HomeMy WebLinkAbout059226-A2 - Construction-Related - Contract - RPGA Design Group, Inc.CSC No. 59226-A2
AMENDMENT No . 02
TO CITY SECRETARY CONTRACT No. CSC No. 59226
WHEREAS, the City of Fort Worth (CITY) and RPGA Design Group, Inc,
(ARCHITECT) made and entered into City Secretary Contract No. CSC No.
59226, (the CONTRACT) which was authorized M&C 23-0225 on the 215t day of
March, 2023 in the amount of $ 444,000.00; and
WHEREAS, the CONTRACT involves architectural services for the
following project:
Fire Station No. 37, CPN 104186; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 01
in the amount of $ 11,000.00 which was administratively authorized on the
30�' day of July, 2025; and.
WHEREAS, it has become necessary to execute Amendment No. 02 to the
CONTRACT to include an increased scope of work and revised fee in the
amount of $ 33,600.00.
NOW THEREFORE, CITY and ARCHITECT, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
Architectural Services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Architect totals $ 44,600.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Architect for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $ 488,600.00.
OFFICIAL RECORD
City of Fort Worth, Texas Fire Station No. 37
Prof services Agreement Amendment Template CITY SECRETARY Project No. 109186
Revision Date: 12/OS/2023
Page � of 3 FT. WORTH� TX
K�
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Valer�hington�(M 4, 2026 1625�13 CST)
Valerie Washington
Assistant City Manager
DATE : 03/04/2026
ATTEST:
�,� � .��
Jannette Goodall
City Secretary
4p4aoonb
�p�� ��RT �pdd
P�° o 0 09�1 d
�o
PVo o=G
�Cd�F �oo o� *d
O�nn nE4A54pq
APPROVAL RECOMNIENDED:
� �<<ti,_1;�a��
Marilyn Marvin
Director, Property Management
of the date subscribed by the City's
ARCHITECT
RPGA Design Group, Inc.
Javi ucio (Feb 5, 2026 15:02:46 CST)
Javier Lucio
Principal
DATE : 02/05/2026
APPROVED AS TO FORM AND LEGALITY:
Steohen inesH (Mar 4 2026 15:20:36 CSTI
Steve M. Hines
Sr. Assistant City Attorney
M&C No.#:
M&C Date:
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
OFFICIAL RECORD
�� ����
Nikita N. Watts
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/OS/2023
Page 2 of 3
CITY SECRETARY
FT. WORTH, TX
Fire Station No. 37
?xc,e�t No. 10�18����
Senior Capital Projects Officer
FUNDING BREAKDOWN SHEET
City Secretary No. 60001
Amendment No. 02
Fund Dept ID Account
34027 0360422 5330500
34027 0360422 5330500
34027 0360422 5330500
Project CF1- CF2 -
ID Activity BOnd
Reference
104185 001130 22040299
104185 001130 22040299
104185 001130 22040299
Total:
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/OS/2023
Page 3 of 3
Amount
$444,000.00
$11,000.00
$33,600.00
$488,600.00
f�iY�. ��t.�it.i�Il i�I�. _,
?xc,e�t No. 10�18����
�� PROJECTMANAGEMENTASSOCIATES
� CIVIL ENGMEERS AN� CONSTRUCTION MANAGERS
August 5, 2025
Javier Lucio
RPGA Design Group, Inc.
1530 W. Rio Grande Avenue, Suite 100
Fort Worth, Texas 76102
RE: City of Fort Worth Fire Station #37, Fort Worth, Texas
Dear Mr. Lucio:
Project Management Associates, PLLC respectfully submits this fee proposal letter for request
of additional services for the preparation and submittal of Express Community Facilities
Agreement (CFA) documents for the Fire Station #37 project. In the past, CFA documents /
submittals were not required for City of Fort Worth fire station projects. We had been told that
the City of Fort Worth does not form a CFA with itself. For this reason, the fee for the
preparation and submittal of CFA documents was excluded from our original Design Fee
Proposal dated December 19, 2022, attached herein for reference. Please note Exclusion No. 2
listed in Exhibit 1, page 3 of 5. We were notified in February of this year that a CFA submittal
would be required for this project.
The scope of work for these services is as follows:
• Prepare Express CFA (IPRC) construction documents in accordance with City of
Fort Worth Criteria
• Submit Express CFA (IPRC) application
• Submit construction documents to IPRC for review and approval
• Attend IPRC review meetings
• Address and revise plans per IPRC review comments received.
Our lump sum fee for the above scope of work is: $ 31,100.00
This work has been completed and the IPRC plans have been approved. The IPRC Project
Number is IPRC25-0050. A breakdown (staff and hours charged) for this fee is provided and
attached herein.
Please contact me at 817.715.1287 if you have any questions.
Sincerely,
Project Management Associates, PLLC
J se oto, P.E.
Senior Vice-President
530 eedford Road Suite 102, eedford Texas 76022. Telephone (972) 302-7635
Westwood
PROJECT CHANGE ORDER TO
GENERAL CONDITIONS OF AGREEMENT
PROJECT TITLE (the "Project")
CLIENT NAME:
DATE OF CHANGE ORDER
Fire Station No. 37 - City of Fort Worth (5639-23170)
RPGA Design Group, Inc.
January 9, 2026
PROJECT CHANGE ORDER NO.: 02
PROJECT LOCATION: Texas
PROJECT NUMBER:
R0042490.00
This Project Change Order between Client and Westwood is set forth pursuant to our Professional Services
Master Agreement executed on January 7, 2026. The purpose of this Project Change Order is to modify the
conditions, deliverables, schedule, and/or the scope of work as set forth herein.
I. Contract Documents
This Project Change Order, the Project Work Order to which this Project Change Order applies, and the
Professional Services Master Agreement comprise the contract documents.
II. Project Description
See Attachment A for project description.
III. Deliverables
See Attachment A- Scope and Fee.
IV. Schedule
Notice to Proceed is understood to be this Project Change Order signed, dated, and fully executed by both
parties.
VI. Project Change Order Attachments
Attachment A— Scope and Fee.
VII. Payment
1. The estimated Westwood cost/total fee for this Project Change Order is: $2,500.00
[Remainder of Page Left Intentionally Blank; Signature Page FollowsJ
westwoodps.com
(888) 937-5150
Westwood
ACC�PT�D AND AGRE�D:
CLIENT:
RPGA Design Gt��up, Ine.
_ ,�/�l_. !i� —
(S i gnat�ai e)
�Javier Luci %
(Name — Printed)
Principal
(Title)
January 23, 2026
(Date)
WESTWOOD:
Weshvood Professional Services, Inc.
�.cra�� - —�
(Signature)
Dustin Pustejovslcy, R.P.L.S.
(Name — Printed)
Service Lead, Land Surveying
(Title)
January 9, 2026
(Date)
westwoodps.com
(888) 937-5150
Westwood
Attachment A— Scope of Services & Fee Schedule
Land Surveying Services
ADDITIONAL EASEMENT DOCUMENTS
Based on a boundary survey of the site prepared by our office, Westwood will prepare separate
instrument dedication documents for water, sanitary sewer, storm sewer, drainage, public utility,
and/or franchise utility easements required as a part of development of the site.
Included in this item:
• Survey exhibits and metes and bounds descriptions for each easement.
• Coordination with City and/or franchise utility company staff for review and approval of each
easement.
• Coordination with Owners attorney regarding preparation of "Front End" legal documents to
be prepared by the attorney.
Not included in this item:
• Coordination with property owners.
• Monumentation of easement corners.
• Preparation of "Front End" legal documents (to be provided by Owner's attorney).
We propose that the total fee of our current contract be increased by a lump sum to cover
personnel expenses involved in these changes as follows:
Land Surveying Services
Service Description Fee
LS *Additional Easement Documents $ 2,500.00
TOTAL $ 2,500.00
Terms and conditions shall be the same as per our original agreement.
DCP/sad
004249o.00_Change Ordero2
westwoodps.com
(888) 937-5150
F�RT ��RTH�
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: RPGA Design Group, Inc.
SubjeCt of the Agreement: The following is Amendment No. 2 to CSC 59226 for Professional Design
services rendered on Fire Station No. 37.
M&C Approved by the Council? * Yes ❑ No ❑✓
If �so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 59226
If �so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 0 No ❑
If �unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No ❑✓
*If �so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. 104186
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ❑✓ No ❑
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.