspector � Carmen Drake �
ADDITIONS
DEPT Qt Unit Unit Cost Total
46 Protect Existing Headwalls Water - Part I 1.00 LS $19,729.00 $19,729.00
Steel Reinforcement #6 bar @6" OC to the Butterfly Valve Vault Greater than Water - Part I 3.00 EA $3,213.00 $9,639.00
47 15' depth
48 dee�hReinforcement #6 bar @8" OC to the Butterfly Valve Vault Less than 15' Water - Part I 5.00 EA $1,713.60 $8,568.00
p
��Vater - Part I $37,936.00
�Fleming Ranch Road Improv.
�Additions Sub Total � $37,936.00
F� 1� T�'�O RT I I city of Fort wortn
Change Order Deletions
Northsitle III - Nhase II - b4-Inch VVater I ransmission Main
Project Name PI Hill WPst - Pha�Ps I apd II
� City Sec No.: � 63082 �
Pro�ect No.(s). I 104940-2 I DOE Nu. � N/A � City Proj. No.: � 104940-2 �
�
Project Description I Installation of a 54" water transmission main. Project also includes paving, drainage, and street lighting improvements for �
Fleming Ranch Road.
Contractor I Thalle Construction Company, Inc. � Change Order: ❑3 Date � 12/30/2025 �
City Project Mgr. � Preeti KC � City Inspector. � Carmen Drake �
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
45 Construction Allowance Water - Part I 0.18968 LS $200,000.00 $37,936.00
IWater - Part I
IFleming Ranch Roatl Improv.
�
IDeletions Sub Total
$37,936.00
$37,936.00
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Co #
Previous Change Orders
DATE AMOUNT
Total I $0.00 ,
12/30/2025
Northside III-Phase II 54-inch Water Transmission Main and Chapel Hill West — Phases I and II
Project
CSC: 63082
CPN: 104940-2
Chan�e Order 3 Notes
Staff has reviewed the requested prices and days and considers them to be fair and
reasonable.
Contract Compliance Mana�er
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
P�� KC
Signature
Preeti KC
Name of Employee
Sr. Professional Engineer
Title
4,�.p44�n��
G �O� fORt�O��IP
ATTEST: p�a o=v
p�p'f °oo o ° �`�
�.Q � � b
�`��A,
/, ��=�-�' aan nEXASaa
Jannette Goodall
City Secretary
�•����yra�:�xK•1:�•�
�y��-��xy:��r_�:�-i
FT. WORTH, TX